Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Tower”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Design of an Advanced Wood Composite Rotor and Development of Wood Composite Blade Technology

In support of a program to advance wood composite wind turbine blade technology, a design was completed for a prototype, 90-foot diameter, two-bladed, one-piece rotor, with all wood/epoxy composite structure. The rotor was sized for compatibility with a generator having a maximum power rating of 4000 kilowatts. Innovative features of the rotor include: a teetering hub to minimize the effects of gust loads, untwisted blades to promote rotor power control through stall, joining of blades to the hub structure via an adhesive bonded structural joint, and a blade structural design which was simplified relative to earlier efforts. The prototype rotor was designed to allow flexibility for configuring the rotor upwind or downwind of the tower, for evaluating various types of teeter dampers and/or elastomeric stops, and with variable delta-three angle settings of the teeter shaft axis. The prototype rotor was also designed with provisions for installing pressure tap and angle of attack instrumentation in one blade. A production version rotor cost analysis was conducted. Included in the program were efforts directed at developing advanced load take-off stud designs for subsequent evaluation testing by NASA, development of aerodynamic tip brake concepts, exploratory testing of a wood/epoxy/graphite concept, and compression testing of wood/epoxy laminate, with scarf-jointed plies.

Stroebel, Thomas↗

Wireless Channel Characterization: Modeling the 5 GHz Microwave Landing System Extension Band for Future Airport Surface Communications

We describe a recently completed wideband wireless channel characterization project for the 5 GHz Microwave Landing System (MLS) extension band, for airport surface areas. This work included mobile measurements at large and small airports, and fixed point-to-point measurements. Mobile measurements were made via transmission from the air traffic control tower (ATCT), or from an airport field site (AFS), to a receiving ground vehicle on the airport surface. The point-to-point measurements were between ATCT and AFSs. Detailed statistical channel models were developed from all these measurements. Measured quantities include propagation path loss and power delay profiles, from which we obtain delay spreads, frequency domain correlation (coherence bandwidths), fading amplitude statistics, and channel parameter correlations. In this paper we review the project motivation, measurement coordination, and illustrate measurement results. Example channel modeling results for several propagation conditions are also provided, highlighting new findings.

Matolak, D. W.↗

A New Framework for Quantifying Lidar Uncertainty

As wind turbine sizes increase and wind energy expands to more complex and remote sites, remote sensing devices such as lidars are expected to play a key role in wind resource assessment and power performance testing. The switch to remote sensing devices represents a paradigm shift in the way the wind industry typically obtains and interprets measurement data for wind energy. For example, the measurement techniques and sources of uncertainty for a remote sensing device are vastly different from those associated with a cup anemometer on a meteorological tower. Current IEC standards discuss uncertainty due to mounting, calibration, and classification of the remote sensing device, among other parameters. Values of the uncertainty are typically given as a function of the mean wind speed measured by a reference device. However, real-world experience has shown that lidar performance is highly dependent on atmospheric conditions, such as wind shear, turbulence, and aerosol content. At present, these conditions are not directly incorporated into the estimated uncertainty of a lidar device. In this presentation, we propose the development of a new lidar uncertainty framework that adapts to current flow conditions and more accurately represents the actual uncertainty inherent in lidar measurements under different conditions. In this new framework, sources of uncertainty are identified for estimation of the line-of-sight wind speed and reconstruction of the three-dimensional wind field. These sources are then related to physical processes caused by the atmosphere and lidar operating conditions. The framework is applied to lidar data from an operational wind farm to assess the ability of the framework to predict errors in lidar-measured wind speed.

