Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Management Information Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Developing a Decision Support Engine to Enable Irrigation Modernization - Poster

Irrigation systems in the United States are some of the oldest continually utilized infrastructure in existence today, with some systems exceeding 100 years in age. They are operated to meet farming demands but are managed through a balance of varying influence: policies limiting water usage, stakeholder interests, and environmental impacts. Irrigation modernization is defined as a set of activities that update and improve existing irrigation systems, including, but not limited to improving water quantity, development of distributed energy resources for surrounding communities, ecosystem services, and improved agricultural yields. Modernizing an existing irrigation system can enable stakeholders to combat changing environmental and population demands but is difficult because the complexity involved in determining the potential benefits and consequences of irrigation modernization is high. We are combining a large amount of various geospatial, tabular, and temporal data with subject matter expertise into a decision support engine that will enable stakeholders to determine the benefits and consequences of irrigation modernization in their irrigation systems. A web-based GIS will allow the user to construct the modifications out of a palette of modernization options, which will be sent to the analytics engine for computations, and back to the web client for a graphical display and comparison of relevant metrics. Our development process involves four phases: 1) identify mechanisms of modernization, 2) identify data requirements, data streams, first principles and applicable algorithms necessary to quantify modernization mechanisms, 3) create ‘modules’ for each modernization mechanism, these modules will form the decision support engine, each capable of performing independently but can also inform other modules when needed, 4) Merge the decision support engine with a user interface, capable of ingesting user inputs and returning insights into the impacts of a modernization project as they relate to economic, environmental, monetary, and energy generation. Once complete, it is our intention that this tool will be fundamental in irrigation modernization projects, providing a strong analytical basis from which stakeholders can quickly make informed decisions regarding project development.

13 HYDRO ENERGY↗

The CanBikeCO Mini Pilot: Preliminary Results and Lessons Learned

In fall 2020, the Colorado Energy Office, as part of the State of Colorado’s “Can Do Colorado” initiative, initiated a project aimed at encouraging energy-efficient transportation during the COVID-19 pandemic. The initial mini-pilot provided e-bikes to 13 low-income households under an individual ownership model. This report assesses the impact of providing this additional mobility option on the travel behavior of participants. It also outlines the lessons learned from deploying a continuous monitoring platform to track the travel behavior. These lessons will influence the evaluation component for the full pilot, which will cover multiple geographic regions, starting in summer 2021, and run for 2 years. The continuous data collection was enabled by a customized version of the open-source e-mission platform, called CanBikeCO, configured with a behavioral gamification feature. The Colorado Energy Office used this system to collect a unique data set consisting of 3 months of partially automated travel diaries, combining sensed and surveyed data and linked with demographic information, from 12 participants. The data collection process worked well overall: users generally liked the app, appreciated the game, and did not complain about battery life. The long tracking period introduced behavioral challenges in user engagement, which we plan to address using repeated patterns and automated status checks for the full pilot. The analysis results, based on the subset of trips with user-reported labels (68%), indicate that the e-bike was the dominant commute mode share (31%), in sharp contrast to the census bicycle commute mode share (<1%). E-bike trips primarily replaced single-occupancy vehicle (SOV) trips (28%), followed closely by walking (24%) and regular bike (20%). The nonmotorized mode replacement corresponds to lower travel time and increased productivity enabled by the program. The emissions impact analysis of the program, computed using trip-level energy intensity factors, indicates savings of 1,367 lbs. of CO 2 . Although the results are strongly positive, the narrow demographic profile of study participants, their limited mobility alternatives, and nonuniform labeling indicate caution in broader interpretation. These preliminary results do suggest that such programs, supported by real-time education and support from program managers, can simultaneously meet equity and sustainability goals. The planned full pilot, addressing the data collection challenges and broadening the geographic scope, will provide additional insights into the generality of this approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

