Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Reserves”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

SnRK1-ZmRFWD3-Opaque2: A Nexus of Seed Nutrient Accumulation and Diurnal Cycles

Plant seeds store nutrients in the form of protein, starch, and oil to support seed germination and seedling establishment. The seed nutrient reserves are supplied with carbon and nitrogen assimilated in vegetative tissues, where primary metabolism oscillates in a circadian manner (Farré and Weise, 2012). However, whether the nutrient accumulation in developing seeds is also tuned during the diurnal cycle remained unclear until now. In a recent study, Li et al. (2020) identified a signaling module at the nexus between nutrient accumulation in maize (Zea mays) seed and the diurnal cycle.

59 BASIC BIOLOGICAL SCIENCES↗

Re-Additization of Commercial Biodiesel Blends During Long-Term Storage

Commercial biodiesel blends representative of the U.S. market were aged following procedure ASTM D4625, Standard Test Method for Middle Distillate Fuel Storage Stability at 43°C (110°F), with periodic monitoring of fuel properties indicative of oxidation. The oxidation stability—or oxidation reserve expressed as Rancimat induction period (IP)—gradually decreased from its initial value, as expected. At a predetermined IP threshold, an antioxidant was used to restore IP to the ASTM D7467 specification minimum of 6 six hours, referred to as re-additization. At lower IP values, the amount of antioxidant required increased significantly, and the effectiveness tended to be reduced. Once IP fell to essentially zero, the acid content increased to above the allowable limit. Insoluble material was detectable after the acid number increased out of specification. Storage life was increased with re-additization relative to the as-received fuels, as evidenced by longer time to produce acids. Experience in the field may vary based on storage conditions; however, these results indicate re-additization can significantly increase the storage life of biodiesel blends when used with regular monitoring of IP and acid number. An assessment of property changes during long-term storage showed the initial IP did not predict storage behavior, although fuels above the specification minimum remained stable for greater than 12 weeks of D4625 accelerated aging (1 one year simulated).

09 BIOMASS FUELS↗

The Arctic LDRD project: What happened?

This presentation overviews results from the 2019 LDRD Reserve project “Diagnosing near-future changes in Arctic sea ice and ocean conditions” and a follow-up 2020 CSES Rapid Response project “Multi- Model Risk Assessment for Arctic Navigability.” We analyzed Arctic simulations from 4 CMIP6 model ensembles (E3SM, CESM-CAM, CESM-WACCM and CESM-DPLE), comparing them with observations. We then applied a machine-learning approach using copulas to produce joint probabilities of adverse conditions along potential shipping transit routes through the Arctic. Here we compare and contrast the different models and examine the utility of the copula approach applied to these data sets.

58 GEOSCIENCES↗

Implications of a regional resource adequacy program on utility integrated resource planning: Study for the Western United States

LBNL collaborated with the Western Interstate Energy Board and the University of Texas, Austin to investigate the implications of a regional resource adequacy (RA) program on utility integrated resource planning. This report is focused on an active policy discussion to develop a novel voluntary program to share capacity resource and improve RA in the Western Interconnection. This report identifies two RA components of IRP that will be highly impacted by a regional RA program: resource capacity accreditation and RA targets. There are at least four resources that will require specific attention for their capacity credit calculation: (1) variable renewable resources, (2) demand-side resources, (3) hydropower, and (4) contracts. It will then be necessary to decide on a RA target reliability metric (e.g., a planning reserve margin) that is at least the minimum requirement in IRPs to ensure consistency in RA requirement calculations. The report finds that load forecasting and transmission expansion analyses will be moderately impacted, but that most of IRP components will not be significantly impacted. The report includes (i) a review of traditional resource adequacy practices in IRP; (ii) a case study of an existing regional RA program that interacts with IRP (Southwest Power Pool) and (iii) an overview of the NWPP regional resource adequacy proposal that is the object of this work. This paper does not (1) advocate for or against a regional RA program for the NWPP, (2) make detailed design recommendations for this program, or (3) assess its benefits and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Distributed Wind Controls: A Research Roadmap for Microgrids, Infrastructure Resilience, and Controls Launchpad (MIRACL)

The Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL) project’s controls research area aims to expand the benefits from distributed wind (DW) generation assets beyond solely providing low cost power directly to consumers. To make distributed wind turbines operate more effectively there is a need for more advanced ways to control them, allowing power companies, businesses, and energy consumers to take advantage of the unique characteristics of wind energy. DW can contribute to the safe and secure operation of grid by providing services such as voltage regulation, frequency regulation, spinning reserves, and even black start capabilities. In the larger DER context where much of the research has focused around solar technologies, the inertia available in wind technologies has generally not been considered. For wind turbines to provide these services in an optimal and expanded way, development and demonstration of control methods and communication interfaces within a grid and microgrid framework are required. In this document, NREL led the literature review in collaboration with SNL, of DER controls-focused integration research to establish a baseline for the controls research under the MIRACL project to identify specific control functions to be focused on throughout this project. This literature review focused primarily on the control functions of variable distributed generation, largely pulling from past solar PV and battery controls works, with a specific focus on applicability for distributed wind energy systems. The goal of this document is to identify a research roadmap based on the open literature and past national laboratory works to inform advanced wind turbine and power electronics control functions for four use cases: 1) distributed wind in isolated systems, 2) grid-connected microgrids (wind-hybrid systems and islanded operation), 3) behind-the-meter distributed wind applications in the power distribution systems, and 4) front-of-the-meter distributed wind applications in the power distribution systems.

17 WIND ENERGY↗

Final Report for ARPA-E NODES "Real-Time Optimization and Control of Next-Generation Distribution Infrastructure" Project

The project examined next-generation power distribution systems with high levels of power- electronics-interfaced distributed energy resources (DERs) that include: renewable energy systems (RESs), energy-storage devices, electric vehicles, fuel cells, small-scale diesel generators, and controllable loads. The project developed a comprehensive distribution- network management framework that unifies real-time voltage and frequency control with network-wide energy management under an integrated framework. The aim of the project was to: i) systematically optimize network-wide operation and congruently regulate voltages and frequency in the face of high volatility induced by rapidly varying RES and uncontrolled loads; ii) facilitate high renewable integration beyond 50% on an energy basis; iii) meet power-quality requirements and operational constraints; and, iv) respect response, ramp- time, and hold-time requirements for synthetic frequency and regulating reserves via fast- and longer-term dynamic energy management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

February 2020 Bayou Choctaw Subsidence Analysis

Subsidence monitoring is a crucial component to understanding cavern integrity of salt storage caverns. This report looks at the historical and current subsidence monitoring program and includes interpretation of the data from the Bayou Choctaw Strategic Petroleum Reserve site. The current monitoring program consists of an annual elevation survey as well as GPS and tiltmeter instruments above both Cavern 4 and Cavern 20. This year's level and rod survey indicates little subsidence across the site. In addition, the GPS and tiltmeter instruments do not indicate any substantial movement above caverns 4 and 20. As such, there is no reason to indicate any of the caverns at Bayou Choctaw have lost integrity.

02 PETROLEUM↗

Properties, Theory, and Measurements for Understanding the Function of Heavy Elements (Project 20180474CR, Final Technical Report)

The FY18-20 Laboratory Directed Research and Development (LDRD) funded Properties, Theory, and Measurements for Understanding the Function of Heavy Elements Project aim has been to advance heavy element science in a comprehensive project connecting targeted research with Los Alamos mission imperatives. The mechanisms for project implementation were (1) support of a multi-year broad-based postdoctoral fellows project, (2) a summer student fellows research project and two seminar series, and (3) organization of structured workshops and integrated educational and career development opportunities. The project was successfully administered by the Glenn T. Seaborg Institute (GTSI) for Transactinium Science and has shown to be an exceptional investment in supporting the Los Alamos National Laboratory (LANL) mission areas requiring heavy element and actinide science by attracting and funding the future generation of scientists and engineers. This project exhibited its value across the laboratory in heavy element and actinide science areas include materials, material properties, signatures, modeling, predictions, fabrication, detection, disposal, global security implications, forensics, and the specialized science surrounding plutonium, uranium, and their surrogates as fuels for energy and nuclear weapons. In this report, the GTSI project staff documents the “high return on investment” implementation as measured against the successes of previous actinide research and science-based projects and as evidenced by the retention of 30% of G.T. Seaborg Postdoctoral Fellows as permanent employees. With additional funding through LDRD Reserve funding during this project period, the GTSI expanded its support for heavy element and actinide science research with a Visiting Research Seaborg Scholar and a Rapid Response Small Projects call. These innovations have served to advance GTSI pursuits as communicated in our FY21-23 LDRD Proposal Project#: 20210527CR Seaborg Institute: Center for Advancing Actinide Science and Technology at LANL

