Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Remote-Controlled Removal of Bricks from a Reactor Shaft: An Unconventional Approach - 16406

The first German prototype Fast Breeder Nuclear Reactor (KNK) is currently being dismantled after being the only operating Fast Breeder-type reactor in Germany. The complete dismantling is based on 10 decommissioning permits. Package 3 of the 9. decommissioning permit, which is currently under preparation, comprises the dismantling of the biological shield. Package 2 comprised the dismantling of the Primary Shield. In preparation to lift the 14 primary shield segments on height of the reactor core, these were milled at 16 positions and equipped with a total of 26 holes. As a result of the milling and drilling process, an estimated amount of 500-600 kg cast iron swarfs accumulated at the bottom of the 12 m deep reactor shaft. The cobalt in the cast iron was activated to cobalt-60 during operation. This results in a measurable dose-rate of 30-35 mSv/h. At the conical bottom of the reactor shaft were still the remaining parts of the thermal insulation consisting of a lining with brick stones, covered with loose remnants of the thermal insulation, loose metallic residues and cut-off wheels of the angel grinder. For the next dismantling step, the removal of the activated part of the biological shield, it is necessary that the cast iron swarfs must be removed as well as the remains of the thermal insulation. Firstly, this is necessary to reduce the dose rate inside the shaft for subsequent breakthrough operations and, secondly to have a statically resilient surface for the installation of a necessary working platform for next dismantling tools. There was no access for personnel. A manual removal was also not possible due to the existing dose rate. The cast iron swarfs supposed to be removed by a remote controlled suction unit, which was installed on top of a drum and mounted in a special rack. The complete system was lowered into the reactor shaft by using a crane. After removing the major amount of swarfs, the remaining swarfs as well as the sheet metal liner should be collected with a magnetic grabber. The solution for the metal removal was easy to realize, but there was no idea how to remove the remaining bricks remote controlled out of the reactor shaft. Another boundary was that only existing facilities were supposed to be used in addition to the new suction system, i.e. the existing cranes, gripper, as well as the double lid lock of the encasing for the handling of the vacuum cleaner, the transport of the drum and the lock procedure. The design essentially consists of a suction unit and a collecting unit. Both units are connected hooked by the three single suspension chains on the rack on the traverse and connection of the suction tube. Subsequently the entire unit was drained in the 12 m deep reactor shaft. The entire unit has been lifted out of the reactor shaft and placed on a defined set-down position. At this position, now both of the units could be separated by using the Master-Slave-Manipulator in the encasing (A100). By using different suction pipes the reactor shaft bottom could be exempted from the cast iron swarfs within a few days. The suction unit worked in such a positive way that it was decided to remove the loose refractory bricks, metallic residues, cut off wheels, etc., too. Metal parts remaining on the ground were removed by a magnet. This pragmatic approach avoided additional complex design works and the need of constructing special solutions and thus, massively saved time, cost and dose rate. The duration of planning, permission including implementation amounted to approximately 3 to 4 months. The additional work could be performed directly after the actual dismantling step.

07 ISOTOPE AND RADIATION SOURCES↗

Development of the Licensing Procedure and Regulatory Framework for the Spent Fuel Storage facility in Korea - 16423

The Public Engagement Commission on SNF management (PECOS) published the recommendation report on the spent fuel management of Korea in June, 2015. Based on this report, the future national policy for spent fuel management of Korea has been established, taking into consideration the national/international trends on policy and technology development. Regardless of the recommendation report of PECOS, Spent fuel storage casks are necessary in Korea. Therefore, various types of spent fuel storage casks are now being developed by Korea vendors. For example, Concrete storage casks and dual purpose metal casks are now under development by the KORAD (Korea Radioactive waste agency) for future use in the interim storage facility. Unfortunately, there is no independent licensing procedure for spent fuel storage casks in Nuclear Safety Act (NSA) because is the casks are considered an integral part of the interim storage facility safety equipment. Furthermore, the definition of radioactive waste in the NSA was changed recently. Now, spent fuel is separated from the definition of 'radioactive waste'. Spent fuel can only become radioactive waste by the decision through the meeting of the relative ministers of Korea government. For that reason, the licensing procedure for interim spent fuel storage facilities was separated from the current 'disposal facility, etc.' in accordance with the article 63 of NSA. The aim of this study is to develop the licensing procedure for the storage cask, and also to develop a revised draft of interim storage facility procedure within the NSA. Once this independent licensing procedure on the spent fuel storage cask is introduced to the NSA, it is expected that developers or operators can develop and commercialize the storage cask in Korea. In this study, an independent licensing procedure for the spent fuel storage facility was developed including the storage cask licensing procedure for the NSA. The procedure was composed of the permit for construction and operation of interim storage facility, criteria for permit, inspection criteria, periodic safety review, and decommissioning criteria, etc. The detailed contents of these requirements were also developed to introduce the regulatory framework for the interim storage facility. Particularly, periodic safety review and decommissioning criteria were developed in accordance with the recommendation of IRRS (International Regulatory Review Service) of IAEA. The developed licensing procedure for spent fuel storage facility will be introduced in NSA in response to the revised definition of NSA and the recommendation report of PECOS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canada's Nuclear Legacy Liabilities Program - Ten Years of Progress and Achievements - 16456

