Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Digital control hardware”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

656 records · Page 37

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A summary final report of work accomplished is presented. Work was performed in the following areas: (1) Galileo Probe science analysis, (2) Galileo probe Atmosphere Structure Instrument, (3) Mars Pathfinder Atmosphere Structure/Meteorology instrument, (4) Mars Pathfinder data analysis, (5) Science Definition for future Mars missions, (6) Viking Lander data analysis, (7) winds in Mars atmosphere Venus atmospheric dynamics, (8) Pioneer Venus Probe data analysis, (9) Pioneer Venus anomaly analysis, (10) Discovery Venus Probe Titan probe instrument design, and (11) laboratory studies of Titan probe impact phenomena. The work has resulted in more than 10 articles published in archive journals, 2 encyclopedia articles, and many working papers. This final report is organized around the four planets on which there was activity, Jupiter, Mars, Venus, and Titan, with a closing section on Miscellaneous Activities. A major objective was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo probe, and to receive, analyze and interpret data received from the spacecraft. The instrument was launched on April 14, 1989. Calibration data were taken for all experiment sensors. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature and acceleration sensors, and the supporting engineering temperature sensors. Computer programs were written to decode the Experiment Data Record and convert the digital numbers to physical quantities, i.e., temperatures, pressures, and accelerations. The project office agreed to obtain telemetry of checkout data from the probe. Work to extend programs written for use on the Pioneer Venus project included: (1) massive heat shield ablation leading to important mass loss during entry; and (2) rapid planet rotation, which introduced terms of motion not needed on Venus. When the Galileo Probe encountered Jupiter, analysis and interpretation of data commenced. The early contributions of the experiment were to define (1) the basic structure of the deep atmosphere, (2) the stability of the atmosphere, (3) the upper atmospheric profiles of density, pressure, and temperature. The next major task in the Galileo Probe project was to refine, verify and extend the analysis of the data. It was the verified, and corrected data, which indicated a dry abiabatic atmosphere within measurement accuracy. Temperature in the thermosphere was measured at 900 K. Participation in the Mars atmospheric research included: (1) work as a team member of the Mars Atmosphere Working Group, (2) contribution to the Mars Exobiology Instrument workshop, (3) asssistance in planning the Mars global network and (4) assitance in planning the Soviet-French Mars mission in 1994. This included a return to the Viking Lander parachute data to refine and improve the definition of winds between 1.5 and 4 kilometer altitude at the two entry sites. The variability of the structure of Mars atmosphere was addressed, which is known to vary with season, latitude, hemisphere and dust loading of the atmosphere. This led to work on the Pathfinder project. The probe had a deployable meteorology mast that had three temperature sensors, and a wind sensor at the tip of the mast. Work on the Titan atmospheric probe was also accomplished. This included developing an experiment proposal to the European Space Agency (ESA), which was not selected. However, as an advisor in the design and preparation of the selected experiment the researcher interacted with scientist on the Huygens Probe Atmosphere Structure Experiment. The researcher also participated in the planning for the Venus Chemical Probe. The science objectives of the probe were to resolve unanswered questions concerning the minor species chemistry of Venus' atmosphere that control cloud formation, greenhouse effectiveness, and the thermal structure. The researcher also reviewed problems with the Pioneer Venus Probe, that caused anomalies which occurred on the Probes at and below 12.5 km level of the Venus' atmosphere. He convened and participated in a workshop that concluded the most likely hardware cause was insulation failure in the electrical harness outside the Probes' pressure vessels. It was discovered that the shrink tubing material failed at 600K. This failure could explain the anomalies experienced by the probes. The descent data of the Pioneer probes, and the Soviet Vega Lander was analyzed to evaluate the presence of small scale gravity waves in and below the Venus cloud layer.

