Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Management System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Integration of a Smart Outlet-Based Plug Load Management System with a Building Automation System

The growth of and reliance on renewable energy necessitate a multi-pronged approach to achieve grid reliability and economics. As they represent a notable portion of U.S. energy consumption, commercial buildings must play an active role in this effort. Conserving energy and responding to grid conditions through demand flexibility can be achieved through the integration of major building systems. Integration of plug and process loads with lighting and heating, ventilation, and air conditioning systems maximizes the effectiveness of integrated building energy management. In this research, we demonstrate the integration of smart outlets into a building automation system. We cover the installation process as well as the architecture required for smart outlets to communicate data to the building automation system and to receive commands back. After recording power measurements for one week as a baseline, we configured the building automation system to turn the smart outlets on and off according to a set schedule. This resulted in energy savings of 66% during 1 week on 25 plug loads. This work demonstrates that grid-interactive efficient buildings are achievable through building system integration.

building automation system↗

The Development of a Smart Distribution Grid Testbed for Integrated Information Management Systems

This paper presents a smart distribution grid testbed to test or compare designs of integrated information management systems (I2MSs). An I2MS extracts and synthesizes information from a wide range of data sources to detect abnormal system behaviors, identify possible causes, assess the system status, and provide grid operators with response suggestions. The objective of the testbed is to provide a modeling environment with sufficient data sources for the I2MS design. The testbed includes five information layers and a physical layer; it generates multi-layer chronological data based on actual measurement playbacks or simulated data sets produced by the physical layer. The testbed models random hardware failures, human errors, extreme weather events, and deliberate tampering attempts to allow users to evaluate the performance of different I2MS designs. Initial results of I2MS performance tests showed that the testbed created a close-to-real-world environment that allowed key performance metrics of the I2MS to be evaluated.

99 GENERAL AND MISCELLANEOUS↗

Multifunctional Systems for Planetary Exploration

We summarize the findings and recommendations of the Adaptive Multifunctional Systems for Micro-climate Control Study held at the Caltech Keck Institute for Space Studies. The objective of the Study was to adapt the most recent advances in multifunctional reconfigurable and adaptive systems to enable a microenvironment control to enable space exploration in extreme environments of the Solar System. The technical goal was to identify the most efficient materials, architectures, structures, system autonomy and energy management solutions needed to optimally project or generate a micro - environment around space assets. An important aspect of the Study was the consideration of distributed cellular systems as an architecture for multifunctional systems.

Quadrelli, Marco B.↗

TOPEX electrical power system

The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

Chetty, P. R. K.↗

Maximizing Thermal Efficiency and Optimizing Energy Management [Fact Sheet]

Researchers at the Thermal Test Facility (TTF) on the campus of the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) in Golden, Colorado, are addressing maximizing thermal efficiency and optimizing energy management through analysis of efficient heating, ventilating, and air conditioning (HVAC) strategies, automated home energy management (AHEM), and energy storage systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Will the Measurement Robots Take Our Jobs? An Update on the State of Automated M&V for Energy Efficiency Programs

Trustworthy savings calculations are critical to convincing regulators of both the cost-effectiveness of energy efficiency program investments and their ability to defer supply-side capital investments. Today’s methods for measurement and verification (M&V) of energy savings constitute a significant portion of the total costs of energy efficiency programs. They also require time-consuming data acquisition. A spectrum of savings calculation approaches is used, with some relying more heavily on measured data and others relying more heavily on estimated, modeled, or stipulated data. The rising availability of “smart” meters and devices that report near-real time data, combined with new analytical approaches to quantifying savings, offers potential to conduct M&V more quickly and at lower cost, with comparable or improved accuracy. Commercial energy management and information systems (EMIS) technologies are beginning to offer M&V capabilities, and program administrators want to understand how they might assist programs in quickly and accurately measuring energy savings. This paper presents the results of recent testing of the ability to use automation to streamline some parts of M&V. Here in this paper, we detail metrics to assess the performance of these new M&V approaches, and a framework to compute the metrics. We also discuss the accuracy, cost, and time trade-offs between more traditional M&V, and these emerging streamlined methods that use high-resolution energy data and automated computational intelligence. Finally we discuss the potential evolution of M&V and early results of pilots currently underway to incorporate M&V automation into ratepayer-funded programs and professional implementation and evaluation practice.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation and Demonstration of Blockchain Applicability Framework

