Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probability distribution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

A Path Towards Quantum Advantage in Training Deep Generative Models with Quantum Annealing

A class of quantum-classical hybrid machine-learning algorithms can be obtained by integrating classical deep generative models with quantum probability distributions as 'priors' over their latent variables. We introduce a hybrid implementation of variational autoencoders (QVAE) and also present a technique to hybridize flow-based invertible generative models. We demonstrate the use of D-Wave quantum annealers as physical simulators of quantum Boltzmann machines (QBM) to perform quantum-assisted training of QVAE. Latent-space QBM develop slowly mixing modes, opening a path to obtain quantum advantage in generative modeling with available quantum devices.

Vinci, Walter↗

Seasonal Variations of Arctic Low-Level Clouds and its Linkage to Sea Ice Seasonal Variations

Using CALIPSO-CloudSat-Clouds and the Earth's Radiant Energy System (CERES)-Moderate Resolution Imaging Spectrometer (MODIS) (C3M) dataset, this study documents the seasonal variation of sea ice, cloud, and related atmospheric properties in the Arctic region (70°N–82°N) during the period 2007-2010. The surface type stratification used reveals the surface type influence on the Arctic cloud liquid water path (LWP)seasonality. Four surface types are defined: i) Permanent Ocean, ii) Land, iii) Permanent Ice, and iv) Transient Sea Ice. The Transient Ice regions are further divided into sub-regions according to the onset dates of melt/freeze season. Results show that the sea ice cover has no significant direct influence on the seasonal variation of the water vapor in the lower troposphere and the low-level cloud LWP. Rather, the role played by sea ice appear indirect by modifying the surface temperature response to increased solar insolation and influencing lower tropospheric stability (LTS). The results suggest that the combined increase in atmospheric water vapor due to warming air temperatures and the weakening of the inversion strength that governs the seasonal structure of cloud LWP. Over Transient Ice regions, the results suggest that the May peak in LWP coincides with a decrease in LTS and that is insensitive to melt and freeze onset. Variations in melt and freeze onset set are found to influence probably distribution of cloud LWP where regions of earlier melt and later freeze onset how a higher likelihood of larger values.

Yueyue Yu↗

A Framework for Evaluating Climate Model Performance Metrics

The CMIP5 archive contains future climate projections from over 50 models provided by dozens of modeling centers from around the world. Individual model projections, however, are subject to biases created by structural model uncertainties. As a result, ensemble averaging of multiple models is often used to add value to model projections: consensus projections have been shown to consistently outperform individual models. Previous reports for the IPCC establish climate change projections based on an equal-weighted average of all model projections. However, certain models reproduce climate processes better than other models. Should models be weighted based on performance? Unequal ensemble averages have previously been constructed using a variety of mean state metrics. What metrics are most relevant for constraining future climate projections? This project develops a framework for systematically testing metrics in models to identify optimal metrics for unequal weighting multi-model ensembles. A unique aspect of this project is the construction and testing of climate process-based model evaluation metrics. A climate process-based metric is defined as a metric based on the relationship between two physically related climate variables?e.g., outgoing longwave radiation and surface temperature. Metrics are constructed using high-quality Earth radiation budget data from NASA's Clouds and Earth's Radiant Energy System (CERES) instrument and surface temperature data sets. It is found that regional values of tested quantities can vary significantly when comparing weighted and unweighted model ensembles. For example, one tested metric weights the ensemble by how well models reproduce the time-series probability distribution of the cloud forcing component of reflected shortwave radiation. The weighted ensemble for this metric indicates lower simulated precipitation (up to .7 mm/day) in tropical regions than the unweighted ensemble: since CMIP5 models have been shown to overproduce precipitation, this result could indicate that the metric is effective in identifying models which simulate more realistic precipitation. Ultimately, the goal of the framework is to identify performance metrics for advising better methods for ensemble averaging models and create better climate predictions.

Noel C Baker↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

Current Environmental Control and Life Support System (ECLSS) development and test activities are not generating data fast enough to provide statistically-supportable precise Orbital Replacement Unit (ORU) failure rate estimates for future missions. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches – namely regular resupply and rapid abort capabilities – will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of operations on board the International Space Station (ISS), a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass for future missions. A Bayesian failure rate estimation approach, such as the one currently implemented by the ISS Program, can help reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior failure rate estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, these subjective (and often inaccurate) prior estimates currently have a strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Supportability↗

Assessing the Viability of Using GEOS-Forecast Product for Landslides Forecasting: A Step Toward Early Warning System

