Supplemental Environmental Project, Supplemental Sampling and Monitoring Work Plan Regarding Settlement Agreement and Stipulated Final Order HWB-14-20, Addendum 3: Certification Package: Sampling and Monitoring

In accordance with the Supplemental Environmental Project (SEP), Settlement Agreement and Stipulated Final Order HWB-14-20 (signed January 22, 2016), Addendum 3: Supplemental Sampling and Monitoring Work Plan (sent December 12, 2016), this correspondence certifies that the Sampling and Monitoring subproject has been completed. When all Supplemental Sampling and Monitoring SEP subprojects are completed, Department of Energy (DOE) and TRIAD, LLC shall submit a signed and sworn Certification of Completion in accordance with the approved SEP Addendum 3.

54 ENVIRONMENTAL SCIENCES↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 8 Deliverable 8.0 - Commercialization Plan

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis from industrial facilities that are not collocated with prospective storage geology (i.e., the Coastal Plain of the Southeastern U.S. in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns are required to identify CO 2 storage opportunities in under-developed areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province of the Appalachian Fold and Thrust Belt occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale.

20 FOSSIL-FUELED POWER PLANTS↗

1995 OMPO Model Development Project

The 1995 Oahu Metropolitan Planning Organization (OMPO) Model Development Project for Oahu Island was intended to document how Oahu residents use the streets, highways, and transit services in the region. These data were used to develop the Travel Demand Forecasting Model, which is used to forecast the traffic impacts of various land use changes. The survey collected complete travel information of 4,060 Oahu households for a 24-hour period, including demographic and socioeconomic data.

1Hz data↗

Fossil Energy Planning for Navajo Nation

This project includes fossil energy transition planning to find optimal solutions that benefit the Navajo Nation and stakeholders. The majority of the tribe’s budget currently comes from fossil energy-revenue. The purpose of this work is to assess potential alternative energy resources including solar photovoltaics and biomass (microalgae for either biofuel or food consumption). This includes evaluating carbon-based reserves related to the tribe’s resources including CO 2 emissions for the Four Corners generating station. The methodology for this analysis will consist of data collection from publicly available data, utilizing expertise from national laboratories and academics, and evaluating economic, health, and environmental impacts. Finally, this report will highlight areas of opportunities to implement renewable energy in the Navajo Nation by presenting the technology requirements, cost, and considerations to energy, water, and environment in an educational structure.

20 FOSSIL-FUELED POWER PLANTS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Mixed-Material Scintillators (MMSS Quarterly Report FY20Q2)

This project aims to invent, model, and prototype mixed-material scintillator systems (MMSSs), a new class of radiation detectors that use heterogenous internal structures of different scintillating materials to detect additional properties of radiation. These internal structures can be produced using additive manufacture (3D printing) of scintillator, a currently emerging application of additive manufacture technology. MMSSs combine the low cost and complexity of conventional scintillation detectors with capabilities currently only available in more expensive and complex detectors. By identifying promising MMSS designs, this project will enable a new class of detectors to meet DNN’s mission needs for SNM detection. This quarter, we delivered one the MMSS Particle-ID Modeling report, a major deliverable of this project. This report describes our results on simulations of the particle-ID (PID) class of detectors. We found that these detectors outperform competing approaches for neutron-gamma discrimination, neutron source pointing, and neutron spectroscopy. Further highlights of the report are described below. During this quarter, We alerted HQ to a change in schedule for the remaining simulations planned for this project: we plan to put off further simulation and reporting of the position-resolving (PR) detector class until July. This change in schedule has allowed us to go into additional detail in the PID work that is both very promising and motivates our upcoming proposal. The other active task in this project is prototyping 3D-printed scintillators with the aim of realizing the designs we’ve simulated. On that front, we had three focuses: measuring the light output, increasing the size of printed parts, and combining blue and green scintillators. We succeeded in measuring the light output, showing an output of 30% of commercial standard. This result leaves room for improvement but is within striking distance of where we need to be. We were on track to demonstrate a key requirement for increasing the size of parts and also to show combined green/blue prints before the laboratory moved to a Minimum Safe (MinSafe) Operations posture as a result of local Shelter In Place orders due to Covid-19.

