Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Sellafield Plan - 12458

The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear missions in West Cumbria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Contamination Tenacity on Building Substrate - 17417

Radiological decontamination is an essential enterprise that has become more important over the last four decades due to unfortunate accidents and the threat of terrorist actions. Decontamination can be an effective, beneficial alternative for the cleanup of radiological contamination events; however, the costs and benefits need to be balanced against those for complete removal and demolition of contaminated areas or facilities. Demolition and removal are often the first options considered in such circumstances as decontamination may be thought of as slow and costly. Decontamination has advantages, including significant waste reduction over demolition. In areas with buildings of cultural or societal importance, demolition may not be an option. Three decontamination evaluation test series are the focus of this article: SIMCON 1 and 2 (i.e., simulated contamination), and Urban RDD (radiological dispersal device, i.e., a dirty bomb detonation). These test series revealed that different contaminants respond differently during decontamination. This was found to be true with both SIMCON and Urban RDD simulant tests. SIMCON 2 especially demonstrated that chemically different contaminants respond differently to different decontamination methods: cesium appears to be less tenacious (more easily removed) than zirconium using chemical methods. These differences were underscored by the Urban RDD tests where americium and cobalt tended to precipitate on high pH surfaces (such as concrete), making them easier to remove, while cesium and strontium were essentially unaffected by surface pH and were imbibed more strongly into the substrate pore structure. While authorities argue over the contributions of contaminant chemistry and substrate morphology, the clear answer is that each has a contribution to the tenacity of a contaminant. Knowing how these characteristics interact will make us better at decontamination in the field. This knowledge refutes the efforts of perhaps well-meaning marketers to define our decontamination problems by what products they are trying to sell; often a 'one size fits all' type approach. Knowing even a little bit about the character of the decontamination problem will save time and money and increase the efficacy of decontamination. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biofuel Air Emissions Analysis

U.S. has goals to produce 3 billion gallons of sustainable aviation fuel (SAF) annually by 2030, increasing to 35 billion gallons by 2050 to decarbonize the aviation sector. Meeting these production targets will require large number of biorefineries to be set up. However, ability to comply with federal air quality standards is prerequisite to being issued a construction permit. Negotiating the permitting process for a new biorefinery can be quite onerous and cost the investors significant time and money. Although there can be numerous reasons for delayed biorefinery construction, air permitting is fraught with pitfalls because the permitting process relies on precedence, which the future SAF biorefineries lack. NREL's Biofuel Air Emissions Analysis project is unique and innovative in terms of the tools, approaches, and analyses provided. NREL is the only national laboratory that is actively working at the intersection of Federal air quality regulations, emissions and air quality analysis across the supply chain, and process design. This project is focused on providing much needed data and analyses that address biorefinery air permitting. This project develops models and quantitative analyses and measures progress towards meeting air quality regulatory requirements. These models and methods are applied to analyze air permitting related to wastewater sludge to biofuel conversion pathways using hydrothermal liquefaction (HTL), impacts of HTL pathway on local and regional air quality including an assessment of health and equity impacts. In addition to filling research gaps, this project also disseminates the findings to the relevant stakeholders at BETO, other national labs, and regulatory agencies.

air quality↗

An underground laboratory in the context of salt disposal research - 15549

Evaluating the basis of need for an underground research laboratory for salt science and engineering is imperative because of the significant commitment of time and money involved. Decades of salt repository studies, numerous experiments, and sophisticated modeling capabilities underpin the scientific database that supports safe disposal of nuclear waste in salt. The safety case for disposal of non-heat-generating waste such as transuranic waste interred at the Waste Isolation Pilot Plant is robust, with the only long-term releases to the environment projected to be by way of human intrusion. The scientific evidence also favors safe disposal of heat-generating waste. Technical evaluations for disposal of heat-generating waste in salt experienced a rather long hiatus in the United States subsequent to certification of the Waste Isolation Pilot Plant and issuance of the Nuclear Waste Policy Act Amendment that ended salt disposal research for the civilian program. Similar salt repository research in Germany was delayed by a ten-year moratorium that ended in 2010. In collaboration with German peers, the United States Department of Energy has reviewed and evaluated thermally driven processes in salt disposal and identified key technical areas in which to prioritize resources. The goal for disposal research in salt is to provide sufficient technical information to license a repository successfully. The necessity or utility of a salt underground laboratory is to be evaluated in the context of an overall research agenda that supports a license application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brownfields to Brightfields: A Sustainability Initiative at DOE'S East Tennessee Technology Park Cleanup - 16120