Nuclear legacy liabilities have resulted from more than 60 years of nuclear research and development carried out on behalf of Canada. The liabilities are located at Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories in Ontario and Whiteshell Laboratories in Manitoba, as well as three shutdown prototype reactors in Ontario and Quebec that are being maintained in a safe storage state. Estimated at about $10.6 billion (B) (current day Canadian dollars), these liabilities consist of disused nuclear facilities and associated infrastructure, a wide variety of buried and stored waste, and contaminated lands. The Government of Canada established the Nuclear Legacy Liabilities Program (NLLP) in 2006 to implement a long-term strategy to safely and cost-effectively reduce risks and liabilities, and invested approximately $1.4 B over the 10-year duration of the Program to implement the strategy. Risks and liabilities were reduced through projects and activities that decommissioned and removed out-dated facilities, remediated lands affected by past practices, and improved the management of legacy radioactive waste. The NLLP formally ended in September 2015 when the restructuring of AECL's Nuclear Laboratories was completed, and a Government-owned Contractor-operated (GoCo) management model came into effect. The nuclear decommissioning and waste management work that was previously carried out under the NLLP was transitioned into the new GoCo contract. Over the 10-year duration of the NLLP, the Program achieved good progress in addressing health, safety and environmental priorities, reducing liabilities, and providing the studies, plans and facilities that will be needed to enable subsequent phases of the strategy. The NLLP provided a strong basis for the GoCo contractor to accelerate risk and liability reduction at AECL sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving the Safety Culture by Strengthening Leadership Skills - 16563

As a primary contractor for the U.S. Department of Energy (DOE), CH2M HILL Plateau Remediation Company (CH2M) is managing a team of approximately 1,400 employees at the Hanford Site in Southeast Washington. The work on this 10-year, $5.7 billion contract ranges from design and construction to decommissioning and cleanup. In 2013, CH2M began the second half of its contract and expanded its leadership development program to focus on succession planning and strengthening the leadership skills of its employees. The goal is to create and sustain qualified leaders to lead the Hanford cleanup mission today and into the future. CH2M launched the Leadership Impact Initiative, a training program modeled from best practices used at other CH2M projects, including the Idaho Cleanup Project. Based on the results of a CH2M HILL Plateau Remediation Company site-wide safety culture survey, the company developed an improvement strategy focused on leadership development with emphasis on the front-line leadership. The strategy stresses core leadership principles and skill development to help managers more effectively engage the workforce. The two-day workshop gives employees the opportunity to build leadership on the job in an audience of their peers. CH2M expanded the workshops to include employees from all levels of the organization, including bargaining unit employees. The workshops are reinforced at quarterly all-manager meetings, communications among team members and regular sharing of lessons learned and experiences in the field. The Leadership Impact Initiative advances CH2M's vision of quality leadership and project delivery anchored by health and safety performance excellence. Since 2013, CH2M hosted more than 25 Leadership Impact Initiative workshops, reaching approximately 500 participants. Meanwhile, the company achieved the best safety record since the start of its contract, and results from its 2015 safety culture survey show improvements in the safety climate. A DOE assessment of the CH2M worker health and safety culture for the Voluntary Protection Program (VPP) found the workshop was a contributing factor to the contractor achieving VPP Star and VPP Star of Excellence Status. This paper summarizes the strategy behind the leadership development program, the outcomes and its relevance for other companies, particularly those on DOE Environmental Management decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Realization of the National Disposal Facility for Radioactive Waste in Bulgaria - 16611

