Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ROOFS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

AN ASSESSMENT OF THE SERVICE HISTORY AND CORROSION SUSCEPTIBILITY OF TYPE IV WASTE TANKS

Type IV waste tanks were designed and built to store waste that does not require auxiliary cooling. Each Type IV tank is a single-shell tank constructed of a steel-lined pre-stressed concrete tank in the form of a vertical cylinder with a concrete domed roof. There are four such tanks in F-area, Tanks 17-20F, and four in H-Area, Tanks 21-24H. Leak sites were discovered in the liners for Tanks 19 and 20F in the 1980's. Although these leaks were visually observed, the investigation to determine the mechanism by which the leaks had occurred was not completed at that time. Therefore, a concern was raised that the same mechanism which caused the leak sites in the Tanks in F-area may also be operable in the H-Area tanks. Data from the construction of the tanks (i.e., certified mill test reports for the steel, no stress-relief), the service history (i.e., waste sample data, temperature data), laboratory tests on actual wastes and simulants (i.e., electrochemical testing), and the results of the visual inspections were reviewed. The following observations and conclusions were made: (1) Comparison of the compositional and microstructural features indicate that the A212 material utilized for construction of the H-Area tanks are far more resistant to SCC than the A285 materials used for construction of the F-Area tanks. (2) A review of the materials of construction, temperature history, service histories concluded that F-Area tanks likely failed by caustic stress corrosion cracking. (3) The environment in the F-Area tanks was more aggressive than that experienced by the H-Area tanks. (4) Based on a review of the service history, the H-Area tanks have not been exposed to an environment that would render the tanks susceptible to either nitrate stress corrosion cracking (i.e., the cause of failures in the Type I and II tanks) or caustic stress corrosion cracking. (5) Due to the very dilute and uninhibited solutions that have been stored in Tank 23H, vapor space corrosion has occurred on some of areas of the liner. The mild pitting that was observed is broad and shallow and has no structural impact. Further significant pit growth has not been observed since the 1980's.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA Summary Document for the David Witherspoon 1630 Site, Knoxville, Tennessee

The 48-acre David Witherspoon, Inc. (DWI) 1630 Site operated as an unregulated industrial landfill and scrap yard. The Tennessee Division of Superfund (TDSF) closed the landfill in 1974. During the period of operation, the site received solid and liquid wastes from salvage and industrial operations. The site consists of five separate tracts of land including a small portion located across the Norfolk Southern Railroad track. The landfill occupies approximately 5 acres of the site, and roughly 20 acres of the 48 acres contains surface and buried debris associated with the DWI dismantling business operation. Beginning in 1968, the state of Tennessee licensed DWI to receive scrap metal at the DWI 1630 Site, contaminated with natural uranium and enriched uranium (235U) not exceeding 0.1 percent by weight (TDSF 1990). The U.S. Department of Energy (DOE) has agreed to undertake remedial actions at the DWI 1630 Site as specified under a Consent Order with the Tennessee Department of Environment and Conservation (TDEC) (Consent Order No. 90-3443, April 4, 1991), and as further delineated by a Memorandum of Understanding (MOU) between DOE and the State of Tennessee (MOU Regarding Implementation of Consent Orders, October 6, 1994). The soil and debris removal at the DWI 1630 Site is being performed by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. Remediation consists of removing contaminated soil and debris from the DWI 1630 site except for the landfill area and repairing the landfill cap. The DWI 1630 remediation waste that is being disposed at the Environmental Management Waste Management Facility (EMWMF) as defined as waste lot (WL) 146.1 and consists primarily of soils and soil like material, incidental debris and secondary waste generated from the excavation of debris and soil from the DWI 1630 site. The WL 146.1 includes soil, soil like material (e.g., shredded or chipped vegetation, ash), discrete debris items (e.g., equipment, drums, large scrap metal, cylinders, and cable) and populations of debris type items (e.g., piles of bricks, small scrap metal, roofing material, scaffolding, and shelving) that are located throughout the DWI 1630 site. The project also generates an additional small volume of secondary waste [e.g., personal protective equipment (PPE), and miscellaneous construction waste] that is bagged and included in bulk soil shipments to the EMWMF. The Waste Acceptance Criteria (WAC) for the EMWMF does not allow for material that does not meet the Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDRs). The waste being excavated in certain areas of the DWI 1630 site contained soil that did not meet RCRA LDR criteria; therefore this waste had to be segregated for treatment or alternate disposal offsite. This document identifies the approach taken by the DWI 1630 project to further characterize the areas identified during the Phase II Remedial Investigation (RI) as potentially containing RCRA-characteristic waste. This document also describes the methodology used to determine excavation limits for areas determined to be RCRA waste, post excavation sampling, and the treatment and disposal of this material.

