Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Novel Planar and Integrated Microwave Antennas

This project dealt with design, analysis, and testing of new types of planar and integrated antennas operating in the microwave frequency range. The following was accomplished during this project period:

Saed, Mohammad A.↗

Testing the Preliminary X-33 Navigation System

The X-33 Reusable Launch Vehicle (RLV) must meet the demanding requirements of landing autonomously on a narrow landing strip following a flight that reaches an altitude of up to 200,000 feet and a speed in excess of Mach 9 with significant in-flight energy bleed-off maneuvers. To execute this flight regimen a highly reliable avionics system has been designed that includes three LN-100G Inertial Navigation System/Global Positioning System (INS/GPS) units as the primary navigation system for the X-33. NASA's Marshall Space Flight Center (MSFC) tested an INS/GPS system in real-time simulations to determine the ability of this navigation suite to meet the in flight and autonomous landing requirements of the X-33 RLV. A total of sixty-one open loop tests were performed to characterize the navigation accuracy of the LN-100G. Twenty-seven closed-loop tests were also performed to evaluate the performance of the X-33 Guidance, Navigation and Control (GN&C) algorithms with the real navigation hardware. These closed-loop tests were also designed to expose any integration or operational issues with the real-time X-33 vehicle simulation. Dynamic road tests of the INS/GPS were conducted by Litton to assess the performance of differential and nondifferential INS/GPS hybrid navigation solutions. The results of the simulations and road testing demonstrate that this novel solution is capable of meeting the demanding requirements of take-off, in-flight navigation, and autonomous landing of the X-33 RLV. This paper describes the test environment developed to stimulate the LN-100G and discusses the results of this test effort. This paper also presents recommendations for a navigation system suitable to an operational RLV system.

Lomas, James J.↗

Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

Patterson-Hine, Ann↗

The Implementation of Payload Safety in an Operational Environment

The objective of this paper is to define the safety life-cycle process for a payload beginning with the output of the Payload Safety Review Panel and continuing through the life of the payload on-orbit. It focuses on the processes and products of the operations safety implementation through the increment preparations and real-time operations processes. In addition, the paper addresses the role of the Payload Operations and Integration Center and the interfaces to the International Partner Payload Control Centers.

Cissom, R. D.↗

Sabatier Engineering Development Unit

To facilitate life support system loop closure on board the International Space Station (ISS), the Node 3 Oxygen Generation System (OGS) rack contains a functional scar to accommodate a carbon dioxide reduction assembly (CRA). As part of the effort to better understand and define the functional scar, significant risk mitigation activities have been performed. To address integration risks, a CRA Engineering Development Unit (EDU) has been developed that is functionally equivalent to a flight CRA and is suitable for integrating with ground based carbon dioxide removal and oxygen generation systems. The CRA EDU has been designed to be functionally equivalent to the Sabatier Reactor Subsystem (SRS) portion of the CRA. The design of the CRA EDU and testing results in a stand alone configuration with simulated OGA and CDRA interfaces are reported. Carbon dioxide flow control is a major area requiring development since the size of the CO2 accumulator may result in periods of CRA starvation. The capability of the CO2 flow control algorithm to effectively manage integrated CRA operations is discussed.

Perry, Jay↗

Research progress and accomplishments on International Space Station

The first research payloads reached the International Space Station (ISS) more than two years ago, with research operating continuously since March 2001. Seven research racks are currently on-orbit, with three more arriving soon to expand science capabilities. Through the first five expeditions, 60 unique NASA-managed investigations from 11 nations have been supported, many continuing into later missions. More than 90,000 experiment hours have been completed, and more than 1,000 hours of crew time have been dedicated to research, numbers that grow daily. The multidisciplinary program includes research in life sciences, physical sciences, biotechnology, Earth sciences, technology demonstrations as well as commercial endeavors and educational activities. The Payload Operations and Integration Center monitors the onboard activities around the clock, working with numerous Principal Investigators and Payload Developers at their remote sites. Future years will see expansion of the station with research modules provided by the European Space Agency and Japan, which will be outfitted with additional research racks. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.

long duration↗

MIMOS II on MER One Year of Mossbauer Spectroscopy on the Surface of Mars: From Jarosite at Meridiani Planum to Goethite at Gusev Crater

The miniaturized Mossbauer (MB) spectrometer MIMOS II [1] is part of the Athena payload of NASA s twin Mars Exploration Rovers "Spirit" (MER-A) and "Opportunity" (MER-B). It determines the Fe-bearing mineralogy of Martian soils and rocks at the Rovers respective landing sites, Gusev crater and Meridiani Planum. Both spectrometers performed successfully during first year of operation. Total integration time is about 49 days for MERA (79 samples) and 34 days for MER-B (85 samples). For curiosity it might be interesting to mention that the total odometry of the oscillating part of the MB drive exceeds 35 km for both rovers.