17 WIND ENERGY↗

Efficient Loads Surrogates for Waked Turbines in an Array

Accurately and efficiently predicting wind turbine structural loading is a crucial step in wind farm design. Without considering structural loading, wind farm optimization could negatively impact turbine fatigue and ultimate loads, especially for waked and partially waked turbines, which could result in higher maintenance costs and reduced turbine lifetime. However, predicting turbine loads throughout an array is a costly step, as these quantities require time-accurate results across long time histories, which is often intractable for large array optimization. Therefore, surrogate models that link array spacing to load outputs are often used, but the surrogates are then unique to the inflow conditions and array configurations in the training library. This work develops surrogate models for many wind turbine load outputs based solely on rotor plane velocity measurements, with no required input about array configuration or freestream inflow parameters. Surrogate models were constructed for many turbine quantities of interest (QoI), considering mean, standard deviation, ultimate, and fatigue loads. In general, most QoI statistics were accurately captured, as measured by predicted vs. actual correlation coefficient, confirming the suitability of the approach. Temporal mean values of the QoI required only temporal mean measurements of the rotor plane inflow velocity. However, accurate prediction of temporal standard deviation, ultimate, and fatigue values of QoI also required temporal standard deviations of the rotor plane velocity field. Poor surrogate performance was observed when too many correlated inputs were used, such as multiple velocity components. If the fewest inflow parameters are used to construct the surrogates, the average correlation coefficient value for all output QoI statistics is 0.89. Surrogates for standard deviations and damage equivalent loads (DELs) of turbine QoIs generally had lower accuracy and tower-base and shaft load channels posed the most difficult to capture accurately. The results suggest that these surrogates could be easily paired with analytic wake models, which are frequently used for pre-construction wind farm array optimization, to account for turbine loading in addition to power production. By including the optimal inflow conditions, the surrogate accuracy can improve to an average correlation coefficient value for all output QoI statistics of 0.92. This work has established the ability to build accurate surrogates for mean, standard deviation, ultimate load, and DEL turbine QoI values based on the rotor plane inflow velocity, and identified which inflow conditions lead to greater surrogate accuracy.

17 WIND ENERGY↗

Wind power

A historical background on windmill use, the nature of wind, wind conversion system technology and requirements, the economics of wind power and comparisons with alternative systems, data needs, technology development needs, and an implementation plan for wind energy are presented. Considerable progress took place during the 1950's. Most of the modern windmills feature a wind turbine electricity generator located directly at the top of their rotor towers.

Savino, J. M.↗

Chapter 6: Wind Energy: Effects on Bats

Utility-scale wind energy facilities require no fuel, consume no water, and produce no greenhouse gas emissions or other pollutants during energy production. Wind power currently supplies approximately 6.4% of the electricity consumed in the United States (U.S.), with continued growth expected in the coming years. Although further expansion of wind power is anticipated to provide environmental and economic benefits, there are increasing concerns about bat fatalities occurring at wind energy facilities across North America. Recent estimates place the number of bat fatalities in the several hundreds of thousands on an annual basis, and that number is projected to rise. As a result, population-level impacts of wind turbine-caused mortality are of increasing concern. For example, modeling efforts for a widespread species, the hoary bat (Lasiurus cinereus), indicate that the population could decline by 90% within 50 years, assuming no growth in installed wind power capacity and no significant implementation of conservation measures. Given increasing demand for wind energy and increasing evidence suggesting that bats are attracted to wind turbines, the need to develop cost-effective and practical impact minimization strategies is a high priority. Current strategies include siting restrictions and operational minimization, both of which limit wind power generation. Potential solutions that do not limit power generation include broadcasting ultrasound from wind turbines or using ultraviolet (UV) light to deter bats from approaching and entering the rotor-swept area where fatalities occur. Another possible solution is the development of turbine-surface materials that reduce the relative attractiveness of wind turbine towers to bats. In this chapter, we provide a succinct summary of known impacts of wind energy on bats and present current and future research priorities. We also describe the challenges and opportunities associated with developing and implementing effective solutions to minimize wind turbine-caused bat fatality.