Blockchain technology has been gaining great interest from a variety of industry sectors, including financial, food processing, and power and energy markets. Realizing the strength of blockchain technology beyond the successful application in the cryptocurrency arena, researchers have been evaluating and using blockchain for applications such as supply chain management, transactive industry (both financial and energy), system integrity, device cybersecurity, identity management, and much more. One of the unique elements of the blockchain technology that made it such a captivating technology to researchers is its plethora of features. Some of the features include smart contracts, cryptocurrency and tokenizing, immutable distributed ledger, cryptographic hashing, and digital signature. In addition, there are multiple types of blockchains, such as permissioned/private and permissionless/public, and various consensus models, such as proof-of-work, proof-of-authority, proof-of-burn, and proof-of-stake. Therefore, it is often non-trivial to determine if an application requires a blockchain. If so, what kind of blockchain and consensus is most appropriate? This paper discusses the blockchain applicability framework (BAF), which was specifically designed with the purpose to answer those questions. BAF is divided into five domains, 18 subdomains, and about 100 controls. It is designed to ingest detailed user requirements to perform a weighted evaluation that is built on mathematical constructs to determine the ideal combination of blockchain that is appropriate for an application. Along with the core logical formulation of BAF, this paper depicts the efficacy of BAF through two use cases

Gourisetti, Sri Nikhil G.↗

A Control Strategy for Turbine Electrified Energy Management

Hybrid electric propulsion architectures provide the infrastructure to enable additional benefits to the propulsion system that are otherwise unrealizable with the sole use of the current, state-of-the-art, gas-driven, turbine engines. The presence of electric machines (EMs) coupled to the shaft(s) of the turbine engine provide the ability to actively alter the operation of the engine to the benefit of the propulsion system and the aircraft it propels. This is the goal of the Turbine Electrified Energy Management (TEEM) concept, which at its broadest level addresses the management of energy across the electrified propulsion system. Prior work has demonstrated the use of this concept to alter steady-state operation and improve transient operability of a hybrid-electric propulsion system. The main benefits previously illustrated include the elimination of stability bleeds and expansion of the turbomachinery design space in order to enable more efficient designs. This paper focuses on the development of control strategies to implement the TEEM concept, and it explores several possible architecture variants for applying this concept. Comparison studies are conducted between a purely gas-driven turbofan (baseline engine configuration) and TEEM augmented variants of the baseline engine. The variants are distinguished by the shaft(s) that possess an EM. The configurations consider EMs on both shafts, an EM on the high pressure spool (HPS) only, and an EM on the low pressure spool (LPS) only. These configurations are referred to as the dual-spool configuration, the HPS configuration, and LPS configuration, respectively. The studies expose several options in configuring and controlling the system, including the use of a single EM coupled to a single shaft of a two-spool engine to positively impact the operability of both shafts. The studies also demonstrate the use of independently designed controllers for the electric machine(s) that allow for a decoupled control design process.

Energy management↗

A Control Strategy for Turbine Electrified Energy Management

Hybrid electric propulsion architectures provide the infrastructure to enable additional benefits to the propulsion system that are otherwise unrealizable with the sole use of the current, state-of-the-art, gas-driven, turbine engines. The presence of electric machines (EMs) coupled to the shaft(s) of the turbine engine provide the ability to actively alter the operation of the engine to the benefit of the propulsion system and the aircraft it propels. This is the goal of the Turbine Electrified Energy Management (TEEM) concept, which at its broadest level addresses the management of energy across the electrified propulsion system. Prior work has demonstrated the use of this concept to alter steady-state operation and improve transient operability of a hybrid-electric propulsion system. The main benefits previously illustrated include the elimination of stability bleeds and expansion of the turbomachinery design space in order to enable more efficient designs. This paper focuses on the development of control strategies to implement the TEEM concept, and it explores several possible architecture variants for applying this concept. Comparison studies are conducted between a purely gas-driven turbofan (baseline engine configuration) and TEEM augmented variants of the baseline engine. The variants are distinguished by the shaft(s) that possess an EM. The configurations consider EMs on both shafts, an EM on the high pressure spool (HPS) only, and an EM on the low pressure spool (LPS) only. These configurations are referred to as the dual-spool configuration, the HPS configuration, and LPS configuration, respectively. The studies expose several options in configuring and controlling the system, including the use of a single EM coupled to a single shaft of a two-spool engine to positively impact the operability of both shafts. The studies also demonstrate the use of independently designed controllers for the electric machine(s) that allow for a decoupled control design process.

