Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Palm”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

666 records · Page 37

Rapid Memory Footprint Access Diagnostics

Footprint and reuse distance measure temporal locality and therefore do not capture the significance of access patterns (spacial locality). A strided access pattern has the largest possible footprint but usually has the best performance. To highlight exposed memory latency, we separate footprint into strided (prefetchable) and irregular (non-prefetchable) access components and calculate the growth rate of each. To rapidly compute these footprint access diagnostics, we present two methods, whole-program and precise. Current footprint analyses can cause 200× or more slowdown with realistic inputs and are therefore impractical. Our whole-program method reduces the overhead to 10% by computing upper bounds, but still yields inter-procedural insight through a call path profile. Our precise method uses additional static analysis and profiling to refine the upper bounds for intra-procedural loop nests. We evaluate our approaches using benchmarks that vary access patterns (strided \vs unpredictable), sparsity (all words in a cache line \vs some), and reuse (varying and repeated accesses per element). Notably, for loop nests with unpredictable accesses, the precise method's accuracy is within 10% of ideal. The whole-program method has sufficient accuracy to diagnose bottlenecks.

data locality, memory footprint, footprint access ↗

Optical Diagnostic Results from the MERIT High-Power Target Experiment

We report on the analysis of data collected from the optical diagnostics of the MERIT experiment which was run at CERN in the fall of 2007. The breakup of the free mercury jet resulting from the impact of intense proton beams from the CERN PS within a magnetic field environment is described.

43 PARTICLE ACCELERATORS↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 17374

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license, granted by the competent authority in this field, which has been the Federal Office of Radiation Protection (BfS) until July 2016 and currently is the Federal Office for the Safety of Nuclear Waste Management (BfE). A first license was granted in 1983 for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) at the interim storage facility in Gorleben. This license was reviewed in 1995. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since that time at each site of an operational NPP storage facilities were licensed and erected. Thus additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow) there are now 12 storage facilities onsite the NPPs. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. The German 'Programme for the safe and responsible management of spent fuel and radioactive waste' expects to take the disposal facility into operation in the year 2050. Thus necessary preparations for interim storage till that time have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and a consulting of the German parliament (Bundestag) is mandatory if inevitable events would require an extension of currently licensed interim storage period. In the year 2016, the regulatory body in Germany was given a new structure. The BfS was formerly competent authority in the field of radiation protection since 1989. It had competencies for ionizing and non-ionizing radiation protection (e.g. mobile phone radiation, high voltage power lines and the effects of electric fields), licensing storage of spent nuclear fuel and as the operator of facilities for final disposal. Now there is a new structure with two Federal Offices (BfS and BfE) and a federal company for final disposal (BGE). The BfE is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF are now granted by this office. The search for a repository site will be coordinated there as well. The site selection, construction and operation of the repository will be in the responsibility of BGE. The parts of the former BfS dealing with recovery of the waste from Asse (a former salt mine used for disposal research) and the construction of the repository Konrad (for low and medium level radioactive waste) will be transferred into that company. It is planned to incorporate the German company for construction and management of waste disposal facilities (DBE) which is owned by the German utilities as well. The BfS will focus on the scientific foundations and further advancement of radiation protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Twenty years of dry interim storage of spent nuclear fuel (SNF) in Germany- History and developments - 15575

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office of Radiation Protection. In 1983 a license to store spent nuclear fuel (SNF) and later expanded for vitrified high level waste (HAW) for the interim storage facility in Gorleben was granted. Dry Interim storage at the NPP sites in its actual form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facility and three central storage facilities have been built. All of these facilities use dry storage in metallic casks. The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years starting with the first cask emplacement. As no opening of the cask is intended during the storage period the condition of the inventory and the cask before loading has to be known in detail. This requires for instance detailed knowledge of the history of the SNF loaded as well as supervision of the manufacturing process of the cask. Within the last twenty years several mishaps influenced the regulatory point of view. During a loading campaign in a boiling water reactor traces of pool water remained in the gasket slot and during the drying procedure crystalline boron salts prevented the required tightness. After that event a long-term experiment was started and is still going on which studies the effects of water and minor damages to the gasket. As well changes in the loading procedure have been introduced. The pressure switch used to monitor the pressure in the space between primary and secondary lid has a self surveillance function. This indicated a malfunction 23 times in the last twenty years. Examinations of all events indicated no systematic failure, but a weak point seems to be the plug-in connection. The manufacturer introduced some modifications to improve the system. Introduction of FEM methods in safety analysis to amend the existing methods of testing allowed a new view on and in the cask safety analysis. Progress in this field is closely connected to the available computing capacity and stipulates experts to ongoing improvement. After expiring of the storage license which will be the case for the first cask loaded in 1992 and stored in Ahaus 2032 an extension or a new license can only be granted if the at this time relevant requirements are met. This will require detailed knowledge about the happenings and accidents during the previous storage period. All experience of the periodic safety assessment (PSA) which started in 2013 and accompanying experiments conducted till now and during the licensed storage time will be needed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perspective of Dry Interim Storage of spent nuclear fuel (SNF) in Germany - 16504

