Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Rationale for Mars Rover/Sampler Return mission

A Mars Rover/Sample Return (MRSR) mission is currently being studied for the late 1990's. The objectives of the mission are to better understand the origin and evolution of Mars, to search for evidence of former life, and to improve the knowledge of the Martian environment in preparation for subsequent human exploration. Having formed in a different part of the Solar System from Earth, Mars will provide clues that will better enable the discrimination between conflicting theories of Solar System formations. Mars is also a natural laboratory on which a wide range of geologic and meteorological processes have operated under conditions very different from those on Earth. Samples are needed so that the full range of analytical techniques available here on Earth can be applied to the study of these issues. The rover provides the mobility needed to access different materials, and can be equipped with an analytical capability so that the planet can be sampled intelligently. The rover will also provide the means of exploring the planet on a human scale and performing a wide range of in situ measurements at different locations. Different mission scenarios are currently being studied with the goal of achieveing sample return before the end of the century.

Carr, Michael H.↗

Mars 94 Mission: Current plans and science

The Soviet Space Program proposes large-scale investigations of Mars as one of the most important trends for the next 10 to 15 years. The objectives include global studies of the surface of Mars, its atmosphere, and the return of soil samples to Earth. The first stage of the program is to be implemented in the mid-90s. It includes measurements from an orbiter and a balloon in the atmosphere and on the surface from a rover as well. This can be done using the high energy upper stage of the launch vehicle. The payload mass could amount to about 1500 to 1700 kg. The capabilities of the Mars Mission in 1994 are discussed. As presently planned, Mars will be studied concurrently with the following facilities: an orbiter with instruments for remote sensing from a polar orbit; a balloon deployed in the Martian atmosphere; a rover on the surface; a network of smaller stations on the surface; a subsatellite; and a device to return a container with photo films of the Martian surface taken with a super high resolution. If the exploration of Mars with the MARS-94 spacecraft begins late in 1994 the American Mars-Observer will still be functioning in the near-Mars orbit. Thus, joint operation of the two satellites becomes possible providing coordinated exploration, the creation of joint data banks, joint data interpretation, and the development of a joint engineering model of Mars for its further exploration. There is an opportunity for experiments and instrumentation on the Soviet missions that address questions of interest to exobiology. American scientists are invited to participate in the upcoming Soviet missions, and lend expertise to further understanding of the relationship between the physical and chemical evolution of the solar system and the appearance of life.

Mukhin, Lev↗

The Preparation for and Execution of Engineering Operations for the Mars Curiosity Rover Mission

The Mars Science Laboratory Curiosity Rover mission is the most complex and scientifically packed rover that has ever been operated on the surface of Mars. The preparation leading up to the surface mission involved various tests, contingency planning and integration of plans between various teams and scientists for determining how operation of the spacecraft (s/c) would be facilitated. In addition, a focused set of initial set of health checks needed to be defined and created in order to ensure successful operation of rover subsystems before embarking on a two year science journey. This paper will define the role and responsibilities of the Engineering Operations team, the process involved in preparing the team for rover surface operations, the predefined engineering activities performed during the early portion of the mission, and the evaluation process used for initial and day to day spacecraft operational assessment.

Mars↗

Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team

Personnel representing several NASA field centers have formulated a "Reference Mission" addressing human exploration of Mars. This report summarizes their work and describes a plan for the first human missions to Mars, using approaches that are technically feasible, have reasonable risks, and have relatively low costs. The architecture for the Mars Reference Mission builds on previous work of the Synthesis Group (1991) and Zubrin's (1991) concepts for the use of propellants derived from the Martian Atmosphere. In defining the Reference Mission, choices have been made. In this report, the rationale for each choice is documented; however, unanticipated technology advances or political decisions might change the choices in the future.

Stephen J Hoffman↗

Mars Observer mission plan

The paper describes plans devised for operating the Mars Observer mission during its five phases of activity: the launch, the cruise, the orbit insertion, the mapping, and the Mars 1994 support. The latter phase is to provide a data relay for a Sovier mission to Mars which will be launched in 1994. These plans will be used to plan detailed sequencing strategies for the Mars Observer mission. The low-altitude orbit and a full Martian year of observations will provide, both in temporal and spatial coverage and resolution, the most comprehensive study of an extraterrestrial planet to date.

