Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PUBLIC SERVICE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Valuing Resilience for Microgrids: Challenges, Innovative Approaches, and State Needs

The United States depends on the delivery of reliable, affordable, clean, and safe electricity. Electric utilities invest billions of dollars each year in generation, transmission, and distribution assets to meet this need. However, experiences with recent natural disasters of increasing frequency and duration demonstrate the shortcomings of this approach in the face of modern threats. Further, as customers rely on electricity for a broader range of important needs, such as transportation, as well as critical life-saving services and mission critical facilities such as water treatment, medical care, shelters, telecommunications, and more, the need to minimize the likelihood and impacts of outages grows. Against this backdrop, resilience has emerged as a key consideration to guide electricity spending, whether from utilities, customers, or taxpayers. Although reliability has been defined and measured for decades with broadly accepted metrics that measure how many customers lose power and at what frequency and duration, resilience considers the electricity system’s response to a disruption and its subsequent impacts on customers. Developing tools and methods to accurately assess the costs and benefits of resilience investments is a critical step toward the goal of mitigating the impacts of outages on customers and society. Today, electric system resilience is largely treated as an externality due to challenges estimating the costs of long-duration outages, impacts of outages on society, and increasing reliance on electricity for a growing set of interdependent services. These interdependencies include the water, wastewater, telecommunications, natural gas, and health sectors. Without knowing how much a given resilience investment will benefit customers or society more broadly, investors, policymakers, and regulators are less likely to make or approve such investments, and less able to prioritize those investments. State Energy Offices and public utility commissions (PUCs) lead the development of state-level energy policy and utility regulation, respectively, and each has interests in encouraging appropriate public and private investments in resilience. To this end, the National Association of State Energy Officials (NASEO) and National Association of Regulatory Utility Commissioners (NARUC), with the support of the U.S. Department of Energy (DOE) Office of Electricity (OE), formed a joint Microgrids State Working Group to explore the costs and benefits of microgrids, barriers to broader deployment of microgrids to meet resilience and other objectives, and policy and regulatory strategies to optimize investments in resilience, including but not limited to microgrids. Although no universally accepted valuation tool for resilience exists, National Laboratories, utilities, researchers, and state and federal agencies have collaborated to develop, apply, and improve a number of approaches to quantify resilience, several of which are still in progress at the time this report is published. This report seeks to share these important advances by discussing current definitions of resilience (Section 1), how microgrids are defined and used to meet resilience objectives (Section 2), new approaches to valuing resilience (Section 3), steps State Energy Offices and PUCs have taken to further resilience valuation efforts (Section 4), and finally, considerations and suggested next steps for State Energy Offices and PUCs (Section 5). Relevant examples of specific microgrid projects and resilience valuation efforts are included throughout the report. While this report is written specifically for NASEO and NARUC members, it may be useful for utilities, local governments, and individual customers interested in improving the way public and private dollars are spent to achieve resilience outcomes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Department of Energy Office of Legacy Management Progress on Defense-Related Uranium Mines Program - 18119