Radioactive waste is generated in the Republic of Bulgaria from the operation and decommissioning of the country's nuclear power plants and from other sources in research, medical applications, and the industry. The need for building a National Disposal Facility (NDF) is recognized by the Bulgarian government and described and justified in its Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low- and intermediate-level radioactive waste (SL-LILW) to discharge its statutory responsibilities in waste management is. The European Union (EU) finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund (KIDSF). After an international tendering procedure, SERAW placed a contract for the development of the design of the NDF to the Consortium of Westinghouse Electric Spain S.A.R and DBE Technology GmbH of Germany, with ENRESA, the Spanish National Waste Management Agency providing technical review and support. Two Bulgarian companies participate also in the project as subcontractors - EQE Bulgaria and to a lesser extent KK-Project. The repository project official name is 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria', usually abbreviated as 'R-Project 5'. After obtaining SERAW's approval for the preferred repository conceptual design variant, the R Project 5 focused on developing the Technical Design on the one hand, and on preparing the Intermediate Safety Analysis Report (ISAR) to demonstrate the safety and suitability of the proposed NDF design on the other. These documents were handed over to the Bulgarian Nuclear Regulatory Authority (BNRA) as well as to the different authorities involved in the comprehensive licensing process required for nuclear facilities in the country. The corresponding permits have mostly been received or are expected for early 2016. In the last quarter of 2015 the procurement procedure for repository construction as turn-key project was started with the pre-qualification of possible constructors for the Phase I repository realization on a lump sum contract basis. Repository construction is now expected to start in 2016, with the start of waste disposal now scheduled for around 2020. With the realization of the Bulgarian National Disposal Facility an important milestone for waste disposal in the European Union is about to be achieved. This paper is a sequel of previously presented papers on the NDF construction, now including details of the complex licensing process that this disposal facility underwent, now in its final stages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Modular Design in Abatement of Fuel Element Debris (FED) Liquid Waste Stream - 16635

This paper provides a description of the processes applied within the Aqueous Discharge Abatement Plant (ADAP) at Bradwell nuclear power plant in the UK. This incorporates the Fuel Element Debris (FED) abatement plant and the Modular Active Effluent Treatment Plant (MAETP). These plants are housed in adjacent, but separate, structures and are inter-linked and share common services and control systems. The FED abatement plant, which has a shorter mission than MAETP, can be removed for decommissioning or redeployment without any impact to MAETP operation. ADAP treats aqueous waste streams generated during the ongoing decontamination and decommissioning (D and D) operations for release from the Bradwell Power Station. The plant is designed to receive and treat two major classes of liquids: 1. Slightly contaminated water from various D and D sources and collected rainwater from the power station, referred to as Aqueous Effluent (AE). 2. Dissolved fuel element debris solution. This comprises of contaminated magnesium alloy (generated during the stripping of external structures from spent Magnox fuel elements prior to shipment for reprocessing) which has been dissolved in nitric acid. All received wastes are treated to remove heavy metals and radioactive constituents prior to isolation, sampling, verification, and ultimately release to the Blackwater Estuary. The treatment consists of multiple processes including precipitation, filtration, adsorption and ion exchange carefully designed to remove targeted radionuclides and heavy metals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Surrender of Radioactive Substances (Environmental) Permits on UK Nuclear Licensed Sites - 16646

This paper is split into three, linked, parts; each part explains work being taken forward by the United Kingdom (UK) Government and/or the nuclear site regulators to apply proportionate regulatory controls before, during and after nuclear site decommissioning and clean-up. Part I of the paper describes work led by UK Government to examine credible options for a step-wise removal of those safety, security and environmental protection regulations that apply to nuclear site decommissioning and clean-up. Any removal of regulations will have to take due account of and be proportionate to the residual risk following cessation of all clean-up works. Part II of the paper describes the approach used by the UK Environment Agencies to regulate final site clean-up of UK nuclear licensed sites. Ultimately, clean-up will result in nuclear sites being released from radioactive substances regulation. Part III of the paper links Parts I and II of the paper together by describing how the UK Environment Agencies will apply proportionate regulation to the clean-up of the 140-acre Dounreay site in Caithness which is the largest nuclear clean-up project in Scotland and the second largest in the UK, after Sellafield. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Governmental Collaboration on Best Practice in Aging Infrastructure Management - 18027

