Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Outages”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

657 records · Page 37

Resilience-Motivated Distribution System Restoration Considering Electricity-Water-Gas Interdependency

A major outage in the electricity distribution system may affect the operation of water and natural gas supply systems, leading to an interruption of multiple services to critical customers. Therefore, enhancing resilience of critical infrastructures requires joint efforts of multiple sectors. In this paper, a distribution system service restoration method considering the electricity-water-gas interdependency is proposed. The objective is maximizing the supply of electricity, water, and gas to critical customers after an extreme event. The operational constraints of electricity, water, and natural gas networks are considered. Additionally, the characteristics of electricity-driven coupling components, including water pumps and gas compressors, are also modeled. Relaxation techniques are applied to non convex constraints posed by physical laws of those networks. Consequently, the restoration problem is formulated as a mixed-integer second-order cone program, which can readily be solved by the off-the-shelf solvers. The proposed method is validated by numerical simulations on an electricity-water-gas integrated system, developed based on benchmark models of the subsystems. The results indicate that considering the interdependency refines the allocation of limited generation resources and demonstrate the exactness of the proposed convex relaxation

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Secure and Adaptive Hierarchical Multi-Timescale Framework for Resilient Load Restoration Using a Community Microgrid

Distribution system integrated community microgrids (CMGs) can partake in restoring loads during extended duration outages. At such times, the CMGs are challenged with limited resource availability, absence of robust grid support, and heightened demand-supply uncertainty. Here, this paper proposes a secure and adaptive three-stage hierarchical multi-timescale framework for scheduling and real-time (RT) dispatch of CMGs with hybrid PV systems to address these challenges. The framework enables the CMG to dynamically expand its boundary to support the neighboring grid sections and is adaptive to the changing forecast error impacts. The first stage solves a stochastic extended duration scheduling (EDS) problem to obtain referral plans for optimal resource rationing. The intermediate near-real-time (NRT) scheduling stage updates the EDS schedule closer to the dispatch time using new obtained forecasts, followed by the RT dispatch stage. To make the decisions more secure and robust against forecast errors, a novel concept called delayed recourse is designed. The approach is evaluated via numerical simulations on a modified IEEE 123-bus system and validated using OpenDSS and hardware-in-loop simulations. The results show superior performance in maximizing load supply and continuous secure distribution network operation under different operating scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying Distribution System Resilience From Utility Data: Large Event Risk and Benefits of Investments

We focus on blackouts in electric distribution systems that have a large cost to customers. To quantify resilience to these events, we show how to calculate risk metrics from the historical outage data routinely collected by utilities' outage management systems. Risk is defined using a customer cost exceedance curve. The exceedance curve has a heavy tail that implies large fluctuations in large blackout costs, and this makes estimating the mean large cost in the usual way impractical. To avoid this problem, we use new resilience metrics describing the large event risk; these metrics are the probability of a large cost event, the annual log cost resilience index, and the average of the logarithm of the cost of large-cost events or the slope magnitude of the tail on a log–log exceedance curve. Resilience can be improved by planned investments to upgrade system components or speed up restoration. The benefits that these investments would have had if they had been made in the past can be quantified by “rerunning history” with the effects of the investment included, and then recalculating the large event risk to find the improvement in resilience. An example using utility data shows a 2% reduction in the probability of a large cost event due to 10% wind hardening and 6%–7% reduction due to 10% faster restoration in two different areas of a distribution utility. This new data-driven approach to quantify resilience and resilience investments is realistic and much easier to apply than complicated approaches based on modeling all the phases of resilience. Moreover, an appeal to improvements to past lived experience may well be persuasive to customers and regulators in making the case for resilience investments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recovery Simulator and Analysis Formulation: Mathematical Framework for Enhanced Resilience and Resource Allocation