54 ENVIRONMENTAL SCIENCES↗

Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).

54 ENVIRONMENTAL SCIENCES↗

Notification of Concurrence - K-25/K-27 D&D Project, ETTP - Change Number of EMWMF Waste Lots in the Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the ETTP, Oak Ridge, TN From Two to Three

Section 5.1 of the approved Waste Handling Plan for Demolition ofthe K-25 and K-2 7 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (WHP) includes two Environmental Management Waste Management (EMWMF) waste lots: (1) Asbestos-contaminated roofing/transite; and (2) Construction debris, such as nonasbestos roofing, structural steel/miscellaneous metal/equipment, nonradiological piping, wood, and miscellaneous small quantities of concrete. This concurrence form adds an additional EMWMF waste lot 6.47 for lavatory sink drains. Based on an analysis of the building structure characterization data, the only individual building structure with either an analytic carcinogenic or Hazard Index (HI) sum-of-fractions (SOF) greater than 1 is the lavatory sink drains (Table 1). The HI SOF for the lavatory sink drains is 1.34 (Table 2). When all media are combined with the material of construction calculations, the HI SOF is 1.22 (Table 3). However, when the lavatory sink drains are segregated from all other media, the HI SOF is only 0.256, which is well below the EMWMF waste acceptance criteria SOF limit of 1 (Table 4). Given the large volume (124, 625 cubic yards) of other building structure media with a small HI SOF of 0.256 and the small volume (one cubic yard) of lavatory sink drains with a large HI SOF of 1.34, a separate waste lot for lavatory sink drains is recommended. Lead is the primary contributor to the large HI SOF in the lavatory sink drains. Lead in the lavatory sink drains was shown using the Wilcoxon rank-sum test statistically to have higher concentrations than all other building structure media combined. Other analytes having statistically different median concentrations in the lavatory sink drains compared to all other media are antimony, arsenic, boron, cadmium, selenium, solver, vanadium, zinc, mercury, strontium, and Uranium-233/234 (Table 5). A separate waste lot for the lavatory sink drains minimizes the volume weighted sum-of fractions since a much smaller volume of waste will have the higher HI SOF of 1.34, while a much larger volume of waste will have a small HI SOF of 0.256.

54 ENVIRONMENTAL SCIENCES↗

105-H Reactor Interim Safe Storage Project Final Report

The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dose calculations using MARS for Bremsstrahlung beam stops and collimators in APS beamline stations.