Legacy nuclear sites in the US, UK and Canada are all facing a similar challenge of completing their operational and cleanup missions in parallel in a safe, efficient and cost-effective manner. Compounding the challenge is the fact that many important facilities are old with a significant level of deferred maintenance/capital needs, resulting in the need for a strategic approach to infrastructure management to ensure that maintenance and capital funding is directed at the highest priority items and that neither operations nor ongoing Decontamination and Decommissioning (D and D) activities are compromised. To help address this challenge, a Technical Information Exchange meeting was held in Ottawa, Canada in early June 2017 which brought together responsible parties from; - Government agencies including the UK Nuclear Decommissioning Authority (NDA), US Department of Energy Environmental Management (DOE EM), US National Nuclear Security Administration (NNSA), Atomic Energy of Canada Ltd (AECL) and Canadian Department of Defense - Implementers and other Government entities including Savannah River National Laboratory, Idaho National Laboratory and Canadian Nuclear Laboratories (CNL) - Associations including representation on behalf of the Institute of Asset Management and; - Contractors including Mission Support Alliance, Mott McDonald, and Longenecker and Associates The objective of this meeting was to share information about respective 'best practices' and to begin to develop common approaches to the prioritization and management of aging infrastructure investment across the organizations. The exchange focused on identifying common critical issues which were discussed through a series of presentations and small group discussions. The outcome from the meeting was an improved understanding by all participants of the latest approaches being applied to Infrastructure Asset Management and the formation of four International Working Groups which now meet on a regular (4-6 week) basis to share lessons learned and to develop international best practice in their area of interest. This paper details; - the issues and challenges that were identified during the meeting - how these were assimilated and distilled into discrete areas to enable formation of specific Working Groups - progress made by the Working Groups to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotics for Nuclear Monitoring and Inspection - 18029

As a greater number of the world's nuclear facilities approach the end of their planned lifetime and enter the decommissioning and dismantling phase, a greater impetus than ever is being placed on the use of novel technologies to assist in this otherwise extremely lengthy, complicated and costly process. Being host to numerous first-generation plants, as well as the Sellafield Limited nuclear reprocessing facility, the UK is now requiring the use of a range of robotic systems and is well-placed to act as a test-bed for the deployment of these platforms. Presented in this work is the overview of the wide range of robotic research that is occurring at the University of Bristol. Not limited to ground-based platforms - those developed at the University Bristol,UK, include; airborne, underwater as well as pipeline network monitoring systems. Through the application of each of these robotic systems, not only is the dose-rate otherwise experienced by the operator removed, but the costs associated with the work are also significantly reduced, as well as the speed at which it is performed dramatically increased. All the systems descried in this work have been successfully deployed at one (or multiple) nuclear sites, with the results used to inform further decommissioning - typically within environments previously uncharacterised due either to their inaccessibility or high levels of radioactivity. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Industrial Perspective of Research Within the DISTINCTIVE Program - 18045

UK Engineering and Physical Sciences Research Council (EPSRC) and three industrial partners, the Nuclear Decommissioning Authority (NDA), the National Nuclear Laboratory (NNL) and Sellafield Ltd (SL) are supporting the DISTINCTIVE (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) consortium of eleven universities to carry out research in four theme areas of importance to the UK nuclear industry: Advanced Gas-cooled Reactor (AGR), Magnox and exotic spent fuels; PuO{sub 2} and fuel residues; legacy ponds and silo wastes; and structural integrity. This paper describes the main industry challenges in each of these theme areas and some of industry led activities to address these challenges, and provides examples of where the DISTINCTIVE research output is assisting the nuclear industry in meeting these challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The D and D of Nuclear Facilities: a Systemic Approach for Project Organization and Monitoring - 18099