Lester, Peter↗

Optimization of WAAM Process to Produce AUSC Components with Increased Service Life

Additive manufacturing has the potential to revolutionize industrial hardware and unlock efficiency gains through the fabrication of geometries and architectures not possible by conventional processing. Wire Arc Additive manufacturing (WAAM) process is a class of directed energy deposition process enabling higher build rate and allowing custom wire feedstock allowing spatial variation of microstructure. The larger spot size and lower speed creates a larger melt pool, reducing residual stress and often time creating directional/columnar microstructure for Ni-superalloy. The use of flexible platform provides freedom in deposition strategy, which can accommodate complex substrates, including feature addition onto existing structures, non-flat layers, and repair methods. However, the certification of the final component needs to match the strength requirement. Hence, the quality of the component produced is stringently monitored to avoid buildup of residual stress, cracks, porosity and to reduce detrimental segregated phases commonly observed during alloy solidification. Simulation plays a huge role in predicting the melt pool dimension and can be used to optimize the process parameter. Similar development is also required to perform physics-based modeling of microstructural development in WAAM that can predict the microstructural features during solidification and can be used to optimize the process more effectively. To move toward this goal, Raytheon Technologies Research Center together with Siemens worked to create a set of computational tools to control the process parameters, enable on-line measurements and acquisition with feedback to the optimized process parameters, and eventually track material evolution through each step of the additive process. Computational fluid dynamics is used for accurate prediction and calibration of the thermal field during WAAM process. and phase field models for microstructure evolution as a function of processing parameters to establish a connection between additive parameters and the final microstructure. Here we report cellular automata (CA) model development to predict the dendritic microstructure evolution with surface and bulk nuclei for single track and multiple layers. The CA model was developed to account for secondary element addition and predict segregation, local melting, and latent heat release as well as prediction of Euler angles from orientation information and validated against experiments. This framework was utilized to tailor spatially-varying composition in a part by appropriately controlling the microstructure evolution during the additive process. Functionally graded Haynes 282 alloy with high Cr content at the surface was tested for oxidation and mechanical properties. An advanced physics-based reaction-diffusion model predicting the simultaneous creation of chromium oxide and alumina is developed and validated to extend life expectancy of the WAAM manufactured high temperature part. A machine-learning data-driven framework establishing the process-structure relationship from a dataset of real microstructure images and corresponding process history data has been developed and implemented in the NX Siemens design system. The digital twin configuration along with the tool path generation enabled prediction of WAAM component buildup time and the techno-economic analysis provided a favorable option for all 4 cases with 15-40% cost reduction.

33 ADVANCED PROPULSION SYSTEMS↗

Firmware Architecture of the ARMADAS Bolting Robot

The Automated Reconfigurable Mission Adaptive Digital Assembly Systems (ARMADAS) project, under development at NASA Ames Research Center, has demonstrated on-ground autonomous robotic assembly of extensive digital structures, and it is now moving forward towards in-space demonstration. The ARMADAS system comprises of the operation software, the operation user interface (opsUI), and a swarm of robots. The robotic system consists of a multitude of collaborative agents specifically designed to transport, place and bolt the building blocks, called voxels (volumetric pixels). This paper focuses on the bolting robot, referred to as Mobile Metamaterial Internal Co-Integrator (MMIC-I). MMIC-I is a battery-powered crawling robot. It navigates the structure through extension, contraction and gripping. Two distinct controller boards operate the robot's two symmetric modules, referred to as module A and B. Board A is the master board: it coordinates motion planning and motion primitives execution, hosts the WiFi client, performs periodic self-assessment and system idle check and triggers faults if anomalies are detected. Board B periodically sends a heartbeat to board A, through a wired communication channel that uses the Serial protocol. Additionally, board A's WiFi client receives heartbeat packet requests or motion/bolting commands from a dedicated server board, and acknowledges reception sending back a response heartbeat packet containing information about the overall robot status, e. g. electrical current and voltage values, target and actual angles, operating mode, fault status. Whenever a motion command is sent, the motion planning section of the firmware determines the current robot configuration, using Inertial Measurement Unit readings and the motors Pulse Width Modulation values. Afterwards, it calculates the list of primitives needed to reach the target state, and controls their execution in the proper order. MMIC-I can receive and execute motion and bolting commands only when it is in operational mode. MMIC-I has three operating modes: standby, operational and safed. Standby mode is automatically entered upon startup. While in standby mode, all motors are powered off, and the only accepted commands are the ones relative to a change of mode and heartbeat packet request. Fault detection causes the robot to automatically enter safed or standby mode. Whenever the detected fault occurs within a motion and requires immediate intervention, e. g. an over-current situation, the robot enters safed mode. Safed mode powers off all motors except for the locomotion module, thus preventing the robot from collapsing. Conversely, when the detected fault doesn't require immediate intervention (low battery warning, for instance), the robot enters standby mode after completing the ongoing motion. This paper provides a detailed discussion of MMIC-I's firmware architecture. It accurately describes the implementation approach for each module: sensor data reading, motor control and actuation, WiFi server-client communication, intra-boards Serial communication, operating modes and autonomous fault detection, motion planning, coordination and execution, etc. Moreover, in support of the software description, this paper includes a thorough characterization of MMIC-I's hardware and avionics.