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office of Radiation Protection (BfS). In 1995 a license to store spent nuclear fuel (SNF) and vitrified high level waste (HAW) for the interim storage facility in Gorleben was granted. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facility and three central storage facilities have been built. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2035. During the last two years in Germany preparatory consultations to restart the process towards finding a repository took place, organised by a commission. This commission consists out of members of the scientific community, religious parties, social communities and environmental organizations as well as members of federal states governments and members of the German parliament (Bundestag). Recently the commission decided to extend its working period until summer 2016. Taking this background into account the BfS plans to intensify its research into extended interim storage with respect to potential material degradation leading to interference with safety functions (e.g. neutron shielding material). This includes topics like ageing of gasket materials which are already studied in ongoing experiments (e.g. at the Federal Institute for Materials Research and Testing) as well as studies of long term relaxation processes. Because of the need for transportation towards a repository another important field is the behaviour of the inventory under mechanical loads. For SNF, first calculations showed that because of the lower decay heat load after 60 years due to hydride reorientation the cladding might become much less ductile. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 18137

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office for Safety of Nuclear Waste Management (BfE). In 1995, a license for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) was granted for the interim storage facility in Gorleben. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the nuclear power plant NPP Lingen. Since this time twelve NPPs erected their own storage facilities additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow). In all of these facilities the concept of dry storage in metallic dual purpose casks (DPCs) is implemented. The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. In Germany the decision about a repository site will be taken in the year 2031. To enable the utilities to hand over the SNF and HAW to the repository regime while the current licenses are still valid would require a very fast process licensing and construction of the required facilities at this location. As a delay cannot be excluded, necessary preparations have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and consulting the German parliament (Bundestag) is mandatory if inevitable events would require an extension of the currently licensed interim storage period. The new structure with the Federal Office BfE, and two companies for final disposal 'Bundesgesellschaft fuer Endlagerung' (BGE mbH) and interim storage 'Bundesgesellschaft fuer Zwischenlagerung' (BGZmbH) was established in 2017. The Federal Office for Safety of Nuclear Waste Management (BfE) is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF will be granted by this office. Furthermore, it is the regulator for the repository and will finally grant a license for the German deep geological repository. Site selection and construction and operation of the repository will be the responsibility of BGE. On January 1, 2018, the BGZ will take over all remaining interim storage facilities operating under a license due to article six of the Atomic Energy Act. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Nuclear Waste Management in Germany - Licensing Procedures for storage of SNF and Public Involvement - 19612

According to article 6 of the German Atomic Energy Act (AtG), storage of Spent Nuclear Fuel requires a license. The competent licensing authority in this field is the Federal Office for Safety of Nuclear Waste Management (BfE). According to the Act for selecting a repository site for heat-generating radioactive waste (HAW) (Site Selection Act - StandAG) dating from 2017, BfE has been assigned the task of developing, conducting, and evaluating public participation procedures in the process of site search and selection for a deep geological repository for radioactive waste and SNF. Article 6 AtG applies to interim storage of SNF. If the legally defined licensing conditions by article 6 (2) AtG are met, the storage license applied for has to be granted. For on-site facilities, interim storage has been limited to 40 years. The licensing procedures for interim storage of SNF are carried out in accordance with the general administrative procedural rules. In certain cases due to the Environmental Impact Assessment Act (EIA Act), an EIA has to be carried out. In these cases, a formalized licensing procedure including an involvement of the public is conducted. The Nuclear Licensing Procedure Ordinance (AtVfV) originating from 1977 and reformulated in 1995 defines formalized rules for the public participation procedure which have to be followed strictly. These include a public hearing. The risen objections are evaluated by the licensing authority and taken account of in the licensing decision. The process of repository site selection defined by the StandAG exceeds these formalized procedures significantly: The objective of this process is to achieve a broad social consensus about the site selection procedure and about a repository site that will offer the best possible safety for one million years. Therefore, the process has to be particularly transparent, and involvement of the public - including newly developed forms of public involvement - is an essential part of it. BfE as competent authority in both the fields of repository site search and selection and licensing of interim storage of SNF has recently developed new strategies of involving the public concerning interim storage of SNF. Supplementing the standard licensing procedures, BfE presently informs and involves the public about topical issues regarding the present state and recent developments in the field of interim storage of SNF. Current central topics are for example the return of HAW and MAW from reprocessing of SNF in France and UK as well as perspective longer interim storage periods on the interface with final disposal. Regarding longer interim storage, host communities of interim storage facilities are concerned that interim storage might be extended indefinitely. Additionally, there is a strong fear of transports of radioactive waste and SNF from one place to another. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The MERIT High-Power Target Experiment at the CERN PS.