Geothermal Hydraulic Stimulation: Overview of Methods and Best Practices

This paper outlines important information related to the hydraulic stimulation of geothermal wells and considerations for regulators responsible for evaluating applications to conduct these operations. Hydraulic stimulation applied to geothermal wells is an evolving technology that is different from the hydraulic fracturing process widely used to complete unconventional oil and gas wells. Important differences relate to operating pressures, variations in rock and fracture processes, and characteristics and disposal of hydraulic fracture fluids. Hydraulic stimulation is not widely used in the geothermal industry; however, future development of enhanced geothermal systems (EGS) will require hydraulic stimulation in order to enhance and create fracture permeability to allow wells to deliver sufficient heat and fluid to power plants. Gigawatts of EGS potential have been identified (U.S. Department of Energy 2019), so it is expected that the use of hydraulic stimulation of geothermal wells will be more common in the future. At present, there are no formal regulations guiding drilling programs or sundry notices that propose hydraulic stimulation of geothermal wells. On federal lands, important constraints and oversight are embedded in the process for obtaining Geothermal Drilling Permits outlined in the Code of Federal Regulations (43 CFR Section 3262.11); in Geothermal Resource Order 2 (GRO 2) guidance for assessment and mitigation of impacts of geothermal operations as well as construction and testing of geothermal wells; and in a Bureau of Land Management (BLM) Induced Seismicity Instruction Memorandum (BLM 2018). Additionally, local knowledge from BLM field offices and expertise of BLM engineers, or that of state regulators for operations on private and state lands, will be applied to fully assess operator applications to conduct geothermal hydraulic stimulation activities. Significant research effort has been directed toward EGS, so geothermal hydraulic stimulation techniques, impacts, and results are evolving and becoming better understood, including adaptation of decades of oil and gas industry experience with hydraulic fracturing of unconventional reservoirs. Recent EGS activities in the United States provide details about hydraulic stimulation with respect to oversight, stimulation design, execution, and results. Based on experience to date, the important issues to address when hydraulically stimulating a geothermal well include the following: 1. Wellbore construction and integrity must be appropriate to protect groundwater and manage stimulation pressures. 2. Understanding of lithology, faults, fractures, and subsurface stress state is necessary to design stimulation plans and predict results. 3. Seismic monitoring allows for observation and mitigation of induced seismicity.

geothermal↗

Development and Evaluation of Velocity Predictive Optimal Energy Management Strategies in Intelligent and Connected Hybrid Electric Vehicles

In this study, a thorough and definitive evaluation of Predictive Optimal Energy Management Strategy (POEMS) applications in connected vehicles using 10 to 20 s predicted velocity is conducted for a Hybrid Electric Vehicle (HEV). The presented methodology includes synchronous datasets gathered in Fort Collins, Colorado using a test vehicle equipped with sensors to measure ego vehicle position and motion and that of surrounding objects as well as receive Infrastructure to Vehicle (I2V) information. These datasets are utilized to compare the effect of different signal categories on prediction fidelity for different prediction horizons within a POEMS framework. Multiple artificial intelligence (AI) and machine learning (ML) algorithms use the collected data to output future vehicle velocity prediction models. The effects of different combinations of signals and different models on prediction fidelity in various prediction windows are explored. All of these combinations are ultimately addressed where the rubber meets the road: fuel economy (FE) enabled from POEMS. FE optimization is performed using Model Predictive Control (MPC) with a Dynamic Programming (DP) optimizer. FE improvements from MPC control at various prediction time horizons are compared to that of full-cycle DP. All FE results are determined using high-fidelity simulations of an Autonomie 2010 Toyota Prius model. The full-cycle DP POEMS provides the theoretical upper limit on fuel economy (FE) improvement achievable with POEMS but is not currently practical for real-world implementation. Perfect prediction MPC (PP-MPC) represents the upper limit of FE improvement practically achievable with POEMS. Real-Prediction MPC (RP-MPC) can provide nearly equivalent FE improvement when used with high-fidelity predictions. Constant-Velocity MPC (CV-MPC) uses a constant speed prediction and serves as a “null” POEMS. Results showed that RP-MPC, enabled by high-fidelity ego future speed prediction, led to significant FE improvement over baseline nearly matching that of PP-MPC.