Landslides across the globe are mostly triggered by extreme rainfall events affecting infrastructure, transportation and livelihoods. The risks are rarely quantified due to lack of data, analytical skills and limited modeling techniques. Knowledge of local to global scale landslide risks provides communities and national agencies the ability to adapt disaster management practices to mitigate and recover from these hazards. In order to minimize the risks and improve characterization of community resilience to landslides, it is vital to have reliable information about the factors triggering landslides such as rainfall, well ahead in time. Forecasting potential landslide activity and impacts can be achieved through reliable precipitation forecast models. However, it is challenging because of the temporal and spatial variability of precipitation, an important factor in triggering landslides. Evaluation of the precipitation field, associated errors, and sampling uncertainties is integral for development of efficient and reliable landslide forecasting and early warning system. This study develops a methodology to assess the viability of using a precipitation field provided by a global model and its potential integration in the landslide forecasting system. The study focuses on the comparison between the IMERG (Integrated Multi-satellitE Retrievals for Global Precipitation Mission) and GEOS (NASA Goddard Earth Observing System)-Forecast product over contiguous United States (CONUS). GEOS model assimilates new observations every 6 hours, at 00, 06, 12, and 18 UTC. The framework is tested on the GEOS-Forecast Model initialized at 00 UTC using daily IMERG early product as reference using both categorical and continuous statistics. The categorical statistics includes the probability of detection (POD), success ratio (SR), critical success index (CSI), and the hit bias. Continuous statistics such as correlation, normalized standard deviation, and root-mean-square error are also evaluated. Overall, GEOS-Forecast precipitation field over the analysis period (~1 year) show underestimation with respect to IMERG early for the daily accumulated rainfall. However, the probability distribution function and cumulative distribution function of both show similar patterns. In terms of correlations, POD, SR, CSI, hit bias, the performance varies with respect to the rainfall threshold used.

Sana Khan↗

Strategic Planning with Unscented Optimal Guidance for Urban Air Mobility

This study proposes a strategic trajectory planning framework to support development of Urban Air Mobility (UAM) traffic networks and optimization of UAM aircraft trajectories that are robust to uncertain wind fields. The development of UAM traffic networks considers static aviation constraints and dynamic weather constraints in urban airspace and the connections to ground transportation networks for preliminary selection of feasible time-optimal routes. The trajectory optimization of UAM aircraft utilizes an unscented optimal guidance approach to generate cost-optimal trajectories constrained on the selected sigma values of probability distribution of uncertain wind fields while ensuring that the end-point constraints are met for reducing wind-induced trajectory uncertainty. Unscented guidance commands are assessed based on trajectory perturbations at subsequent end-points in various wind fields by conducting Monte Carlo simulations.An example of wind-optimal UAM corridor and the associated trajectory-based operation volume is created utilizing the perturbations of the unscented trajectories for preliminary assessment of required aircraft separation minima without knowledge of aircraft navigation performance.

Strategic Planning↗

Laboratory characterization of silicon avalanche photodiodes (APD) for pulse position modulation (PPM) detection

Two commercially available large area silicon avalanche photodiodes (APD) were characterized in the laboratory. Specifically, the response of the APD’s to a sequence of 8-bit pulse position modulated (256-PPM) laser pulses, with and without background noise, was recorded and stored for post analysis. Empirical probability distribution functions (pdf) were constructed from the signal and noise slot data and compared to pdf’s predicted by an analytical model based on Webb/Gaussian statistics. The limited pulse sequence was also used to generate bit-error rate (BER) versus signal photons per pulse values, albeit with large error bars. These BER measurements were also compared to results predicted using the Gaussian and Webb/Gaussian models for APD channel statistics. While the measurements qualitatively reflect features predicted by theory, significant quantitative deviations are displayed between the measurements and theory. The source of these discrepancies is not currently well understood, but it is surmised that inaccurate knowledge of detector parameters such as gain and noise equivalent temperature models may explain the discrepancies.

Biswas, A.↗

Life Qualification of Hall Thrusters By Analysis and Test

High power Hall thrusters under development for deep space robotic and human exploration missions have demanding lifetime and operational requirements that make thruster life qualification challenging. The required burn times make it infeasible to conduct multiple tests with durations exceeding the life requirement, and complex wearout phenomena and the need for power throttling during missions complicate analyses and testing. The traditional qualification approach, a single life test that typically demonstrates 50 to 100% margin on the required lifetime, does not provide enough information to demonstrate low failure risk. It is a weak source of statistical information about the location of the peak in the failure probability distribution and provides no information on the width of the distribution. Testing does provide information that can be used to validate physics-based models of failure processes, however, and the combination can be used to assess mission risk. Validated, conservative, deterministic analysis can be used to demonstrate that most failure processes have such large margins that more detailed analysis is unnecessary. For a subset of the failure modes a more detailed probabilistic analysis is required. Pole erosion in a 12.5 kW Hall thruster is used as a detailed example of this qualification process.