Electrified↗

Thermal Management Tools for Propulsion System Trade Studies and Analysis

Energy-related subsystems in modern aircraft are more tightly coupled with less design margin. These subsystems include thermal management subsystems, vehicle electric power generation and distribution, aircraft engines, and flight control. Tighter coupling, lower design margins, and higher system complexity all make preliminary trade studies difficult. A suite of thermal management analysis tools has been developed to facilitate trade studies during preliminary design of air-vehicle propulsion systems. Simulink blocksets (from MathWorks) for developing quasi-steady-state and transient system models of aircraft thermal management systems and related energy systems have been developed. These blocksets extend the Simulink modeling environment in the thermal sciences and aircraft systems disciplines. The blocksets include blocks for modeling aircraft system heat loads, heat exchangers, pumps, reservoirs, fuel tanks, and other components at varying levels of model fidelity. The blocksets have been applied in a first-principles, physics-based modeling and simulation architecture for rapid prototyping of aircraft thermal management and related systems. They have been applied in representative modern aircraft thermal management system studies. The modeling and simulation architecture has also been used to conduct trade studies in a vehicle level model that incorporates coupling effects among the aircraft mission, engine cycle, fuel, and multi-phase heat-transfer materials.

McCarthy, Kevin↗

Considerations for Involving Citizen Science in an Integrated Waste Management System - 17506

The U.S. Department of Energy's (DOE's) goal is to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The DOE has been exploring options for an integrated waste management system to transport, store, and dispose of SNF and HLW from commercial electricity generation, as well national defense activities. To support its efforts, DOE has been exploring ways to seek broad input from the public. The role of citizen science in a wide range of projects is increasing. In the U.S. 2013 and 2015 Open Government National Action Plans, the U.S. government encouraged all Federal agencies to pursue public participation through citizen science, and a large number of agencies and organizations have responded. This paper explores the potential for considering citizen science projects as part of an integrated waste management system, including the siting of facilities. A literature review was performed to gain insights into how citizen science projects can be effectively developed and deployed, including success factors and lessons learned. Results highlight the experiences shared by many people who have developed and implemented citizen science projects, which provide valuable context for potential application to a facility siting process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ultra-Capacitor Energy Storage in a Large Hybrid Electric Bus

The power requirements for inner city transit buses are characterized by power peaks about an order of magnitude larger than the average power usage of the vehicle. For these vehicles, hybrid power trains can offer significantly improved fuel economy and exhaust emissions. A critical design challenge, however, has been developing the energy storage and power management system to respond to these rapid power variations. Most hybrid vehicles today use chemical energy storage batteries to supplement the power from the fuel burning generator unit. Chemical storage batteries however, present several difficulties in power management and control. These difficulties include (1) inadequate life, (2) limited current delivery as well as absorption during regenerative braking, (3) inaccurate measurement of state of charge, and (4) stored energy safety issues. Recent advances in ultra-capacitor technology create an opportunity to address these concerns. The NASA Lewis Research Center, in cooperation with industry and academia, has developed an advanced hybrid electric transit bus using ultra-capacitors as the primary energy storage system. At over 15,000-kg gross weight, this is the largest vehicle of its kind ever built using this advanced energy storage technology. Results of analyses show that the vehicle will match the performance of an equivalent conventionally powered vehicle over typical inner city drive cycles. This paper describes the overall power system architecture, the evolution of the control strategy, and analysis of power flow and vehicle performance.

Viterna, L. A.↗

ADMS and DER Coordinated Capability Demonstrations to Assist Utilities to Increase Resilience and Reliability

The proliferation of distributed energy resources (DERs) presents opportunities and challenges to distribution grid operators. The National Renewable Energy Laboratory (NREL) and Survalent are collaborating to demonstrate advanced distribution management system (ADMS) and DER coordinated capability to assist utilities to increase resilience and reliability. ADMS and Distributed Energy Resource Management System (DERMS) Coordination for Peak Load Management (PLM). Fault Location, Isolation, and Service Restoration (FLISR) in the Presence of DERs. Grid-Edge Intelligent Distribution Automation System for Self-Healing Distribution Grids. These laboratory demonstrations use NREL's ADMS Test Bed.