33 ADVANCED PROPULSION SYSTEMS↗

HydroForecast Long-term: Improving hydropower’s resilience to climate change through accurate climate-scale

With hydrologic patterns and water availability across the globe shifting due to climate change, advancements in hydrologic prediction systems can help significantly reduce the uncertainties that utilities and water supply entities have in their decision making. Understanding and estimating hydrology at the climate scale is critical for managing water resources under changing climate scenarios. This project focuses on integrating state-of-the-art neural network modeling with downscaled climate projections to deliver the reliable water supply projections decades into the future to meet an urgent need from hydropower operators and water utilities. In this Phase 1 DOE SBIR proposal, we developed and validated a theory-guided neural network model, HydroForecast Long-term, for climate-scale hydrology and implemented the model within existing HydroForecast infrastructure. HydroForecast Long-term combines the most accurate streamflow modeling system with a flexible and scalable data architecture to generate water supply projections out to the year 2100. This report illustrates that we have achieved our four objectives: 1) create a prototype of HydroForecast Long-term, building the neural network prediction model, 2) build an automated data input pipeline that processes large amounts of data from the latest global temperature and precipitation climate models; 3) benchmark the accuracy of the hydrologic model over the recent two decades over a large set of diverse basins, and 4) create a set of output visuals and summary metrics informed by customer feedback that connect the data to critical decision points. This work empowers water users to make data-informed decisions supporting a resilient, renewable-powered grid and water system. The results advance the Department of Energy’s mission by addressing critical gaps in water supply planning under climate change.

13 HYDRO ENERGY↗

Design and implementation of dynamic I/O control scheme for large scale distributed file systems

In this paper, we have analyzed the input/output (I/O) activities of Cori, which is a high-performance computing system at the National Energy Research Scientific Computing Center at Lawrence Berkeley National Laboratory. Our analysis results indicate that most users do not adjust storage configurations but rather use the default settings. In addition, owing to the interference from many applications running simultaneously, the performance varies based on the system status. To configure file systems autonomously in complex environments, we developed DCA-IO, a dynamic distributed file system configuration adjustment algorithm that utilizes the system log information to adjust storage configurations automatically. Our scheme aims to improve the application performance and avoid interference from other applications without user intervention. Moreover, DCA-IO uses the existing system logs and does not require code modifications, an additional library, or user intervention. To demonstrate the effectiveness of DCA-IO, we performed experiments using I/O kernels of real applications in both an isolated small-sized Lustre environment and Cori. Our experimental results shows that our scheme can improve the performance of HPC applications by up to 263% with the default Lustre configuration.

97 MATHEMATICS AND COMPUTING↗

NPD Classification Tools – User Guide NPD Explorer and NPDamCAT Apps

The existing infrastructure at non-powered dams (NPDs) presents a variety of opportunities from generating electricity and economic value to the myriad services they provide. However, it also presents a significant challenge because aging structures must be maintained, and changes to the ecosystems and river systems by NPDs must be managed. The various stakeholders interested in these opportunities and challenges require varying information about NPDs; in many cases, interest in NPDs can extend across the entire population of dams. Even when interest is more narrowly focused on an individual dam or a small subset of dams, understanding how these dams relate to the broader context of NPD infrastructure can be important. As noted in TM 2021/2155, “Each NPD has unique characteristics describing its design, operation, environmental impacts, social impacts, and economic potential. The large number of dams, the diversity of interests related to dams, the variety of dam characteristics, and the types of data required to describe dams all pose major challenges to an analysis of the entire dam population." This user guide describes two web-based tools that facilitate exploration of dams from a variety of perspectives: the NPD Explorer and the NPD Custom Analysis and Taxonomy (NPDamCAT). These tools facilitate access to information about dams and help users interact with the information, making small- to large-scale analyses more convenient for a broad set of stakeholders.

13 HYDRO ENERGY↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past years. I used the computer and office machines, and also worked with personnel in setting up a Cost Estimation Plan. I gained office experience in Word, Excel, and Power Point, with the completion of a variety of tasks. I made spreadsheets that pertained to the budget plan for Journey to Tomorrow, to name a few I have supported the office by tracking resource information: including programmatic travel, project budget at the center level to budgets for individual research sub-projects and grants. I also assisted the Program Support Office in their duties including, representing the office on numerous occasions on center-wide team/panels, such as the Space management committee, IFMP Budget Formulation, Journey to Tomorrow Committee, and the Vehicle Systems Program Business Process Team.

