Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Earth Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

IVGEN

The Exploration Medical Capabilities Element of NASA's Human Research Program chartered the IV fluid GENeration (IVGEN) project at the NASA Glenn Research Center to develop a system that could produce IV fluid in a microgravity environment meeting USP standards. NASA's flight surgeons have identified medical conditions likely to arise during exploration missions of various length and distance from the earth. Adequately treating some of those conditions will require the ability to utilize Intravenous (IV) therapy to either serve as a method for delivering pharmaceuticals that can only be administered via that route, or to hydrate patients that are unable to hydrate themselves. Given that need, NASA currently maintains a reserve of IV fluid on ISS sufficient to treat an astronaut until they can be returned to earth, which is generally within 24 hours. Because such a rapid return will not be an designed to produce United States Pharmacopeia ( USP) grade IV fluid in a reduced gravity p option for missions extending beyond low earth orbit, NASA must either fly as many as 100 liters of IV fluid, with a total mass of 100 Kg, or provide systems that can use vehicle resources to produce such fluid if it is needed. The IVGEN hardware, a compact water purification and mixing system, was environment using available resources.

DeVon, Griffin↗

Pilot Field Test: Performance of a Sit-to-Stand Test After Long-Duration Space Flight

BACKGROUND: Astronauts returning from the International Space Station are met by a team of recovery personnel typically providing physical assistance and medical support immediately upon landing. That is because long-duration spaceflight impacts astronauts' functional abilities. Future expeditions to planets or asteroids beyond the low Earth orbit, however, may require crewmembers to egress the vehicle and perform other types of physical tasks unassisted. It is therefore important to characterize the extent and longevity of functional deficits experienced by astronauts in order to design safe exploration class missions. Pilot Field Test (PFT) experiment conducted with participation of ISS crewmembers traveling on Soyuz expeditions 34S - 41S comprised several tasks designed to study the recovery of sensorimotor abilities of astronauts during the first 24 hours after landing and beyond. METHODS: The first test in the PFT battery sequence, and also the least demanding one from the sensorimotor perspective, was a Sit-to-Stand test. Test subjects were seated in the chair and had to stand up on command and remain standing for ten seconds. The subjects were instructed to stand up unassisted as quickly as they were able to, while maintaining postural control. Synchronized wireless inertial sensors mounted on the head, chest, lower back, wrists, and ankles were used to continuously log body kinematics. Crewmembers' blood pressure and heart rate were monitored and recorded with the Portapres and Polar systems. Each session was recorded with a digital video camera. During data collections occurring within the 24-hour postflight period, crewmembers were also asked to (1) evaluate their perceived motion sickness symptoms on a 20-point scale before and after completion of the test and (2) estimate how heavy they felt compared to their normal (preflight) body weight. Consent to participate in PFT was obtained from 18 crewmembers (11 US Orbital Segment [USOS] astronauts and 7 Russian cosmonauts). For 10 subjects, the first set of data was collected in the medical tent in Soyuz landing zone (1-2 hours after landing); the other 8 subjects were tested at the Kazakhstan deployment airport (4-5 hours after landing). 8 of the 11 astronauts were tested twice more within the first 24 hours postflight, at a refueling stop on the way to Houston (approximately 13 hours after landing) and at the Johnson Space Center (approximately 24 hours after landing). Later postflight data were collected in the first two weeks on some crewmembers. Finally, 6 astronauts were tested 60+ days after landing to establish a delayed baseline. RESULTS/DISCUSSION: Two of the 18 PFT participants felt too ill to attempt any tests in Kazakhstan (at either the landing zone or deployment airport). The remaining test subjects completed the Sit-to-Stand test and their reported motion sickness scores were unaffected by this task. The task completion times and body kinematics data analysis are currently underway. Preliminary analysis of astronaut data shows a steep improvement in the time to complete the task on the second data take, and in some cases, the trend continues through day six postflight. Head and trunk pitch angles and pitch rates were also examined and increases in all measures are evident throughout the observed recovery period (60+ days postflight). Interesting patterns of head and trunk pitch coordination have also emerged. One of the data analysis objectives is comparison of initial postflight performance and recovery of experienced crewmembers and first-time fliers. Another one - possible differences in performance between USOS and Russian crewmembers.

