Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Cybersecurity and Infrastructure Security Agency (CISA) Infrastructure Security Division (ISD) Assessment Prioritization Project

The Cybersecurity and Infrastructure Security Agency’s Infrastructure Security Division (CISA ISD) manages a diverse portfolio of assessments across the nation’s critical infrastructure sectors. These assessments—ranging in type, scope, and complexity—are essential for identifying vulnerabilities and strengthening national security. However, the wide variation in assessment offerings and the increasing demand for limited resources have highlighted the need for a transparent, structured approach to prioritizing assessment activities. To address this challenge, CISA ISD partnered with Lawrence Livermore National Laboratory (LLNL) to review current assessment methodologies, analyze existing prioritization practices, and develop a comprehensive, national-security-focused prioritization framework. This report summarizes the project’s approach, key findings, and actionable recommendations for enhancing ISD’s assessment program.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework for Storage Complexes Contributed to EDX (Work Product 2.1.c)

On September 30, 2021, a Needs Assessment Framework for Storage Complexes was completed for the SECARB-USA region by the Southern States Energy Board (SSEB) and The University of Texas at Austin Bureau of Economic Geology (UT-BEG). The Needs Assessment Framework for Storage Complexes documented a region-wide assessment to identify data needed to advance storage projects at sites of relevance to industrial, academic, and government stakeholders. The region-wide assessment addresses the needs of CO2 source, storage, and utilization stakeholders, finance and insurance institutions, state and local government agencies, local stakeholders at prospective storage complexes, environmental non-governmental organizations (NGOs), and others as identified by the Partners. This assessment was tested against various potential storage sites and modified to include site-specific issues, such as surface or pore space rights. The framework was provided to stakeholders for review and then used in other tasks, such as the ML initiative (Subtask 3.4) and storage complex readiness evaluation (Subtask 4.2). In accordance with the SOPO, this assessment satisfied completion of Work Product 2.1.b. The OSTI ID is 3015803, and the DOI link is https://doi.org/10.2172/3015803. On February 28, 2022, SSEB uploaded Work Product 2.1.b to NETL’s Energy Data eXchange (EDX). As such, Work Product 2.1.c is completed as documented below.

42 ENGINEERING↗

Development of autonomous magnetometer rotorcraft for wide area assessment

Large areas across the United States are potentially contaminated with UXO, with some ranges encompassing tens to hundreds of thousands of acres. Technologies are needed which will allow for cost effective wide area scanning with 1) near 100 % coverage and 2) near 100 % detection of subsurface ordnance or features indicative of subsurface ordnance. The current approach to wide area assessment is a multi-level one, in which medium - altitude fixed wing optical imaging is used for an initial site assessment. This assessment is followed with low altitude manned helicopter based magnetometry. Subsequent to this wide area assessment targeted surface investigations are performed using either towed geophysical sensor arrays or man portable sensors. In order to be an effective tool for small UXO detection, the sensing altitude for magnetic site investigations needs to be on the order of 1 – 3 meters. These altitude requirements mean that manned helicopter surveys will generally only be feasible in large, open and relatively flat terrains. While such surveys are effective in mapping large areas relatively fast there are substantial mobilization/demobilization, staffing and equipment costs associated with these surveys (resulting in costs of approximately $100-$150/acre). In addition, due to the low altitude there are substantial risks to pilots and equipment. Surface towed arrays provide high resolution maps but have other limitations, e.g. in their ability to navigate rough terrain effectively. There is thus a need for other systems which can be used for effective data collection. An UAV (Unmanned Aerial Vehicle) magnetometer platform is an obvious alternative. The motivation behind such a system is that it reduces risk to operators, is lower in initial and Operational and Maintenance (O&M) costs (and can thus potentially be applied to smaller sites) and has the potential of being more effective in terms of detection and possibly characterization (through the use of dynamic acquisition, i.e. survey mission inflight reprioritization). We describe and report on a one year effort with as primary goal to provide a recommendation to SERDP for a path forward in the implementation of one or more autonomous unmanned magnetometer rotorcraft platforms. This recommendation (which is provided in chapter 6) is based on the following three elements a) An assessment on the applicability of autonomous rotorcraft magnetometer systems to the current DoD site inventory, and an initial assessment of which type(s) of autonomous unmanned magnetometer rotorcraft platforms (in terms of performance characteristics such as payload, altitude, obstacle avoidance, production rate and flight time) would be most relevant to this inventory (chapter 3); b) An evaluation of the feasibility of assembling such platforms from commercial components (unmanned rotorcraft, control systems and sensors – both magnetometer sensors and supporting sensors). This evaluation included several highly successful field tests (chapter 4 and 5); c) A recommendation of the path forward, which includes a detailed outline of the efforts required in the design, assembly and testing of different modular platforms (chapter 6)