Blume, William H.↗

In-Situ Mosaic Production at JPL/MIPL

Multimission Image Processing Lab (MIPL) at JPL is responsible for (among other things) the ground-based operational image processing of all the recent in-situ Mars missions: (1) Mars Pathfinder (2) Mars Polar Lander (3) Mars Exploration Rovers (MER) (4) Phoenix (5) Mars Science Lab (MSL) Mosaics are probably the most visible products from MIPL (1) Generated for virtually every rover position at which a panorama is taken (2) Provide better environmental context than single images (3) Valuable to operations and science personnel (4) Arguably the signature products for public engagement

Multimission Image Processing Lab (MIPL)↗

In-Space Assembly Capability Assessment for Potential Human Exploration and Science Applications

Human missions to Mars present several major challenges that must be overcome, including delivering multiple large mass and volume elements, keeping the crew safe and productive, meeting cost constraints, and ensuring a sustainable campaign. Traditional methods for executing human Mars missions minimize or eliminate in-space assembly, which provides a narrow range of options for addressing these challenges and limits the types of missions that can be performed. This paper discusses recent work to evaluate how the inclusion of in-space assembly in space mission architectural concepts could provide novel solutions to address these challenges by increasing operational flexibility, robustness, risk reduction, crew health and safety, and sustainability. A hierarchical framework is presented to characterize assembly strategies, assembly tasks, and the required capabilities to assemble mission systems in space. The framework is used to identify general mission system design considerations and assembly system characteristics by assembly strategy. These general approaches are then applied to identify potential in-space assembly applications to address each challenge. Through this process, several focus areas were identified where applications of in-space assembly could affect multiple challenges. Each focus area was developed to identify functions, potential assembly solutions and operations, key architectural trades, and potential considerations and implications of implementation. This paper helps to identify key areas to investigate were potentially significant gains in addressing the challenges with human missions to Mars may be realized, and creates a foundation on which to further develop and analyze in-space assembly concepts and assembly-based architectures.

Jefferies, Sharon A.↗

Trade Space Analyses: Balancing Crew and Mission Design Parameters-Candidate Mars Master Task List

In 2020, the Associate Administrator for Human Exploration and Operations and the Agency’s Federated Board requested an assessment to develop a methodology for trade space analysis comparing crew size for Mars missions against mission design parameters. The NASA Engineering and Safety Center (NESC) conducted an assessment to develop a methodology for systematic, repeatable trade space analysis for crew size and developed an initial set of human performance models and a list of candidate crew tasks for NASA’s first mission to Mars. This report contains list of candidate crew tasks for Mars.

Crew Duties and Tasks↗

Planetary protection implementation on future Mars lander missions

A workshop was convened to discuss the subject of planetary protection implementation for Mars lander missions. It was sponsored and organized by the Exobiology Implementation Team of the U.S./Russian Joint Working Group on Space Biomedical and Life Support Systems. The objective of the workshop was to discuss planetary protection issues for the Russian Mars '94 mission, which is currently under development, as well as for additional future Mars lander missions including the planned Mars '96 and U.S. MESUR Pathfinder and Network missions. A series of invited presentations was made to ensure that workshop participants had access to information relevant to the planned discussions. The topics summarized in this report include exobiology science objectives for Mars exploration, current international policy on planetary protection, planetary protection requirements developed for earlier missions, mission plans and designs for future U.S. and Russian Mars landers, biological contamination of spacecraft components, and techniques for spacecraft bioload reduction. In addition, the recent recommendations of the U.S. Space Studies Board (SSB) on this subject were also summarized. Much of the discussion focused on the recommendations of the SSB. The SSB proposed relaxing the planetary protection requirements for those Mars lander missions that do not contain life detection experiments, but maintaining Viking-like requirements for those missions that do contain life detection experiments. The SSB recommendations were found to be acceptable as a guide for future missions, although many questions and concerns about interpretation were raised and are summarized. Significant among the concerns was the need for more quantitative guidelines to prevent misinterpretation by project offices and better access to and use of the Viking data base of bioassays to specify microbial burden targets. Among the questions raised were how will the SSB recommendations be integrated with existing Committee on Space Research (COSPAR) policy and how will they apply to and affect Mars '94, Mars '96, MESUR Pathfinder, and MESUR Network missions? One additional topic briefly considered at the workshop was the identification of some issues related to planetary protection considerations for Mars sample return missions. These issues will form the basis for a follow-on joint U.S./Russian workshop on that subject.