17 WIND ENERGY↗

Wind Resource Assessment Report: Mille Lacs Indian Reservation, Minnesota

The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy on potentially contaminated land and mine sites. EPA collaborated with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) and the Mille Lacs Band of Chippewa Indians to evaluate the wind resource and examine the feasibility of a wind project at a contaminated site located on the Mille Lacs Indian Reservation in Minnesota. The wind monitoring effort involved the installation of a 60-m met tower and the collection of 18 months of wind data at multiple heights above the ground. This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and an assessment of the economic feasibility of a potential wind project sited this site.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Powering OSCAR

Recycling waste has been an issue on Earth for decades. The OSCAR project seeks to find ways to make sure that it does not become an issue in space. The main focus of OSCAR is the combustion of waste and reclamation of gaseous products in microgravity. The first phase of testing relies on a ground rig that operates both under normal (Earth) gravity and in drop tower tests that briefly simulate a microgravity environment. In the second phase, a test will be performed during a suborbital flight were the experiment will be carried out in microgravity. Throughout the spring term, interns have played an integral part in continuing the progress made by the project. They performed work in upgrading the electrical and mechanical systems that make up OSCAR. They made multiple improvements to the test rig's operating software to improve readability and usability. They prepared and edited documents that were vital to the engineering process. And, they were responsible for performing lab tests and refining the lab operations document and procedure. The interns were a big help in maintaining the rigorous test schedule. OSCAR, which stands for Orbital Syngas Commodity Augmentation Reactor, is to find a way to turn astronaut waste into chemical energy. The two parts of this are important: finding a way to dispose of waste generated in space, and seeing if there is a way to recycle that waste into chemical energy. The importance of the disposal aspect is that there is currently no way to dispose of, or recycle, waste that is created in space other than jettisoning it (which is what the ISS does via empty supply capsules). As manned missions go deeper into space, that method will no longer be viable, as a craft would essentially be littering the space and planets that they visit. Energy reclamation is also important because of the high monetary and spatial costs of sending supplies on space missions. Every little bit extra that can be reused out of what is sent can save room and funds for other supplies. The facet of this problem that the OSCAR project is focusing on is how to combust waste in zero gravity. Combustion in the presence of gravity is one of those things that is taken for granted. When something burns on Earth, the flames rise above the fuel as oxygen flows from underneath. In microgravity, the flames surround the object completely, which restricts the amount of oxygen that can reach the fuel, and retards the combustion. OSCAR uses a vortex reaction chamber to counter this phenomenon. The OSCAR test rig will eventually be tested on a suborbital flight to see if it is an effective solution to the issue in real-world conditions. Currently, there is a prototype test rig that is fully functional. This rig has been previously tested in a 2 second drop test at Glenn Research Center’s (GRC) Zero Gravity Facility (ZGF). (The free-fall conditions of the drop mimic microgravity, if only for a brief period of time). This session’s focus was on upgrading the test rig and software, updating the paperwork, performing additional lab tests, and readying the rig for the five second drop test, again at GRC. II. Upgrades The state of the testing rig at the start of the session was in between its configurations for the two second drop tower and the five second drop tower. The rig needed upgrades to address various insufficiencies that either were discovered during the two second campaign or were a direct result of the differences between the two drop tower setups. The main differences that had to be handled were the increase in shock loads from 30g to 65g, a difference in drop indicating signal (on the falling edge of a pulse instead of a change from high to low), and the ambient pressure of the test apparatus (the two second tower dropped the rig in atmosphere, while the five second tower drops in vacuum).

Cauvel, Thomas↗

Description of the 3 MW SWT-3 wind turbine at San Gorgonio Pass, California

The SWT-3 wind turbine, a microprocessor controlled three bladed variable speed upwind machine with a 3MW rating that is presently operational and undergoing system testing, is discussed. The tower, a rigid triangular truss configuration, is rotated about its vertical axis to position the wind turbine into the prevailing wind. The blades rotate at variable speed in order to maintain an optimum 6 to 1 tip speed ratio between cut in and fated wind velocity, thereby maximizing power extraction from the wind. Rotor variable speed is implemented by the use of a hydrostatic transmission consisting of fourteen fixed displacement pumps operating in conjunction with eighteen variable displacement motors. Full blade pitch with on-off hydraulic actuation is used to maintain 3MW of output power.