The Decontamination and Decommissioning (D and D) of Licensed Nuclear facilities takes place under circumstances which make it a very complex field. On the one hand, more and more facilities of widely varying types are concerned, and many D and D projects are currently running or planned. A nuclear facility's life cycle is often very long and the building may be modified or impacted by incidents during its operation. These changes need to be known and taken into account for the D and D plans, in order to ensure safety at all times. In addition, the numerous stakeholders involved in a project express needs which impose many requirements. These encompass various points of view, and data from different detail levels must be managed to satisfactorily meet them. On the other hand, legacy data (including records, plans etc.) is a recurring issue for D and D projects. The quality and availability of relevant data regarding the different phases of the nuclear facility lifetime may be insufficient, for instance due to the lack of traceability practices in the past. The uncertainty level is not always specified and explained, old documents can be damaged and are not necessarily digitized, etc. It is therefore particularly important to define the relevant type of raw data to be collected and traced for D and D projects as early as possible. In this context, CEA (Commissariat a l'energie Atomique et aux energies Alternatives) has been analyzing past D and D projects for many years. The goal is to facilitate reproducibility by generalizing best practices and promoting efficient organizational rules and technical solutions. A method is currently being studied to help project managers to prepare specifications for future D and D operations and improve both the efficiency and the relevance of the decommissioning strategy throughout each project, depending on the expected quality of its end-state. This method first consists in formalizing and specifying the entire set of requirements to be taken into consideration, e.g. technical, operational, logistical, regulatory, financial, organizational, safety and security, human, ethical, or, naturally, environmental aspects. Second, based on these requirements, it will enable the project team to structure, check, and then to demonstrate the coherence and feasibility of the project from both the technological and organizational points of view. Lastly, the method will enable the evaluation of the various possible solutions for the management of dismantling products, for instance, regarding the waste outlets: direct disposal or interim storage. To conclude, the method should permit a constant re-evaluation of the D and D strategy depending on the possible evolution of the stakeholders' requirements, and thus it should optimize the monitoring of D and D projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: Legacy Ponds and Silo Wastes - 18135

The UK Engineering and Physical Sciences Research Council (EPSRC) sponsored DISTINCTIVE consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) is undertaking 22 science and engineering projects across 11 universities related to the decommissioning of the Legacy Ponds and Silos at Sellafield. These are grouped into three work packages that focus on wasteform durability, effluent treatment and pond and silo sludges. Specific challenges include understanding the durability of intermediate level waste (ILW) glass-ceramic waste forms, studying thermally treated Pu-containing materials, producing and testing new inorganic ion exchange materials including derivatized magnetic nanoparticles for Cs, Sr and U removal from effluent, developing micro- and ultra-filtration methods, providing improved modelling and simulation of sludge disturbance, mobilisation and transport, developing a better understanding of gas hold-up in sludges, exploring methods for sludge characterisation including the use of acoustic backscatter and quartz crystal microbalance techniques and Raman spectroscopy and computer modelling of the interaction of cations with brucite surfaces. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Combined Assay Systems for the Characterisation of Historical ILW at of the Dounreay Shaft and Silo-18140

In 1955 the Dounreay nuclear power development establishment was created on the northern coast of Scotland primarily to pursue the UK Government policy of developing Fast Breeder Reactor (FBR) technology. The site operated then by the United Kingdom Atomic Energy Authority (UKAEA) saw the development, test and operation of 3 nuclear reactors, two of them FBRs, alongside fabrication and reprocessing facilities for the FBR fuel elements. From the late 1950's until 1977 Intermediate Level radioactive Waste (ILW) generated on site was disposed of into a 65 m deep, 4.6 m diameter shaft. In January 1977, an explosion thought to be caused by hydrogen generated from sodium and potassium wastes reacting with water occurred in the upper part of the shaft, thus stopping any further waste disposal. A second ILW storage facility, the ILW-Silo, started operation in 1971 to deal with the increasing volume of intermediate level waste generated on site in the mid-1960's and continued receiving waste until 1998. The decommissioning of the Shaft and Silo facilities is a challenging engineering task due to the complexity and potential hazards linked with the retrieval and handling of historical waste. Following recovery it is intended to shred the majority of the waste and load it into 200-l assay drums. Sludges would be separated and solidified within a special annulus drum to make them suitable for assay. To support the decommissioning strategies put forward by Dounreay Site Restoration Limited (DSRL), Mirion Technologies Canberra UK Ltd have designed and completed the manufacture of a pair of combined non-destructive waste assay (NDA) systems. The two identical automated ILW counters are intended to provide a means to characterise the waste materials by performing active and passive neutron measurement as well as segmented high resolution gamma spectrometry (HRGS) of 200-l sacrificial waste drums. The active neutron technique is based on the Differential Die Away (DDA) technique using a pulsed Deuterium-Tritium neutron generator to interrogate fissile material present in the waste. The active neutron measurements support, as well as the passive neutron coincidence measurements, a matrix correction capability by use of an Add-a-Source mechanism. The publication will describe in broad lines the approach proposed by DSRL in the processing of the waste retrieved from both the Shaft and Silo facilities. It will also present a description of the overall design of the NDA counters, illustrating how the measurements to be performed will allow DSRL to safely characterise the retrieved waste materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Long-term Safety Assessment for the Planned LLW Disposal Facility at Al-Tuwaitha, Iraq - 18142