36 MATERIALS SCIENCE↗

Harold Agnew’s son gives Lab never-before-seen photos, documents

When I arrived at Los Alamos in 2003, the Laboratory’s long-retired third director was still a very popular figure. He was so popular, in fact, that he enjoyed an honor typically reserved for only the most adored and outrageous pop stars and Brazilian footballers: He was known by one name. Back then, most Lab staff knew exactly who you were talking about when you referred to “Harold.” Harold Agnew was at the helm from 1970 – 1979, though his career here began when he was still just in his 20s. He was recruited to work on the U.S. government’s top-secret project to build the first atomic bombs and help bring a swift end to World War II. Harold died in 2013 at 92, but March 28 would have been his 100th birthday. Although he’s no longer here to celebrate with us, we can gain inspiration by remembering his remarkable life of service – and mischief. Both are now well-documented in the collections of the National Security Research Center (NSRC), the Lab’s classified library, which also includes unclassified pieces of our history. The NSRC’s newest addition to its collections comes from Harold’s son John Agnew, who just recently gave me a box of about 250 images and about 15 documents that belonged to his dad. The contents are nothing short of remarkable, one-of-a-kind, and in some cases, hilarious. As the NSRC staff are accessioning these pieces into the Lab’s collections, looking through these materials is a chance for me to remember our former director and my friend.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Methods for Representing Flexible, Energy-Constrained Technologies in Utility Planning Tools

Capacity expansion models are widely used by power system researchers, planners, and policy analysts to evaluate alternative power system investment scenarios. With the increasing deployment of wind and solar in the US, there has been much focus on improving the representations of variable generation (VG) technologies within capacity expansion models. Models that capture the variable net-load profiles and larger reserve requirements associated with high penetration VG systems represent an improvement to classic capacity expansion models, but fall short of capturing the complexities associated with storage technologies, such as battery energy storage (BES) and concentrating solar power with thermal energy storage (CSP with TES). While difficult to model in a capacity expansion setting, these technologies are potentially competitive sources of flexibility with the intriguing characteristics of being able to absorb VG that would otherwise be curtailed and directly contribute to renewable energy goals, respectively. In this paper we present methods for accurately representing these technologies in a large-scale capacity expansion model with high electrical and geospatial resolution. VG modeling techniques, including novel methods for capturing curtailment due to unit commitment and other hourly dispatch phenomena, are also reviewed. Modeling for a region in the southwestern United States demonstrates the economic relevance of being able to explicitly trade off the costs and capabilities of energy-constrained technologies, especially BES, against other resources in the near-term, in time to make plans for the coming decade

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deployment of Community Scale Solar Photovoltaic Energy Systems in Forest County Potawatomi Community

FCPC is a federally recognized tribe with a membership of more than 1400. The Tribe has a reservation in Forest County, Wisconsin, and tribal trust lands in Milwaukee County, Wisconsin, with significant governmental and business operations in both areas. Until relatively recently, FCPC was one of the poorest tribes in the Midwest. Due to its successful gaming operations, it now has improved its financial situation and is using its resources to benefit both its members and the general public through environmental and other community efforts, many of which are long-delayed because of the extended period of abject poverty. The Tribe has developed the long-term goal of becoming energy independent using renewable resources. In order to meet this goal, the Tribe has taken several important steps. As an interim step, FCPC is purchasing nearly 55 million kilowatt hours of renewable energy certificates (“RECs”) annually from certified renewable energy facilities in the United States. These RECs offset more than 100% of the present electricity use at all of the Tribe’s facilities. The Tribe is currently ranked number 11 on the Environmental Protection Agency’s (EPA) Top 20 Local Government list of green power purchasers and is a member of the EPA’s Green Power Partnership. The original project suggested small scale installations on tribal homes and certain government buildings. The Tribe suggested that the project would result in 730 kw installed. By revising the project, the Tribe was able to install 938 kw and owns the largest installation in Northern Wisconsin with the 800 kW installation at the Potawatomi Carter Casino Hotel (“PCCH”). The PCCH installation, in summer months, can provide near 90% of the use during daylight hours. Although tracking was not immediately available FCPC has since confirmed significant production with certain quarterly savings nearing $210,000. These installations provide a reduction in facility costs providing more revenue for Tribal services including cultural, health, sustainable food sources, environmental preservation and other Tribal initiatives. Further, the installations have resulted in positive steps towards the Tribe’s goals of energy sovereignty and the use of 100% renewable clean energy. Finally, the PCCH project, specifically, has had the additional benefit of providing a likely area for a microgrid. The size of the installation and offset achieved have pushed the Tribe toward planning for storage and a microgrid system that would both further the Tribe’s energy goals and provide a safe haven for the Community during times of need.