58 GEOSCIENCES↗

Technical Letter Report Assessment of Ultrasonic Phased Array Inspection Method for Welds in Cast Austenitic Stainless Steel Pressurizer Surge Line Piping JCN N6398, Task 1B

Research is being conducted for the U.S. Nuclear Regulatory Commission (NRC) at the Pacific Northwest National Laboratory (PNNL) to assess the effectiveness and reliability of advanced nondestructive examination (NDE) methods for the inspection of light water reactor components. The scope of this research encompasses primary system pressure boundary materials including cast austenitic stainless steels (CASS); dissimilar metal welds; piping with corrosion-resistant cladding; weld overlays, inlays and onlays; and far-side examinations of austenitic piping welds. A primary objective of this work is to evaluate various NDE methods to assess their ability to detect, localize, and size cracks in coarse-grained steel components. In this effort, PNNL supports cooperation with Commissariat à l’Energie Atomique (CEA) to assess reliable inspection of CASS materials. The NRC Project Manager has established a cooperative effort with the Institut de Radioprotection et de Surete Nucleaire (IRSN). CEA, under funding from IRSN, are supporting collaborative efforts with the NRC and PNNL. Regarding its work on the NDE of materials, CEA is providing its modeling software (CIVA) in exchange for PNNL offering expertise and data related to phased-array detection and sizing, acoustic attenuation, and back scattering on CASS materials. This collaboration benefits the NRC because CEA performs research and development on CASS for Électricité de France (EdF). This technical letter report provides a summary of a technical evaluation aimed at assessing the capabilities of phased-array (PA) ultrasonic testing (UT) methods as applied to the inspection of welds in CASS pressurizer (PZR) surge line nuclear reactor piping. A set of thermal fatigue cracks (TFCs) was implanted into three CASS PZR surge-line specimens (pipe-to-elbow welds) that were fabricated using vintage CASS materials formed in the 1970s, and flaw responses from these cracks were used to evaluate detection and sizing performance of the PA-UT methods applied. This effort was comprised of multiple elements that included use of microstructural knowledge (dimensional analysis, grain orientation, and grain type) as well as sound field modeling to more effectively modify inspection parameters and enhance the inspection outcomes. Advanced probe design and sound field simulations were employed to enhance detection and characterization of circumferentially oriented flaws, and an assessment of lateral (circumferential) flaw localization capability and performance was also conducted. An evaluation of flaw detection, length sizing, depth sizing, and signal-to-noise ratio was performed for all flaws in the subject specimens, as a function of various inspection parameters, and finally, measurements were made to quantify and assess the baseline CASS material noise and its potential impact on flaw detection.

36 MATERIALS SCIENCE↗

Application of Direct Assessment Approaches and Methodologies to Cathodically Protected Nuclear Waste Transfer Lines

The U.S. Department of Energy's (DOE) Hanford Site is responsible for the safe storage, retrieval, treatment, and disposal of approximately 54 million gallons (204 million liters) of radioactive waste generated since the site's inception in 1943. Today, the major structures involved in waste management at Hanford include 149 carbon steel single-shell tanks, 28 carbon-steel double-shell tanks, plus a network of buried metallic transfer lines and ancillary systems (pits, vaults, catch tanks, etc.) required to store, retrieve, and transfer waste within the tank farm system. Many of the waste management systems at Hanford are still in use today. In response to uncertainties regarding the structural integrity of these systems,' an independent, comprehensive integrity assessment of the Hanford Site piping system was performed. It was found that regulators do not require the cathodically protected pipelines located within the Hanford Site to be assessed by External Corrosion Direct Assessment (ECDA) or any other method used to ensure integrity. However, a case study is presented discussing the application of the direct assessment process on pipelines in such a nuclear environment. Assessment methodology and assessment results are contained herein. An approach is described for the monitoring, integration of outside data, and analysis of this information in order to identify whether coating deterioration accompanied by external corrosion is a threat for these waste transfer lines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies: Preprint