42 ENGINEERING↗

Nuclear Energy Advanced Modeling and Simulation (NEAMS) Structural Mechanics Module Development Plan

The NEAMS project aims to develop a simulation toolkit, the "NEAMS ToolKit," which will enable predictive virtual test and experiments. The NEAMS toolkit will generate insights by exploring reactor system behavior in regimes that are too difficult, too risky, or even impossible to achieve exclusively in a laboratory setting. The objective of the NEAMS toolkit is to develop a "pellet-to-plant" simulation capability useful for predicting performance and safety for a broad range of nuclear reactor power systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Model Validation for the FY2021 SRS Composite Analysis Monitoring Plan

Using a projected end-state date of 2065 (SRNS 2015b), the Savannah River Site (SRS) Composite Analysis (CA) modeling for each facility and waste site began on the inventory year assigned to it so that source depletion and radionuclide transport out of the system could be appropriately captured. Some SRS waste sites that have already achieved their end states (i.e., end-state inventories and end-state configuration) are currently contributing to the potential off-site public dose through source release, groundwater transport, discharge to on-site surface streams, and stream transport to the CA point of assessments (POAs). The inventory year assigned to these waste sites is 2002 or before. This means that SRS CA results from 2002 and beyond are a reasonable representation for these waste sites that have already achieved their end states and are currently contributing to the potential off-site public dose. The SRS Annual Environmental Report (AER) monitoring can differentiate and separate liquid pathway data allowing the data representing only waste sites at their end state to be produced. Because the SRS CA has projected reasonable end-state impacts from 2002 and beyond, and the AER monitoring can differentiate and separate operating and end-state contributions to annual liquid pathway release, an opportunity exists to use the AER monitoring data to validate the SRS CA model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multiplexed Sensor for Synthesis Gas Compsition and Temperature

The overall goal of this project has been to develop a highly sensitive, multiplexed TDL-based sensor for CO{sub 2}, CO, H{sub 2}O (and temperature), CH{sub 4}, H{sub 2}S, and NH{sub 3}. Such a sensor was designed with so-called 'plug-and-play' characteristics to accommodate additional sensors, and provided in situ path-integrated measurements indicative of average concentrations at speeds suitable for direct gasifier control. The project developed the sensor and culminated in a real-world test of the underlying technology behind the sensor. During the project, new underlying measurements of spectroscopic constants for all of the gases of interest performed, in custom cells built for the project. The envisioned instrument was built from scratch from component lasers, fiber optics, amplifier blocks, detectors, etc. The sensor was tested for nearly a week in an operational power plant. The products of this research are expected to have a direct impact on gasifier technology and the production of high-quality syngas, with substantial broader application to coal and other energy systems. This report is the final technical report on project DE-FG26-04NT42172. During the project we completed all of the milestones planned in the project, with a modification of milestone (7) required due to lack of funding and personnel.

01 COAL, LIGNITE, AND PEAT↗

FXR double-pulse gamma camera imaging plans

Presentation describes project to improve radiographic diagnostic capability in the Contained Firing Facility at Site 300 to take full advantage of ongoing improvements to the linac.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Illinois Storage Corridor CarbonSAFE Phase III: Stakeholder Engagement and Outreach Plan