The Defense-Related Uranium Mines (DRUM) Program provides the structure and basis for the US Department of Energy Office of Legacy Management (LM) to manage the verification and validation (V and V) of defense-related uranium mines (mines) that provided ore to the Atomic Energy Commission from 1947 to 1970. V and V activities are conducted to fully understand the scope of potential problems posed by these mines by determining their location, reclamation or remediation status, and potential impacts to public safety, human health, and the environment. Land management agencies have limited resources and have generally not conducted comprehensive inventories of abandoned uranium mines, thus adding to the need to undertake this program. LM has entered into memoranda of understanding (MOUs) with the US Bureau of Land Management (BLM) and US Forest Service (USFS) to facilitate a better understanding of the scope of the problem posed by these mines. Currently, LM has executed MOUs with the BLM state offices in Colorado, New Mexico, Utah, and Wyoming and the USFS Rocky Mountain Region, which includes the national forests in Colorado, Wyoming, and South Dakota. This collaborative effort with partner agencies has led LM to develop a V and V Work Plan that describes the numerous activities and types of data to be collected at the mines. V and V activities verify actual mine location, collect coordinates of mining-related features, collect radiological data and soil samples, identify potential physical safety hazards, prioritize mines using a risk-based screening approach, and report the information to partner agencies. The partner agencies may use the reports to assess priorities and determine if any further action is warranted. The DRUM Program goals are to: - Improve data quality and content in the LM national inventory of abandoned uranium mines; - Conduct site-specific reconnaissance at mines for data verification and validation; - Exchange mine information with other federal agencies and state governments to help address mines presenting the greatest risks; - Develop reports for each mine that will contain a risk scoring assessment to help each agency develop priorities. The preliminary risk screening methodology was based on a joint effort between LM and BLM to develop factors that would be based on field observations, field data, and laboratory data using a multiple-lines-of-evidence approach. The multiple-lines-of-evidence assessment allows land managers the opportunity and flexibility to query specific criteria and make rankings based on specific priorities. The risk screening for each mine is based on evaluating the primary hazards of physical safety and risks to human health and several modifying factors that include accessibility and ecological/environmental risks. Gamma radiation scans are performed across the disturbed area of the mine, and soil samples are taken from waste rock piles and drainages, when applicable. This paper presents the results of performing inventory, environmental sampling, and risk ranking along with other accomplishments and lessons learned during the initial year of V and V activities and reporting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE JGI Metagenome Workflow

The DOE Joint Genome Institute (JGI) Metagenome Workflow performs metagenome data processing, including assembly; structural, functional, and taxonomic annotation; and binning of metagenomic data sets that are subsequently included into the Integrated Microbial Genomes and Microbiomes (IMG/M) (I.-M. A. Chen, K. Chu, K. Palaniappan, A. Ratner, et al., Nucleic Acids Res, 49:D751–D763, 2021, https://doi.org/10.1093/nar/gkaa939) comparative analysis system and provided for download via the JGI data portal (https://genome.jgi.doe.gov/portal/). This workflow scales to run on thousands of metagenome samples per year, which can vary by the complexity of microbial communities and sequencing depth. Here, we describe the different tools, databases, and parameters used at different steps of the workflow to help with the interpretation of metagenome data available in IMG and to enable researchers to apply this workflow to their own data. We use 20 publicly available sediment metagenomes to illustrate the computing requirements for the different steps and highlight the typical results of data processing. The workflow modules for read filtering and metagenome assembly are available as a workflow description language (WDL) file (https://code.jgi.doe.gov/BFoster/jgi_meta_wdl). The workflow modules for annotation and binning are provided as a service to the user community at https://img.jgi.doe.gov/submit and require filling out the project and associated metadata descriptions in the Genomes OnLine Database (GOLD) (S. Mukherjee, D. Stamatis, J. Bertsch, G. Ovchinnikova, et al., Nucleic Acids Res, 49:D723–D733, 2021, https://doi.org/10.1093/nar/gkaa983).

59 BASIC BIOLOGICAL SCIENCES↗

Vascular flora of the Rocky Flats area, Jefferson County, Colorado, USA

The Rocky Flats Site (Site) is a U.S. Department of Energy (DOE) facility near Golden, Colorado that produced nuclear weapons components during the Cold War. Like many federal properties that have been off-limits to public access for decades, it has become a refugia for biodiversity as surrounding landscapes have been lost to agriculture and urbanization. A floristic study of the area was conducted on approximately 2,505 ha (6,189 ac) and includes the parcels currently managed and operated by DOE and the U.S. Fish and Wildlife Service (Rocky Flats National Wildlife Refuge). A flora of 630 species of vascular plants in 84 families and 340 genera was documented, including 12 species endemic to the southern Rocky Mountains and seven species considered rare or imperiled by the Colorado Natural Heritage Program. The flora of the Site is characterized by a predominantly Western North American floristic element, however, an Adventive floristic element contributes the greatest number of species. The vegetation is dominated by xeric tallgrass prairie and mixed grass prairie, with areas of wetland, shrubland, and riparian woodland.

