Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Effect of Vacuum on Force Response of an Ultrasonic Penetrator

Introduction: The Apollo astronauts encountered higher than expected resistances when interacting with the lunar soil via the Apollo Lunar Surface Drill (ALSD) and the trenching tool. Reducing the force required to move tools or other mechanical components through regolith will impact many steps of the resource extraction process. Force reduction has been achieved in soil materials by imparting vibration to tooling interfaces such as a vibratory farming cultivator, a percussive scoop, and ultrasonically resonant penetrators. Vibration-assisted tools in granular media reduce interaction forces by fluidizing a volume around the tool, allowing the tool to progress through a dynamic (fluid) medium instead of a static (solid) medium. This work seeks to quantify ultrasonic vibration’s effect on the force response of a penetrator in lunar soil simulant in vacuum sufficient to be within the molecular flow regime of any disturbed gases. Methods: A custom vacuum chamber setup, CUBEvac, was designed and built to facilitate penetration testing in a high vacuum environment, for comparison to penetration behavior in ambient terrestrial environment. A two-stage pumping system (Agilent Triscroll 600 roughing pump, Agilent VHS-6 oil diffusion pump) reached chamber pressures of about 5x10-6 Torr with regolith simulant in place. Figure 1 is a schematic of the heart of the assembly (note the penetration drive mechanisms above the chamber feedthrough and the regolith simulant sample in the bottom are not shown). The penetration actuation stack was comprised of a stepper motor driving a lead screw to move the ultra-sonic probe vertically inside the chamber. Motion was coordinated with an Arduino Uno. GRC-3 lunar simulant was used for this set of experiments. Samples were prepared in a four-liter stain-less steel, cylindrical pot with an internal diameter of approximately 15.56 cm (6.125 in) and a depth of 19.37 cm (7 5/8 in) for testing. The soil was baked out prior to compaction preparation as a measure to reduce soil moisture which interfered with pump down capacity. The soil was not baked again if it was removed from the vacuum chamber, prepped, and immediately returned to the vacuum chamber for pump down. The soil was compacted using a 60 Hz vibration table with a surcharge of 34 kg place on top of the soil in the container. Prepared soil samples weighed approximately 6.5 kg (bulk density 1.895-1.934 g/cm3). Two probe end effectors were tested: A cone penetrometer (static only) with a nominal diameter of 12.7 mm (0.5 in) and a nominal height of 28.6 mm (1.125 in); and a vibrating cylindrical probe measuring 12.7 mm in diameter and 50.8 mm in effective length from the tip (Figure 2). The cylindrical probe vibrated resonantly at 20 kHz with an amplitude 23 μm. The cone penetration tests were conducted to assess potential soil behavior differences in vacuum. The cylinder probe tests were conducted as the primary subject of this investigation to assess force response in vacuum. For each test, a regolith simulant sample was load-ed and compacted in the chamber, which was then evacuated for roughly 18 hours to reach the lowest possible pressure (approximately 5x10-6 Torr for most tests). The probe was then moved to about 10 mm above the soil surface before being pushed to a depth of 50 mm for the cylinder probe tests and to a depth of 100 mm for the cone penetrometer tests, both at a speed of 2 mm/s. The simulant samples were prepared the same for all tests. Ideally, they would respond consistently to probe penetration under ambient and vacuum conditions. This was evaluated by measuring the resistance of representative prepared simulant beds with a standard cone penetrometer in both environments. Results and Discussion: The resistance of the simulant samples in the vacuum tests was consistently lower than in the ambient tests as determined by the cone penetration tests. Thus, the ambient and vacuum results cannot be compared directly; work is underway to de-confound and better correlate the data. Still, figures 3-6 show that probe penetration forces are lower overall in the vacuum environment. In both environments, resonant vibration of the probe provides two useful effects: It reduces the probe penetration force and smooths the force-depth curve, significantly reducing local maxima. These effects have implications for various potential applications, such as astronaut hand-tools, where benefits (reducing astronaut effort) outweigh the cost of the additional energy re-quired to generate vibration. These results demonstrate that resonantly vibrating tools can meaningfully reduce the penetration force required for excavation, probing, and drilling tools in simulated lunar regolith deposits under vacuum levels approaching those that will be experience on the Moon’s surface. Lunar-gravity, ambient environment tests are scheduled soon. The effects of realistic temperatures and temperature gradients and deeper vacuum remain to be tested.