Kofman, I. S.↗

Aerothermodynamic Analysis of the Project FIRE II Afterbody Flow

35 years later, the Project FIRE II ballistic reentry to Earth at a nominal velocity of 11.4 km/s remains one of the best sources of heating data for the design of sample return capsules. The data from this flight experiment encompass both the thermochemical non-equilibrium and equilibrium flow regimes and include measurements of both radiative and total heating on the forebody and afterbody. Because of this, a number of researchers have performed computational fluid dynamics (CFD) simulations of the forebody of the FIRE II entry vehicle, with generally good results. In particular, Olynick et. al. coupled a Navier-Stokes solver (GIANTS) with a radiation code (NOVAR) and showed excellent agreement in surface heat transfer over the FIRE II trajectory between 1634 and 1651 seconds (77 km to 37 km). However, in most cases the primary motivation of the previous work was to understand and model the coupling between shock layer radiation and aerothermodynamics, and thus the simulations concentrated on the forebody flow only. To our knowledge there have been no prior published attempts to reproduce the afterbody heating data. However, an understanding of this data is critical to our efforts to design the next generation of Earth and planetary entry vehicles and to assess our need for additional flight data.

Wright, Micheal J.↗

Mars Orbiter Sample Return Power Design

Mars has greatly intrigued scientists and the general public for many years because, of all the planets, its environment is most like Earth's. Many scientists believe that Mars once had running water, although surface water is gone today. The planet is very cold with a very thin atmosphere consisting mainly of CO2. Mariner 4, 6, and 7 explored the planet in flybys in the 1960s and by the orbiting Mariner 9 in 1971. NASA then mounted the ambitious Viking mission, which launched two orbiters and two landers to the planet in 1975. The landers found ambiguous evidence of life. Mars Pathfinder landed on the planet on July 4, 1997, delivering a mobile robot rover that demonstrated exploration of the local surface environment. Mars Global Surveyor is creating a highest-resolution map of the planet's surface. These prior and current missions to Mars have paved the way for a complex Mars Sample Return mission planned for 2003 and 2005. Returning surface samples from Mars will necessitate retrieval of material from Mars orbit. Sample mass and orbit are restricted to the launch capability of the Mars Ascent Vehicle. A small sample canister having a mass less than 4 kg and diameter of less than 16 cm will spend from three to seven years in a 600 km orbit waiting for retrieval by a second spacecraft consisting of an orbiter equipped with a sample canister retrieval system, and a Earth Entry Vehicle. To allow rapid detection of the on-orbit canister, rendezvous, and collection of the samples, the canister will have a tracking beacon powered by a surface mounted solar array. The canister must communicate using RF transmission with the recovery vehicle that will be coming in 2006 or 2009 to retrieve the canister. This paper considers the aspect and conclusion that went into the design of the power system that achieves the maximum power with the minimum risk. The power output for the spherical orbiting canister was modeled and plotted in various views of the orbit by the Satellite Orbit Analysis Program (SOAP).

Mardesich, N.↗

Robust Exploration and Commercial Missions to the Moon Using Nuclear Thermal Rocket Propulsion and In Situ Propellants Derived from Lunar Polar Ice Deposits