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Uncertainties In Performance Assessments For The Yucca Mountain Site And The Edge-of-Compliance

Numerical performance assessments of deep geologic disposal systems of long-lived radioactive wastes serve as the primary tool for quantitatively assessing projected performance and for making regulatory compliance decisions, both in the U.S. and disposal programs abroad. However there is a significant body of opinion, expressed in the international literature, that the confidence that can be placed on such assessments decreases significantly as the analysis time frames increase into the many hundreds of thousands of years. With the inclusion of highly corrosion resistant metals in the planned waste package designs for the Yucca Mountain (YM) system commercial spent fuel and defense-generated high-level radioactive waste disposal, published projections for the site show doses to the receptor at times extending into the many hundreds of thousands of years. The question of relative confidence in dose projections becomes more important at very long time frames, particularly when the time frame for significant doses increases dramatically reflecting the effects of using highly corrosion resistant materials. To examine uncertainties in performance assessments of the YM disposal system over very long time frames, a site model developed by the U.S. Department of Energy to assess sensitivities in peak dose performance was modified and used to examine the propagation of uncertainties for a hypothetical disposal system. These analyses start with a hypothetical disposal system at the 'edge-of-compliance' at 10,000 years, reflecting the generic repository standard in 40 CFR Part 191. The hypothetical system was poised to give a mean dose of 0.15 milli-sievert/year (15 mrem/yr.) at 10,000 years, by allowing a fixed number of waste packages to 'fail' within the first 5,000 years after closure. By maintaining the number failed waste packages constant over time, the spread in dose estimates over the time to peak dose was calculated for this system perched at the 'edge-of-compliance' at 10,000 years. This hypothetical construct removes waste package performance from the analyses and allows the site model to explore the effects of uncertainties in the natural barrier and site conditions on the dose projections out to the time of peak dose. The sensitivities of these projections to various 'driver' parameters were examined, including infiltration rates, solubility constraints, water chemistry and roof collapse assumptions. Overall, the initial construct showed a one and one-half order of magnitude spread between the 5. and 95. percentiles at 10,000 years, the initial state for the analyses. This spread increased to approximately three and one-half orders of magnitude at peak dose, reflecting the effects of transport and retardation mechanisms on the fixed source term. The model eliminated portions of the transport path from the repository where relatively little retardation would be expected. Travel times were therefore significantly reduced thereby eliminating radioactive decay as an important mechanism in reducing projected doses. Solubility controls appear to be a major source of uncertainties in the dose projections for the model used. These results support the general international consensus that confidence in dose projections over very long time frames does decrease, and illustrates that this conclusion also applies to assessments of the YM projected performance as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of External Hazards at Radioactive Waste and Used Fuel Management Facilities - 13505

One of the key lessons from the Fukushima accident is the importance of having a comprehensive identification and evaluation of risks posed by external events to nuclear facilities. While the primary focus has been on nuclear power plants, the Canadian nuclear industry has also been updating hazard assessments for radioactive waste and used fuel management facilities to ensure that lessons learnt from Fukushima are addressed. External events are events that originate either physically outside the nuclear site or outside its control. They include natural events, such as high winds, lightning, earthquakes or flood due to extreme rainfall. The approaches that have been applied to the identification and assessment of external hazards in Canada are presented and analyzed. Specific aspects and considerations concerning hazards posed to radioactive waste and used fuel management operations are identified. Relevant hazard identification techniques are described, which draw upon available regulatory guidance and standard assessment techniques such as Hazard and Operability Studies (HAZOPs) and 'What-if' analysis. Consideration is given to ensuring that hazard combinations (for example: high winds and flooding due to rainfall) are properly taken into account. Approaches that can be used to screen out external hazards, through a combination of frequency and impact assessments, are summarized. For those hazards that cannot be screened out, a brief overview of methods that can be used to conduct more detailed hazard assessments is also provided. The lessons learnt from the Fukushima accident have had a significant impact on specific aspects of the approaches used to hazard assessment for waste management. Practical examples of the effect of these impacts are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancing performance assessments using the ASCEM tool-set - 15222