E Rezich↗

Evaluation of a simplified gross thrust calculation technique using two prototype F100 turbofan engines in an altitude facility

The technique which relies on afterburner duct pressure measurements and empirical corrections to an ideal one dimensional flow analysis to determine thrust is presented. A comparison of the calculated and facility measured thrust values is reported. The simplified model with the engine manufacturer's gas generator model are compared. The evaluation was conducted over a range of Mach numbers from 0.80 to 2.00 and at altitudes from 4020 meters to 15,240 meters. The effects of variations in inlet total temperature from standard day conditions were explored. Engine conditions were varied from those normally scheduled for flight. The technique was found to be accurate to a twice standard deviation of 2.89 percent, with accuracy a strong function of afterburner duct pressure difference.

Kurtenbach, F. J.↗

Low cost solar array project cell and module formation research area: Process research of non-CZ silicon material

Liquid diffusion masks and liquid applied dopants to replace the CVD Silox masking and gaseous diffusion operations specified for forming junctions in the Westinghouse baseline process sequence for producing solar cells from dendritic web silicon were investigated. The baseline diffusion masking and drive processes were compared with those involving direct liquid applications to the dendritic web silicon strips. Attempts were made to control the number of variables by subjecting dendritic web strips cut from a single web crystal to both types of operations. Data generated reinforced earlier conclusions that efficiency levels at least as high as those achieved with the baseline back junction formation process can be achieved using liquid diffusion masks and liquid dopants. The deliveries of dendritic web sheet material and solar cells specified by the current contract were made as scheduled.

Source record↗

The Proof of the SIFT Implementation

The Software Implemented Fault Tolerance SIFT specifications consist primarily of constraints on the schedule table and descriptions of the changes each routine makes to the global variables. The proof proceeds by proving that each routine is consistent with its specification. Each of these proofs is separate from the others and the order of the proofs is unimportant. A routine is proved by generating a set of verification conditions from the PASCAL code and the SPECIAL specifications. Each verification condition is a set of assertions derived from a particular path in the routine. A verification condition (VC) is generated for each possible path through the routine.

Source record↗

Managing Information On Costs

Cost Management Model, CMM, software tool for planning, tracking, and reporting costs and information related to costs. Capable of estimating costs, comparing estimated to actual costs, performing "what-if" analyses on estimates of costs, and providing mechanism to maintain data on costs in format oriented to management. Number of supportive cost methods built in: escalation rates, production-learning curves, activity/event schedules, unit production schedules, set of spread distributions, tables of rates and factors defined by user, and full arithmetic capability. Import/export capability possible with 20/20 Spreadsheet available on Data General equipment. Program requires AOS/VS operating system available on Data General MV series computers. Written mainly in FORTRAN 77 but uses SGU (Screen Generation Utility).

Taulbee, Zoe A.↗

Lifetime predictions for the Solar Maximum Mission (SMM) and San Marco spacecraft

