Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2008”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Vehicle Technologies Program: Energy Storage R&D (2008 Annual Progress Report)

One of the primary objectives of the Energy Storage effort is the development of durable and affordable advanced batteries (and ultracapacitors) for use in a full range of vehicle applications, from start/stop to full-power HEVs, EVs, and PHEVs. The battery technology development activity spans three areas: system development of full battery systems; benchmark testing of emerging technologies in order to remain abreast of the latest industry developments; and Small Business Innovative Research (SBIR) to fund early-stage R&D for small businesses/entrepreneurs.

25 ENERGY STORAGE↗

Final Report Grant No. DE-FG02-98ER20307 Lipopolysaccharide Structures and Genes Required for Root Nodule Development August 1, 2004 to July 31, 2008

This project dealt with the plant-bacterial symbiosis that gives rise to root nodules on leguminous plants in which the bacteria carry out nitrogen fixation. Nitrogen fixation, like carbon dioxide fixation, is essential for life on planet earth, and this symbiosis is estimated to account for half of all nitrogen fixed on land. Aside from being important for the sustenance of global life, this ability allows legumes to grow without nitrogen fertilizers. Basic studies such as this project are aimed at understanding the symbiosis well enough that eventually it can be engineered into important crop species so that they no longer depend on nitrogen fertilizer for growth. The production and distribution of excessive fertilizer needed for optimal crop yields is responsible for a significant portion of the energy costs in agriculture. The specific aims of this work were to further the understanding of a bacterial factor that is essential for the symbiotic infection process. This factor is a bacterial surface molecule, lipopolysaccharide O antigen. In this project we showed that, not only the presence, but the specific structure of this molecule is crucial for infection. Although the success of bacterial infections in many pathogenic and mutualistic interactions have been shown to depend on intact O antigen, it has been very rare to establish that specific features of the structure are important. One of the features in this case is the presence of one additional methyl group on one sugar in the O antigen. It is very surprising that such a minor change should have an observable effect. This work sets the stage for biochemical studies of possible plant receptors that may be involved. During the course of this grant period, we developed a method of testing the importance of this bacterial component at stages of nodule development beyond the step that is blocked by null mutation. The method works adequately for this purpose and is being improved. It has implications for testing the roles of other important bacterial factors at multiple stages of nodule development. The project also investigated the biosynthesis of this bacterial factor. It has a complex structure and the first accomplishment was the determination of the sequences of genetic regions known to be important. Next the discovered genes were mutated to identify the 26 that are required for its synthesis. In addition, six others were discovered that are believed to change its structure under various environmental conditions. By studying mutants affected in specific genes, genes were associated with each of the predicted steps in the biosynthesis. Current work is testing the predicted biosynthetic model with studies conducted in vitro with bacterial extracts. Overall, the work funded by this grant establishes this system as a model for host-bacterial interactions based on specific polysaccharide structure. All areas that are needed for a comprehensive model have been significantly advanced: the biological function, the structural features that are crucial, the complete set of bacterial genes involved, and a model for the biosynthesis.

59 BASIC BIOLOGICAL SCIENCES↗

Remaining Sites Verification Package for the 331 Life Sciences Laboratory Drain Field Septic System, Waste Site Reclassification Form 2008-020

The 331 Life Sciences Laboratory Drain Field (LSLDF) septic system waste site consists of a diversion chamber, two septic tanks, a distribution box, and a drain field. This septic system was designed to receive sanitary waste water, from animal studies conducted in the 331-A and 331-B Buildings, for discharge into the soil column. However, field observations and testing suggest the 331 LSLDF septic system did not receive any discharges. In accordance with this evaluation, the confirmatory sampling results support a reclassification of the 331 LSLDF waste site to No Action. This site does not have a deep zone or other condition that would warrant an institutional control in accordance with the 300-FF-2 ROD under the industrial land use scenario.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remaining Sites Verification Package for the 128-F-2, 100-F Burning Pit Waste Site, Waste Site Reclassification Form 2008-031