As DOE works toward completing their cleanup mission at the East Tennessee Technology Park (ETTP), the ultimate goal is to return property no longer needed for government use to the community for beneficial re-use. The vision for ETTP is to transform the former gaseous diffusion facility into a commercial industrial park, leveraging the site's infrastructure to attract businesses to the site. While hundreds of acres at ETTP have been transferred for re-use, areas within the former production footprint of the site have future use restricted due to the presence of residual contamination, underground structures and utilities and/or physical features that limit their reuse potential. Brownfield redevelopment with solar energy generation has proven to be an excellent option for beneficial reuse and sustainability thanks to the flexible nature of solar photovoltaic technology and design that can address the restrictions and limitations of the site. Developing a solar project on a cleanup site can be challenging due to a large number of stakeholders and regulatory compliance issues of the environmental legacy at DOE cleanup sites; however, the challenges can be offset by the available infrastructure and low cost property. The requirement for large amounts of land or surface area is a major constraint to the growth of photovoltaic solar systems. An average solar generating facility requires 2 or more hectares (5 acres) for each megawatt (MW) of power generated. Re-using land that is otherwise un-developable provides a cost effective site for renewable energy generation to innovative solar developers. At ETTP, DOE's Oak Ridge Office of Environmental Management and the community reuse organization (Community Reuse Organization of East Tennessee - CROET) supported a local small business (Restoration Services, Inc. - RSI) familiar with the site and environmental regulations to secure a power purchase agreement with the regional electric provider (Tennessee Valley Authority - TVA) for a 1 MW utility-scale photovoltaic solar facility. The solar facility, Powerhouse Six, was developed through a commercial partnership (RSI and Vis Solis, Inc.) that worked closely with the lead ETTP site cleanup contractor (URS-CH2M Oak Ridge LLC - UCOR) and the local government. The selected site at ETTP had limitations on subsurface disturbance to 10 feet below ground surface because of utility ducts and residual contamination. Near surface relics (facility foundation remnants) were also found to prohibit ground penetration. A photovoltaic solar design using a ballasted ground mount system was developed to conform to the restrictions. The ballasted system could follow existing land contours, eliminating the need for any extensive site preparation and avoiding the risk of ground penetration. The lead cleanup contractor's role in facilitating the completion of this project included making the necessary environmental assessment documentation available to obtain the construction notice to proceed from the regional electric provider. They accelerated the transfer of ETTP power lines and electric demand to the city electric department to accommodate connection to the electric grid and supplied the communication connection required for metering the electric power generation. DOE's support along with their cleanup contractor's re-industrialization program and power integration group provided regular communication with the project stakeholders for more than six months to facilitate the early transfer of the utility infrastructure. Powerhouse Six sustainability benefits: - Generates enough clean energy to power more than 100 homes or prevents pollution equivalent to removing 240 cars from the road annually (1,141 metric tons of carbon dioxide); - Provides Brownfield reuse/redevelopment at ETTP; - Eliminates the generation of wastes through excavation and saves money to cleanup other areas for re-use; - Supports regional electric provider's renewable energy initiative; - Offers community economic development/ jobs and property tax income to the City of Oak Ridge; - Demonstrates benefit of ETTP re-industrialization; - Provides long-term lease payments to the community reuse organization; - Supports DOE renewable energy goals; - Demonstrates collaboration between DOE and a public utility for renewable energy development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Germany's First Steps in the Restarted Site Selection Process - 18015

After the Fukushima event in 2011 Germany has decided to phase out nuclear power. Subsequently, it seemed to be politically attractive also to achieve a broad consensus with respect to final disposal of the high-active heat-generating waste after a long societal conflict lasting for decades. Germany has then decided to start a new site selection program for the determination of a site for high-active and heat-generating waste. In 2013, an overall parliamentary consensus could be achieved to agree on a new Repository Site Selection Act. This law has then been evaluated by a commission and the Repository Site Selection Act became amended. Besides, also organization and responsibilities became adapted as well as the financing system. A fund has been installed, which was financed by the utilities, to secure the availability of money to finance the whole process. In the meanwhile, the organizations for licensing of interim storage and final disposal facilities (BfE), for the operation of interim storage facilities for spent fuel, high-active waste and low and intermediate level waste (BGZ) and for site investigation, construction, operation and decommissioning of repositories for spent fuel and high-active waste as well as for low and intermediate level waste (BGE) had been founded and the site investigation process has just started. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost Estimates for NPP Decommissioning Projects and Insights from Cost Analysis - 18118