Brophy, John R.↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

Projected land ice contributions to twenty-first-century sea level rise

The land ice contribution to global mean sea level rise has not yet been predicted1 using ice sheet and glacier models for the latest set of socio-economic scenarios, nor using coordinated exploration of uncertainties arising from the various computer models involved. Two recent international projects generated a large suite of projections using multiple models2,3,4,5,6,7,8, but primarily used previous-generation scenarios9 and climate models10, and could not fully explore known uncertainties. Here we estimate probability distributions for these projections under the new scenarios11,12 using statistical emulation of the ice sheet and glacier models. We find that limiting global warming to 1.5 degrees Celsius would halve the land ice contribution to twenty-first-century sea level rise, relative to current emissions pledges. The median decreases from 25 to 13 centimetres sea level equivalent (SLE) by 2100, with glaciers responsible for half the sea level contribution. The projected Antarctic contribution does not show a clear response to the emissions scenario, owing to uncertainties in the competing processes of increasing ice loss and snowfall accumulation in a warming climate. However, under risk-averse (pessimistic) assumptions, Antarctic ice loss could be five times higher, increasing the median land ice contribution to 42 centimetres SLE under current policies and pledges, with the 95th percentile projection exceeding half a metre even under 1.5 degrees Celsius warming. This would severely limit the possibility of mitigating future coastal flooding. Given this large range (between 13 centimetres SLE using the main projections under 1.5 degrees Celsius warming and 42 centimetres SLE using risk-averse projections under current pledges), adaptation planning for twenty-first-century sea level rise must account for a factor-of-three uncertainty in the land ice contribution until climate policies and the Antarctic response are further constrained.

Tamsin L. Edwards↗

Sensitivity Study of Dust-Laden Flows in the DLR GBK Facility using the DUST-US3D Framework

The current work is aimed at performing a detailed numerical sensitivity study of dust-laden flow through the DLR GBK facility using the DUST-US3D frame-work. A three-dimensional volumetric grid of the GBK facility with emphasis on a precise reproduction of the dust particle injection process and the transit of particles through the facility has been developed for this work. The sensitivity study on this grid involves varying particle injection parameters such as the diameter distribution probability function, input velocity magnitude, and input velocity direction and accounting for particle-particle collisions. The resulting impact on particle-related statistics such as the dust mass flow rate is studied, and comparisons made to experimental data.

Dusty Flows↗

Modeling the Meteoroid Environment Far from the Ecliptic Plane: Can a Tilted Plane of Symmetry Explain Seasonal Variations in the Meteoroid Environment?

NASA's Meteoroid Engineering Model (MEM) describes the meteoroid environment encountered by spacecraft in the inner solar system. MEM's algorithms take advantage of the fact that the vast majority of spacecraft remain close to the ecliptic plane in order to make several simplifying assumptions. However, this results in a model that cannot describe the environment for spacecraft such as Ulysses that travel far from the ecliptic, and limits the potential to validate the model using impact signatures from asteroids on inclined orbits. We are in the process of developing a new version of the code, numbered 3.1-alpha, that correctly computes the meteoroid flux and directionality far from the ecliptic. We present a new formulation of the spatial probability distribution function for fully precessed meteoroid models and compare our results with zodiacal light data.

Althea Moorhead↗

Analyzing Recharge Dynamics and Storage in a Thick, Karstic Vadose Zone

Karst vadose zone heterogeneity creates complex transmission and storage dynamics that affect the timing and magnitude of aquifer recharge. Young, high-matrix permeability eogenetic karst aquifers may have significantly higher matrix storage than older, lower matrix permeability counterparts. In vulnerable and water-limited karst regions, the timescales of storage may be important for seasonal and sub-seasonal water resource management. We create a framework to quantify storage dynamics in karst aquifers using high-resolution precipitation and groundwater levels from the Northern Guam Lens Aquifer in the US territory of Guam. We estimate recharge using the Water Table Fluctuation method, and then develop transfer functions between precipitation and recharge to quantify storage and release of water from the vadose zone. The transfer functions are partitioned into different flow pathways including conduit, conduit/matrix, and slowly draining matrix. Probability distributions are fit to each pathway to determine the average travel times of infiltrated waters. The results show that aquifer recharge through secondary porosity features typically occurs within a few hours of a rainfall event, but this rapid recharge accounts for only 12%–28% of total recharge. The majority of aquifer recharge (>70%) occurs within a month of a contributing storm event. An additional 10% of recharge, on average, took longer than a month to reach the water table. The framework established can help improve the hydrological modeling and freshwater management for karst aquifers.