54 ENVIRONMENTAL SCIENCES↗

Pipelining RDP Data to the "Taxomatic" (Final Report)

This project builds on the results of previously funded research by integrating data and software that had been previously used in building resources used in the preparation of Bergey's Manual of Systematic Bacteriology, 2 nd Edition (Volumes 1 & 2A-C) and the Ribosomal Database Project-II (RDP-II) so as to both enhance the value of the data and create a pipeline approach to keeping the data current. Earlier, we demonstrated the value of using exploratory data analysis (EDA) to visualize large sets of sequence data (notably SSU rRNA gene sequences used in constructing a comprehensive phylogeny of prokaryotes. While the Self- Organizing Self-Correcting Classification (SOSCC) algorithms we developed were computationally efficient and useful for unraveling problems within the underlying data (e.g., identification of annotation errors, detection of unresolved synonymies, taxonomic and nomenclatural errors), bottlenecks at the preprocessing stage limited deployment of our applications as tools for end-users. To overcome the bottlenecks (which included hand alignment and computation of large matrices of pair-wise evolutionary distances), we proposed building a data pipeline between the "Taxomatic" application and RDP-II. The objectives were to accelerate the production and distribution of the updated versions of the prokaryotic taxonomy in lock-step with publication of new taxa and rearrangement of existing taxa, and to distribute these data more readily with the RDP-II and and other stakeholders in the community. A related goal of the current project is to deploy our visualization techniques as an interactive web application by which end-users can view manipulate, and select datasets of particular interest based upon phylogenetic and genomic information, access sequence data, and ultimately the scientific literature where the original observations were made and those that build on the original observations. The Taxomatic is a web-based tool to visualize distance matrices. The tool accepts raw distance matrices or aligned sequence information as data sources. When sequence information is provided the distance matrix is computed using the uncorrected distance model. Users can upload files to the Taxomatic website or sequences can be submitted by a SOAP service. This SOAP service is used by RDP to streamline Taxomatic use with RDP data. In addition to supplying source information, users can either supply their own taxonomic information by uploading it in XML, retrieve data taxonomic information from the RDP using either RDP or Genbank identifiers as source data, with or without classification by the RDP Classifier web service, or completely omit taxonomic data. In the latter case, the input distance matrix can be viewed in the order in which it was loaded.

59 BASIC BIOLOGICAL SCIENCES↗

Key performance metrics for clean energy application centers: fiscal year 2011

The U.S. Department of Energy (DOE) funds nine Clean Energy Application Centers (CEACs) that promote and assist in transforming the market for Combined Heat and Power (CHP), waste heat to power, and district energy (DE) technologies and concepts throughout the United States. The key services provided by the CEACs are market assessments, education and outreach, and technical assistance. There are eight regional centers that serve specific areas of the country and a separate center operated by the International District Energy Association (IDEA) which supports the regional centers with technical assistance related to district energy and provides education, training, publicity, and outreach about that technology.

Clean Energy Application Centers↗

Integration of equitable resilience metrics into climate-informed electric utility planning processes: phase one

Working together, Sandia National Laboratories, Southern California Edison (SCE) - an Investor-Owned Utility (IOU) - and the California Public Utilities Commission (CPUC) are studying how electric utilities can use equity and resilience metrics to help inform the prioritization and sequencing of resilience-driven infrastructure investments. To this end, this project evaluated “Social Burden,” an equitable resilience metric which measures the potential impact of disruptions in access to non-electric critical services on people and estimates community resilience to these disruptions. The Social Burden was expanded to incorporate SCE’s existing equity metric and applied to evaluate the potential impacts from a range of climate-informed hypothetical outage scenarios developed under SCE’s 2022 Climate Adaptation Vulnerability Assessment. One baseline (“blue-sky”) state and eight different outage scenarios were evaluated to measure the potential impacts of the outages on non-electric infrastructure, critical services, and people. Key findings include: 1) the Social Burden framework is flexible enough to adapt to and build upon existing utility equity and/or resilience metrics, 2) Social Burden results highlight the high degree of non-electric service redundancy within the SCE service area with most (6/8) hypothetical outage scenarios predicted to increase people’s Social Burden by less than 10%; however, 3) access to critical services and people’s ability to obtain them is unequal and spatially clustered, meaning that there are some hypothetical outage scenarios (2/8) that will exert a higher toll on communities directly experiencing the outage as well as some nearby communities with pre-existing vulnerabilities. The report concludes with recommendations for potential use cases of the expanded Social Burden metric and identifies priority follow-on work. Potential use cases may include incorporating equity into IOU’s prioritization of climate resilience investments. Additionally, Social Burden analysis may provide additional data and insights to augment grid planning, potentially by identifying additional needs and/or prioritizing previously identified needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