The technical ability to decommission NPPs shut down after normal operation has been well demonstrated. However, concerns remain about the ability to accurately calculate and demonstrate the validity of decommissioning cost estimates, and to control costs during decommissioning. This paper describes recent international guidance on quality cost estimates for nuclear decommissioning projects and explores the potential added value that could be attained through more systematic analysis and reporting of decommissioning project costs. The OECD Nuclear Energy Agency (NEA) and the International Atomic Energy Agency (IAEA) have long been concerned about the need to promote greater transparency in decommissioning costing and have collaborated in a number of initiatives in pursuit of this objective. Together with the European Commission, they published 'The International Structure for Decommissioning Costing (ISDC)' in 2012. The ISDC provides a useful common reporting format for decommissioning costing. The NEA has also published guidance on the international peer reviews of decommissioning cost studies (2014) and on the practice of decommissioning cost estimation (2015). In September 2017, the NEA and IAEA published detailed guidance on addressing uncertainties in decommissioning cost estimates (the 'Addressing Uncertainties' report). This joint report sets out an approach to treating uncertainties reflecting current good practices in cost estimating. Specifically, it describes how uncertainties in decommissioning cost estimation can be addressed using standardized methods of estimating uncertainty and risk analysis. Its recommendations aim at enabling a consistent and comprehensive treatment of risk and uncertainty in the preparation of decommissioning cost estimates. Together these publications establish a good basis for producing comprehensive and high-quality cost estimates for nuclear decommissioning projects and for enhancing confidence in the estimates through improving transparency concerning the underpinning data and calculations, and more explicit representation of the uncertainties that may impact on project costs. There is increasing attention on understanding variations between cost estimates and apparent escalation of decommissioning costs. This arises both from the need to assure the adequacy of financing arrangements for future decommissioning projects and the ambition to improve the performance and ensure value-for-money in the delivery of decommissioning projects and services. A systematic analysis of actual decommissioning project costs in relation to the cost estimates would be expected to yield valuable insights about key cost drivers in actual decommissioning projects, and the extent to which current cost estimates accurately capture and reflect these. Aligning the reporting of decommissioning project costs with the underpinning cost estimates for the projects would also facilitate the identification of causes of major deviations between projected and actual costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pseudo-dynamic Aspen Plus{sup R} Model of the Defense Waste Processing Facility - 18475

The Defense Waste Processing Facility (DWPF) at the Savannah River Site converts legacy high-level waste from the Cold War into borosilicate glass for permanent disposal in a geological repository. The waste sludge is chemically adjusted by the addition of acid, mixed with frit, and concentrated in the DWPF Chemical Process Cell (CPC) to ensure that the final glass has the desired properties. The resulting mixture is fed into the melter where the waste is melted and poured into stainless steel storage canisters. We present an Aspen Plus{sup R} model of the DWPF CPC, which is being developed to aid chemical processing decisions pertaining to the current flowsheet and to aid decisions regarding optimizing future processing. Given a waste feed composition with acid and frit additions, the model will predict the sludge and off-gas compositions throughout the processing, as well as the final melter feed composition. This allows different processing scenarios to be investigated easily, reducing the reliance on experimental testing, and hence saving time and money. The model has multiple potential applications, including calculating the acid and frit additions required to give acceptable glass properties, off-gas permitting, tracking mercury steam-stripped from the waste in the off-gas system, tracking flammable gases in the offgas system, investigating the effect of reducing air purges in the condensers, and general process optimization. The waste is processed in the CPC in batches, requiring dynamic simulation to track the time-dependent operations. Accurate modeling of the processing also requires calculations of phase and electrolyte chemical equilibria and parallel rate-dependent reactions. Due to existing technical limitations with dynamic simulation of the complex chemical system, we have adopted a pseudo-dynamic approach in which time intervals are treated as consecutive steady-state operations in Aspen Plus{sup R}. Thus, the model consists of ∼100 replicas of the processing vessel and its off-gas system, with the sludge output by one replica (representing one time interval) becoming the feed to the next (representing the next time interval). By examining the results from these replicas in sequence, one can see the time evolution of the model. This general approach can be used wherever simultaneous calculation of phase and electrolyte chemical equilibria in a dynamically evolving system is needed. In addition to describing the general structure and chemistry of the model, we present results from tests of the model against experimental data. These data are from laboratory-scale process simulations of the CPC with a nonradioactive waste sludge simulant. These tests include the model's predictions of the offgas composition, the sludge pH, and the final sludge composition. We will also discuss planned future developments of the model. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in Interim and Final Storage of HLW in Germany - 19060