Lifetime prediction techniques developed by the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) are described. These techniques were developed to predict the Solar Maximum Mission (SMM) spacecraft orbit, which is decaying due to atmospheric drag, with reentry predicted to occur before the end of 1989. Lifetime predictions were also performed for the Long Duration Exposure Facility (LDEF), which was deployed on the 1984 SMM repair mission and is scheduled for retrieval on another Space Transportation System (STS) mission later this year. Concepts used in the lifetime predictions were tested on the San Marco spacecraft, which reentered the Earth's atmosphere on December 6, 1988. Ephemerides predicting the orbit evolution of the San Marco spacecraft until reentry were generated over the final 90 days of the mission when the altitude was less than 380 kilometers. The errors in the predicted ephemerides are due to errors in the prediction of atmospheric density variations over the lifetime of the satellite. To model the time dependence of the atmospheric densities, predictions of the solar flux at the 10.7-centimeter wavelength were used in conjunction with Harris-Priester (HP) atmospheric density tables. Orbital state vectors, together with the spacecraft mass and area, are used as input to the Goddard Trajectory Determination System (GTDS). Propagations proceed in monthly segments, with the nominal atmospheric drag model scaled for each month according to the predicted monthly average value of F10.7. Calibration propagations are performed over a period of known orbital decay to obtain the effective ballistic coefficient. Progagations using plus or minus 2 sigma solar flux predictions are also generated to estimate the despersion in expected reentry dates. Definitive orbits are compared with these predictions as time expases. As updated vectors are received, these are also propagated to reentryto continually update the lifetime predictions.

Smith, E. A.↗

Transformation reborn: A new generation expert system for planning HST operations

The Transformation expert system (TRANS) converts proposals for astronomical observations with the Hubble Space Telescope (HST) into detailed observing plans. It encodes expert knowledge to solve problems faced in planning and commanding HST observations to enable their processing by the Science Operations Ground System (SOGS). Among these problems are determining an acceptable order of executing observations, grouping of observations to enhance efficiency and schedulability, inserting extra observations when necessary, and providing parameters for commanding HST instruments. TRANS is currently an operational system and plays a critical role in the HST ground system. It was originally designed using forward-chaining provided by the OPS5 expert system language, but has been reimplemented using a procedural knowledge base. This reimplementation was forced by the explosion in the amount of OPS5 code required to specify the increasingly complicated situations requiring expert-level intervention by the TRANS knowledge base. This problem was compounded by the difficulty of avoiding unintended interaction between rules. To support the TRANS knowledge base, XCL, a small but powerful extension to Commom Lisp was implemented. XCL allows a compact syntax for specifying assignments and references to object attributes. XCL also allows the capability to iterate over objects and perform keyed lookup. The reimplementation of TRANS has greatly diminished the effort needed to maintain and enhance it. As a result of this, its functions have been expanded to include warnings about observations that are difficult or impossible to schedule or command, providing data to aid SPIKE, an intelligent planning system used for HST long-term scheduling, and providing information to the Guide Star Selection System (GSSS) to aid in determination of the long range availability of guide stars.

Gerb, Andrew↗

The Australian National Airborne Field Experiment 2005: Soil Moisture Remote Sensing at 60 Meter Resolution and Up

Spatially-distributed soil moisture observations have applications spanning a wide range of spatial resolutions from the very local needs of individual farmers to the progressively larger areas of interest to weather forecasters, water resource managers, and global climate modelers. To date, the most promising approach for space-based remote sensing of soil moisture makes use of passive microwave emission radiometers at L-band frequencies (1-2 GHz). Several soil moisture-sensing satellites have been proposed in recent years, with the European Space Agency's Soil Moisture Ocean Salinity (SMOS) mission scheduled to be launched first in a couple years. While such a microwave-based approach has the advantage of essentially allweather operation, satellite size limits spatial resolution to 10's of km. Whether used at this native resolution or in conjunction with some type of downscaling technique to generate soil moisture estimates on a finer-scale grid, the effects of subpixel spatial variability play a critical role. The soil moisture variability is typically affected by factors such as vegetation, topography, surface roughness, and soil texture. Understanding and these factors is the key to achieving accurate soil moisture retrievals at any scale. Indeed, the ability to compensate for these factors ultimately limits the achievable spatial resolution and/or accuracy of the retrieval. Over the last 20 years, a series of airborne campaigns in the USA have supported the development of algorithms for spaceborne soil moisture retrieval. The most important observations involved imagery from passive microwave radiometers. The early campaigns proved that the retrieval worked for larger and larger footprints, up to satellite-scale footprints. These provided the solid basis for proposing the satellite missions. More recent campaigns have explored other aspects such as retrieval performance through greater amounts of vegetation. All of these campaigns featured extensive ground truth collection over a range of grid spacings, to provide a basis for examining the effects of subpixel variability. However, the native footprint size of the airborne L-band radiometers was always a few hundred meters. During the recently completed (November, 2005) National Airborne Field Experiment (NAFE) campaign in Australia, a compact L-band radiometer was deployed on a small aircraft. This new combination permitted routine observations at native resolutions as high as 60 meters, substantially finer than in previous airborne soil moisture campaigns, as well as satellite footprint areal coverage. The radiometer, the Polarimetric L-band Microwave Radiometer (PLMR) performed extremely well and operations included extensive calibration-related observations. Thus, along with the extensive fine-scale ground truth, the NAFE dataset includes all the ingredients for the first scaling studies involving very-high-native resolution soil moisture observations and the effects of vegetation, roughness, etc. A brief overview of the NAFE will be presented, then examples of the airborne observations with resolutions from 60 m to 1 km will be shown, and early results from scaling studies will be discussed.