BASIN-3D Data Integration for Selected ARM Data Field Campaign Report

The purpose of this data services request was to demonstrate integration of the Atmospheric Radiation Measurement (ARM) User Facility’s “met” datastreams with time series data from other earth science data sources using the BASIN-3D data synthesis software tool. BASIN-3D is an open-source Python library that enables researchers to integrate data across configured public and private data sources. It provides a common query language for researchers to request measurement locations and time series data based on specified locations, variables, time period, statistics, aggregation, and data quality. BASIN-3D acquires the data that match the query from each configured data source and translates the results into harmonized vocabularies, thus reducing researchers' data-wrangling effort. In addition, because the queries are executed on demand, researchers can easily regenerate their synthesized data sets as new data and/or data updates become available, eliminating one-off data products. BASIN-3D can output data using a variety of different data structures for end-user applications including Python pandas data frames and hdf5 output formats.

54 ENVIRONMENTAL SCIENCES↗

Comparative Survival Study (CSS) of PIT-Tagged Spring/Summer Chinook and Summer Steelhead : 2008 Annual Report.

The Comparative Survival Study (CSS; BPA Project 199602000) began in 1996 with the objective of establishing a long term dataset of the survival rate of annual generations of salmon from their outmigration as smolts to their return to freshwater as adults to spawn (smolt-to-adult return rate; SAR). The study was implemented with the express need to address the question whether collecting juvenile fish at dams and transporting them downstream in barges and trucks and releasing them downstream of Bonneville Dam was compensating for the effect of the Federal Columbia River Power System (FCRPS) on survival of Snake Basin spring/summer Chinook salmon migrating through the hydrosystem. The Completion of this annual report for the CSS signifies the 12th outmigration year of hatchery spring/summer Chinook salmon marked with Passive Integrated Transponder (PIT) tags as part of the CSS and the 9th complete brood year return as adults of those PIT-tagged fish (report covers adult returns from 1997-2006 hatchery Chinook juvenile migrations). In addition, the CSS has provided PIT-tags to on-going tagging operations for wild Chinook since 2002 (report covers adult returns from 1994-2006 wild Chinook juvenile migrations). The CSS tags wild steelhead on the lower Clearwater River and utilized wild and hatchery steelhead from other tagging operations in evaluations of transportation (report covers adult returns from 1997-2005 wild and hatchery steelhead migrations). The primary purpose of this report is to update the time series of smolt-to-adult survival rate data and related parameters with additional years of data since the completion of the CSS 10-yr retrospective analysis report (Schaller et al 2007). The 10-yr report provided a synthesis of the results from this ongoing study, the analytical approaches employed, and the evolving improvements incorporated into the study as reported in CSS annual progress reports. This current report specifically addresses the constructive comments of the most recent regional technical review conducted by the Independent Scientific Advisory Board and Independent Scientific Review Panel (ISAB and ISRP 2007). This report completes the 3-salt returns from migration years 2004 for wild and hatchery Chinook and steelhead (all returns are to Lower Granite Dam). For wild and hatchery Chinook, this report also provides 3-salt returns from migration year 2005 and 2-salt returns from migration year 2006 through a cutoff date of August 13, 2008. For wild and hatchery steelhead, it provides completed 2-salt returns for wild and hatchery steelhead that outmigrated in 2005 (any 3-salt returns of PIT-tagged steelhead are few, but will occur after July 1, 2008). All of the Chinook salmon evaluated in the CSS study exhibit a stream-type life history. All study fish used in this report were uniquely identifiable based on a PIT-tag implanted in the body cavity during (or before) the smolt life stage and retained through their return as adults. These tagged fish can then be detected as juveniles and adults at several locations of the Snake and Columbia rivers. Reductions in the number of individuals detected as the tagged fish grow older provide estimates of survival. This allows comparisons of survival over different life stages between fish with different experiences in the hydrosystem (e.g. transportation vs. in-river migrants and migration through various numbers of dams) as illustrated in Figure 1.1. The CSS is a long term study within the Northwest Power and Conservation Council's Columbia Basin Fish and Wildlife Program (NPCC FWP) and is funded by Bonneville Power Administration (BPA). Study design and analyses are conducted through a CSS Oversight Committee with representation from Columbia River Inter-Tribal Fish Commission (CRITFC), Idaho Department of Fish and Game (IDFG), Oregon Department of Fish and Wildlife (ODFW), U.S. Fish and Wildlife Service (USFWS), and Washington Department of Fish and Wildlife (WDFW). The Fish Passage Center (FPC) coordinates the PIT-tagging efforts, data management and preparation, and CSSOC work. The location of all tagging sites is identified in Figures 1.2 and 1.3. All draft and final written work products are subject to regional technical and public review and are available electronically on FPC and BPA websites: FPC: http://www.fpc.org/documents/CSS.html; and BPA: http://www.efw.bpa.gov/searchpublications/index.aspx?projid.