Buttler, Jennifer A.↗

Reimagining Earth in the Earth System

Abstract Terrestrial, aquatic, and marine ecosystems regulate climate at local to global scales through exchanges of energy and matter with the atmosphere and assist with climate change mitigation through nature‐based climate solutions. Climate science is no longer a study of the physics of the atmosphere and oceans, but also the ecology of the biosphere. This is the promise of Earth system science: to transcend academic disciplines to enable study of the interacting physics, chemistry, and biology of the planet. However, long‐standing tension in protecting, restoring, and managing forest ecosystems to purposely improve climate evidences the difficulties of interdisciplinary science. For four centuries, forest management for climate betterment was argued, legislated, and ultimately dismissed, when nineteenth century atmospheric scientists narrowly defined climate science to the exclusion of ecology. Today's Earth system science, with its roots in global models of climate, unfolds in similar ways to the past. With Earth system models, geoscientists are again defining the ecology of the Earth system. Here we reframe Earth system science so that the biosphere and its ecology are equally integrated with the fluid Earth to enable Earth system prediction for planetary stewardship. Central to this is the need to overcome an intellectual heritage to the models that elevates geoscience and marginalizes ecology and local land knowledge. The call for kilometer‐scale atmospheric and ocean models, without concomitant scientific and computational investment in the land and biosphere, perpetuates the geophysical view of Earth and will not fully provide the comprehensive actionable information needed for a changing climate.

Meteorology & Atmospheric Sciences↗

Abstract for CRADA between NETL and Rivalia Chemical Co

The National Energy Technology Laboratory (NETL) will assist Rivalia Chemical Co (Participant) with system analyses to aid the Participant with setting priorities and securing funding. The Participant is an early-stage startup pioneering new chemical extraction technology to solve two important problems: critical mineral scarcity and coal ash waste management. The U.S. generates coal fly ash from coal combustion for power generation and has amassed over two billion metric tons of ash, which contains valuable rare earth elements. The ash is often stored in unlined ponds and frequently contaminates the local environment. The Participant’s patent-pending process harvests rare earths from ash, then transforms the residual ash for use in green concrete, providing an economic pathway for utilities to empty and remediate the ash ponds. Founder Laura Stoy created the company in July 2022 after developing the core intellectual property during her Ph.D. at the Georgia Institute of Technology. Stoy is currently participating in the Chain Reactions Innovations (CRI) program at the U.S. Department of Energy (DOE) Argonne National Laboratory (ANL) where she will be optimizing the core technology and scaling from bench scale to demonstration scale. The technology has been validated at bench scale (TRL3); the goal is to approach TRL5 by the conclusion of the CRI program and prepare to raise capital investment for a pilot facility. NETL and the Participant will develop an updated technoeconomic analysis (TEA) and identify key sustainability performance parameters to inform ’s research and development priorities and de-risk the technology. NETL will also provide the Participant with guidance to prepare a more detailed life cycle assessment (LCA), and a narrative on the Participant’s product markets. These tools will aid the Participant with the next steps of commercialization.

01 COAL, LIGNITE, AND PEAT↗

Exceedance Probabilities and Recurrence Intervals for Extended Power Outages in the United States