Kim, E. J.↗

Develop a Model Component

During my internship at NASA, I was a model developer for Ground Support Equipment (GSE). The purpose of a model developer is to develop and unit test model component libraries (fluid, electrical, gas, etc.). The models are designed to simulate software for GSE (Ground Special Power, Crew Access Arm, Cryo, Fire and Leak Detection System, Environmental Control System (ECS), etc. ~.) before they are implemented into hardware. These models support verifying local control and remote software for End-Item Software Under Test (SUT). The model simulates the physical behavior (function, state, limits and 110) of each end-item and it's dependencies as defined in the Subsystem Interface Table, Software Requirements & Design Specification (SRDS), Ground Integrated Schematic (GIS), and System Mechanical Schematic.(SMS). The software of each specific model component is simulated through MATLAB's Simulink program. The intensiv~ model development life cycle is a.s follows: Identify source documents; identify model scope; update schedule; preliminary design review; develop model requirements; update model.. scope; update schedule; detailed design review; create/modify library component; implement library components reference; implement subsystem components; develop a test script; run the test script; develop users guide; send model out for peer review; the model is sent out for verific~tionlvalidation; if there is empirical data, a validation data package is generated; if there is not empirical data, a verification package is generated; the test results are then reviewed; and finally, the user. requests accreditation, and a statement of accreditation is prepared. Once each component model is reviewed and approved, they are intertwined together into one integrated model. This integrated model is then tested itself, through a test script and autotest, so that it can be concluded that all models work conjointly, for a single purpose. The component I was assigned, specifically, was a fluid component, a discrete pressure switch. The switch takes a fluid pressure input, and if the pressure is greater than a designated cutoff pressure, the switch would stop fluid flow.

Ensey, Tyler S.↗

An Evaluation of a Flight Deck Interval Management Algorithm Including Delayed Target Trajectories

NASA's first Air Traffic Management (ATM) Technology Demonstration (ATD-1) was created to facilitate the transition of mature air traffic management technologies from the laboratory to operational use. The technologies selected for demonstration are the Traffic Management Advisor with Terminal Metering (TMA-TM), which provides precise timebased scheduling in the terminal airspace; Controller Managed Spacing (CMS), which provides controllers with decision support tools enabling precise schedule conformance; and Interval Management (IM), which consists of flight deck automation that enables aircraft to achieve or maintain precise in-trail spacing. During high demand operations, TMA-TM may produce a schedule and corresponding aircraft trajectories that include delay to ensure that a particular aircraft will be properly spaced from other aircraft at each schedule waypoint. These delayed trajectories are not communicated to the automation onboard the aircraft, forcing the IM aircraft to use the published speeds to estimate the target aircraft's estimated time of arrival. As a result, the aircraft performing IM operations may follow an aircraft whose TMA-TM generated trajectories have substantial speed deviations from the speeds expected by the spacing algorithm. Previous spacing algorithms were not designed to handle this magnitude of uncertainty. A simulation was conducted to examine a modified spacing algorithm with the ability to follow aircraft flying delayed trajectories. The simulation investigated the use of the new spacing algorithm with various delayed speed profiles and wind conditions, as well as several other variables designed to simulate real-life variability. The results and conclusions of this study indicate that the new spacing algorithm generally exhibits good performance; however, some types of target aircraft speed profiles can cause the spacing algorithm to command less than optimal speed control behavior.