Howell, Robert↗

Strategic Implications of Phobos as a Staging Point for Mars Surface Missions

As human exploration endeavors begin to set sights beyond low Earth orbit to the surface of the Moon, exploration of the surface of Mars continues to serve as the “horizon destination” to help focus development and research efforts. One Mars exploration strategy often discussed is the notion of utilizing the moons of Mars, namely Phobos, as an exploration destination prior to Mars surface missions. The premise behind this is that staging missions from Mars’ moons as well as exploring the moons themselves would be less costly and risky. However, understanding potential advantages of Phobos staging and exploration must be done in the context of the overall end-to-end Mars surface exploration needs, goals, objectives, campaign approach, and systems required. This paper examines the strategic implications of utilizing the moons of Mars as a potential location for exploration of Mars. Operational concepts utilizing both Phobos and Mars orbital strategies will be examined to understand the architectural impacts of this staging strategy. The strategic implications of each operational concept are assessed to determine the overall key challenges and strategic links to other exploration destinations. Results from this analysis indicate that, if the objective is to conduct Mars surface missions, utilizing Phobos as an exploration destination adds little benefit toward the goal of exploration of Mars.

Drake, Bret G.↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Mars Observer mission

The salient features of the Mars Observer mission are overviewed. Special attention is given to the science objectives of the mission, the spacecraft design, the mapping orbit to be used, and the mission operations. The mission is to be launched in August 1993 and, after four months of trim maneuvers, will come into a low-altitude circular orbit where it will make systematic measurements of the atmosphere, the surface, and the interior of Mars.

Albee, A. L.↗

Liquid Rocket Propulsion for Atmospheric Flight in the Proposed ARES Mars Scout Mission

Flying above the Mars Southern Highlands, an airplane will traverse over the terrain of Mars while conducting unique science measurements of the atmosphere, surface, and interior. This paper describes an overview of the ARES (Aerial Regional-scale Environmental Survey) mission with an emphasis on airplane propulsion needs. The process for selecting a propulsion system for the ARES airplane is also included. Details of the propulsion system, including system schematics, hardware and performance are provided. The airplane has a 6.25 m wingspan with a total mass of 149 kg and is propelled by a bi-propellant liquid rocket system capable of carrying roughly 48 kg of MMH/MON3 propellant.

Kuhl, Christopher A.↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Aerobraking at Mars: The MGS Mission

The Mars Global Surveyor (MGS) mission, scheduled for launch in November 1996, will employ aerobraking as a means of reaching a low altitude, sun-synchronous mapping orbit. This technique is necessary to minimize the cost of the mission. The dry mass of the spacecraft and the launch vehicle capability do not permit an all-propulsive transfer to the desired orbit. Aerobraking concepts are discussed.

Mars↗

Mars Reconnaissance Orbiter Navigation Strategy for Support of Mars 2020 Mission's Entry, Descent and Landing Sequence

The Mars Reconnaissance Orbiter provided primary relay support during the Mars 2020 mission’s entry, descent, and landing sequence on February 18, 2021. To position the orbiter for relay support during this sequence, two propulsive maneuvers were performed: the first on September 2, 2020 and the second on January 20, 2021. This paper documents the maneuver strategy developed by the navigation team for positioning the Mars Reconnaissance Orbiter to within phasing requirements to support the Mars 2020 mission during landing and provides details on how well those phasing requirements were met.

Woollands, Robyn M.↗