This report introduces recovery simulator and analysis (RSA), a framework aimed at enhancing the resilience of electrical grids post-disruption. The RSA model leverages an optimization problem formulation that focuses on maximizing the load served (or optionally customers served) through a coordinated and cooptimized recovery of non-black start generation, transmission lines, feeders and substations subject to labor budget constraints. By integrating advanced linear programming techniques, the simulator selects efficient reocovery pathways, optimizing both short-term and long-term grid recovery strategies. The mathematical framework guides decision-making through a comprehensive evaluation of potential recovery actions, factoring in the trade-offs between labor constraints and load (or optionally customer) restoration efficacy. This enables grid operators to simulate diverse outage scenarios and delineate optimal recovery pathways, thereby prioritizing critical repair tasks and ensuring resource allocation is both economical and effective. The intended use case of RSA is to allow planners to explore many recovery scenarios quickly and determine assets most critical across a wide range of scenarios, and therefore strong candidates for hardening or additional investment. RSA might also be used in an operational setting, following a single event, for exploring efficient recovery pathways.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution System Blackstart and Restoration Using DERs and Dynamically Formed Microgrids

Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids (MGs), sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated MGs. In DERs-aided blackstart, the continuous operation of these MGs is limited by the finite energy capacity of commonly used blackstart units like battery energy storage (BES)-based gridforming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between dynamic MGs and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition is developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottomup blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. In conclusion, the proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic Microgrid Scheduling With Chance‐Constrained Resilience Consideration

Traditionally, it is assumed that microgrids transition seamlessly from grid‐connected operation to islanded mode in the event of sudden main grid outages. In reality, the islanding process, especially unintentional islanding, is rarely seamless. Instead, it is subject to voltage and frequency fluctuations caused by the instantaneous disconnection of the point of common coupling (PCC) switch, variations in loads and renewable generation output and even the protection tripping of distributed energy resources (DERs). To mitigate these fluctuations and facilitate a smooth islanding process, we propose a stochastic microgrid scheduling model that incorporates chance‐constrained resilience measures. Specifically, the resilience measure is defined as the probability of successful islanding (PSI), that is, the probability that a microgrid can mitigate the generation‐demand imbalance caused by the disconnection of the PCC switch, variations in load and renewable generation and DER tripping. This measure is modelled using chance constraints. Unlike existing reliability and resilience indices, which typically neglect the possibility of microgrid/DER failure under extreme events and assume their survival while primarily focussing on reducing impact duration or magnitude, the proposed PSI‐based framework explicitly addresses microgrid and DER survival during the islanding transition. The formulated nonlinear chance constraints are approximated using a multiinterval approach and equivalently represented as a mixed‐integer linear programming (MILP) formulation. Case study results validate the proposed method, showing that the PSI estimation error is reduced to less than 8%, compared to approximately 28% with existing methods. Various sensitivity analyses on the DER tripping rate and PSI settings were performed to validate the robustness of the proposed method. In particular, the necessity of accounting for DER tripping in the PSI calculation was demonstrated.

chance constrained optimization↗

Microgrid Conceptual Design Guidebook | 2022

This guide is meant to assist communities – from residents to energy experts to decision makers – in developing a conceptual microgrid design that meets site-specific energy resilience goals. Using the framework described in this guidebook, stakeholders can come together and start to quantify site-specific vulnerabilities, identify the most significant risks to delivery of electricity, and establish electric outage tolerances across the community. In addition to establishing minimum service needs, this framework encourages communities to consider broader sustainability goals and policy constraints and begin to estimate up-front costs associated with the installation of alternative microgrid solutions. The framework guides a community through data collection and a high-level assessment of its needs, constraints, and priorities, prior to engaging engineers, vendors, and contractors. The first sections of this guidebook provide a high-level primer on electric systems. The latter sections include guidance for step-by-step data gathering and analysis of site conditions. The ultimate product resulting from the stepwise approach is a conceptual microgrid design. A conceptual design is defined as an initial design (10%-20% complete) that considers the specific threats, needs, limitations, and investment options for a given location. Going through this exercise and developing the conceptual microgrid design as a community ensures the same community members who will ultimately live with the solution are the developers of its foundational design. Often, these are also the very same people who understand system tolerances and needs the best and are therefore the ideal candidates for establishing these criteria. Especially when it comes to evaluating critical infrastructure, it is the community that best understands the most critical services. The framework is intended to facilitate a systematic approach to planning for resilience and provide a deeper understanding of how to use a framework to make decisions around microgrid solutions. Like many processes where tradeoffs need to be considered, this is often an iterative process. If this guide serves to help educate and empower communities who are beginning the process of deploying a microgrid, it has met the goal of its authors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