Swieringa, Kurt A.↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

Massively Parallel Dantzig-Wolfe Decomposition Applied to Traffic Flow Scheduling

Optimal scheduling of air traffic over the entire National Airspace System is a computationally difficult task. To speed computation, Dantzig-Wolfe decomposition is applied to a known linear integer programming approach for assigning delays to flights. The optimization model is proven to have the block-angular structure necessary for Dantzig-Wolfe decomposition. The subproblems for this decomposition are solved in parallel via independent computation threads. Experimental evidence suggests that as the number of subproblems/threads increases (and their respective sizes decrease), the solution quality, convergence, and runtime improve. A demonstration of this is provided by using one flight per subproblem, which is the finest possible decomposition. This results in thousands of subproblems and associated computation threads. This massively parallel approach is compared to one with few threads and to standard (non-decomposed) approaches in terms of solution quality and runtime. Since this method generally provides a non-integral (relaxed) solution to the original optimization problem, two heuristics are developed to generate an integral solution. Dantzig-Wolfe followed by these heuristics can provide a near-optimal (sometimes optimal) solution to the original problem hundreds of times faster than standard (non-decomposed) approaches. In addition, when massive decomposition is employed, the solution is shown to be more likely integral, which obviates the need for an integerization step. These results indicate that nationwide, real-time, high fidelity, optimal traffic flow scheduling is achievable for (at least) 3 hour planning horizons.

Rios, Joseph Lucio↗

NGST Optical Testing

An Integrated Product Team (IPT) was formed to develop a detailed optical test methodology for testing of the Next Generation Space Telescope (NGST) mirrors and the optical system on the ground. Optical testing is a significant cost driver therefore the testing has to be planned in detailed fashion early. This paper will discuss the preliminary metrology test plan at the mirror component and telescope system level. Instrumentation, facilities and schedule will also be addressed.

Keski-Kuha, Ritva↗

Progress Towards the Solar Dynamics Observatory

The Solar Dynamics Observatory, or SDO, is scheduled to be the first mission to launch in 2007 under the new Living With a Star (LWS) program. It builds on the success of SOHO and other recent solar missions, but will observe the Sun at greater resolution and faster time cadence with a set of remote sensing instruments generating data in excess of 100 megabytes per second. The Science Definition Team produced a report consisting of a series of science objectives and a baseline instrument complement. Instrument proposals were due in April 2002, with selection to occur in the late summer of 2002. The spacecraft is being built at NASA Goddard Spacecraft Center by a team of engineers which are currently undergoing the formulation process. The presentation will discuss the current status of the science investigation selection and the spacecraft formulation.

Thompson, B. J.↗

Research in extreme ultraviolet and far ultraviolet astronomy

Analysis and interpretation continued on data generated by the flight of 27.086 in April of 1986 and by the successful UVX mission. Optical and mechanical design of the 1 meter EUV telescope, planned for launch with the large SPARTAN type carrier, ASTRO-SPAS, was also continued. The major effort centered on the preparation of flight 27.106, scheduled to launch in September, 1986. Work which was performed included: design of the skins and bulkheads; completion of the optical, mechanical, and electrical design; purchase of the major components of the instruments; assemblage of the electrical components; and performance of theoretical work, to support the data interpretation.