In-space assembly↗

Laboratory Instrument Software Controlled Spread Spectrum Time Domain Reflectometry for Electrical Cable Testing

This research discusses development of a software-controlled laboratory instrument based spread spectrum time domain reflectometry system (SSTDR). This constitutes one task within PNNL’s Light Water Sustainability Program (LWRS) whose mission includes advancing nondestructive examination (NDE) techniques for off-line and on-line in-situ cable condition monitoring. In 2022, PNNL evaluated SSTDR for detection and characterization of a number of cable anomalies (Glass et al. 2022). The review included comparison of SSTDR to Frequency Domain Reflectometry (FDR) techniques which have enjoyed encouraging feedback and are starting to be used in nuclear power plants for periodic cable condition monitoring of cable systems as part of the plant’s overall cable aging management program. The FDR test introduces a broad-band chirp onto the cable at the cable end then listens for any reflection from a change of impedance along the cable caused by a damaged conductor or insulation, splices, contact with moisture, or other cable anomalies. The signal is captured in the frequency domain then transformed back to the time domain using an inverse Fourier transform (IFT). Based on the velocity of propagation, the impedance response signal is plotted against distance along the cable. Peak locations along the X-axis indicate the distance along the cable where a portion of the signal has been reflected back to the instrument as a result of a cable anomaly. The FDR test is considered the gold standard of reflectometry however it does require the cable to be de-energized to perform the test. The LIVEWIRE commercial SSTDR produces a similar plot to the FDR however all processing is in the time domain. A pseudo-random noise code (PN code) is input onto the cable conductor and the instrument listens for any reflected response from cable anomalies. The SSTDR processes the signal as an autocorrelation comparing the input PN code to any reflected signal detected. The autocorrelation analysis for thermal aging, water and water ingress detection, ground fault and phase-to-phase fault detection at various locations along the cable and with the cable attached and detached from a motor load, and on both energized and un-energized conditions were performed. These results were contrasted to Frequency Domain Reflectometry (FDR) measurements of the un-energized cable. Results were encouraging but indicated more work was warranted – particularly with the SSTDR, it seemed that the insulation damage would likely be better evaluated with multiple bandwidth cable tests particularly including larger bandwidths than were possible with the current commercial instrument. The commercial instrument’s bandwidth was set at 6, 12, 24, and 48MHz but note that SSTDR and FDR definitions of bandwidth trend similarly but are not the same. The FDR response could be more broadly adjusted, and the bandwidth of 100 to 500 MHz produced the best responses. FDR responses to anomalies were clearer than SSTDR responses and indications were that a broader bandwidth SSTDR may lead to improved SSTDR detection capability. This project used a laboratory instrument based SSTDR (primarily using an Arbitrary Waveform Generator (AWG) and a digital oscilloscope plus Python in-house software) that allowed software adjustment of the SSTDR bandwidth, window functions applied to the exciting Pseudo-random Noise (PN) code plus and other aspects of the SSTDR signal processing. Hereafter, this will be referred to as the PNNL SSTDR. Evaluating specific performance of the PNNL SSTDR is left to a separate report. This report documents hardware and software development to produce the SSTDR cable test system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The electronics and data acquisition system for the DarkSide-50 veto detectors