The Office of Soil and Groundwater Remediation within the U.S. Department of Energy's Office of Environmental Management (EM) is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is an open source and modular computing framework that incorporates new advances and tools for predicting contaminant fate and transport in natural and engineered systems. ASCEM integrates modeling tools into a common work-flow that facilitates integrated approaches to modeling and site characterization, and enables robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project includes collaboration with end users engaged in performance assessments and subsurface simulation. Two working groups are engaged in performance assessment activities at the Hanford Site and Savannah River Site (SRS). The Hanford Site working group is focused on evaluating an alternative conceptual model that includes fine-scale heterogeneities. The baseline conceptual model for the performance assessment includes the large-scale stratigraphy at the site. The working group is applying the ASCEM tool-set to develop and evaluate alternative conceptual models and evaluate the effect of heterogeneities on long-term transport under rainfall-driven conditions. Because the heterogeneous models require long compute times due to increased model complexity, the simulations are implemented on a high-performance computing platform to reduce simulation times. The ASCEM Akuna work-flow enables efficient organization, simulation execution, and processing and visualization of results. Current performance assessments for waste tank closure at the SRS are limited to two-dimensional axi-symmetric representations. The SRS working group is collaborating with the site contractor to address technical review issues by resolving fine-scale tank features and simulating three-dimensional flow with Richards equation for selected closure scenarios using the ASCEM simulator, Amanzi. The Akuna tool-set is being applied to support model setup, sensitivity analysis, uncertainty quantification, and visualization. Both of the ASCEM working groups are addressing issues that cannot readily be evaluated with the existing tools. In these efforts, ASCEM is being used to provide technical underpinnings for ongoing performance assessments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of IAEA MODARIA II Program Working Group 1 on Assessment and Decision Making of Existing Exposure Situations for NORM and Nuclear Legacy Sites - 18308

The International Atomic Energy Agency (IAEA) launched the Modelling and Data for Radiological Impact Assessments (MODARIA) II Programme in October. As part of the IAEA effort to enhance the capabilities of its Member States in assessing radiological impacts of radionuclides released to the environment from sites that were not operated in accordance with current standards, and to ensure protection of the public and the environment, the MODARIA II Programme aims to: (1) test the performance of models developed for predicting the transfer of radionuclides in the environment and assessing radiological impacts to the public and the environment; (2) develop and improve models for particular environments and, where appropriate, to agree on data sets that are generally applicable for use in testing environmental transfer models; and (3) provide an international forum for the exchange of experiences, ideas and research information. The Programme will run for 3 years from 2016 to 2019. The Programme comprises seven working groups covering a wide range of topics (https://wwwns.iaea.org/projects/modaria/modaria2.asp?s=8 and l=129). MODARIA II Working Group 1 (WG1) is focused on dose assessment and decision making regarding existing exposure situations due to naturally occurring radioactive material (NORM) and nuclear legacy sites. WG1 was formed as a combination of two MODARIA I WGs: WG1 focused on application of decision-aiding tools in remediation; and WG3 focused on risk assessment for NORM and radioactively contaminated legacy sites (https://wwwns.iaea.org/projects/modaria/default.asp?s=8 and l=129). It was recognized that the decision-making needs will inform the scope of risk assessments, and the risk insights and structured decision analyses will aid in informed decision-making. Therefore, MODARIA II WG1 is focused on developing methods and toolsets for risk-informed decision-making for NORM and nuclear legacy sites, including demonstration of decision-making processes and tools through case studies. MODARIA II WG1 has 91 registered participants from 33 Member States and IAEA (as of November 2017), some 30 of whom are actively engaged in various collaborative research and development activities within WG1. Members of WG1 participated in the First Technical Meeting of MODARIA II, which was held in Vienna, Austria from 31 October to 4 November 2016. The group then held its First Interim Meeting in Brussels, Belgium from 26 to 30 June 2017, which included a field trip to the legacy Tessenderlo Chemie (TCH) Phosphate Processing Site. At this meeting, the TCH Site and the Pridneprovsky Chemical Plant (PChP) in Ukraine were selected for case studies. The Los Alamos National Laboratory (LANL) Material Disposal Area B in the USA and the Beaverlodge Uranium Mill and Mill Site in northern Canada were selected as examples for sharing of good practices and lessons learned in risk-informed decision-making for environmental remediation and land conveyance. At the Second Technical Meeting held in Vienna on 30 October to 3 November 2017, an additional NORM site for tin processing in Brazil was added to the case studies, with another NORM site in Yunnan, China included for consideration at the Second Interim Meeting of WG1. The Second Interim Meeting will be held in in early to mid-May, 2018. The group has also decided to prepare an Interim Report by October 2018 to document the WG1 discussions and analyses for the period of 2016-2018, which will be finalized at the conclusion of MODARIA II in October 2019. Initial assignments have been discussed for IM1 participants to collect data, conduct modelling and analyses, and prepare draft sections for the Interim Report. This paper will provide an overview of the work plans for WG1. It will also highlight some near-term activities that the group is currently working on. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MY EXES and EDM for Automated Remediation Data Quality Assessments - 19053