Before 1991, Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest nuclear site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were concentrated. During the first Gulf War in 1991, all sites suffered significant damage from bombing and subsequent looting. Currently, the Ministry of Science and Technology is responsible for the ten heavily damaged nuclear sites and for the management of radioactive waste in Iraq in general. The task of decommissioning the damaged nuclear facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Commission (EC), and the United States (US). In the framework of its Instrument for Nuclear Safety Cooperation (INSC), the EC has launched a cooperation project to support the planned construction of an engineered repository for short-lived low- and intermediate level waste for the safe disposal of radioactive waste resulting from the decommissioning activities, as well as for waste from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The main objectives of this project, which was awarded to a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany and JAVYS a.s. of Slovakia, are the development of an initial conceptual level basic design and preliminary safety assessment report (PSAR) and the subsequent detailed engineering design and supporting pre-construction safety assessment report (PCSAR). The current paper focuses on the development of the PSAR. Special focus is given to the long-term calculations and difficulties associated with the limited data base in regard to site characterization as well as the expected inventory for the future repository. Because of the ongoing security concerns in Iraq, the Ministry of Science and Technology had already selected the Al-Tuwaitha Site as the best suited location for the planned surface repository at the start of the project. Although some site characterization work had already been carried out prior to the start of the project, certain data for modelling the geology and hydrology of the site are still lacking. Missing data have been compensated by conservative assumptions and the assessment of alternative scenarios. Consequently, for the development of the simplified GoldSim{sup R} computer model used to carry out the long-term calculations supporting the PSAR, existing site information was used and, as appropriate, amended or replaced by conservative assumptions. Due to the nature of the waste, data on the expected inventory are associated with large uncertainties. Although certain estimates related to the future volume of the waste exist, little to no information is available on the expected radionuclide vector and respective activities. Therefore, the long-term calculations were carried out for a generic inventory including a broad range of radionuclides that are to be expected as being important considering the kind of waste to be disposed of in the facility. Based on the results of these calculations, the maximum total capacity of the facility was estimated and converted into activity limits for individual radionuclides that will be integrated into the existing general WAC for the facility. Compliance with these WAC will then guarantee the safety of the repository in regard to potential radionuclide releases via the groundwater pathway. In parallel to the determination of activity limits for the WAC, long-term calculations were carried using different estimates for the expected total activity to determine the general suitability of the proposed technical solution of the repository for receiving the total amount of Iraqi radioactive waste principally acceptable for surface disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autonomous 3D and Radiation Mapping in Tunnel Environments Using Aerial Robots - 18156

In this paper we present the algorithms and systems developed to enable autonomous 3D and radiation mapping, as well as radiological source localization in tunnel environments using aerial robots. The developed technologies aim to address the need of autonomous robotic inspection of nuclear sites such as facilities in the process of being decommissioned. As a motivational example, the PUREX tunnels at the Hanford Site are considered and the robot is designed to be able to conduct multi-modal 3D/radiation characterization of the tunnel environment without any prior knowledge or map provided beforehand. In order to enable the necessary GPS-denied simultaneous localization and mapping in dark, visually-degraded tunnel environments, a multi-modal mapping unit was developed which fuses the data from stereo vision cameras synchronized with flashing LEDs, inertial sensors, and three time-of-flight 3D depth sensors. The robot's pose and surrounding map are estimated at 20 Hz through a depth-enhanced visual- inertial localization and mapping framework. Provided this ability to estimate the robot's pose and develop a dense map in real-time, a receding horizon sampling-based autonomous exploration path planning algorithm was utilized and equips the robot with the ability to explore its environment given no prior map. The aforementioned key robotic functionalities are further extended through the integration of miniaturized fully solid-state scintillation detectors, utilizing advanced scintillators and Silicon Photomultipliers. The derived sensor data is employed for radiation mapping, which when fused with the 3D maps and the spectroscopic source localization methods, allow the aerial robotic platform to localize the radiation source and identify the specific source isotope. The source location is estimated through a geometric algorithm which can localize a source given only three measurements and short dwell times. The developed systems were tested using two small aerial robot platforms of the F450 and F550 frame classes with weights of 2.6 kg and 2.9 kg respectively. All localization and planning as well as high-level control algorithms are executed onboard. The scintillation detector is integrated on the robot and its data is collected through a dedicated microcontroller. A set of field experiments were conducted inside the dark and GPS-denied environment of a 4.25 m wide, 7.5 m tall, and 137 m long railroad tunnel. A Cs-137 source was placed within the tunnel, the associated 3D/radiation maps were derived, and the source location was estimated. Through these efforts, the goal is to develop the robotic technology that would enable the autonomous systematic inspection or emergency response in nuclear waste decommissioning facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From the Cesium Pond Soil Shipping Campaign at Whiteshell Laboratories - 18206