14 SOLAR ENERGY↗

Sensitive Resources Assessment and Forest Analysis for The SSP-2A Parcel and Proposed Oak Ridge Enhanced Technology and Training Center (ORETTC), Oak Ridge, Tennessee

This report summarizes current knowledge of natural and cultural resources associated with potential land use changes within an 81-acre (32.8-hectare) parcel, termed SSP-2A, on the US Department of Energy’s (DOE’s) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Figure 1). A primary goal for the work presented here was to evaluate potential impacts to sensitive resources within the SSP-2A parcel that might result from land disturbance and construction of the Oak Ridge Enhanced Technology and Training Center (ORETTC). In addition to on-the-ground surveys of the ORETTC footprint and SSP-2A parcel during summer 2020 (Figure 1), this report leverages historical (pre-1995) and contemporary (1995–present) data from additional sources such as the Tennessee Department of Environment and Conservation (TDEC). The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess, manage, and research sensitive resources on the ORR. This report should facilitate more environmentally sound decisions during planning and development of the ORETTC, provide a foundation for further assessment of sensitive and cultural resources associated with the broader SSP-2A parcel (should additional actions take place), and help project managers address regulatory guidance and DOE policy on sustainable development. Those who reference this report must consider that the timing of surveys does not permit complete delineation of resources. Data deficiencies are indicated where possible. Additional surveys may be required to account for seasonal patterns of various threatened and endangered species (e.g., bats), and additional assessment will be required if activities extend beyond the ORETTC site (Figure 2).

54 ENVIRONMENTAL SCIENCES↗

Production of Uranium from Seawater Using a Novel Polymer Adsorbent – Process Development and Cost Analysis (Final Scientific/Technical Report SBIR Phase II)

Research in developing techniques for extracting uranium from seawater is of considerable current interest. One reason which drives scientists to develop techniques of sequestering uranium from ocean is the prediction that the land-based uranium reserves would be depleted by the end of this century based on the current production rate. Uranium exists in seawater at a very low concentration (about 3 ppb) and as highly stable uranyl tris-carbonato complexes, primarily in the form Ca 2 [UO 2 (CO 3 ) 3 ]. Because of the enormous volume of seawater, the total amount of uranium in ocean is estimated to be a thousand times greater than the land-based uranium resources. As early as 1964, the idea of extracting uranium from seawater was discussed by Davies et al. in a Nature paper. In the past decades, many different materials were tested to evaluate their ability for sequestering uranium from seawater. Among them, amidoxime and carboxylate containing polymer fiber adsorbents appear most promising because of their high uranium adsorption capacity and stability in seawater. The carboxylate groups are necessary to make the polymer adsorbent hydrophilic whereas the amidoxime groups provide strong coordination sites for uranyl ions. Moreover, according to theoretical analysis, the adsorbability of uranium may involve synergistic effects of both amidoxime and carboxyl groups in the fiber adsorbent.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radiological Monitoring Plan for the Oak Ridge Y-12 National Security Complex: Surface Water