DarkSide-50 is a detector for dark matter candidates in the form of weakly interacting massive particles. It utilizes a liquid argon time projection chamber for the inner main detector, surrounded by a liquid scintillator veto (LSV) and a water Cherenkov veto detector (WCV). The LSV and WCV act as the neutron and cosmogenic muon veto detectors for DarkSide-50. This paper describes the electronics and data acquisition system used for these two detectors. The system is made of a custom built front end electronics and commercial National Instruments high speed digitizers. The front end electronics, the DAQ, and the trigger system have been used to acquire data in the form of zero-suppressed waveform samples from the 110 PMTs of the LSV and the 80 PMTs of the WCV. The veto DAQ system has proven its performance and reliability. This electronics and DAQ system can be scaled and used as it is for the veto of the next generation DarkSide-20k detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Solar Dynamics Observatory Guidance, Navigation, and Control System Overview

The Solar Dynamics Observatory (SDO) was designed and built at the Goddard Space Flight Center, launched from Cape Canaveral on February 11, 2010, and reached its final geosynchronous science orbit on March 16, 2010. The purpose of SDO is to observe the Sun and continuously relay data to a dedicated ground station. SDO remains Sun-pointing throughout most of its mission for the instruments to take measurements of the Sun. The SDO attitude control system (ACS) is a single-fault tolerant design. Its fully redundant attitude sensor complement includes sixteen coarse Sun sensors (CSSs), a digital Sun sensor (DSS), three two-axis inertial reference units (IRUs), and two star trackers (STs). The ACS also makes use of the four guide telescopes included as a part of one of the science instruments. Attitude actuation is performed using four reaction wheels assemblies (RWAs) and eight thrusters, with a single main engine used to provide velocity-change thrust for orbit raising. The attitude control software has five nominal control modes, three wheel-based modes and two thruster-based modes. A wheel-based Safehold running in the attitude control electronics box improves the robustness of the system as a whole. All six modes are designed on the same basic proportional-integral-derivative attitude error structure, with more robust modes setting their integral gains to zero. This paper details the final overall design of the SDO guidance, navigation, and control (GN&C) system and how it was used in practice during SDO launch, commissioning, and nominal operations. This overview will include the ACS control modes, attitude determination and sensor calibration, the high gain antenna (HGA) calibration, and jitter mitigation operation. The Solar Dynamics Observatory mission is part of the NASA Living With a Star program, which seeks to understand the changing Sun and its effects on the Solar System, life, and society. To this end, the SDO spacecraft carries three Sun-observing instruments: Helioseismic and Magnetic Imager (HMI), led by Stanford University; Atmospheric Imaging Assembly (AIA), led by Lockheed Martin Space and Astrophysics Laboratory; and Extreme Ultraviolet Variability Experiment (EVE), led by the University of Colorado. The basic mission is to observe the Sun for a very high percentage of the 5-year mission (10-year goal) with long stretches of uninterrupted observations and with constant, high-data-rate transmission to a dedicated ground station to be located in White Sands, New Mexico. These goals guided the design of the spacecraft bus that will carry and service the three-instrument payload. Overarching design goals for the bus are geosynchronous orbit, near-constant Sun observations with the ability to fly through eclipses, and constant HGA contact with the dedicated ground station. A three-axis stabilized ACS is needed both to point at the Sun accurately and to keep the roll about the Sun vector correctly positioned with respect to the solar north pole. This roll control is especially important for the magnetic field imaging of HM I. The mission requirements have several general impacts on the ACS design. Both the AIA and HMI instruments are very sensitive to the blurring caused by jitter. Each has an image stabilization system (ISS) with some ability to filter out high frequency motion, but below the bandwidth of the ISS the control system must compensate for