Accelerated Aging Humidity Chamber for Nuclear Grade HEPA Filter Media

A unique accelerated aging humidity chamber for simulating the natural aging process of nuclear grade high efficiency particulate air (HEPA) filter media is being designed, implemented, and tested. The nuclear industry currently lacks information regarding the shelf life and service life of HEPA filter media. The Department of Energy recommends disposing of HEPA filters 10 years after the manufacture date for filters operated under dry conditions. Studies have shown the tensile strength and water repellency of HEPA filter media diminish with age. The chamber's principal function is to sustain an elevated relative humidity condition for an extended duration specified by the Arrhenius aging model. To accomplish this, various design parameters were established: (1) consistently achieve uniform humidity conditions within the chamber to equally expose media sheets, (2) ensure the chamber is sufficiently sealed to mitigate the uncontrolled infiltration of air, (3) confidently secure the media sheets to avert the introduction of unnecessary stressing/creasing, (4) fabricate the chamber from clear polycarbonate material to allow inspection of the media sheets, (5) provide a safe and ergonomic design for personnel, (6) ensure the chamber design is replicable and relatively easy to fabricate/assemble. A humidity source, fan, PID controller, humidity and temperature transmitters, and data loggers are required for proper operation and control of the chamber. The humidity source must accommodate target values up to 95% relative humidity throughout the chamber. The three humidity and temperature transmitters are strategically spaced throughout the chamber to ensure uniform conditions. The 10 cubic feet per minute (CFM) fan selected intends to accomplish the desired air change rate inside the chamber of approximately 20 air changes per hour (ACH). The 2 plenums on the upper and lower portions of the chamber utilize a perforated design to uniformly distribute air, promote air mixing, and control the air velocity entering the chamber. Industrial blueprint hanging clamps are being retrofitted to be seated within the chamber drawers and firmly secure the nuclear grade filter media. The aged media will be evaluated using autopsy methodology, and the results obtained intend to help clarify the useful life of nuclear grade HEPA filters. Nuclear grade high efficiency particulate air (HEPA) filters are defined as disposable, extended-media, dry-type filters with a rigid casing enclosing the full depth of the pleats and have a minimum particle removal efficiency of 99.97%. [1] - HEPA filters are constantly exposed to stressors and subsequently have been shown to degrade as the filter ages. Properties such as tensile strength and water repellency, along with others, are negatively impacted. [2] - Due to the scarcity of naturally aged HEPA filters available, it is crucial to develop accelerated aging methods which effectively mimic the natural degradation effects. - After accelerated aging, the filters are subject to testing in the Axial Flow Large Scale Test Stand (ALSTS) and other analysis techniques such as the same qualification tests performed directly after being manufactured. - Quality data is necessary for future decisions regarding the lifetime of nuclear grade HEPA filters. - The objective is to develop a prototype accelerated aging humidity chamber for nuclear grade HEPA filter media. The chamber should expose the media to commonly occurring stressors to expedite the degradation process caused by aging. PID yields reliable and reproducible results: - CFD model correlates well with actual performance; - Further analysis is needed to complete characterization; - Future work for the chamber is still to be completed. The data shown in Figure 5 and Table 1 indicate the system is functioning as designed. As can be determined from the system response evaluation in Table 1, the PID controller is yielding reliable and reproducible results at each set point. As the set point increases, the time constant and 20% settling time increase accordingly. From the results in Table 1, it stands to reason that the CFD model correlates well with the actual performance of the system. Each system response parameter for the 90%RH* CFD model is slightly lower than the parameters collected from the physical model tested at an equivalent set point. This is to be expected considering the inlet in the CFD model is a constant supply of water vapor, whereas the physical model uses a PID controller to monitor the amount of water vapor needed and reacts accordingly. More analysis is still to be done on the prototype chamber. A pressure test will be conducted in order to determine the hourly leak rate of the chamber. This test will involve constant air flow into the chamber until the desired pressure is reached. A uniformity test will also be conducted in order to ensure each filter medium is being exposed to equivalent relative humidity levels. This test will involve an array of humidity meters strategically oriented inside the chamber to record any possible gradients. Future work for the chamber includes dehumidification abilities, tests while fully loaded with filters, and temperature control. Once completed, the autopsy team at Institute of Clean Energy Technology will conduct necessary accelerated aging studies as needed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hypergames and Cyber-Physical Security for Control Systems