DOE Order 458.1 requires that dose estimates consider contributions from all facilities. In the Y-12 Radiological Monitoring Plan (RMP), surface water is monitored at points that reflect individual facilities, as well as at points that reflect the combined contributions of all facilities. This monitoring plan does not consider other potential routes (i.e., airborne releases and food chains). Thus, a complete determination of total effective dose (TED) cannot be made based on this plan alone. The other routes from Y-12, and all routes from other DOE facilities on the Oak Ridge Reservation (e.g., Oak Ridge National Laboratory (ORNL) and The Heritage Center), must be considered in order to satisfy DOE Order 458.1 requirements. Determination of TED from all sites and pathways is done through the use of dose-assessment models and is documented in the Annual Site Environmental Report. This monitoring plan provides adequate monitoring goals for Y-12 surface water releases to provide input of sufficient sensitivity and accuracy to reliably determine the Y-12 surface water component of the TED. The routine radiological monitoring program is designed to monitor effluents at four types of locations: (1) treatment facilities, (2) other point and area source discharges, (3) instream locations, and (4) production building roof run-off. With this sampling and analysis program, data will be obtained on primary point sources as well as on locations that represent the composite of other potential sources. This plan will be reviewed periodically to determine necessary modifications to the sampling frequencies, parameters, and locations. Modifications, if any, will be based on the analysis of the previous data and its effectiveness in satisfying the objectives of this plan. Appendix A contains graphs of the sum of the DCS fractions for locations and frequencies contained in a previous version of this plan. The data was collected from January 2009 through December 2019. Each sample was analyzed, and each result was divided by the appropriate DCS to compute a DCS fraction. These fractions were summed for all isotopes. According to DOE –STD-1196-2011, the annual average of these sums should be below 1.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan (CY 2021)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2021 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2021 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2021) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F. Modifications to the CY 2021 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This report contains the groundwater and surface water monitoring data obtained during calendar year (CY) 2019 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system, shown as Plant North. The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Background information in Section 2 of this report outlines the hydrogeologic framework for groundwater and surface water quality monitoring at Y-12 and includes an overview of the groundwater contamination in each hydrogeologic regime. Section 3 provides details regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP, including sampling locations and frequency, sample collection and handling, field measurements and laboratory analytes, quality assurance (QA)/quality control (QC) sampling, data management, and data quality assessment (DQA). However, the equivalent QA/QC or DQA information for the groundwater and surface water data associated with the monitoring programs implemented by UCOR are not included in this report and instead are deferred to referenced programmatic plans and reports issued by OREM and UCOR. Section 4 of this report presents a summary evaluation of the CY 2019 monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring. The evaluation is based primarily on the analytical results for the following principal groundwater contaminants at Y-12: nitrate, uranium, gross alpha activity, gross beta activity, and volatile organic compounds (VOCs). Section 5 summarizes the most significant findings with respect to the principal contaminants along with recommendations for any proposed changes to the ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Technical reports and plans cited in the narrative sections of the report are listed in Section 6. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and data tables (excluding data summary tables incorporated in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for each well sampled during CY 2019 by either the Y-12 GWPP or UCOR, along with schematic diagrams for wells equipped with Westbay™ multiport sampling equipment or Barcad® pump systems. Appendix D supports the background summary discussion in Section 2 and provides more detailed information about the hydrogeologic framework for groundwater and surface water monitoring at Y-12, including the primary sources of groundwater contamination in each hydrogeologic regime. Results for all field measurements and laboratory analyses obtained by the Y-12 GWPP and UCOR are presented in Appendix E, which also includes the sample numbers for the QA/QC samples associated with groundwater and surface water monitoring performed by the Y-12 GWPP.

54 ENVIRONMENTAL SCIENCES↗

Bryan Mound Abandoned Cavern 3 Stability Analysis - 2021 Review

The U.S. Strategic Petroleum Reserve is moving towards employing an expanded enhanced monitoring program. In doing so it has become apparent that there is a need for a better project wide understanding of the current state of Bryan Mound abandoned Cavern 3 stability. Cavern 3 has been inaccessible since 1988 when it was plugged and abandoned and thus this comprehensive report is structured by focusing on 1) a summarization of what can be discerned from historical records prior to 1988 and 2) a presentation and discussion of our current understanding of Cavern 3 based solely on surface monitoring and geomechanical analyses. Historical literature state the cavern was deemed unsuitable for oil storage, as it could not be definitively determined if fluid pressure could be maintained in the borehole. Current surface monitoring indicates the largest surface subsidence rates are occurring above Cavern 3. The subsidence rates are linear with no evidence of acceleration. Cavern collapse could occur if there is insufficient pressure holding up the roof. Next steps are to implement a microseismic system that will lend to a better understanding of cavern stability, as well as provide an improved early warning system for loss of integrity.

02 PETROLEUM↗