The 128-F-2 waste site consisted of multiple burn and debris filled pits located directly east of the 107-F Retention Basin and approximately 30.5 m east of the northeast corner of the 100-F Area perimeter road that runs along the riverbank. The burn pits were used for incinerating nonradioactive, combustible materials from 1945 to 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

100-F Burning Pit↗

Remaining Sites Verification Package for the 100-F-26:9, 1607-F2 Sanitary Sewer Pipelines, Waste Site Reclassification Form 2008-029

The 100-F-26:9 underground pipeline subsite consists of the sanitary sewers servicing the 105-F, 108-F, 184-F, 185-F, and 190-F buildings, and the 1700-F administration and service buildings (1704-F, 1707-F, 1707-FA, 1713-F, 1717-F, 1719-F, and 1722-F). In accordance with this evaluation, the confirmatory and verification sampling results support a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

100-F-26:9 underground pipeline subsite↗

Remaining Sites Verification Package for the 600-111, P-11 Critical Mass Laboratory Crib, and UPR-600-16, Fire and Contamination Spread Waste Sites, Waste Site Reclassification Form 2008-045

The UPR-600-16, Fire and Contamination Spread waste site is an unplanned release that occurred on December 4, 1951, when plutonium contamination was spread by a fire that ignited inside the 120 Experimental Building. The 120 Experimental Building was a laboratory building that was constructed in 1949 and used for plutonium criticality studies as part of the P-11 Project. In November 1951, a criticality occurred in the 120 Experimental Building that resulted in extensive plutonium contamination inside the building. The confirmatory evaluation supports a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of the extensive radiological survey of the surface soil and the confirmatory and verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

100-IU-6 Operable Unit↗

High Repetition Rate, LINAC-Based Nuclear Resonance Fluorescence FY 2008 Final Report

This summarizes the first year of a multi-laboratory/university, multi-year effort focusing on high repetition rate, pulsed LINAC-based nuclear resonance fluorescence (NRF) measurements. Specifically, this FY2008 effort centered on experimentally assessing NRF measurements using pulsed linear electron accelerators, operated at various repetition rates, and identifying specific detection requirements to optimize such measurements. Traditionally, interest in NRF as a detection technology, which continues to receive funding from DHS and DOE/NA-22, has been driven by continuous-wave (CW), Van de Graff-based bremsstrahlung sources. However, in addition to the relatively sparse present-day use of Van de Graff sources, only limited NRF data from special nuclear materials has been presented; there is even less data available regarding shielding effects and photon source optimization for NRF measurements on selected nuclear materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

LIFE Target Fabrication Research Plan Sept 2008

The target-system for the baseline LIFE fast-ignition target was analyzed to establish a preliminary estimate for the costs and complexities involved in demonstrating the technologies needed to build a prototype LIFE plant. The baseline fast-ignition target upon which this analysis was developed is shown in Figure 1.0-1 below. The LIFE target-system incorporates requirements for low-cost, high throughput manufacture, high-speed, high accuracy injection of the target into the chamber, production of sufficient energy from implosion and recovery and recycle of the imploded target material residue. None of these functions has been demonstrated to date. Existing target fabrication techniques which lead to current 'hot spot' target costs of {approx}$100,000 per target and at a production rate of 2/day are unacceptable for the LIFE program. Fabrication techniques normally used for low-cost, low accuracy consumer products such as toys must be adapted to the high-accuracy LIFE target. This will be challenge. A research program resulting is the demonstration of the target-cycle technologies needed for a prototype LIFE reactor is expected to cost {approx}$51M over the course of 5 years. The effort will result in targets which will cost an estimated $0.23/target at a rep-rate of 20 Hz or about 1.73M targets/day.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Building America Research Benchmark Definition: Updated December 19, 2008

To track progress toward aggressive multi-year whole-house energy savings goals of 40-70% and onsite power production of up to 30%, DOE's Residential Buildings Program and NREL developed the Building America Research Benchmark in consultation with the Building America industry teams.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Results of groundwater monitoring at Everest, Kansas, in April 2008.