Power outages cause significant economic and societal impacts. An increasing likelihood of extreme weather coupled with aging grid infrastructure is leading to a higher prevalence of extended power outages, which can leave customers without power for multiple days or even weeks. Planners at the facility, local, state, and federal levels are interested in resilience solutions to reduce the impacts of extended power outages. Resilience solutions—such as installing backup systems, integrating microgrid solutions, weatherizing buildings, and hardening distribution and transmission components—can reduce the consequences of extended power outages, but these solutions come with increased capital costs. Conducting cost-benefit analyses is important for determining which steps to take to mitigate the impact of power outages without investing in ineffective and cost-prohibitive resilience solutions. The expected benefits of resilience investments depend on the frequency of power outages of various durations, particularly extended outages lasting several hours, days, or weeks. A significant barrier to resilience planning is the lack of publicly available data on the frequency and duration of extended power outages. The absence of outage duration information severely limits the ability to conduct quantitative cost-benefit analyses of resilience investments. This report provides estimates of recurrence intervals and conditional exceedance probabilities for major power outages by U.S. region between 2015 and 2021. Additionally, we provide estimates for grid management, particularly outages caused by California’s public safety power shutoffs (PSPS), and for natural outages caused by major hurricanes. Outage recurrence intervals are the average number of years between outage events, and conditional exceedance probabilities are the likelihoods that a customer who experiences a major power outage will experience an outage exceeding a given duration. Major outage events are those that affect 10,000 or more customers, as defined by the U.S. Department of Energy’s (DOE’s) Electric Emergency Incident and Disturbance Report, called OE-417 (DOE 2020). These results can be applied to determine the likelihood of experiencing long-duration outages, which can be integrated into cost-benefit analyses of resilience solutions and broader energy resilience studies. We developed a methodology to estimate customer outage durations for extended outage events using publicly available data on customer outages. Shorter-duration power outages are relatively common, with customers experiencing on average more than one power outage each year lasting fewer than 12 hours. An outage event lasting between 1 day and 1 week is expected to occur between once every 16 years and once every 42 years, depending on the region, with an average recurrence rate of once every 32 years across the contiguous United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)↗

Predicting and Managing Lighting and Visibility for Human Operations in Space

Lighting is critical to human visual performance. On earth this problem is well understood and solutions are well defined and executed. Because the sun rises and sets on average every 45 minutes during Earth orbit, humans working in space must cope with ~ extremely dynamic lighting conditions varying from very low light conditions to severe glare and contrast conditions. For critical operations, it is essential that lighting conditions be predictable and manageable. Mission planners need to detelmine whether low-light video cameras are required or whether additional luminaires, or lamps, need to be flown . Crew and flight directors need to have up to date daylight orbit time lines showing the best and worst viewing conditions for sunlight and shadowing. Where applicable and possible, lighting conditions need to be part of crew training. In addition, it is desirable to optimize the quantity and quality of light because of the potential impacts on crew safety, delivery costs, electrical power and equipment maintainability for both exterior and interior conditions. Addressing these issues, an illumination modeling system has been developed in the Space Human Factors Laboratory at ASA Johnson Space Center. The system is the integration of a physically based ray-tracing package ("Radiance"), developed at the Lawrence Berkeley Laboratories, a human factors oriented geometric modeling system developed by NASA and an extensive database of humans and their work environments. Measured and published data has been collected for exterior and interior surface reflectivity; luminaire beam spread distribution, color and intensity and video camera light sensitivity and has been associated with their corresponding geometric models. Selecting an eye-point and one or more light sources, including sun and earthshine, a ~ snapshot of the light energy reaching the surfaces or reaching the eye point is computed. This energy map is then used to extract the required information needed for useful predictions. Using a validated, comprehensive illumination model integrated with empirically derived data, predictions of lighting and viewing conditions have been successfully used for Shuttle and Space Station planning and assembly operations. It has successfully balanced the needs for adequate human performance with the utili zation of resources. Keywords: Modeling, ray tracing, luminaires, refl ectivity, luminance, illuminance.

Maida, James C.↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Value of Information and Data Management Platform Promoting Modern Data Analysis Utilization. STTR Phase I, Final Technical Report

The immense growth in weather and river sensor data availability along with increases in computational power and algorithmic sophistication have enabled the widespread application of physical, machine learning, and artificial intelligence algorithms to river forecasting. The forecasts produced by widely varying model approaches are inherently limited in different ways, such as by the number and quality of training observations, producing biased predictions that achieve optimal skill only over specific ranges of weather and river conditions. Thus, despite the growing availability and new sources of forecasts, hydropower owners cannot fully leverage the information because they lack an effective mechanism to determine the “best” forecast for given conditions or objectives. Tools are needed to consolidate forecast information, demonstrate skill, and extract optimal forecast guidance from the range of possibilities. Such tools will increase uptake and beneficial use of the growing wealth of forecast information, and lead to improved operating decisions, optimal power generation, and enhanced system value. This research proposes to improve the value of forecasts by developing a broadly accessible verification framework and applying machine learning techniques to identify the ‘best’ forecast from an ensemble of sources given the current weather, river, and operating conditions.

13 HYDRO ENERGY↗