MY Electronic data exchange and Evaluation System (EXES) is a new web-based technology providing external admin access and full control to the Web-based EXES tool developed by GD for EPA for automated environmental remediation data quality assessments. EXES replaces most manual assessment processes, reducing remediation data review time and costs and ensuring that data are of known and documented quality. This tool is available from EPA to federal agencies and remediation firms and has successfully been used to support over 190 site investigations, 105 Remedial investigations and over 20 compliance monitoring efforts. The new MY EXES functionality has been developed for project managers and decision makers to setup projects, track receipt of environmental remediation monitoring data, assess data quality, and manage data. It is designed to be flexible and configurable to meet any government agency's data review and data management needs. It is accessible 24/7 through a secure portal. MY EXES efficiently evaluates analytical data regardless of the underlying method and data reporting requirements. It is a centralized project and data assessment tool that is scalable, flexible and configurable; improving data quality while reducing cost through the following: - Provides users with the ability to create a project and to specify the analytical methods corresponding to the data that will be submitted for that project. A project can be modified and managed anytime during the project's life cycle. - Allows users to manage a library of analytical methods that can be made available for association to their projects. - Users can specify the automated tests and assessment that needs to be performed on the analytical data deliverables based on specific requirements in the project's Quality Assurance Project Plan (QAPP). - Users specify: - The format of the incoming data deliverables from the laboratory; - The type and level of review services to be performed; - The assessment deliverables to be generated - output spreadsheets and reports; - Project owner sets up system access and permissions for members of the project team. - A faster (600%) and less expensive (85%) process than the traditional data usability/validation. The EXES Data Manager application (EDM) provides a centralized data repository to view and retrieve generated reports, spreadsheets, and other data deliverables as defined by the client, eliminating the need for data transfer between project team members. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Framework for Quantitative Assessment of Impacts Related to Energy and Mineral Resource Development

Natural resource planning at all scales demands methods for assessing the impacts of resource development and use, and in particular it requires standardized methods that yield robust and unbiased results. Building from existing probabilistic methods for assessing the volumes of energy and mineral resources, we provide an algorithm for consistent, reproducible, quantitative assessment of resource development impacts. The approach combines probabilistic input data with Monte Carlo statistical methods to determine probabilistic outputs that convey the uncertainties inherent in the data. For example, one can utilize our algorithm to combine data from a natural gas resource assessment with maps of sage grouse leks and pinon-juniper woodlands in the same area to estimate possible future habitat impacts due to possible future gas development. As another example: one could combine geochemical data and maps of lynx habitat with data from a mineral deposit assessment in the same area to determine possible future mining impacts on water resources and lynx habitat. The approach can be applied to a broad range of positive and negative resource development impacts, such as water quantity or quality, economic benefits, or air quality, limited only by the availability of necessary input data and quantified relationships among geologic resources, development alternatives, and impacts. In conclusion, the framework enables quantitative evaluation of the trade-offs inherent in resource management decision-making, including cumulative impacts, to address societal concerns and policy aspects of resource development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dynamic risk assessment for geologic CO 2 sequestration