The identification of the Stuxnet worm in 2010 provided a highly publicized example of a cyber attack that physically damaged an industrial control system. This raised public awareness about the possibility of similar attacks against other industrial targets—including critical infrastructure. Here, we use hypergames to analyze how strategic perturbations of sensor readings and calibrated parameters can be used to manipulate a system that employs optimal control. Hypergames form an extension of game theory that enables us to model strategic interactions where the players may have significantly different perceptions of the game(s) they are playing. Past work with hypergames has focused on relatively simple interactions consisting of a small set of discrete choices for each player. Here, we apply single-stage hypergames to larger systems with continuous variables. We find that manipulating constraints can be a more effective attacker strategy than manipulating objective function parameters. Moreover, the attacker need not change the underlying system to carry out a successful attack—it may be sufficient to deceive the defender controlling the system. It is possible to scale our approach up to even larger systems, but this will depend on the characteristics of the system in question, and we identify several characteristics that will make those systems amenable to hypergame analysis.

97 MATHEMATICS AND COMPUTING↗

PR100 One-Year Progress Summary Report: Preliminary Modeling Results and High-Resolution Solar and Wind Data Sets

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a 2-year study by the U.S. Department of Energy's (DOE's) Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico's clean energy future. In Year 1 of the study, the PR100 team rigorously modeled and analyzed scenarios that meet Puerto Rico's renewable energy targets and achieve short-term recovery goals and long-term energy resilience. This report, which summarizes PR100 progress in Year 1, provides considerations that can inform potential funding and implementation decisions by key federal and local agencies and stakeholders. The summary report follows the publication in July 2022 of a PR100 Six-Month Progress Update (in English and Spanish), as well as public webinars in February 2022 to kick off the study and in July 2022 to present the 6-month update. A final written report and web-based visuals will be published in late 2023. All publications and public events associated with the study will be available in Spanish and English. This report is also available in Spanish https://www.nrel.gov/docs/fy23osti/85144.pdf.

100%↗

Big Adaptive Rotor Phase I (Final Report)

The Big Adaptive Rotor (BAR) project was initiate by DOE in 2018 with the goal of identifying novel technologies that can enable large (>100m) blades for low specific power (SP) turbines. Five distinct tasks were completed to achieve this goal: 1. Assess trends, impacts, and value of low-SP turbines, 2. Wind turbine blade cost reduction roadmap study, 3. Research and Development (R&D) opportunity screening, 4. Detailed design and analysis, and 5. Low-cost carbon fiber. These tasks were completed by the national lab team consisting of Sandia National Laboratories (SNL), the National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL). The objective of Task 1 was to assess the historical trends of low-SP of onshore deployments, and to assess the impact and value of low-SP turbines. Analysis under this task showed that there is significant value for low-SP turbines, especially in markets where there is a higher saturation of wind energy on the grid. This has to do with the fact that low-SP turbines have increased capacity factors, and can contribute more reliable energy to the grid, even in lower wind conditions. This bodes well as higher renewable scenarios are likely in the coming years. Task 2 was a detailed analysis on the logistical challenges of deploying very large (>100m) onshore blade. This work was completed by experts at DNV-GL. The report looked at various ways to get around the current transportation constraints which are estimated to be around 75m in length. The report concluded that there are viable solutions to this issue including: segmented blades (which the industry is already pursuing), lighter than air (LTA) transportation, on-site manufacturing, and controlled bending of blades on rail. The final option was recommended for further analysis and study by DOE and the national labs because keeping a single piece blade reduces manufacturing and operations and maintenance (O&M) costs. Task 3 focused on identifying novel concepts that are capable of enabling a cost effective 5MW 206m rotor for onshore deployment. The findings from the first two tasks were considered in the analysis, in that the concepts identified must be able to overcome the transportation logistics challenges. Around 20 concepts were identified and evaluated by experts within the industry. Additionally, science and engineering challenges were identified for each concept. Based on these evaluations six concepts were deemed the most impactful and were selected for further analysis in Task 4. The concepts were: highly flexible rail transportable blades, downwind rotors, distributed aerodynamic control (DAC) devices, inflatable blade, bi-wing blade, and 4/5 bladed rotors. Task 4 conducted detailed design, optimization, and analysis on the selected BAR concepts. A modeling gaps analysis was conducted, and modeling improvements were implemented that allowed for the study and design of the novel concepts. The BAR team established a set of baseline designs by which to compare the selected designs through a technoeconomic analysis. It was found that the highly flexible rail transportable blade, the downwind rotor, and the DAC devices have the most promise to deliver the BAR targets. A Phase II for BAR has been proposed to further mature these concepts and address the open science and engineering challenges identified in Task 3. Task 5 conducted research on optimized carbon fiber materials that were used throughout the BAR Phase I project. Overall, the BAR project has identified low-SP turbines as important to continued LCOE reductions for onshore turbines. Furthermore, the project has identified viable solutions to the technical and logistical challenges to realizing these goals. The most promising technologies that were identified in Phase I of the project will be further matured and de-risked in Phase II of the BAR project.