The nuclear thermal rocket (NTR) has frequently been identified as a key space asset required for the human exploration of Mars. This proven technology can also provide the affordable “access through cislunar space” necessary for commercial development and sustained human presence on the Moon. It is a demonstrated technology capable of generating both high thrust and high specific impulse (I(sub sp) ~900 s)— twice that of today’s best chemical rockets. Nuclear lunar transfer vehicles—consisting of a propulsion stage using three ~16.5-klb(sub f) small nuclear rocket engines (SNREs), an in-line propellant tank, plus the payload—can enable a variety of reusable lunar missions. These include cargo delivery and crewed lunar landing missions. Even weeklong “tourism” missions carrying passengers into lunar orbit for a day of sightseeing and picture taking are possible. The NTR can play an important role in the next phase of lunar exploration and development by providing a robust in-space lunar transportation system (LTS) that can allow initial outposts to evolve into settlements supported by a variety of commercial activities such as in situ propellant production used to supply strategically located propellant depots and transportation nodes. The processing of lunar polar ice (LPI) deposits (estimated to be ~2 billion metric tons) for propellant production—specifically liquid oxygen (LO(sub 2)) and hydrogen (LH(sub 2))—can significantly reduce the launch mass requirements from Earth and can enable reusable, surface-based lunar landing vehicles (LLVs) using LO(sub 2)/LH(sub 2) chemical rocket engines. Afterwards, LO(sub 2)/LH(sub 2) propellant depots can be established in lunar polar and equatorial orbits to supply the LTS. At this point a modified version of the conventional NTR called the LO(sub 2)-augmented NTR, or LANTR, would be introduced into the LTS, allowing bipropellant operation and leveraging the mission benefits of refueling with lunar-derived propellants (LDPs) for Earth return. The bipropellant LANTR engine utilizes the large divergent section of its nozzle as an “afterburner” into which oxygen is injected and supersonically combusted with nuclear preheated hydrogen emerging from the engine’s choked sonic throat—essentially “scramjet propulsion in reverse.” By varying the oxygen-to-hydrogen mixture ratio, LANTR engines can operate over a range of thrust and I(sub sp) values while the reactor core power level remains relatively constant. A LANTR-based LTS offers unique mission capabilities including short transit time crewed cargo transports. Even a “commuter” shuttle service may be possible, allowing “one-way” trip times to and from the Moon on the order of 36 hr or less. If only 1% of the postulated trapped water ice were available for use in lunar orbit, such a supply could support routine commuter flights to the Moon for many thousands of years. This report outlines an evolving LTS architecture that uses propellants derived from LPI and examines a variety of mission types and transfer vehicle designs along with their operating characteristics and increasing demands on LDP production as mission complexity and velocity change ΔV requirements increase. A comparison of the LDP production and mining requirements using LPI and volcanic glass to produce lunar-derived liquid oxygen (LUNOX) via the hydrogen reduction process is included, and the synergy with an evolving helium-3 mining industry is also discussed.

Borowski, Stanley K.↗

Combined high and low thrust propulsion for fast piloted Mars missions

The mission benefits of using both high thrust nuclear thermal propulsion (NTP) and low acceleration, high specific impulse nuclear electric propulsion (NEP) to reduce piloted trip times to Mars with reasonable initial mass are assessed. Recent updates in mission design, such as the Earth fly-by return, are assessed for their impact on previous studies. In addition, the Synthesis Commission split mission to Mars in 2014 is also assessed using combined propulsion. Results show an 80 to 100 day reduction in trip time over the reference NTP or NEP systems and missions, with comparable or reduced vehicle initial masses. The impacts of the mission and system analyses upon technology planning and design are discussed.

Gilland, James H.↗

Concept for a Large Scalable Space Telescope: In-Space Assembly

We present a conceptual design for a scalable (10-50 meter segmented filled-aperture) space observatory operating at UV-optical-near infrared wavelengths. This telescope is designed for assembly in space by robots, astronauts or a combination of the two, as envisioned in NASA s Vision for Space Exploration. Our operations concept for this-space telescope provides for assembly and check-out in an Earth Moon L2 (EML2) orbit, and transport to a Sun-Earth L2 (SEL2) orbit for science operations and routine servicing, with return to EML2 for major servicing. We have developed and analyzed initial designs for the optical, structural, thermal and attitude control systems for a 30-m aperture space telescope. We further describe how the separate components are packaged for launch by heavy lift vehicle(s) and the approach for the robot assembly of the telescope from these components.