Bowyer, C. S.↗

Prediction and Measurement of X-Ray Spectral and Intensity Distributions from Low Energy Electron Impact Sources

In-vacuum electron beam welding is a technology that NASA considered as a joining technique for manufacture of space structures. The interaction of energetic electrons with metal produces x-rays. The radiation exposure to astronauts performing the in-vacuum electron beam welding must be characterized and minimized to insure safe operating conditions. This investigation characterized the x-ray environment due to operation of an in-vacuum electron beam welding tool. NASA, in a joint venture with the Russian Space Agency, was scheduled to perform a series of welding in space experiments on board the United States Space Shuttle. This series of experiments was named the International Space Welding Experiment (ISWE). The hardware associated with the ISWE was leased to NASA, by the Paton Welding Institute (PWI) in Ukraine, for ground based welding experiments in preparation for flight. Two tests were scheduled, using the ISWE electron beam welding tool, to characterize the radiation exposure to an astronaut during the operation of the ISWE. These radiation exposure tests consisted of Thermoluminescence Dosimeters (TLD's) shielded with material currently used by astronauts during Extra Vehicular Activities (EVA) and exposed to x-ray radiation generated by operation of an in-vacuum electron beam welding tool. This investigation was the first known application of TLD's to measure absorbed dose from x-rays of energy less than 10 KeV. The ISWE hardware was returned to Ukraine before the issue of adequate shielding for the astronauts was verified. Therefore, alternate experimental and analytical methods were developed to measure and predict the x-ray spectral and intensity distribution generated by electron impact with metal. These x-ray spectra were used to calculate the absorbed radiation dose to astronauts. These absorbed dose values were compared to TLD measurements obtained during actual operation of the in-vacuum electron beam welding tool. The calculated absorbed dose values were found to be in good agreement with the TLD values.

Edwards, David L.↗

System-Oriented Runway Management Concept of Operations

This document describes a concept for runway management that maximizes the overall efficiency of arrival and departure operations at an airport or group of airports. Specifically, by planning airport runway configurations/usage, it focuses on the efficiency with which arrival flights reach their parking gates from their arrival fixes and departure flights exit the terminal airspace from their parking gates. In the future, the concept could be expanded to include the management of other limited airport resources. While most easily described in the context of a single airport, the concept applies equally well to a group of airports that comprise a metroplex (i.e., airports in close proximity that share resources such that operations at the airports are at least partially dependent) by including the coordination of runway usage decisions between the airports. In fact, the potential benefit of the concept is expected to be larger in future metroplex environments due to the increasing need to coordinate the operations at proximate airports to more efficiently share limited airspace resources. This concept, called System-Oriented Runway Management (SORM), is further broken down into a set of airport traffic management functions that share the principle that operational performance must be measured over the complete surface and airborne trajectories of the airport's arrivals and departures. The "system-oriented" term derives from the belief that the traffic management objective must consider the efficiency of operations over a wide range of aircraft movements and National Airspace System (NAS) dynamics. The SORM concept is comprised of three primary elements: strategic airport capacity planning, airport configuration management, and combined arrival/departure runway planning. Some aspects of the SORM concept, such as using airport configuration management1 as a mechanism for improving aircraft efficiency, are novel. Other elements (e.g., runway scheduling, which is a part of combined arrival/departure runway scheduling) have been well studied, but are included in the concept for completeness and to allow the concept to define the necessary relationship among the elements. The goal of this document is to describe the overall SORM concept and how it would apply both within the NAS and potential future Next Generation Air Traffic System (NextGen) environments, including research conducted to date. Note that the concept is based on the belief that runways are the primary constraint and the decision point for controlling efficiency, but the efficiency of runway management must be measured over a wide range of space and time. Implementation of the SORM concept is envisioned through a collection of complementary, necessary capabilities collectively focused on ensuring efficient arrival and departure traffic management, where that efficiency is measured not only in terms of runway efficiency but in terms of the overall trajectories between parking gates and transition fixes. For the more original elements of the concept-airport configuration management-this document proposes specific air traffic management (ATM) decision-support automation for realizing the concept.

Lohr, Gary W.↗