After the Fukushima event in 2011 Germany has decided to phase out nuclear power. Subsequently, it seemed to be politically attractive also to achieve a broad consensus with respect to final disposal of the high-active heat-generating waste after a long societal conflict lasting for decades. Germany has then decided to start a new site selection program for the determination of a site for high-active and heat-generating waste. In 2013, an overall parliamentary consensus could be achieved to agree on a new Repository Site Selection Act. This law has then been evaluated by a commission and the Repository Site Selection Act became amended. Besides, also organization and responsibilities became adapted as well as the financing system. A fund has been installed, which was financed by the utilities, to secure the availability of money to finance the whole process. In the meanwhile, the organizations for licensing of interim storage and final disposal facilities (BfE), for the operation of interim storage facilities for spent fuel, high-active waste and low and intermediate level waste (BGZ) and for site investigation, construction, operation and decommissioning of repositories for spent fuel and high-active waste as well as for low and intermediate level waste (BGE) had been founded and the site investigation process has just started. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Why Cleanup Acceptance Is Running into Conflicts - Off-site Disposal Versus On Site Disposal - 19068

For years the U.S. Department of Energy (DOE) identified several sites to receive shipments of various types of wastes. However, with the backlog at the Waste Isolation Pilot Plant (WIPP), the inability to license Yucca Mountain, and the agency's desire to expedite cleanup, DOE is trying to 'dispose of' or 'store' more waste belonging to the Federal government on-site. Some states and communities that were 'promised' disposal of DoE's waste in geologic repositories and licensed landfills in arid locations, are now being told that on-site disposal is the best path forward. Competition for resources is forcing more sites to focus on near term cost savings of on-site disposal, rather than develop comprehensive life-cycle estimates representing a more realistic picture of costs associated with isolating radioactive and other hazardous materials on-site in perpetuity. The paper explores the issues and possible solutions in a case study on proposed on-site disposal of DOE waste, and concludes that DOE needs community support and community acceptance to successfully implement the agency's cleanup mission. Ongoing dialogue with the community saves both time and money but more importantly, cooperation helps ensure that effective long-term cleanup occurs. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3D Gamma Source Mapping and Intervention Analysis - 19243

3D gamma source mapping and intervention analysis, through Transco Products, Inc.'s RadVision3D{sup R}, uses the N-Visage Scanner{sup TM} by Createc combining laser scanning, optical imaging, and CZT (Cadmium Zinc Telluride) technologies to capture plant geometry, images, and gamma radiation data. By capturing multiple scans in an area of interest a full 3D analysis can be performed using N-Visage Fusion{sup TM} software by Createc which develops a 3D model showing radioactive sources in the environment and allowing various interventions, such as shielding or source removal, to be modeled virtually. The output of a RadVision3D{sup R} project is a scaled virtual environment that the user can 'walk through' on a PC for training and work planning activities. Included in the viewer are dose planes for the as-scanned conditions as well as for each intervention, showing the dose rate at any point in the room. A virtual dosimeter is built into the viewer to allow users to be fully immersed in the environment in which they will be working, without being exposed to actual radiation or other hazardous conditions. This technology can help save dose at operating nuclear power plants when used for planning large work scopes in high radiation areas and is valuable as a characterization tool for decommissioning facilities. Adopters of 3D gamma source mapping and intervention analysis save time, money, and dose by evaluating options well in advance of the performance of any work, and optimizing interventions using accurate modelling techniques to plan work evolutions. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing The Mechanical Properties of Polyurethane Foams