13 HYDRO ENERGY↗

The Journal of Open Source Software (JOSS): Bringing Open-Source Software Practices to the Scholarly Publishing Community for Authors, Reviewers, Editors, and Publishers

Open-source software (OSS) is a critical component of open science, but contributions to the OSS ecosystem are systematically undervalued in the current academic system. The Journal of Open Source Software (JOSS) contributes to addressing this by providing a venue (that is itself free, diamond open access, and all open-source, built in a layered structure using widely available elements/services of the scholarly publishing ecosystem) for publishing OSS, run in the style of OSS itself. A particularly distinctive element of JOSS is that it uses open peer review in a collaborative, iterative format, unlike most publishers. Additionally, all the components of the process—from the reviews to the papers to the software that is the subject of the papers to the software that the journal runs—are open. We describe JOSS’s history and its peer review process using an editorial bot, and we present statistics gathered from JOSS’s public review history on GitHub showing an increasing number of peer reviewed papers each year. We discuss the new JOSSCast and use it as a data source to understand reasons why interviewed authors decided to publish in JOSS. JOSS’s process differs significantly from traditional journals, which has impeded JOSS’s inclusion in indexing services such as Web of Science. In turn, this discourages researchers within certain academic systems, such as Italy’s, which emphasize the importance of Web of Science and/or Scopus indexing for grant applications and promotions. JOSS is a fully diamond open-access journal with a cost of around US$\$$5 per paper for the 401 papers published in 2023. The scalability of running JOSS with volunteers and financing JOSS with grants and donations is discussed.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Hydrogenerate: Open Source Python Tool To Estimate Hydropower Generation Time-series

Hydropower is one of the most mature forms of renewable energy generation. The United States (US) has almost 103 GW of installed, with 80 GW of conventional generation and 23 GW of pumped hydropower [1]. Moreover, the potential for future development on Non-Powered Dams is up to 10 GW. With the US setting its goals to become carbon neutral [2], more renewable energy in the form of hydropower needs to be integrated with the grid. Currently, there are no publicly available tool that can estimate the hydropower potential for existing hydropower dams or other non-powered dams. The HydroGenerate is an open-source python library that has the capability of estimating hydropower generation based on flow rate either provided by the user or received from United States Geological Survey (USGS) water data services. The tool calculates the efficiency as a function of flow based on the turbine type either selected by the user or estimated based on the “head” provided by the user.