The Monte Carlo radiation transport code MARS is used to model the generation of gas bremsstrahlung (GB) radiation from 7-GeV electrons which scatter from residual gas atoms in undulator straight sections within the Advanced Photon Source (APS) storage ring. Additionally, MARS is employed to model the interactions of the GB radiation with components along the x-ray beamlines and then determine the expected radiation dose-rates that result. In this manner, MARS can be used to assess the adequacy of existing shielding or the specifications for new shielding when required. The GB radiation generated in the 'thin-target' of an ID straight section will consist only of photons in a 1/E-distribution up to the full energy of the stored electron beam. Using this analytical model, the predicted GB power for a typical APS 15.38-m insertion device (ID) straight section is 4.59 x 10{sup -7} W/nTorr/mA, assuming a background gas composed of air (Z{sub eff} = 7.31) at room temperature (293K). The total GB power provides a useful benchmark for comparisons between analytical and numerical approaches. We find good agreement between MARS and analytical estimates for total GB power. The extended straight section 'target' creates a radial profile of GB, which is highly peaked centered on the electron beam. The GB distribution reflects the size of the electron beam that creates the radiation. Optimizing the performance of MARS in terms of CPU time per incident trajectory requires the use of a relatively short, high-density gas target (air); in this report, the target density is {rho}L = 2.89 x 10{sup -2} g/cm{sup 2} over a length of 24 cm. MARS results are compared with the contact dose levels reported in TB-20, which used EGS4 for radiation transport simulations. Maximum dose-rates in 1 cc of tissue phantom form the initial basis for comparison. MARS and EGS4 results are approximately the same for maximum 1-cc dose-rates and attenuation in the photon-dominated regions; for thicker targets, however, the dose-rate no longer depends only on photon attenuation, as photoneutrons (PNs) begin to dominate. The GB radiation-induced photoneutron measurements from four different metals (Fe, Cu, W, and Pb) are compared with MARS predictions. The simulated dose-rates for beamline 6-ID are approximately 3-5 times larger than the measured values, whereas those for beamline 11-ID are much closer. Given the uncertainty in local values of pressure and Z, the degree of agreement between MARS and the PN measurements is good. MARS simulations of GB-induced radiation in and around the FOE show the importance of using actual pressure and gas composition (Z{sub eff}) to obtain accurate PN dose. For a beam current of 300 mA, extrapolating pressure data measured in previously published studies predicts an average background gas pressure of 27 nTorr. An average atomic number of Z{sub eff} = 4.0 is obtained from the same studies. In addition, models of copper masks presently in use at the APS are included. Simulations show that inclusion of exit masks make significant differences in both the radiation spatial distribution within the FOE, as well as the peak intensity. Two studies have been conducted with MARS to assess shielding requirements. First, dose levels in contact with the outside wall of the FOE are examined when GB radiation strikes Pb or W beam stops of varying transverse size within the FOE. Four separate phantom regions are utilized to measure the dose, two at beam elevation and two at the horizontal beam position. The first two phantoms are used for scoring FOE dose along the outside and back walls, horizontally; the second two collect dose on the roof and vertically on the back wall. In all cases, the beam stop depth is maintained at 30 cm. Inclusion of front end (FE) exit masks typically cause a 1-2 order-of-magnitude increase in the dose-rates relative to the case with no masks. Masks place secondary bremsstrahlung sources inside the FOE, and therefore they must be shielded appropriately. The MARS model does not fully account for all shielding present in the hutches; localized shielding is employed in individual hutches. Typically, a collimator, placed downstream of the FE exit masks, mitigates the possible increase in dose. Regarding beam stop transverse size, a modest reduction in dose on the back wall is noted as the stop dimension (square cross section) is increased from 12 cm to 24 cm. In the second study, the thickness of Pb required to shield against the GB extremal ray is determined. In this study, we are interested in finding the thickness of material necessary to add at the edge of a stop to adequately block GB radiation; therefore, we look at the case of no masks in order to have a well-defined GB beam edge. Simulations show the separation between the extremal ray and the edge of the shielding should be 2R{sub m}, where R{sub m} is the Moliere radius.

43 PARTICLE ACCELERATORS↗

Moisture Risk in Unvented Attics Due to Air Leakage Paths - Minneapolis Minnesota

IBACOS completed an initial analysis of moisture damage potential in an unvented attic insulated with closed-cell spray polyurethane foam. To complete this analysis, the research team collected field data, used computational fluid dynamics to quantify the airflow rates through individual airflow (crack) paths, simulated hourly flow rates through the leakage paths with CONTAM software, correlated the CONTAM flow rates with indoor humidity ratios from Building Energy Optimization software, and used "Warme und Feuchte instationar Pro two-dimensional modeling" to determine the moisture content of the building materials surrounding the cracks. Given the number of simplifying assumptions and numerical models associated with this analysis, the results indicate that localized damage due to high moisture content of the roof sheathing is possible under very low airflow rates. Reducing the number of assumptions and approximations through field studies and laboratory experiments would be valuable to understand the real-world moisture damage potential in unvented attics.