The Department of Energy has many radioactive facilities that are on the path of deactivation and decommissioning (D and D). These facilities can sit cold and dark for many years before final disposition, and must be maintained to ensure no radiological release occurs in the interim. Improvements and additions to D and D tool sets can greatly: Save time and money, Reduce worker risk. Conventional fixatives widely used often take the form of paints or films that are not readily applicable to 3-dimensional void spaces. Foams are one promising platform that may offer solutions to a number of contaminated problem sets such as: Gloveboxes, Pipes, Tanks. SRNL is working to characterize various commercial foams that would encapsulate the interior volume of a given space and are capable of immobilizing any remaining contamination. One key performance metric of these foams is how well they will perform in an accident scenario. To this end, SRNL is researching the mechanical properties of these foams to ensure that the material can withstand the environment of application while maintaining structural integrity. ASTM standard E3191-18 served as a guiding document for this project, outlining the requirements that foaming fixatives used for the mitigation of radioactive contamination need to meet before being implemented. Objective: Quantification of the mechanical properties of 6 commercial polyurethane foams was performed using multiple ASTM standards to record measurements for: Compression testing: Flexible Foams, Force required to produce 50% compression, Rigid Foams, Compressive and apparent modulus, Point of 10% core deformation, The 'Zero Deformation' point, Compressive strength, Yield point. Tensile testing: Tensile strength, Tensile stress, Percent elongation. Experiment 1: An electromechanical compressive tester (MTS Criterion Series 43) was used to evaluate 6 foams (4 flexible, 2 rigid). Per ASTM D1621, each rigid foam was compressed at 10% of the measured thickness per minute until the sample was 13% of it's original thickness. Per ASTM D35/4, each flexible foam was pre-flexed twice to 80% original thickness at a rate of 250 mm/min, then compressed to 80% original thickness at a rate of 50 mm/min. Experiment 2: An electromechanical tensile tester (MTS Criterion Series 43) was used to evaluate 6 foams (4 flexible, 2 rigid). Per ASTM D1623, rigid foams were pulled apart at a rate of 1.27 mm/min until the sample broke. Per ASTM D35/4, flexible foams were pulled apart at a rate of 500 mm/min until the sample broke. The strongest material in both compression and tensile testing scenarios was found to be the rigid intumescent polyurethane Hilti foam. The experiments revealed that the Hilti foam in a tensile scenario had a peak stress value that was larger than the closest competitor by a factor of 2.3 and a compressive yield point that was larger than the closest competitor by a factor of 1.4, indicating that the Hilti foam is the best choice for implementation in mechanically harsh environments. The performance metrics measured can serve as a basis for future mechanical tests that would help set relevant ASTM standards (E3191) for intumescent polyurethane foams in fixating applications. Tests like surface adhesion, impact, and flame tests would serve as a better indicator as to how this material would perform in environmentally harsh scenarios often found in decommissioned nuclear facilities. Further tests of the foams' intumescent properties would also be important should these foams be implemented in environmentally harsh scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 115: Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges

This panel focused on where multiple countries have collaborated to solve difficult remediation and cleanup challenges through either formal or informal means. The focus was to share real examples of where collaboration has accelerated cleanup saving time and money. This could be through policy or process improvements, technology transfer or sharing R and D, or other means of collaborative efforts. Panelists with presentations: Canada-AECL Collaboration Across Borders (Richard Sexton, Alastair MacDonald); Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges (Anthony Banford); IAEA Perspective on International Collaboration in D and ER (Horst Monken Fernandes); How, Why and Benefits of Collaboration (Kurt Gerdes)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Critical Design Elements for an On-Site Mercury Concentration and Holding Facility - 20175