Oegerle, W. R.↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo-era experts to derive other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, William D.↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020 by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage (EDS). This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo era experts to derive other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, WIlliam↗

Pilot Field Test: Recovery from a Simulated Fall and Quiet Stance Stability After Long-Duration Space Flight

Astronauts returning from the International Space Station (ISS) are met by a team of recovery personnel typically providing physical assistance and medical support immediately upon landing. That is because long-duration spaceflight impacts astronauts' functional abilities. Future expeditions to planets or asteroids beyond the low Earth orbit, however, may require crewmembers to egress the vehicle and perform other types of physical tasks unassisted. It is therefore important to characterize the extent and longevity of functional deficits experienced by astronauts in order to design safe exploration class missions. Pilot Field Test (PFT) experiment conducted with participation of ISS crewmembers traveling on Soyuz expeditions 34S - 41S comprised several tasks designed to study the recovery of sensorimotor abilities of astronauts during the first 24 hours after landing and beyond.

Kofman, I. S.↗

Venus Landsailer Zephyr

Imagine sailing across the hot plains of Venus! A design for a craft to do just this was completed by the COncurrent Multidisciplinary Preliminary Assessment of Space Systems (COMPASS) Team for the NASA Innovative Advanced Concepts (NIAC) project. The robotic craft could explore over 30 kilometers of the surface of Venus, driven by the power of the wind. The Zephyr Venus Landsailer is a science mission concept for exploring the surface of Venus with a mobility and science capability roughly comparable to the Mars Exploration Rovers (MER) mission, but using the winds of the thick atmosphere of Venus for propulsion. It would explore the plains of Venus in the year 2025, near the Venera 10 landing site, where wind velocities in the range of 80 to 120 centimeters per second (cm/s) were measured by earlier Soviet landing missions. These winds are harnessed by a large wing/sail which would also carry the solar cells to generate power. At around 250 kilograms (kg), Zephyr would carry an 8 meter tall airfoil sail (12 square meters area), 25 kg of science equipment (mineralogy, grinder, and weather instruments) and return 2 gigabytes of science over a 30 day mission. Due to the extreme temperatures (450 degrees Centigrade) and pressures (90 bar) on Venus, Zephyr would have only basic control systems (based on high temperature silicon carbide (SiC)electronics) and actuators. Control would come from an orbiter which is in turn controlled from Earth. Due to the time delay from the Earth a robust control system would need to exist on the orbiter to keep Zephyr on course. Data return and control would be made using a 250 megahertz link with the orbiter with a maximum data rate of 2 kilobits per second. At the minimal wind speed required for mobility of 35 cm/s, the vehicle move at a slow but steady 4 cm/s by positioning the airfoil and use of one wheel that is steered for pointing control. Navigation commands from the orbiter will be based upon navigation cameras, simple accelerometers and stability sensors; Zephyr's stability is robust, using a wide wheel base along with controls to "feather" or "luff" the airfoil and apply brakes to stop the vehicle in the case of unexpected conditions. This would be the science gathering configuration. The vehicle itself would need to be made from titanium (Ti) as the structural material, with a corrosion-barrier overcoating due to extreme temperatures on the surface.

Wind Sailing↗

Opportunities and Strategies for Testing and Infusion of ISRU in the Evolvable Mars Campaign