17 WIND ENERGY↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Final Report

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a comprehensive analysis based on extensive stakeholder input of possible pathways for Puerto Rico to achieve its goal of 100% renewable energy by 2050. PR100 was an integrated effort drawing on expertise and capabilities of the contributing national laboratories that explored possible pathways for Puerto Rico to achieve its goal of 100% renewable energy in the long term (by 2050), increase reliability and resilience in the immediate term (within the next few years), and work toward energy justice. The purpose of the study is to provide decision support and inform investment decisions for implementers of Puerto Rico's energy transition. See NREL/TP-6A20-88614 for the Spanish translation of this report.

100% renewable energy target↗

Restoration Hydro: A Watershed Approach to Standard Modular New Hydropower

The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.

13 HYDRO ENERGY↗

Securing Distributed Energy Resource Integration

The penetration of distributed energy resources (DER) is growing at much higher rates than predicted 20 years ago. Far from being used only in residential settings, DER are now installed on distribution and transmission circuits. In this position, they do not have the same properties as traditional generators and are more flexible in many cases. The growing penetration and range of uses for DER motivate the need to reliably and safely integrate them into the grid. Operators must be able to rely on them not only for normal operation, but also during abnormal conditions like black starts or adverse cyber scenarios. To that end, we study the communications, device interfaces, and potential consequences of DER operation under abnormal and adversarial conditions. The weaknesses of communications networks are studied based on the industrial protocols used, and the benefits of security features are examined. The device interfaces are found to be vulnerable to attack based on the requirements in the IEEE-1547 standard for DER interconnection and interoperability, which is expected to be adopted in the next ten years. In addition to exploring the requirements of the standard, we show that these vulnerabilities and others do exist and can be used maliciously in a modern storage system DER. Consequences of these vulnerabilities range from exacerbated grid instability, to simultaneous loss of large portions of DER penetration, to physical damage to inverters or DER themselves and other sensitive equipment. We tie these outcomes to specific attacker actions in an effort to give operators a better threat intelligence view that allows them to prioritize mitigations. Finally, we discuss mitigations that could prevent many of the adversarial scenarios described. Some solutions can be added to existing infrastructure, while others may require longer term planning for grid modernization with consideration for security.

25 ENERGY STORAGE↗

Comprehensive Study of the Potential of Extracting and Processing Critical Minerals from Coal-Based Resources - Phase I