Rybak, S. C.↗

Telemetry Boards Interpret Rocket, Airplane Engine Data

For all the data gathered by the space shuttle while in orbit, NASA engineers are just as concerned about the information it generates on the ground. From the moment the shuttle s wheels touch the runway to the break of its electrical umbilical cord at 0.4 seconds before its next launch, sensors feed streams of data about the status of the vehicle and its various systems to Kennedy Space Center s shuttle crews. Even while the shuttle orbiter is refitted in Kennedy s orbiter processing facility, engineers constantly monitor everything from power levels to the testing of the mechanical arm in the orbiter s payload bay. On the launch pad and up until liftoff, the Launch Control Center, attached to the large Vehicle Assembly Building, screens all of the shuttle s vital data. (Once the shuttle clears its launch tower, this responsibility shifts to Mission Control at Johnson Space Center, with Kennedy in a backup role.) Ground systems for satellite launches also generate significant amounts of data. At Cape Canaveral Air Force Station, across the Banana River from Kennedy s location on Merritt Island, Florida, NASA rockets carrying precious satellite payloads into space flood the Launch Vehicle Data Center with sensor information on temperature, speed, trajectory, and vibration. The remote measurement and transmission of systems data called telemetry is essential to ensuring the safe and successful launch of the Agency s space missions. When a launch is unsuccessful, as it was for this year s Orbiting Carbon Observatory satellite, telemetry data also provides valuable clues as to what went wrong and how to remedy any problems for future attempts. All of this information is streamed from sensors in the form of binary code: strings of ones and zeros. One small company has partnered with NASA to provide technology that renders raw telemetry data intelligible not only for Agency engineers, but also for those in the private sector.

Source record↗

Wash Vehicle Fleet Sizing for Contingency Planning Against Dust Storms: Preprint

Wash vehicles containing either high- or low-pressure water sprayers, a collection of rotating brushes, or a combination of these, are frequently utilized in concentrating solar power (CSP) plants to maintain a high level of optical efficiency in the solar field. In recent years, multiple modeling approaches have been developed to obtain fleet sizes and mirror-washing schedules that optimize the tradeoff of vehicle capital and use costs and labor versus lost revenues due to soiling. These planning models cover normal operating conditions well but do not consider rare events such as dust storms which can a significant reduction in receiver productivity, or shut down operations until most or all of the solar field’s mirrors have been cleaned. To that end, we propose a methodology that evaluates whether additional capital should be deployed to hedge against these events by weighing the net present value of the expected benefits against the capital costs. The output of this method is a breakeven frequency, a metric we sue to determine whether an additional vehicle should be purchased to address the contingency of dust storms by comparing it to the expected annual storm frequency We develop a small collection of case studies using commercial-scale CSP tower plants and obtain breakeven frequencies that mostly fall between 0.1 and 1.0 storms per year, depending on the existing fleet size and storm severity.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Duration Test Report for the Ventera VT10 Wind Turbine

This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small wind turbines. Five turbines were tested at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) as a part of round one of this project. Duration testing is one of up to five tests that may be performed on the turbines, including power performance, safety and function, noise, and power quality. Test results will provide manufacturers with reports that can be used to fulfill part of the requirements for small wind turbine certification. The test equipment included a grid-connected Ventera Energy Corporation VT10 wind turbine mounted on an 18.3-m (60-ft) self-supporting lattice tower manufactured by Rohn.

17 WIND ENERGY↗

Motor technology for mining applications advances

AC motors are steadily replacing DC motors in mining and mineral processing equipment, requiring less maintenance. The permanent magnet rotor, or the synchronous motor, has enabled Blador to introduce a line of cooling tower motors. Synchronous motors are soon likely to take over from the induction motor. 1 photo.