Array↗

Evaluation of Early Performance Results for Massachusetts Homes in the National Grid Pilot Deep Energy Retrofit Program

In 2009, National Grid started a DER pilot program that offered technical support and financial incentives to qualified Massachusetts homeowners who planned and successfully completed a retrofit that incorporated the performance requirements and goals of the National Grid DER measures package. This DER measures package, developed through collaboration with Building Science Corporation (BSC), includes specific thermal and airtightness goals for the enclosure components as well as health, safety, durability, and indoor air quality requirements. By providing measures that can be included with common renovation activities such as roof replacement, window replacement, re-siding, basement remediation, and remodeling, this DER measures package is expected to have widespread application for existing homes in the New England area. The post-retrofit performance and cost ranges provided by this research project can provide concrete input for homeowners who are considering a DER. Field test data available for air tightness measured using blower door test. House 1 - Address Belchertown, MA 01007, Notes: Energy Savings: 75%, Company: Clark House 2-1 and 2 - Address (1) Brownsberger, MA 02478 and (2) Belmont, MA 02478, Notes Energy Savings: 73%, Company: Brownsberger House 3 - Address Millbury, MA 01527, Notes Energy Savings: 31%, Company: Tweedly House 4 - Address Milton, MA 02186 Notes Energy Savings: 42%, Company: Koh House 5 - Address Quincy, MA 02169, Notes Energy Savings: 57%, Company: Hall House 6-1 and 2 - Address Arlington, MA 02476, Notes Energy Savings: 55%, Company: Venable-Hwang House 7 - Address Newton, MA 02459, Notes Energy Savings: 42%, Company: Lavine House 8-1, 2, and 3 - Address Jamaica Plain, MA 02130, Notes Energy Savings: 43%, Company: Buhs House 9 - Address Northampton, MA 01060, Notes Energy Savings: 49%, Company: Wick House 10 - Address Lancaster, MA 01523, Notes Energy Savings: 40%, Company: Habitat for Humanity of North Central Massachusetts House 11 - Address Brookline, MA 02445, Notes Energy Savings: 27%, Company: Aquiline House 12 - Address Westford, MA 01886, Notes Energy Savings: 30%, Company: Atkins House 13 - Address Gloucester, MA 01930, Notes Energy Savings: 35%, Company: Cunningham

airtightness↗

Sustainable Wood-Waste-Based Thermal Insulation Foam for Building Energy Efficiency

Wood is one of the most abundant biomaterials on Earth, which has been used for centuries in construction applications including furniture, roofing, flooring, and cabinetry. However, wood chips—which are a low-quality and plentiful waste byproduct of lumber milling, woodworking, and shipping operations—have low economic value and complicated disposal methods. In this paper, we propose a strategy for wood chip reuse through the fabrication of bio-based building insulation foam. Through a high-temperature chemical treatment delignification process, we introduced additional small pores within the wood chips, effectively lowering their thermal conductivity, and used them in combination with a binding agent to produce a porous insulation foam. The porous insulation foam achieved a low thermal conductivity of 0.038 W/(m·K) and a high compressive strength of 1.1 MPa (70% strain). These characteristics demonstrate that wood waste can be repurposed into an effective building material, addressing challenges in both waste management and sustainable construction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Urban weather modeling using WRF: linking physical assumptions, code implementation, and observational needs