The MERIT experiment was designed as a proof-of-principle test of a target system based on a free mercury jet inside a 15-T solenoid that is capable of sustaining proton beam powers of up to 4 MW. The experiment was run at CERN in the fall of 2007. We describe the results of the tests and their implications. Plans are being discussed for possible future machines which can deliver proton beams with multi-MW beam powers. A prominent application for these powerful beams will be to produce intense secondary beams suitable for investigating important physics issues. Examples include investigations of rare decay processes and neutrino oscillations. The Neutrino Factory and Muon Collider Collaboration [1] has proposed a target system [2, 3] which will be capable of supporting proton beam powers of 4 MW with the purpose of producing and collecting intense muon beams for eventual use in storage rings. The core of this proposed target system consists of a high-Z, free-flowing liquid mercury jet which intercepts the proton beam within the confines of a high-field (15-20 T) solenoid. An important attribute of this system is that the liquid jet target can be replaced for subsequent proton pulses. The experiment described in this paper was designed to provide a proof-of-principle demonstration of this concept. Preparations for this experiment have been previously reported [4].

43 PARTICLE ACCELERATORS↗

The MERIT(nTOF-11) High Intensity Liquid Mercury Target Experiment at the CERN PS

The MERIT(nTOF-11) experiment is a proof-of-principle test of a target system for a high power proton beam to be used as front-end for a neutrino factory or a muon collider. The experiment took data in autumn 2007 with the fast-extracted beam from the CERN Proton Synchrotron (PS) to a maximum intensity of 30 x 10{sup 12} per pulse. The target system, based on a free mercury jet, is capable of intercepting a 4-MW proton beam inside a 15-T magnetic field required to capture the low energy secondary pions as the source for intense muon beams. Particle detectors installed around the target setup measure the secondary particle flux out of the target and can probe cavitation effects in the mercury jet when excited by an intense proton beam.Preliminary results of the data analysis will be presented here.

43 PARTICLE ACCELERATORS↗

The MERIT (nTOF-11) High Intensity Liquid Mercury Target Experiment at the CERN PS

The MERIT(nTOF-11) experiment is a proof-of-principle test of a target system for a high power proton beam to be used as front-end for a neutrino factory or a muon collider. The experiment took data in autumn 2007 with the fast-extracted beam from the CERN Proton Synchrotron (PS) to a maximum intensity of $30 \times 10^{12}$ per pulse. The target system, based on a free mercury jet, is capable of intercepting a 4-MW proton beam inside a 15-T magnetic field required to capture the low energy secondary pions as the source for intense muon beams. Particle detectors installed around the target setup measure the secondary particle flux out of the target and can probe cavitation effects in the mercury jet when excited by an intense proton beam. Preliminary results of the data analysis will be presented here.

43 PARTICLE ACCELERATORS↗

The MERIT High-Power Target Experiment at the CERN PS

The MERIT experiment was designed as a proof-of-principle test of a target system based on a free mercury jet inside a 15-T solenoid that is capable of sustaining proton beam powers of up to 4 MW. The experiment was run at CERN in the fall of 2007. We describe the results of the tests and their implications.

43 PARTICLE ACCELERATORS↗

The MERIT High-Power Target Experiment at the CERN PS

The MERIT experiment was designed as a proof-of-principle test of a target system based on a free mercury jet inside a 15-T solenoid that is capable of sustaining proton beam powers of up to 4 MW. The experiment was run at CERN in the fall of 2007. We describe the results of the tests and their implications.

43 PARTICLE ACCELERATORS↗

Time Structure of Particle Production in the MERIT High-Power Target Experiment

The MERIT experiment is a proof-of-principle test of a target system for high power proton beam to be used as front-end for a neutrino factory complex or amuon collider. The experiment took data in autumn 2007 with the fast extracted beam from the CERN Proton Synchrotron (PS) to a maximum intensity of about 30 x 10{sup 12} protons per pulse. We report results from the portion of the MERIT experiment in which separated beam pulses were delivered to a free mercury jet target with time intervals between pulses varying from 2 to 700 {micro}s. The analysis is based on the responses of particle detectors placed along side and downstream of the target.

43 PARTICLE ACCELERATORS↗

The MERIT High-Power Target Experiment at the CERN PS

We report on the analysis of data collected in the MERIT experiment at CERN during the Fall of 2007. These results validate the concept of a free mercury jet inside a high-field solenoid magnet as a target for a pulsed proton beam of 4-MW power, as needed for a future Muon Collider and/or Neutrino Factory.

43 PARTICLE ACCELERATORS↗