01 COAL, LIGNITE, AND PEAT↗

CMB in a box: Causal structure and the Fourier-Bessel expansion

This paper makes two points. First, we show that the line-of-sight solution to cosmic microwave anisotropies in Fourier space, even though formally defined for arbitrarily large wavelengths, leads to position-space solutions which only depend on the sources of anisotropies inside the past light cone of the observer. This foretold manifestation of causality in position (real) space happens order by order in a series expansion in powers of the visibility {gamma}=e{sup -}{mu}, where {mu} is the optical depth to Thomson scattering. We show that the contributions of order {gamma}{sup N} to the cosmic microwave background (CMB) anisotropies are regulated by spacetime window functions which have support only inside the past light cone of the point of observation. Second, we show that the Fourier-Bessel expansion of the physical fields (including the temperature and polarization momenta) is an alternative to the usual Fourier basis as a framework to compute the anisotropies. The viability of the Fourier-Bessel series for treating the CMB is a consequence of the fact that the visibility function becomes exponentially small at redshifts z>>10{sup 3}, effectively cutting off the past light cone and introducing a finite radius inside which initial conditions can affect physical observables measured at our position x-vector=0 and time t{sub 0}. Hence, for each multipole l there is a discrete tower of momenta k{sub il} (not a continuum) which can affect physical observables, with the smallest momenta being k{sub 1l{approx}}l. The Fourier-Bessel modes take into account precisely the information from the sources of anisotropies that propagates from the initial value surface to the point of observation - no more, no less. We also show that the physical observables (the temperature and polarization maps), and hence the angular power spectra, are unaffected by that choice of basis. This implies that the Fourier-Bessel expansion is the optimal scheme with which one can compute CMB anisotropies.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗

Advanced Offshore Wind Energy: Atlantic Consortium

This project developed relationships among the lead institution, U of Delaware, wind industry participants from 11 companies, and two other universities in the region. The participating regional universities were University of Maryland and Old Dominion University. Research was carried out in six major areas: Analysis and documentation of extreme oceanic wind events & their impact on design parameters, calibration of corrosivity estimates measured on a coastal turbine, measurment and modeling of tower structures, measurement and modeling of the tribology of major drive components, and gearbox conditioning monitoring using acoustic sensors. The project also had several educational goals, including establishing a course in wind energy and training graduate students. Going beyond these goals, three new courses were developed, a graduate certificate program in wind power was developed and approved, and an exchange program in wind energy was established with Danish Technical University. Related to the installation of a Gamesa G90 turbine on campus and a Gamesa-UD research program established in part due to this award, several additional research projects have been carried out based on mutual industry-university interests, and funded by turbine revenues. This award and the Gamesa partnership have jointly led to seven graduate students receiving full safety and climb training, to become “research climbers” as part of their wind power training, and contributing to on-turbine research. As a result of the educational program, already six graduate students have taken jobs in the US wind industry.

17 WIND ENERGY↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements: Preprint

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology's total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

concentrating solar power↗

Estimating the Performance and Economic Value of Multiple Concentrating Solar Power Technologies in a Production Cost Model

Concentrating solar power with thermal energy storage (CSP-TES) is a unique source of renewable energy in that the solar thermal energy can be dispatched similarly to conventional thermal generation. However, CSP-TES plants are energy-limited, meaning that their response might be restricted by solar availability. Therefore, the use of this limited solar energy must be optimally scheduled toprovide the greatest value to the system. The timing of CSP-TES dispatch depends on a variety of factors, including electricity demand patterns, the penetration of variable generation sources, and the configuration of the CSP-TES plant itself. We use an established CSP-TES modeling framework in a commercially available production cost model to compare the dispatch and value of two CSP-TEStechnologies (molten salt towers and parabolic troughs) in a Colorado test system. In addition, we consider a range of configuration parameters, such as the solar multiple and thermal energy storage limit, to evaluate how the operational and capacity value varies with plant configuration.

14 SOLAR ENERGY↗