Klingelhoefer, G.↗

STS-114: Discovery Day 3/Mission Status Briefing

Paul Hill, STS-114 Lead Flight Director, and John Shannon, Flight Operations and Integrations Manager for the Space Shuttle Program were present. Paul gave a detailed description of the Orbiter's performance upon its arrival on the International Space Station, orbital rendezvous and docking was completed, performance was nominal by all measures, and crew is already inside the ISS. He also briefly mentioned the next day crew activities, robotics work and first space walk. John emphasized on ground technical engineering tasks, data gathering and inspection of data, imagery and damage assessment, assessing the performance of the external tank, engineering analysis, and the increase of understanding of the overall condition of the vehicle. Safety of the vehicle, battery lifetime, foam loss, tile damage, post launch analysis were some of the topics discussed with the News Media.

Source record↗

STS-114: Discovery Mission Status Briefing

This STS-114 Discovery Mission Status Briefing begins with Eileen Collins, Commander of the STS-114 Discovery, and crewmembers in orbit talking with mission control after launch of the Space Shuttle Discovery. Collins gives tribute to the crewmembers of the Space Shuttle Columbia and their families. Phil Engelauf, STS-114 Mission Operations Representative presents his mission status briefing and John Shannon, Space Shuttle Flight Operations and Integration Manager talks about the processing of radar data taken of the Space Shuttle Discovery during ascent. A video presentation from the Solid Rocket Booster Camera is shown by John Shannon. The video includes: 1) Piece of orbiter tile and origins of debris; 2) Pictures of debris after SRB separation; 3) TYVEK covers; and 4) Bird impacts external tank nose cone. Questions from the news media about tile shearing, vehicle damage and debris from the external tank are answered.

Source record↗

STS-114: Discovery Mission Status Briefing (incl. Statement from Cmdr. Collins and Crew)

Commander Eileen Collins and crew briefly thanked everyone who worked hard to get the Shuttle back in space, and dedicated the mission to the Columbia crew as she bids their first "good night" to the Mission Control Room in Houston. Video continues with the Mission Status Briefing by Phil Engelauf, STS-114 Mission Operations Representative, and John Shannon, Manager of the Space Shuttle Operations and Integration. Phil noted that launching and ascent had gone extremely well, the crews and the flight control team performed well and the vehicle performed exceptionally as well. The launch is the beginning of a 12 day mission period. John details the tasks of the Engineering team processing the radar data taken during ascent and checking frame by frame the imagery from both on vehicle imagery and ground imagery. John further detailed the two debris event from ascent video clips of tile loss and an unidentified material falling off from the external tank; the release of TYVEK covers, and bird impact on the external tank nose cone. Tile shearing, tile damage, tile repair, landing gear door seals, repair capabilities, debris assessment, safety, inspections criteria, data acquisitions and data analysis were topics covered with the News media.

Source record↗

STS-114: Discovery Day 3 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director and John Shannon, Space Shuttle Flight Operations and Integration Manager are seen in this STS-114 flight day three Mission Status Briefing. Hill expresses that the Discovery Orbiter is performing beautifully and that STS-114 crew performed a picture perfect rendezvous. He also shows a video of the Rendezvous Pitch Maneuver (RPM) where Commander Eileen Collins slowly flips Discovery in a circle to give the Expedition 11 crew a view of Discovery's heat resistant tiles. He talks about the removal of the Multi-Purpose Logistics Module (MPLM) from Discovery's payload bay using the ISS Robotic Arm. Shannon discusses two objectives that his team is fulfilling on this mission. They include: 1) Understanding the health of Space Shuttle Discovery; and 2) Assessing the performance of the External Tank. Questions from the news media pertaining to the life expectancy of the Space Shuttle Discovery, battery lifetime on the wing leading edge impact sensors, foam loss, PAL ramps, and the safety of the Space Shuttle Discovery are addressed.

Source record↗

The NASA Bed Rest Project

NASA s National Vision for Space Exploration includes human travel beyond low earth orbit and the ultimate safe return of the crews. Crucial to fulfilling the vision is the successful and timely development of countermeasures for the adverse physiological effects on human systems caused by long term exposure to the microgravity environment. Limited access to in-flight resources for the foreseeable future increases NASA s reliance on ground-based analogs to simulate these effects of microgravity. The primary analog for human based research will be head-down bed rest. By this approach NASA will be able to evaluate countermeasures in large sample sizes, perform preliminary evaluations of proposed in-flight protocols and assess the utility of individual or combined strategies before flight resources are requested. In response to this critical need, NASA has created the Bed Rest Project at the Johnson Space Center. The Project establishes the infrastructure and processes to provide a long term capability for standardized domestic bed rest studies and countermeasure development. The Bed Rest Project design takes a comprehensive, interdisciplinary, integrated approach that reduces the resource overhead of one investigator for one campaign. In addition to integrating studies operationally relevant for exploration, the Project addresses other new Vision objectives, namely: 1) interagency cooperation with the NIH allows for Clinical Research Center (CRC) facility sharing to the benefit of both agencies, 2) collaboration with our International Partners expands countermeasure development opportunities for foreign and domestic investigators as well as promotes consistency in approach and results, 3) to the greatest degree possible, the Project also advances research by clinicians and academia alike to encourage return to earth benefits. This paper will describe the Project s top level goals, organization and relationship to other Exploration Vision Projects, implementation strategy, address Project deliverables, schedules and provide a status of bed rest campaigns presently underway.