Mitra, Bhaskar↗

Development of hybrid 3-D hydrological modeling for the NCAR Community Earth System Model (CESM)

This is the Final Report of our four-year (3-year plus one-year no cost extension) collaborative project between the University of Arizona (UA) and the National Center for Atmospheric Research (NCAR). The overall objective of our project is to develop and evaluate the first hybrid 3-D hydrological model with a horizontal grid spacing of 1 km for the NCAR Community Earth System Model (CESM). We have made substantial progress in model development and evaluation, computational efficiencies and software engineering, and data development and evaluation, as discussed in Sections 2-4. Section 5 presents our success in data dissemination, while Section 6 discusses the scientific impacts of our work. Section 7 discusses education and mentoring success of our project, while Section 8 lists our relevant DOE services. All peer-reviewed papers that acknowledged this project are listed in Section 9. Highlights of our achievements include: • We have finished 20 papers (most published already) on model development and evaluation, computational efficiencies and software engineering, and data development and evaluation • The global datasets developed under this project have been permanently archived and publicly available • Some of our research results have already been implemented in WRF and CLM • Patrick Broxton and Michael Brunke have received their Ph.D. • PI Zeng has served on DOE proposal review panels and DOE lab scientific focus area (SFA) review panels

58 GEOSCIENCES↗

Energy End-Use Patterns in Full-Service Hotels: A Case Study

The U.S. Department of Energy (DOE) recently initiated a program -- Commercial Building Partnerships (CBP) -- to work with private-sector companies in the design of highly-efficient retrofit and new construction projects. Pacific Northwest National Laboratory (PNNL) is conducting a project with a major hotel company to retrofit a full-service, large hotel with the goal of reducing energy consumption by at least 30%. The first step of the project was an intensive metering and monitoring effort aimed at understanding energy end use patterns in the hotel. About 10% of the guest rooms (32), as well as circuits for most of the end uses in public spaces (lighting, elevators, air handlers and other HVAC system components, and various equipment), were equipped with meters. Data are being collected at 1- or 5-minute intervals and downloaded on a monthly basis for analysis. This paper presents results from the first four months of the monitoring effort, which revealed energy end-use consumption patterns, variability of guest room energy use, daily load curves, monthly variations, and other aspects of hotel energy use. Metered end-use data for hotels at this level of detail are not available from any currently-available public sources. This study presents unique information and insight into energy end-use patterns in the lodging sector of commercial buildings and can also serve as a case study of a complex sub-metering project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DESC DC2 Data Release Note

In preparation for cosmological analyses of the Vera C. Rubin Observatory Legacy Survey of Space and Time (LSST), the LSST Dark Energy Science Collaboration (LSST DESC) has created a 300 deg$^2$ simulated survey as part of an effort called Data Challenge 2 (DC2). The DC2 simulated sky survey, in six optical bands with observations following a reference LSST observing cadence, was processed with the LSST Science Pipelines (19.0.0). In this Note, we describe the public data release of the resulting object catalogs for the coadded images of five years of simulated observations along with associated truth catalogs. We include a brief description of the major features of the available data sets. To enable convenient access to the data products, we have developed a web portal connected to Globus data services. We describe how to access the data and provide example Jupyter Notebooks in Python to aid first interactions with the data. We welcome feedback and questions about the data release via a GitHub repository.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

10 CFR 851, Worker Safety & Health Program↗

Data publication with the structural biology data grid supports live analysis

Access to experimental X-ray diffraction image data is fundamental for validation and reproduction of macromolecular models and indispensable for development of structural biology processing methods. Here, we established a diffraction data publication and dissemination system, Structural Biology Data Grid (SBDG; data.sbgrid.org), to preserve primary experimental data sets that support scientific publications. Data sets are accessible to researchers through a community driven data grid, which facilitates global data access. Our analysis of a pilot collection of crystallographic data sets demonstrates that the information archived by SBDG is sufficient to reprocess data to statistics that meet or exceed the quality of the original published structures. SBDG has extended its services to the entire community and is used to develop support for other types of biomedical data sets. In conclusion, it is anticipated that access to the experimental data sets will enhance the paradigm shift in the community towards a much more dynamic body of continuously improving data analysis.

59 BASIC BIOLOGICAL SCIENCES↗