The Phase I report prepared for the Department of Energy addresses U.S. Executive Order 13817 titled A Federal Strategy to Ensure Secure and Reliable Supplies of Critical Minerals, issued on December 20, 2017, that lists 35 critical minerals that are vulnerable to supply disruption. A comprehensive review of each of the minerals was conducted to determine the criticality based primarily on extractability from coal-based resources. Several other factors were also considered such as gaps in supply and demand, use in current technology, and the existence of viable substitutes. It was determined that the critical minerals that show highest potential for extraction from coal-based resources are lithium, rare earth elements (REEs), cobalt, and manganese. All four of the critical minerals listed serve an important role in the technology industry, have few substitutes, and have a heavy import reliance. Most notably are lithium, which is widely used in the electric vehicle industry, and the REEs which can be found in virtually all electronic devices. The research of critical mineral extraction from coal-based resources was completed using a combination of literature review from public sources as well as cooperation from coal mines and power plants across the United States. Samples collected from six different geographical locations across the U.S. were subjected to sample preparation (i.e., pH measurement, moisture content, particle size analysis) and characterization studies using Inductively Coupled Plasma-Mass Spectroscopy (ICP-MS) and Scanning Electron Microscopy, Energy Dispersive X-Ray Spectroscopy (SEM-EDX) instruments. 27 samples of coal waste materials such as refuse, sludge, and fly ash were tested to characterize the rare earth element concentration by total rare earth elements (TREEs), heavy rare earth elements (HREEs), and light rare earth elements (LREEs). Of the 27 samples tested, 22 contained a TREE concentration higher than the threshold of 300 ppm, which is considered a viable feedstock material. 3 samples contained less than 300 ppm of TREEs; however, they were within 20 ppm of the threshold, and could potentially be considered viable sources in the future pending the advancement of more efficient extraction technologies. 2 of the 27 samples had significantly low TREE concentrations, which does not imply any potential for being a source for REEs. For the minerals identified as most critical in the literature review, a conceptual process flow diagram (PFD) was developed for their extraction from different coal-based feedstocks. The process targets selective recovery of one commodity (i.e., rare earths, lithium, cobalt, and manganese) via several hydrometallurgical separation methods. By identifying potentially extractable coal-based critical mineral resources, a study of the current and future market environments for each critical mineral, and a review of current processing methodologies for critical mineral extraction from coal-based resources, the foundation has been laid to further characterize and explore new resources and extraction techniques. As reliance on technologies in industries such as the production of electronic devices, batteries, and alloys containing critical minerals utilizing critical minerals continues to increase, a sound understanding of our nation’s dependence on and even the global criticality of certain critical minerals, will serve as a catalyst for innovation in virtually all fields of science.

01 COAL, LIGNITE, AND PEAT↗

A Real-Time ANPC Inverter Digital Twin with Integrated Design-For-Trust

The demand for renewable energy has increased over the last few years, and so has the demand for greater expectations within the energy market. This increasing trend has been accompanied by more significant usage of internet-connected devices (IoT), leading to critical electrical infrastructure being connected to the internet. Implementing internet connectivity with such devices and systems provides benefits such as improving the system's performance, facilitating irregularity and anomaly mitigation, and providing additional situational awareness for enhanced decision-making. However, enhancing the connected system with IoT introduces a drawback – a greater vulnerability to cyber-attacks. Cyber-attacks targeting critical infrastructure in the electrical sector have occurred in the United States and Ukraine. These cyber-attacks highlight and expose vulnerabilities that a system inherits when connecting to the internet. These attacks left thousands of customers without electricity for hours until operators could regain control of the electric utility grid. Therefore, to address the vulnerabilities of an internet-connected power electronic device, this work focused on the hardware layer of the system. Implementing a cyber-control system inside the hardware layer can significantly reduce the possibility of an attacker patching malicious controller firmware into a photovoltaic grid-connected inverter, thus mitigating the likelihood that the inverter becomes inactive a cyber-attack scenario. With this mitigation technique, if a cyberattack is successful and an attacker gains control of the network, a cyber-defense technique is in place to mitigate the impact of the cyber-attack. This additional protection layer was developed based on an innovative concept known as Digital Twin (DT). A DT, in this case, replicates an Active-Neutral Point Clamped (ANPC) inverter and was designed using a hardware language known as VHDL (Very High-Speed Integrated Circuit Hardware Description Language) and applied to Field-Programmable-GateArray (FPGA). The DT is embedded within the FPGA and contained in a controller board, the UCB (Unified Controller Board), developed by the University of Arkansas electrical engineering team. This UCB also contains two Digital Signal Processors (DSPs) responsible for generating associated signals to control an authentic physical inverter. These DSP signals are received and processed by the FPGA that implements the DT of an ANPC; in other words, it simulates in realtime the expected output of an actual ANPC inverter using the signals from the DSP. When a new firmware is ready to be patched, the DT provides output signals simulating behavior that a real ANPC inverter would generate with the new firmware. The new firmware is tested to check if it meets all the operational requirements established using a Design-For-Trust technique (DFTr). If the new firmware fails in at least one of the DFT tests, it is considered malicious and must be rejected. This work is divided into sections, such as Background, which explains the pieces that were used and the strategy behind this work; Process and Procedure, which explains the methodology that was adopted to prove the reliability and effectiveness of this work; Results and Discussion, where the simulations and results are described and explained; followed by Conclusion and Future work section, which concludes this work and adds possible future projects to continue this work further.