Rhodes, Bradley↗

Thermal Simulator Development: Non-Nuclear Testing of Space Fission Systems

Non-nuclear testing can be a valuable tool in the development of a space nuclear power system. At the NASA MSFC Early Flight Fission Test Facility (EFF-TF), highly designed electric heaters are used to simulate the heat from nuclear fuel to test space fission power and propulsion systems. To allow early utilization, nuclear system designs must be relatively simple, easy to fabricate, and easy to test using non-nuclear heaters to closely mimic heat from fission. In this test strategy, highly designed electric heaters are used to simulate the heat from nuclear fuel, allowing one to develop a significant understanding of individual components and integrated system operation without the cost, time and safety concerns associated with nuclear testing.

Bragg-Sitton, Shannon M.↗

Architecting the Communication and Navigation Networks for NASA's Space Exploration Systems

NASA is planning a series of short and long duration human and robotic missions to explore the Moon and then Mars. A key objective of the missions is to grow, through a series of launches, a system of systems communication, navigation, and timing infrastructure at minimum cost while providing a network-centric infrastructure that maximizes the exploration capabilities and science return. There is a strong need to use architecting processes in the mission pre-formulation stage to describe the systems, interfaces, and interoperability needed to implement multiple space communication systems that are deployed over time, yet support interoperability with each deployment phase and with 20 years of legacy systems. In this paper we present a process for defining the architecture of the communications, navigation, and networks needed to support future space explorers with the best adaptable and evolable network-centric space exploration infrastructure. The process steps presented are: 1) Architecture decomposition, 2) Defining mission systems and their interfaces, 3) Developing the communication, navigation, networking architecture, and 4) Integrating systems, operational and technical views and viewpoints. We demonstrate the process through the architecture development of the communication network for upcoming NASA space exploration missions.

Bhassin, Kul B.↗

Benchmarking Gas Path Diagnostic Methods: A Public Approach

Recent technology reviews have identified the need for objective assessments of engine health management (EHM) technology. The need is two-fold: technology developers require relevant data and problems to design and validate new algorithms and techniques while engine system integrators and operators need practical tools to direct development and then evaluate the effectiveness of proposed solutions. This paper presents a publicly available gas path diagnostic benchmark problem that has been developed by the Propulsion and Power Systems Panel of The Technical Cooperation Program (TTCP) to help address these needs. The problem is coded in MATLAB (The MathWorks, Inc.) and coupled with a non-linear turbofan engine simulation to produce "snap-shot" measurements, with relevant noise levels, as if collected from a fleet of engines over their lifetime of use. Each engine within the fleet will experience unique operating and deterioration profiles, and may encounter randomly occurring relevant gas path faults including sensor, actuator and component faults. The challenge to the EHM community is to develop gas path diagnostic algorithms to reliably perform fault detection and isolation. An example solution to the benchmark problem is provided along with associated evaluation metrics. A plan is presented to disseminate this benchmark problem to the engine health management technical community and invite technology solutions.

Simon, Donald L.↗

Environmental Control and Life Support Integration Strategy for 6-Crew Operations

The International Space Station (ISS) crew compliment will be increasing in size from 3 to 6 crew members in the summer of 2009. In order to support this increase in crew on ISS, the United States on-orbit Segment (USOS) has been outfitted with a suite of regenerative Environmental Control and Life Support (ECLS) hardware including an Oxygen Generation System(OGS), Waste and Hygiene Compartment (WHC), and a Water Recovery System (WRS). The WRS includes the Urine Processor Assembly (UPA) and the Water Processor Assembly (WPA). A critical step in advancing to a 6Crew support capability on ISS is a full checkedout and verification of the Regenerative ECLS hardware. With a successful checkout, the ISS will achieve full redundancy in its onorbit life support system between the USOS and Russian Segment (RS). The additional redundancy created by the Regenerative ECLS hardware creates the opportunity for independent support capabilities between segments, and for the first time since the start of ISS, the necessity to revise Life Support strategy agreements. Independent operating strategies coupled with the loss of the Space Shuttle supply and return capabilities in 2010 offers additional challenges. These challenges create the need for a higher level of onorbit consumables reserve to ensure crewmember life support during a system failure. This paper will discuss the evolution of the ISS Life Support hardware strategy in support of 6Crew on ISS, as well as the continued work which will be necessary to ensure the support of crew and ISS Program objectives through the life of station.

FROM↗

Program Assists Satellite Designers

Annapolis, Maryland-based designAmerica Inc., a small aerospace company specializing in the development and delivery of ground control systems for satellites and instrumentation, assisted Goddard Space Flight Center in the development of the ASIST software, a real-time command and control system for spacecraft development, integration, and operations. It was designed to be fully functional across a broad spectrum of satellites and instrumentation, while also being user friendly. The company now has rights to commercial use of the program and is offering it to government and industry satellite designers.

Source record↗