HE Evolvable Mars Campaign (EMC) is developing the plans and systems needed for a robust, evolutionary strategy to explore cis-lunar space, the Mars sphere of influence (including the moons of Mars), and the surface of Mars. Recently, the emphasis of NASA's plans has changed to focus on the prolonged pioneering of space, rather than focusing on a single crewed mission as the ultimate goal. A sustainable, pioneering vision of space would include in-situ resource utilization (ISRU) in multiple forms and at multiple destinations: atmospheric capture of Mars CO2 and/or volatiles for consumables and propellants, regolith for bulk and refined materials, and in-situ manufacturing at the Moon, Mars, and other bodies. These resources would enable a reduction in the logistical needs from Earth for future missions, thus preparing the way for a sustained presence on Mars. Although the EMC initially relies only on propellant production for the Mars ascent vehicle via ISRU, one of its primary objectives is to prospect at every EMC destination to understand the potential for ISRU; this will permit true pioneering to be enabled after the first crew arrives at Mars. Recent and ongoing analysis has considered the possible prospecting measurements that can be performed at the asteroid returned to cis-lunar space by the Asteroid Robotic Redirect Mission (ARRM), at the lunar surface, at Phobos and Deimos, and on the surface of Mars to identify available resources for future use. These opportunities will be available on missions currently in the Evolvable Mars Campaign construct, and will also facilitate the testing and demonstration of resource acquisition, processing, storage, and useage technologies that can play a role in later missions. This analysis has also led to the identification of several objectives that should be targeted during the missions building up to and including the initial crewed missions. These objectives are mapped to strategies for incorporating ISRU to support resource cycle closure and reduce mass requirements from Earth. This analysis has yielded engineering constraints, based on ISRU, that impact the evaluation of landing sites for missions to the surface of Mars. The terrain of a particular site must be sufficiently flat to permit ISRU systems, as well as ancillary systems such as power and propellant storage tanks, to be landed, moved into position, set up, and operated. Water must be accessible in a form that can be acquired via ISRU, in quantities that align with demands. The chosen method of acquiring and processing water should align with the available resources at a particular site, and that site must have sufficient quantities to meet the requirements (based on crew consumables and propellant demands). Lower altitude landing sites are preferred, as the increase in density can facilitate carbon dioxide acquisition from the atmosphere. Another preference is for sites with a greater ability to move regolith for civil engineering purposes; for example, this would be conducive to both bulk regolith uses (such as the manufacture of berms), and processed regolith uses (such as microwave sintering).

Evolvable Mars Campaign↗

RENDEZVOUS AND DOCKING TECHNIQUES

To implement the primary space mission of this decade – manned lunar exploration -- the operational assistance of rendezvous and docking is being considered as an alternative to possible problems in obtaining a boost vehicle capable of direct flight. This paper concentrates on the mechanization of the rendezvous and docking phase of such a lunar mission. As indicated in previous papers, rendezvous can take place in either an earth or lunar orbit (or on the lunar surface); it can involve the mating of stages, transfer of fuel, or the return of a shuttle to a “mother” ship; direct ascent or parking orbits can be used; the orbits can be circular or more general ellipses; finally, either or both of the spacecraft can participate in the rendezvous maneuvers. Since there is no intent here to discuss the pros and cons of each approach or to cover all possible mission profiles, guidance schemes and hardware configurations, one particular profile has been selected to display the significant features of most rendezvous missions. In many respects, rendezvous is less difficult than aircraft interception since the target is friendly and there is no severe time constraint. The latter feature allows considerable freedom of design especially with the great versatility of a human in the loop. This remains true even for a purely automatic mode. Perhaps the largest design problem concerns the selection of the mission to be implemented followed by the optimization or systems engineering of a mechanization from the multitude of possible schemes and techniques. A most important factor in the optimization is that of reliability and the redundancy, alternate or backup modes, etc., associated with the approach. While a primary system can be rather easily mechanized with modest equipment requirements, reliability considerations will result in additional hardware, tighter specifications and more safety factors (e. g., propellant margin). This is a very complex area and will only briefly be mentioned in the following discussion.

Rendezvous↗

Apollo 2 Second Generation Lunar Exploration System Studies CFY 1963

The Apollo II Second Generation Lunar Exploration System includes the direct landing spacecraft which consists of cargo command module, service module, and landing module. The landing module is also capable of being used as the Lunar Landing Vehicle (LLV) for landing unmanned cargos consisting of shelter modules such as the Lunar Occupancy Payload and other cargo in support of lunar surface operations. High energy cryogenic propellants are utilized to permit direct landing, manned, or logistic missions with use of a single Saturn V class booster. In last year's studies, the LLV was configured for maximum payload and with consideration for the direct three-man landing and return mission. Light weight and low vehicle height above the lunar surface at touchdown were major objectives. Logistic cargos of more than 27,000 pounds landed on the Moon were achieved within the single Saturn V boost capability. For the manned mission, the lunar take-off weight was determined to be 28,000 pounds ready for the return-to-Earth portion of the mission. The command module utilized was an advanced light-weight design weighing 10,000 pounds including supporting subsystems. Cryogenic oxygen/hydrogen propulsion was again used for maximum propulsion efficiency. Study of the Lunar Occupancy Payload was also accomplished last year. This module was configured to serve as an early lunar shelter or outpost station or as a basic module of an integrated base module complex. Single and dual compartment versions, as well as special mission versions, were studied.