disturbances within the ACS bandwidth or avoid exciting jitter at higher frequencies. Within the ACS bandwidth, the control requirement imposed by AIA is to place the center of the solar disk no more than 2 arc sec, 3 , from a body-defined target based on one of the GTs that accompany the instrument. This body-defined target, called the science reference boresight (SRB), was determined from the postlaunch orientation of the GTs by averaging the bounding telescope boresights for pitch to get a pitch SRB coordinate, and by averaging the bounding boresights for yaw toet the yaw SRB coordinate. The location of this SRB in the 0.5-deg field-of-view for each GT then becomes the central target for each telescope; one GT is selected for use as the ACS controlling guide telescope (CGT) at any given time. Fine Sun-pointing is effected based on this SRB for all three instruments when the Sun is within the linear range of the CGT. In addition to limiting jitter, HMI science requires averaging several observations, making the instrument sensitive to low frequency motion that induces differential motion between each observation. This requires the spacecraft attitude to be stable about the roll axis to approximately 10 arcsec over a ten-minute period. Instrument calibrations require that the spacecraft point the SRB up to 2.5 degrees in pitch and yaw away from the center of the Sun, placing the Sun outside the field-of-view of the guide telescopes. In such instances, when the GTs cannot provide the definitive target for the ACS, on-board attitude determination combined with ephemeris prediction of the Sun direction must provide the definitive target. EVE is capable of observing the Sun with less dependence on attitude control. However, the ground data processing needs for calibrations result in the most strict attitude knowledge requirements for the mission: [35,70,70] arcsec, 3 , of knowledge with respect to the center of the solar disk. In addition to driving the ACS sensor selection, the knowledge requirements, which have their effect primarily during Inertial mode calibrations, drive the accuracy requirements for the solar ephemeris. The need to achieve and maintain geosynchronous orbit (GEO) drove the need for high-efficiency propulsive systems and appropriate attitude control. The main engine provided high specific impulse for the maneuvers to attain GEO, while the smaller ACS thrusters managed the disturbance torques of the larger engine and provided the capability for much smaller adjustment burns on orbit. SDO s large solar profile means that solar radiation pressure is a large torque disturbance, and the momentum buildup from this disturbance and the GEO altitude drives the ACS to use thrusters to manage vehicle momentum. The demanding data capture budget for the mission, however, requires SDO to avoid frequent thruster maneuvers, while concerns about on-orbit jitter restrict the maximum desired wheel speeds desired from the RWAs. The plan for on-orbit wheel speed and momentum management will be discussed as well as what is now being done in operation after the jitter environment was characterized. The SDO ACS hardware complement is single-fault tolerant. Two main processors carry virtually identical copies of the command and data handling and ACS software, and two identical attitude control electronics (ACE) boxes carry Coldfire processors with contingency ACS software and other hardware interface cards; the ACE structure allows reaction wheels to be commanded by the Sun-pointing Safehold independent of the Mil Std 1553 data bus. The sixteen Adcole CSSs are grouped into primary and backup sets of eight sensors, each set providing the ability to calculate a sun vector. Each set of eight eyes provides full 4 -steradian coverage. The Adcole DSS comprises an optics head and a separate electronics box providing a 1553 data interface. The electronics box is mounted inside the Faraday cage created by the spacecraft bus module. The DSS head with its 32- deg square FOV is mounted on the instrument module with its boresight along the spacecraft X axis, nearly aligned with the Sun during observations. Adcole has designed the DSS calibration parameters so that the accuracy is 0.24 arcminutes within 10 deg of the boresight, and diminishes to 3 arcminutes as the Sun moves towards the edges of its FOV . This DSS calibration scheme provides higher accuracy attitude determination over the range of the instrument calibration maneuvers.

Morgenstern, Wendy M.↗