do Amaral Custodio, Paulo Vitor↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗

Evaluating the Effectiveness of an Ultrasonic Acoustic Deterrent in Reducing Bat Fatalities at Wind Energy Facilities

This project was designed to use thermal video cameras and fatality monitoring to evaluate the effectiveness of an ultrasonic acoustic deterrent (UAD) on bat activity and mortality, respectively. Our goals were to redesign the UAD device and installation infrastructure, determine the placement on wind turbines to optimize safety, compatibility and functionality, and to compare the mortality among the following conditions: Control (deterrents off and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Deterrent (deterrents on and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Curtailment (deterrents off and turbines feathered up to 5/ m/s), and combination (deterrents on and turbines feathered up to 5 m/s). The project was divided into a Feasibility Study and Comparative Study. The objectives for the Feasibility Study were to develop an installation strategy, redesign a previous iteration of a UAD to improve performance and weatherization, and test the effectiveness of the deterrents on bat activity. The Feasibility Study was intended to work out potential issues using a relatively small number of devices prior to manufacturing and installing numerous devices for a larger-scale comparative study. The division of the project into these separate studies was based on previous experience and the challenges of assessing the capabilities of an untested UAD. During the initial development and manufacturing of the UAD, NRG Systems decided to use a piezoelectric transducer rather than an electrostatic transducer, which was used by a previous device (i.e. Deaton UAD). NRG Systems conducted lab testing (i.e., IP67 or Ingress Protection) to ensure no water or dust ingress. In addition, shock/drop trials and variations in temperature exposure were conducted as part of the reliability testing. NRG Systems also developed a communications system to allow for continuous performance monitoring of the UADs. For the Feasibility Study, we installed 6 UADs on each of 2 Gamesa G90 2-MW wind turbines (Turbine 14 and 8) at the South Chestnut Wind Energy Facility, Pennsylvania and monitored activity under control and treatment (i.e. Deterrent) conditions using thermal video monitoring. There are two major sources of variation in bat activity (beyond the anticipated treatment effect): 1) environment around the turbines might inherently favor more activity at one than the other; 2) weather conditions on any given night or within season difference (e.g., migration later during the study period) might favor more activity on some nights than on other nights. Because we could only monitor two turbines on any night, we sought to control the potential influences of these two sources by alternating the turbine on which deterrents were activated each night. If there were no loss of data due to technical failures, this design would result in an equal number of deterrent and control nights at each turbine through the monitoring period, balancing the effects of both sources of variation. We compared the time bats spent and the number of events that occurred in overlapping cameras FOV as an indicator of risk, since 80% of the overlapping FOV of the cameras was in the RSA. Equipment failures, majority due to lightning, resulted in only 17 nights with useable data, with unbalanced treatment assignment within turbines and uneven distribution of treatment assignment throughout the observational period. This resulted in a confounding of treatment assignment and seasonal change. Deterrent treatment was measured at Turbine 14 on only 2 of the first 8 usable nights (spanning the period from 8/18-9/17), whereas 6 times on Turbine 8. From 9/18-927, deterrent was on at Turbine 14 on 6 of the remaining 10 nights, and 4 on Turbine 8. We recorded a total of 1,057 bats and observed a reduction in number of events and duration of events at the UAD-activated turbine when it was Turbine 14. When Turbine 8 had the UAD activated, we observed no difference in number or duration of events. Variation between turbines is not unusual and can cause issues when study designs have no true replication, i.e., multiple turbines per treatment. Within-turbine differences suggested a trend for reduced activity when UADs were activated, particularly for Turbine 14. These results may be caused by the overall higher bat activity at Turbine 8 and confounding of treatment assignment and seasonal trends. We mapped 58 bat events in 3-dimensional space (3D), 30 and 28 events during control and treatment conditions, respectively. We observed bats crossing the rotor plane under both control and treatment conditions and observed a total of 40 confirmed or near-collisions (i.e., target close to blade but no visual confirmation of a strike) out of a total of 1,491 medium and high confidence bat observations (880 control, 611 at treatment). Twice as many collisions/possible collisions were observed during control conditions. Given the challenges with the equipment and potential confounding of the data (i.e., different activity levels at the two wind turbines), we were unable to determine whether this initial turbine placement and orientation was optimal. Given no new information on how best to install the devices, we elected to use the same placement and