Matzenaur, J. O.↗

A survey of rapid sample return needs from Space Station Freedom and potential return systems

Results are presented of a survey conducted among potential users of the life sciences and material sciences facilities at the Space Station Freedom (SSF) to determine the need for a special rapid sample return (RSR) mission to bring the experimental samples from the Space Station Freedom (SSF) to earth between the Space Shuttle visits. The results of the survey show that, while some experimental objectives would benefit from the RSR capability, other available cost- and mission-effective means could be used instead of the RSR proposed. Potential vehicles for transporting samples from the SSF to earth are examined in the context of the survey results.

Mccandless, Ronald S.↗

A Mars environmental survey (MESUR) - Feasibility of a low cost global approach

In situ measurements of Mars' surface and atmosphere are the objectives of a novel network mission concept called the Mars Environmental SURvey (MESUR). As envisioned, the MESUR mission will emplace a pole-to-pole global distribution of 16 landers on the Martian surface over three launch opportunites using medium-lift (Delta-class) launch vehicles. The basic concept is to deploy small free-flying probes which would directly enter the Martian atmosphere, measure the upper atmospheric structure, image the local terrain before landing, and survive landing to perform meteorology, seismology, surface imaging, and soil chemistry measurements. Data will be returned via dedicated relay orbiter or direct-to-earth transmission. The mission philosophy is to: (1) 'grow' a network over a period of years using a series of launch opportunities; (2) develop a level-of-effort which is flexible and responsive to a broad set of objectives; (3) focus on Mars science while providing a solid basis for future human presence; and (4) minimize overall project cost and complexity wherever possible.

Hubbard, G. S.↗

Global Positioning Svstem (GPS) on International Space Station (ISS) and Crew Return Vehicle (CRV)

Both the International Space Station and Crew Return Vehicle desired to have GPS on their vehicles due to improve state determination over traditional ground tracking techniques used in the past for space vehicles. Both also opted to use GPS for attitude determination to save the expense of a star tracker. Both vehicles have stringent pointing requirements for roll, pitch, and heading, making a sun or earth sensor not a viable option since the heading is undetermined. This paper discusses the technical challenges associated with the implementation of GPS on both of these vehicles. ISS and CRY use the same GPS receiver, but have faced different challenges since the mission of each is di fferent. ISS will be discussed first, then CRY. The flight experiments flown on the Space Shuttle in support of these efforts is also discussed.

Gomez, Susan F.↗

A Long Distance Laser Altimeter for Terrain Relative Navigation and Spacecraft Landing

A high precision laser altimeter was developed under the Autonomous Landing and Hazard Avoidance (ALHAT) project at NASA Langley Research Center. The laser altimeter provides slant-path range measurements from operational ranges exceeding 30 km that will be used to support surface-relative state estimation and navigation during planetary descent and precision landing. The altimeter uses an advanced time-of-arrival receiver, which produces multiple signal-return range measurements from tens of kilometers with 5 cm precision. The transmitter is eye-safe, simplifying operations and testing on earth. The prototype is fully autonomous, and able to withstand the thermal and mechanical stresses experienced during test flights conducted aboard helicopters, fixed-wing aircraft, and Morpheus, a terrestrial rocket-powered vehicle developed by NASA Johnson Space Center. This paper provides an overview of the sensor and presents results obtained during recent field experiments including a helicopter flight test conducted in December 2012 and Morpheus flight tests conducted during March of 2014.

Pierrottet, Diego F.↗