ADMS↗

Army Energy and Water Reporting System Assessment

There are many areas of desired improvement for the Army Energy and Water Reporting System. The purpose of system is to serve as a data repository for collecting information from energy managers, which is then compiled into an annual energy report. This document summarizes reported shortcomings of the system and provides several alternative approaches for improving application usability and adding functionality. The U.S. Army has been using Army Energy and Water Reporting System (AEWRS) for many years to collect and compile energy data from installations for facilitating compliance with Federal and Department of Defense energy management program reporting requirements. In this analysis, staff from Pacific Northwest National Laboratory found that substantial opportunities exist to expand AEWRS functions to better assist the Army to effectively manage energy programs. Army leadership must decide if it wants to invest in expanding AEWRS capabilities as a web-based, enterprise-wide tool for improving the Army Energy and Water Management Program or simply maintaining a bottom-up reporting tool. This report looks at both improving system functionality from an operational perspective and increasing user-friendliness, but also as a tool for potential improvements to increase program effectiveness. The authors of this report recommend focusing on making the system easier for energy managers to input accurate data as the top priority for improving AEWRS. The next major focus of improvement would be improved reporting. The AEWRS user interface is dated and not user friendly, and a new system is recommended. While there are relatively minor improvements that could be made to the existing system to make it easier to use, significant improvements will be achieved with a user-friendly interface, new architecture, and a design that permits scalability and reliability. An expanded data set would naturally have need of additional requirements gathering and a focus on integrating with other existing data sources, thus minimizing manually entered data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An open control sequence specification to scale building demand flexibility via analytics software

For over two decades, researchers and practitioners have showcased the ability of large commercial buildings to provide grid services by shedding or shifting load. Various utility demand response (DR) and virtual power plant (VPP) programs throughout the United States are presently utilizing these demand-side resources. However, growth of these programs have been limited, in part due to the high cost necessary to integrate the DR control strategies into the building automation system (BAS). Implementing these strategies involves adjusting control sequences, necessitating dozens of hours of customized programming per building, limiting their adoption to large organizations and progressive owners. Recent efforts by researchers and industry have demonstrated the capability of energy management and information systems (EMIS), originally designed for fault detection and diagnostics, to interface with existing BAS and perform supervisory control to optimize building operations. While these approaches are quickly being adopted by industry, demand flexibility (DF) control strategies remain limited in product offerings. One of the challenges is the lack of documented best-practice DF sequences, despite the rich literature on field implementations. This paper develops a new open-specification for a zone-based temperature adjustment shed strategy for commercial building HVAC systems, describing the specification’s implementation in two EMIS tools in both experimental and field settings. Both implementations successfully reduced electric load by at least 40% on average during the called event, while maintaining temperature limits. This study’s detailed process from specification to deployment shows the potential for scalability as well as highlights challenges related to integration with heterogeneous BAS products.

Granderson, Jessica↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Building analytics and monitoring-based commissioning: industry practice, costs, and savings

As building energy and system-level monitoring becomes more common, facility teams are faced with an overwhelming amount of data. This data does not typically lead to insights, corrective actions, and energy savings unless it is stored, organized, analyzed, and prioritized in automated ways. The Smart Energy Analytics Campaign is a public-private sector partnership program focused on supporting commercially available energy management and information systems (EMIS) technology use and monitoring-based commissioning (MBCx) practices. MBCx is an ongoing commissioning process with focus on analyzing large amounts of data on a continuous basis. EMIS tools are used in the MBCx process to organize, present, visualize, and analyze the data. With campaign data from over 400 million square feet (sq. ft.) of installed space, this paper presents the results achieved by owners that are implementing EMIS, along with associated technology costs. The study’s EMIS users that reported savings achieved the median cost savings of $0.19/sq. ft. and 7% annually, with savings shown to increase over time. For 35 portfolio owners, the median base cost to install an EMIS was $0.03/sq. ft., with an annual recurring software cost of $0.02/sq. ft. and an estimated annual labor cost of $0.03/sq. ft. Two types of EMIS systems -- energy information systems and fault detection and diagnostic systems -- are defined in the body of the paper. Of the two, we find that fault detection and diagnostic systems have both higher savings and higher costs. The paper offers a characterization of EMIS products, MBCx services, and trends in the industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