Administrative changes and funding issues have delayed the Department of Energy (DOE) from establishing and commissioning a National Repository for mercury as required under the Mercury Export Ban Act (MEBA) of 2008. In the interim, a few hazardous waste Treatment, Storage, and Disposal Facilities (TSDFs) have been authorized to accept mercury classified as a hazardous waste as under Subtitle C of the Resource Conservation and Recovery Act (RCRA). Waste generators are charged (either by weight or by volume) for the waste they manifest to these TSDFs. In many cases, mercury and mercury compounds have chemically sorbed to (or physically lodged into) the interstitial spaces of a substrate material. This almost always causes the amount of waste generated to be unnecessarily large, due to the extra volume (or weight) of the accompanying, non-mercury materials. Depending on a multitude of factors, it could be financially beneficial for waste generators to take greater control of their mercury affairs by separating these substrate materials from the mercury and mercury compounds that have become associated with them. Building and operating an on-site mercury Concentration and Holding Facility (CHF) could help relieve a waste generator's overall cost burden. The purpose of such CHFs is not to treat or dispose of mercury, but to recover and concentrate mercury from bulky mercury-laden materials to the extent that the host substrate to which the mercury may have previously been sorbed could pass a Toxicity Characteristic Leaching Procedure (TCLP) test and either be disposed of at a conventional landfill, or be disposed of at a hazardous waste landfill, but absent additional restrictions specifically for mercury. A CHF represents a way for waste generators to save money by separating mercury from common host materials, concentrating it, and then safely storing it until transportation to an authorized TSDF takes place This paper focuses on the critical design elements waste generators should consider when designing and operating a mercury CHF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Remote Cutting Tools for use at ATR - 20438

As a result of years of operations of the Advanced Test Reactor (ATR) at the Idaho National Lab (INL), the ATR canal has become congested due to the storage of materials including waste consisting of highly irradiated remote handled (RH) metals. In order to support its continuing nuclear mission the ATR requires canal space to support fuel storage and future core internal change out (CIC) components. INL staff determined that the canal must be cleaned out and waste removed to efficiently utilize the valuable canal floor space. It was determined that a methodology for processing, packaging, characterizing, and removing current and future irradiated hardware from the ATR canal is needed. Orano Federal Services (OFS) and its subcontractor Babcock Services Inc. (BSI) were selected to provide remote tooling in order to safely and efficiently size reduce the material currently stored in the ATR canal. INL developed detailed requirements that established the design and performance requirements for the tooling. Orano TN and BSI had recently successfully completed similar tasks in clearing highly activated materials from spent fuel pools and canals at commercial nuclear plants. That experience directly translated into a proven approach that could be used at the ATR thereby saving time and money and lowering risks. Based on BSI's demonstrated proficiency in the design and deployment of remote size reduction specialty tooling at comparable commercial facilities, Orano Federal Services was confident that a solution to INL's requirements could be delivered. The tooling had to be designed to be compatible with the operational requirements of the ATR canal as well as the functionality needed by the facility operators that will use the equipment. Some of the major design requirements and functions of the equipment included remote operations, capability to shear highly irradiated sections of aluminum and steel tubing, pipe, and components ranging in size from 0.6 cm to 16.5 cm diameter into 1.5 m -1.8 m lengths, utilizing buoyancy compensation to assist with underwater operations, and use commercially available existing technology and components as much as practical. The design team evaluated and selected commercially available equipment that could be modified to meet the design and performance specifications. In addition, a waste sizing table (WST) was designed and fabricated to further ensure the size reduction equipment would perform as expected and give the facility operators a stable and usable remote, underwater work platform. After successful development of the tooling, a mock up test and operator training was conducted to ensure the tooling performed as expected and met the requirements of INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model-based verification of I and C specifications - 184

In the field of nuclear I and C (Instrumentation and Control), the late detection of errors in the specifications and the design of I and C has a strong impact in terms of time and money. The early verification in the V cycle of I and C functions is a key issue to capture inconsistencies and errors before the implementation and on-site tests. EDF, in the framework of the collaborative project CONNEXION, has investigated methods based on simulation to formalize I and C requirements and to evaluate them at the conceptual and basic design phases. Behavioral models of the physic parts of the system and I and C functions, described as functional diagrams, are co-simulated in an integration environment based on the FMI (Functional Mockup Interface) standard. In this specific environment, test scenarios are performed on these models. These scenarios are defined on the basis of a high level model of the studied system that takes into account the states to cover (in normal and degraded situations). Requirements, once formalized, are translated into observers that evaluate their fulfillment during the simulations. Simulation logs are then a tool for the designer to analyze the causes of the possible non-fulfillment of requirements and to fix the corresponding errors in the specifications. The proposed methodology enables to detect errors in the specifications of I and C functions, to generate automatically functional test scenarios taking into account the coverage of the requirements and all the different operational modes of the system. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