Whiteshell Laboratories (WL), located in Manitoba, Canada is the first major decommissioning project of a nuclear research establishment in Canada. With the focus now active remediation to return the site to green state, the majority of legacy radioactive waste and waste generated from decommissioning and demolition of nuclear facilities must be transported off site to Chalk River Laboratories (CRL), located in Ontario, Canada. No large radioactive waste shipment campaigns have been undertaken by WL until now. A newly established Waste Management Program specifically designed to support the WL Closure Project has executed its first major shipping campaign of radioactive material, making approximately one hundred shipments and reducing WL's total volume of low-level radioactive waste to transport by seven percent. The shipped waste was approximately 1800 m{sup 3} (2600 metric tons) of known Cs-137 contaminated soil material generated from the excavation of an Experimental Cesium Pond Project designed to study the distribution of dose received by organisms living at the mud-water interface from Cs-137 contamination. This paper outlines the cost benefit analysis undertaken to determine the most cost effective method for transporting the radioactively contaminated soil to CRL, storage challenges experienced by both WL and CRL, the selection of the most appropriate waste package, training of shippers, and the continual optimization of increasing the number of generated waste packages and the number of waste packages shipped and accepted at CRL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: Transforming High Activity Materials Research in the UK - 18212

The DISTINCTIVE consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) is a partnership of 11 research universities, working to decommission and clean up the legacy of civil nuclear energy generation, sponsored by the Engineering and Physical Sciences Research Council (EPSRC). An important component of the research programme is to develop the skills and facilities to address key research questions, requiring the use of highly radioactive materials. Here we highlight the outcomes of four research projects in which access to state of the art research facilities for working with radioactive materials, supported by international partnerships, has advanced research in plutonium storage and immobilisation, and the disposal of spent nuclear fuels. First, we have developed a viable formulation and process for immobilisation of the UK plutonium stockpile, including commissioning of a radiological hot isostatic press and validation studies using plutonium-239. Second, we have further underpinned the interim storage of PuO{sub 2}, through understanding of water and chlorine sorption / desorption, pertinent to the historic practice of containment within, and degradation of PVC bags. Third, we have developed a novel methodology to investigate the in situ radiolysis induced dissolution of actinide oxide thin films, using synchrotron radiation, to underpin the geological disposal of spent nuclear fuel. Fourth we monitored in situ the oxidation and self-ignition mechanism of uranium carbide, a legacy fuel from the Dounreay Prototype Fast Reactor that is waiting for oxidation treatment prior to permanent storage and/or disposal. Through this programme of research, the DISTINCTIVE consortium is rebuilding the UK capability for research with transuranic materials, which, hitherto, was eroded over decades of disinvestment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: Structural Integrity - 18272

The Engineering and Physical Sciences Research Council (EPSRC) sponsored DISTINCTIVE consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) is developing technologies for civil infrastructure repair, in-situ subsurface waste immobilisation, and groundwater protection during construction and decommissioning. The consortium has contributed to the development of skilled cross-disciplinary civil engineers and scientists, that have the knowledge and experience required to develop engineering solutions tailored for application within radiologically contaminated sites. The Structural Integrity Theme focuses on challenges ranging from site-scale infrastructure preservation and restoration, through injectable ground barriers for risk mitigation, to the remote characterisation and handling of individual waste packages. The main aim of the theme is to develop novel engineering solutions, tailored for use on radiologically contaminated sites, for: ground protection; infrastructure characterisation; concrete restoration and waste characterisation. Technologies should minimise current, and future, radiation exposure of the workforce whilst providing economically viable engineering solutions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