The Stakeholder Engagement and Outreach Plan provides a comprehensive framework for engaging stakeholders of the Illinois Storage Corridor (ISC) project. The ISC project is a CarbonSAFE Phase III project designed to facilitate commercial deployment of carbon capture, utilization, and storage (CCUS) in Illinois. The project aims to establish a multi-industry carbon storage corridor through development of storage sites near the One Earth Energy (OEE) ethanol production facility in north-central Illinois and the Prairie State Generating Company (PSGC) coal-fired power plant in south-central Illinois, with combined annual CO 2 capture ultimately exceeding 8.6 million tons per year. Stakeholder engagement is recognized as a critical component for successful CCUS deployment, alongside technical and economic considerations. As an emerging technology, CCUS may not be well understood by the general population, and lack of public awareness can lead to opposition that poses significant barriers to project development. This plan addresses this challenge through systematic stakeholder identification, analysis, planning, and implementation of engagement actions. The plan is structured around four main sections: Communication, Stakeholder Analysis, Stakeholder Engagement, and Environmental Justice. Activities will be conducted under Tasks 1 and 4 of the project's Statement of Project Objectives, with two key subtasks: (1) developing a stakeholder analysis and engagement plan through face-to-face meetings, facilitated discussions, and surveys; and (2) implementing stakeholder engagement and public outreach activities including meetings, open houses, and permit hearings. The Illinois State Geological Survey (ISGS) will manage engagement activities following DOE-NETL best practices, focusing on providing objective, fact-based information about CCUS and the ISC project. A comprehensive Communication Plan establishes protocols for media contacts, site visits, and crisis communications. The stakeholder analysis follows a structured workflow process divided into Pre-feasibility and Feasibility phases, incorporating contextual understanding, assessment, data collection, and analysis. Key stakeholder groups include government bodies, educational organizations, conservation and environmental groups, agricultural communities, and religious organizations. The plan addresses common stakeholder questions regarding project risks, benefits, safety, property values, liability, and environmental impacts. Recommendations emphasize developing clear messaging, creating informational materials, and preparing to address both project-specific and broader environmental concerns to ensure transparent communication and build stakeholder support throughout project implementation.

25 ENERGY STORAGE↗

Southeast Regional Carbon Sequestration Partnership (SECARB) Preparation of Discontinuation Plan

In some CO 2 injection demonstration projects, the injection is planned as a stand-along activity, that may require a final extensive phase for planning for demobilization. The first step toward demobilization is making decisions about when the project is completed in terms of achieving milestones. After this, the project may have a task of satisfying regulators and funding partners that the injected CO 2 , elevated pressure, and well construction have a reached a condition which is acceptable for abandonment. In some projects the condition for closure has been conceptualized as “plume stabilization”; other projects have proposed extracting CO 2 . When agreement on the required conditions are reached, the needed actions are completed, whether monitoring the trend toward stabilization and pressure re-equilibration or undertaking more active processes. At the time defined in the demobilization process, wells and other infrastructure are closed and remediated following processes defined by the demobilization process. At some point, closure of the project is accomplished; in some cases, activities needed for various length of time are described as post-closure care.

01 COAL, LIGNITE, AND PEAT↗

Akiachak Energy Action Plan

In 2017, the Akiachak Native Community received a grant for the Akiachak Energy Efficiency Project from the United States Department of Energy Office of Indian Energy. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Akiachak and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the nine project buildings as well as the I.R.A. Council’s goal for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Akiachak Energy Efficiency Project, but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Akiachak for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scoping Sampling at the Site 300 Water Line Project: Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Liverniore National Laboratory’s (LLNL) Mechanical Utilities Division (MUD) is currently scoping a project with the Project Management Office (PMO) Experimental Test Site 300 (S300) to install/upgrade roughly six miles of water line along established roads within the complex. This Sampling and Analysis Plan (SAP) outlines the requirements to collect an initial round of soil samples from the proposed alignment of the water line to provide preliminary data and information that can be used during project design. The samples will be submitted to an offsite contract laboratory for analysis.

54 ENVIRONMENTAL SCIENCES↗

Atmautluak Energy Action Plan

In 2017, the Native Village of Atmautluak received a grant for the Atmautluak Energy Efficiency Project from the United States Department of Energy Office of Indian Energy. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Atmautluak and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the six project buildings as well as the Traditional Council’s goal for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Atmautluak Energy Efficiency Project, but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Atmautluak for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