At a geologic CO 2 sequestration (GCS) site, geologic uncertainty usually leads to large uncertainty in the predictions of properties that influence metrics for leakage risk assessment, such as CO 2 saturations and pressures in potentially leaky wellbores, CO 2 /brine leakage rates, and leakage consequences such as changes in drinking water quality in groundwater aquifers. The large uncertainty in these risk-related system properties and risk metrics can lead to over-conservative risk management decisions to ensure safe operations of GCS sites. The objective of this work is to develop a novel approach based on dynamic risk assessment to effectively reduce the uncertainty in the predicted risk-related system properties and risk metrics. We demonstrate our framework for dynamic risk assessment on two case studies: a 3D synthetic example and a synthetic field example based on the Rock Springs Uplift (RSU) storage site in Wyoming, USA. Results show that the U.S. National Risk Assessment Partnership’s Open Source Integrated Assessment Model (NRAP-Open-IAM) coupled with a conformance evaluation can be used to effectively quantify and reduce the uncertainty in the predictions of risk-related system properties and risk metrics in GCS.

58 GEOSCIENCES↗

A Geo-Data Science Method for Assessing Unconventional Rare-Earth Element Resources in Sedimentary Systems

Abstract Rare-earth elements (REEs) supply raw materials that constitute many of our modern critical infrastructure, defense, technology, and electrification needs. Despite REE accumulations occurring in conventional bedrock and ion-adsorption deposits sourced from weathering of igneous rocks, unconventional host materials such as coal and related sedimentary strata have been identified as promising sources of REEs to meet growing demand. To maximize the potential of unconventional resources such as REE-coal systems, new approaches are needed overcome challenges from mineral systems with no known deposits and areas with sparse geochemical data. This article presents a systematic knowledge-data resource assessment method for predicting and identifying REE resource potential and occurrence in these unconventional systems. The method utilizes a geologic and geospatial knowledge-data approach informed and guided by REE accumulation mechanisms to systematically assess and identify areas of higher enrichment. An assessment of the Powder River Basin is presented as a test case to demonstrate the method workflow and results. The key output is a potential enrichment score map reported with varying confidence levels based on the amount of supporting evidence. Results from the test case indicate several locations with promising potential for different types of coal-REE deposits, demonstrating the viability of the method for exploration and assessment of unconventional REE resources. The method is flexible by design and, with sufficient applicable knowledge and data, can be adapted for assessing critical mineral systems in other sedimentary systems as well.

58 GEOSCIENCES↗

Conceptual and methodological challenges to integrating SEA and cumulative effects assessment

The constraints to assessing and managing cumulative environmental effects in the context of project-based environmental assessment are well documented, and the potential benefits of a more strategic approach to cumulative effects assessment (CEA) are well argued; however, such benefits have yet to be clearly demonstrated in practice. While it is widely assumed that cumulative effects are best addressed in a strategic context, there has been little investigation as to whether CEA and strategic environmental assessment (SEA) are a 'good fit' - conceptually or methodologically. This paper identifies a number of conceptual and methodological challenges to the integration of CEA and SEA. Based on results of interviews with international experts and practitioners, this paper demonstrates that: definitions and conceptualizations of CEA are typically weak in practice; approaches to effects aggregation vary widely; a systems perspective lacks in both SEA and CEA; the multifarious nature of SEA complicates CEA; tiering arrangements between SEA and project-based assessment are limited to non-existing; and the relationship of SEA to regional planning remains unclear.

54 ENVIRONMENTAL SCIENCES↗

Bibliometric analysis of global environmental assessment research in a 20-year period

Based on the samples of 113,468 publications on environmental assessment (EA) from the past 20 years, we used a bibliometric analysis to study the literature in terms of trends of growth, subject categories and journals, international collaboration, geographic distribution of publications, and scientific research issues. By applying thresholds to network centralities, a core group of countries can be distinguished as part of the international collaboration network. A frequently used keywords analysis found that the priority in assessment would gradually change from project environmental impact assessment (EIA) to strategic environmental assessment (SEA). Decision-theoretic approaches (i.e., environmental indicator selection, life cycle assessment, etc.), along with new technologies and methods (i.e., the geographic information system and modeling) have been widely applied in the EA research field over the past 20 years. Hot spots such as “biodiversity” and “climate change” have been emphasized in current EA research, a trend that will likely continue in the future. The h-index has been used to evaluate the research quality among countries all over the world, while the improvement of developing countries' EA systems is becoming a popular research topic. Our study reveals patterns in scientific outputs and academic collaborations and serves as an alternative and innovative way of revealing global research trends in the EA research field.

54 ENVIRONMENTAL SCIENCES↗