orientation for the comparative study. For the Comparative Study, the objectives were to investigate the relative mortality rates among 4 treatments. We searched the area within 90 m of each turbine daily to recover the highest number of fresh fatalities possible. We were unable to detect a clear reduction in mortality from deterrents alone for any individual species. Surprisingly, mortality rate of the eastern red bat (Lasiurus borealis) was estimated to be 1.3–4.2 times as much when turbines were operating normally and UADs were on than when UADs were off. Reduction in mortality of all bat species combined due to curtailment of turbines was estimated to be between 0%–38%. This effect was nullified when, in addition to curtailment, UADs were on, with 95% confidence interval ranging from a 45% reduction to a 36% increase in mortality. This was likely due to the large proportion of eastern red bats in the total carcass population. Mortality of all low-frequency echolocating bats combined (i.e. hoary bat [L. cinereus], big brown bat [Eptesicus fuscus], silver-haired bat [Lasionycteris noctivagans]) relative to control was lower when curtailed (95% CI: 0%–74%), but the addition of UADs had no detectable effect (95%CI: 13%–79%). The combined treatment reduced mortality in silver-haired bats relative to control by 11%–99%, compared to curtailment (81% reduction–67% increase) or deterrent (82% reduction–67% increase) alone. Because silver-haired bats comprised a large proportion of low-frequency calling bats found during this study, a similar effect was seen for that group. The higher mortality observed for eastern red bats at UAD compared to control could have been caused by several factors, such as the effective range of the UAD, particularly at higher frequencies, behavior, positioning of the devices on the nacelle, or a combination of these. We used 3D thermal videography to compare control and UAD bat behavior from two turbines using a total of 203 3D bat-tracks across 34 nights. We recorded a similar number of bat-tracks between treatment groups, with 51% and 49% for control and UAD, respectively. Due to potential differences in bat behavior around spinning vs stationary turbine blades, we examined UAD effectiveness separately for non-operating turbines (feathered below cut-in speed of 3.5 m/s) and operating (normal operation above wind speed of 3.5 m/s). We found a higher proportion of bat-tracks at operating turbines (82%) compared to non-operating turbines (18%), although this does not account for overall time turbines were operating versus not. At non-operating turbines the UAD appears to be effective at reducing the amount of time, flight length, and number of passes through the rotor plane, compared to control. In addition, we found bats approached turbines similarly between control and treatment turbines, with 61% of control and 63% of UAD bat-tracks originating leeward of the hub. In contrast, at operating turbines, we saw little change in bat behavior in response to UADs. For example, we found an increase in the average duration of bat-tracks between non-operating and operating turbines for UAD but at control turbines we found average duration decreased once turbines became operational. Both control and UAD had a high proportion of bat-tracks that crossed the rotor plane (i.e., collision risk) originate from the windward side when turbines were operational 65% to 92%, respectively. Given that the UAD devices closest to the blades were orientated parallel to the blades, its possible bats were not exposed to the signal until they were close to the turbine blades, as suggested by the slightly higher mean duration within 5 meters of the blades for UAD turbines. Future research should consider concentrating UAD intensity on the areas of risk (i.e. blades) with enough buffer to allow bats to react to the sound before entering the rotor-swept area (RSA). In addition, investigating the potential of installing UAD units windward of the turbine blades (e.g. a hub-mounted UAD), particularly since even under control conditions, a relatively high proportion (65%) of crosses through the blade plane originated windward. 3D thermal videography provided valuable information on future testing strategies (e.g. device placement, UAD orientation) to improve UAD effectiveness when bats are at risk (i.e., operating wind turbines). Across the entire project we experienced issues with the operation and communication with the UADs. Most of the issues occurred during the Feasibility Study and were resolved prior to the Comparability Study. Additional challenges surfaced during the Comparability Study but were remedied immediately and are thought to have little impact on the results. We had logistical constraints at the project that limited our ability use traditional methods in our camera calibration. Several calibrations showed inaccurate scales, which may have been related to inadequate spatial coverage of “points” in the camera calibration volume. Because we were using actual video recordings of bats at a wind turbine, the behavior of bats could have concentrated “points” in specific areas of the turbine (i.e. leeward of nacelle), and limited “points” in other areas, resulting in camera calibration issues. We have plans to address these inconsistencies and improving the software and related methodologies by early 2020.

17 WIND ENERGY↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