The Weather Research and Forecasting (WRF) model includes urban schemes that simulate the influence of urban surfaces on the atmosphere using parameterizations for flux, and radiative exchanges. Three core schemes – the Bulk urban parameterization, Single-Layer Urban Canopy Model (SLUCM), and Multi-Layer Urban Canopy Model (MLUCM) – represent increasing levels of complexity. Although the parameterizations within these urban schemes are described in the literature, their specific implementation remains poorly documented, thus slowing down model development efforts. This manuscript provides a roadmap to the three urban schemes in WRF version 4.5.2, presenting equations using the same symbols as in the model code, along with references to code lines, and including graphics and explanations that connect the code to its physical foundations. Our thorough review of the urban parameterizations implemented in WRF version 4.5.2 highlighted a handful of parameters that may introduce discontinuities in simulations: (i) in the SLUCM, a 1 mm h −1 rain rate threshold is employed to switch between two minimum moisture availability parameterizations, thus impacting latent heat flux calculations; (ii) in the SLUCM a threshold is used to partition shortwave radiation into direct and diffuse components; (iii) in all three urban schemes, the bulk Richardson number is employed to select the similarity function, which influences the vertical distribution of heat and momentum. We also identified a highly simplified treatment of the radiative balance on roof surfaces. The implications of these simplifications can be assessed through targeted observations across relevant conditions, including varying precipitation rates, cloud cover, and transitions between stability regimes. Furthermore, the widespread application of the Monin-Obukhov similarity theory in these urban schemes warrants model evaluation under highly stable and unstable conditions and in heterogeneous urban settings with variable land cover and building heights on scales finer than model resolution. To address these challenges, we offer guidance on observational strategies, emphasizing the need for multi-parametric measurements to capture potential compensating biases and multi-height measurements that align with the levels where quantities are diagnostic and prognosed in the model (i.e., the lowest atmospheric level of the WRF model). Finally, our inspection of the code revealed implementation bugs that have now been corrected in WRF versions 4.6.0 and 4.6.1. Sensitivity tests over the Atlanta urban area show that these corrections affect surface temperatures, underscoring the importance of performing rigorous documentation and verification of the implementation of parameterizations in model code.

54 ENVIRONMENTAL SCIENCES↗

Water vapor isotopic composition during TRACER IOP

The TRACER-Iso project took place from June 1 to September 30, 2022 as part of the intensive observation period (IOP) of the Tracking Aerosol Convection Interactions (TRACER) project at the main project site at the La Porte, Texas, municipal airport. The project sought to use measurements of the stable isotopic composition of water vapor to better understand cloud-aerosol interactions in deep convection in a polluted urban setting. Water vapor isotopologue and humidity measurements were determined using a Picarro L2130 Water Vapor Isotope Analyzer. The instrument was deployed in the guest van and consists of three main components: a water vapor isotope analyzer, and a Los Gatos Research Water Vapor Isotope Standard Source (WVISS), and a Los Gatos Research Dry Air Source. Ambient air samples were collected through an inlet located about one meter above roof of the shipping container. Samples were then delivered to the analyzer through teflon tubing by use of an external pump to minimize the transport time between the inlet and analyzer. The inlet tubing was surrounded by a Briskheat heat trace and insulating material to ensure ambient air samples did not fall below the dew point and result in condensation. The analyzer uses cavity ringdown spectroscopy to report isotopic ratios of ambient air samples at a frequency of 1 Hz. The calibration unit of the instrument was used in conjunction with the dry air source to periodically measure the δ values of standard waters. It uses a nebulizer to push small water droplets into a hot chamber that vaporizes the water without fractionation. This vapor was then transported to the analyzer using a built-in compressor and the dry air source, which allows each standard with known δ values to be measured at a wide range of humidity values for post-measurement calibration of ambient air samples. There are multiple sources of uncertainty introduced at different stages during the data collection and processing. These include (1) instrument precision, (2) uncertainty in the secondary standards, (3) humidity-correction uncertainty, and (4) VSMOW-SLAP calibration uncertainty. Uncertainty from each step is propagated in quadrature to calculate a total uncertainty of each isotopologue. Uncertainty was determined to be 2.3‰ for δD and 0.4‰ for δ18O.

54 ENVIRONMENTAL SCIENCES↗

Water Vapor Isotopic Composition During SAIL

Measurements of the stable isotopic composition of water vapor were collected between 21 November 2022 and 1 June 2023 at the SAIL campaign main site in Gothic Colorado. The data were obtained using a Los Gatos Research Triple Water Vapor Isotopic Analyzer from a heated and insulated inlet mounted on the roof of the guest instrument van. Standards were run periodically during the campaign and the data were corrected for humidity-dependent biases and were normalized to the VSMOW/SLAP scale. Uncertainties in dD and d18O are estimated to be 2.28 permil and 0.38 permil, respectively.