Patricia Spellman↗

Scheduling For Urban Air Mobility Using Safe Learning

This work considers the scheduling problem for Urban Air Mobility (UAM) vehicles travelling between origin-destination pairs with both hard and soft trip deadlines. Each route is described by a discrete probability distribution over trip completion times (or delay) and over interarrival times of requests (or demand) for the route along with a fixed hard or soft deadline. Soft deadlines carry a cost that is incurred when the deadline is missed. An online, safe scheduler is developed that ensures that hard deadlines are never missed and that average cost of missing soft deadlines is minimized. The system is modelled as a Markov Decision Process (MDP) and safe model based learning is used to find the probabilistic distributions over route delays and demand. Monte Carlo Tree Search (MCTS) Earliest Deadline First (EDF) is used to safely explore the learned models in an online fashion and develop a near-optimal non-preemptive scheduling policy. These results are compared with Value Iteration (VI) and MCTS (Random) scheduling solutions.

Urban Air Mobility↗

Scheduling for Urban Air Mobility using Safe Learning

This work considers the scheduling problem for Urban Air Mobility (UAM) vehicles travelling between origin-destination pairs with both hard and soft trip deadlines. Each route is described by a discrete probability distribution over trip completion times (or delay) and over interarrival times of requests (or demand) for the route along with a fixed hard or soft deadline. Soft deadlines carry a cost that is incurred when the deadline is missed. An online, safe scheduler is developed that ensures that hard deadlines are never missed and that average cost of missing soft deadlines is minimized. The system is modelled as a Markov Decision Process (MDP) and safe model based learning is used to find the probabilistic distributions over route delays and demand. Monte Carlo Tree Search (MCTS) Earliest Deadline First (EDF) is used to safely explore the learned models in an online fashion and develop a near-optimal non-preemptive scheduling policy. These results are compared with Value Iteration (VI) and MCTS (Random) scheduling solutions.

Urban Air Mobility↗

Multihierarchy Gaussian Process Models for Probabilistic Aerodynamic Databases using Uncertain Nominal and Off-Nominal Configuration Data

Probabilistic aerodynamic databases are a crucial component of the development lifecycle for aerospace vehicles. A key challenge when building aerodynamic databases is that most data used to construct them represent various simplifications of the real flight vehicle. For example, wind tunnel models often simplify the vehicle geometry and surface roughness characteristics, while CFD computations often make simplifications to the physics being modeled, such as fully laminar or turbulent calculations. Multifidelity data fusion models rely on a user being able to define a hierarchy of fidelity levels anchored to some "truth" data. This approach is unsatisfactory when no data can be considered to accurately reflect real flight conditions. In this work, we provide an alternative approach by presenting a consistent mathematical framework for building probabilistic aerodynamic databases in the form of a conditional probability distribution described by an ensemble of multifidelity Gaussian Processes. Instead of relying on a single hierarchy of data fidelity levels, the presented framework identifies a "nominal" configuration and potential corrections to the nominal which represent specific physical phenomena not represented in the nominal data. The nominal and correction functions themselves are constructed as multifidelity Gaussian Processes and linearly combined to form an ensemble model which fuses the uncertainties associated nominal and correction models. Results obtained using the proposed framework on a simplified Orion Crew Module wind tunnel dataset demonstrate the predictive capability of the multihierarchy framework. We further demonstrate the benefits of such a probabilistic aerodynamic database approach through function sampling and computing the conditional distributions of derived quantities, such as the trim angle of attack and aerodynamic coefficients at trim.

Gaussian Processes↗

Lila: Optimal Dispatching in Probabilistic Temporal Networks using Monte Carlo Tree Search

Executing a Probabilistic Simple Temporal Network (PSTN) amounts at scheduling, i.e. \textit{dispatch}, a set of events under time uncertainty. This constitutes a NP-hard online optimization problem. The right execution time must be dynamically assigned to each event of the PSTN such that the temporal constraints are met, whereas activity durations are progressively observed as the execution unfolds. We propose a dispatching algorithm based on Monte Carlo Tree Search, called Lila, with the following characteristics: (i) it is an anytime algorithm, both offline and online, proven asymptotically optimal; (ii) it returns the current probability of success, either before or at any moment during operations; (iii) it handles any possible continuous or discrete, even non-parametric, probability distributions, as well as inter-dependencies between random variables, exogenous and endogenous uncertainty; and (iv) can be easily extended to handle probabilistic external events, PSTNs with resources, PSTNs with cutoff times and precondition chains, etc. Lila is universal in the sense that it can handle any dispatching protocol, simply by specifying it to the algorithm. It has the unlimited flexibility offered by the simulation paradigm, whilst it asymptotically converges to optimal decisions and/or robustness approximations.

Chien, Steve A.↗