Director: Sebastian Bawab. The helium purification system at Jefferson Lab is approaching the end of its design life. Its capacity no longer meets the facility's capacity requirements and consequently, a new system is needed. Several improvements were incorporated into the new purifier design to include extended cycle time, minimum space usage, and convenient placement of components from both safety and maintenance aspects. The purifier design has been completed and the resulting design documentation has been signed and submitted to the Jefferson Lab cryogenic fabrication group. In general, helium purification systems use both a molsieve bed and a carbon bed for purification process. Their function is to remove the contaminants, such as air (moisture, nitrogen, and oxygen) from the helium that enter the system process helium during operations. For continuous operation, usually two sets of purifiers are required, one on-line while the other is being regenerated. Each purification system also contains a nitrogen boiler and a heat exchanger to maintain the temperature of the carbon bed at 80 K (Kelvin) and to minimize liquid nitrogen (LN2) use. The helium purification system at Spallation Neutron Source (SNS) in Oak Ridge, TN, also designed by Jefferson Lab, served as a model for the new system at Jefferson Lab due to similar requirements. However, space restrictions at Jefferson Lab necessitated design modification and re-examination of the beds' capacity. When both the carbon and molsieve beds were the same size (for economical reasons), the life of the molsieve bed was calculated to be longer than the life of the carbon bed for the given contamination level. The design was centered on the limited space and also to make the valves and components easily accessible for the purifier operation. To reduce heat leak from the surroundings and to maintain the carbon bed temperatures at 80 K and to minimize the LN2 usage, a heat exchanger, nitrogen boiler, piping, and miscellaneous items were encased in a vacuum shell. To allow for the flexibility requirements of the piping for the various operating processes, the piping is designed with additional bends and/or length of piping or flex hoses as required. In addition flex hoses were also used to simplify the fabrication process. The beds were designed, fabricated, tested, and inspected to conform to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section VIII, Rules for Construction of Pressure Vessels. The piping system requirements for design, fabrication, testing and inspection were also made to conform to the ASME Code B31.3, Process Piping. All other design choices were based on sound engineering practices.