54 ENVIRONMENTAL SCIENCES↗

Urban-Scale Heat Wave Visualization: WRF-UCM modeling in Los Angeles, California

This visualization includes an E3SM-based animation of temperatures in North America during the July 2018 heat wave, followed by a higher resolution focus over Los Angeles using the WRF-UCM model to illustrate neighborhood-scale temperatures that account for urban features like buildings, waste heat, and vegetation, as well as sea breeze impacts. Finally, we show the potential impact of cool roofs to reduce temperatures.

Vahmani, Pouya↗

Investigating Building Energy Consumption and CO2 Emission in Phoenix Using AutoBEM and Future Typical Meteorological Year (fTMY) Weather Data

This research investigates the energy performance and CO2 emissions of each building stock across the Phoenix metropolitan area using the Automatic Building Energy Modeling (AutoBEM) framework and Model America v2 (MAv2) dataset from Oak Ridge National Laboratory (ORNL). Typical Meteorological Year (TMY) and Future Typical Meteorological Year (fTMY) files were used for AutoBEM simulation. The simulation results from TMY and fTMY were compared. It was found that a projected 10.28% increase in total CO2 emissions and a 9.30% rise in total energy consumption by 2080–2099 relative to current typical conditions. The results highlight the disparities in emissions among different building stocks and the influence of climate change on future energy demand. The findings underscore the necessity of targeted policy interventions and retrofitting strategies (eg. advanced HVAC systems, improved insulation, reflective roofing) to mitigate emissions in high-energy-use and emission-intensed buildings, particularly as climate conditions evolve. This study contributes to the growing understanding of building-sector emissions and their long-term implications under future climate scenarios.

Li, Hang [ORNL] (ORCID:0000000306001920)↗

Cryogenic vertical test facility for the SRF cavities at BNL

A vertical test facility has been constructed to test SRF cavities and can be utilized for other applications. The liquid helium volume for the large vertical dewar is approximate 2.1m tall by 1m diameter with a clearance inner diameter of 0.95m after the inner cold magnetic shield installed. For radiation enclosure, the test dewar is located inside a concrete block structure. The structure is above ground, accessible from the top, and equipped with a retractable concrete roof. A second radiation concrete facility, with ground level access via a labyrinth, is also available for testing smaller cavities in 2 smaller dewars. The cryogenic transfer lines installation between the large vertical test dewar and the cryo plant's sub components is currently near completion. Controls and instrumentations wiring are also nearing completion. The Vertical Test Facility will allow onsite testing of SRF cavities with a maximum overall envelope of 0.9 m diameter and 2.1 m height in the large dewar and smaller SRF cavities and assemblies with a maximum overall envelope of 0.66 m diameter and 1.6 m height.

43 PARTICLE ACCELERATORS↗

Apparatus for mounting photovoltaic power generating systems on buildings

Rectangular photovoltaic (PV) modules are mounted on a building roof by mounting stands that are distributed in rows and columns. Each stand comprises a base plate and first and second different height brackets attached to opposite ends of the base plate. Each first and second bracket comprises two module-support members. One end of each module is pivotally attached to and supported by a first module-support member of a first bracket and a second module-support member of another first bracket. At its other end each module rests on but is connected by flexible tethers to module-support members of two different second brackets. The tethers are sized to allow the modules to pivot up away from the module-support members on which they rest to a substantially horizontal position in response to wind uplift forces.

14 SOLAR ENERGY↗

All-AC, building integrated photovoltaic system for mass deployment of residential photovoltaic systems

Solar Red is developing novel PV installation methods and system designs that lower costs dramatically and allow seamless integration into the structure of any sloped roof using existing construction tools and processes. The overall objective of this project is to address the greatest barriers to massive adoption of residential and small commercial rooftop solar – scalability of installation and total cost of ownership - by moving Solar Red’s snap-in/snap-out PV installation method from the pre-prototype design phase to the development and construction of a deployed prototype system.

14 SOLAR ENERGY↗