On September 7, 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented a Scoping Memo (Argonne 2005) for preliminary consideration by the Kansas Department of Health and Environment (KDHE), suggesting possible remedial options for the carbon tetrachloride contamination in groundwater at Everest, Kansas. The suggested approaches were discussed by representatives of the KDHE, the CCC/USDA, and Argonne at the KDHE office in Topeka on September 8-9, 2005, along with other technical and logistic issues related to the Everest site. In response to these discussions, the KDHE recommended (KDHE 2005) evaluation of several remedial processes, either alone or in combination, as part of a Corrective Action Study (CAS) for Everest. The primary remedial processes suggested by the KDHE were the following: Hydraulic control by groundwater extraction with aboveground treatment; Air sparging (AS) coupled with soil vapor extraction (SVE) in large-diameter boreholes (LDBs); and Phytoremediation. As a further outcome of the 2005 meeting and as a precursor to development of a possible CAS, the CCC/USDA completed the following supplemental investigations at Everest to address several specific technical concerns discussed with the KDHE: (1) Construction of interpretive cross sections at strategic locations selected by the KDHE along the main plume migration pathway, to depict the hydrogeologic characteristics affecting groundwater flow and contaminant movement (Argonne 2006a). (2) A field investigation in early 2006 (Argonne 2006b), as follows: (a) Installation and testing of a production well and associated observation points, at locations approved by the KDHE, to determine the response of the Everest aquifer to groundwater extraction near the Nigh property. (b) Groundwater sampling for the analysis of volatile organic compounds (VOCs) and the installation of additional permanent monitoring points at locations selected by the KDHE, to further constrain the existing contaminant plume. (c) Resampling of all existing permanent monitoring points for VOCs and biodegradation parameter analyses, at the request of the KDHE. On the basis of these studies (Argonne 2006a,b) and the CCC/USDA's past investigations at Everest (Argonne 2006c), the CCC/USDA concluded that groundwater extraction is not an effective remedial option for the main body of the groundwater plume, and the KDHE concurred (KDHE 2006); the KDHE later noted, however (KDHE 2007a), that this and other technologies might represent viable remedial options in the event of further downgradient migration of the plume toward the intermittent creek. In February 2007, the CCC/USDA presented preliminary analyses of (1) the AS-SVE remedial alternative, incorporating the use of LDBs, and (2) the risks to human health and the environment posed by the observed carbon tetrachloride plume in groundwater (Argonne 2007a). The results of these analyses demonstrated the following: (1) Neither groundwater extraction nor AS-SVE in LDBs represents a practical approach for effective remediation of the groundwater contamination at Everest (near the Nigh property). (2) Periodic sampling and analyses for VOCs conducted by the CCC/USDA documented that the areal extent and range of carbon tetrachloride concentrations detected in the groundwater plume at Everest had changed relatively little from 2000 to 2006. (3) Estimates of groundwater flow and contaminant migration times, based on the hydrogeologic properties of the groundwater flow system identified at Everest (Argonne 2003, 2006b,c), indicated that, at minimum, approximately 4 years would be required for the carbon tetrachloride plume (in the subsurface) to reach the vicinity of the intermittent creek directly west of the Nigh property, and more than 20 years would be required for the contamination to reach the identified groundwater discharge area southwest of the Nigh property. (4) The existing (January-March 2006) plume posed no immediate danger of contamination to the surface waters of the intermittent creek. In light of these observations, the CCC/USDA proposed a phased program--over approximately 2-3 years--of groundwater sampling, surface water sampling, and related monitoring activities at Everest to (1) identify locations where a phytoremediation system would be effective and determine that area's extent and (2) support the potential development of a phytoremediation treatment alternative for the site. The recommended elements of the monitoring program are summarized in Table 1.1. In conjunction with this program, both the CCC/USDA and the KDHE recommended the construction of several new monitoring wells, at locations along and near the intermittent creek west of the Nigh property (Argonne 2007b; KDHE 2007b).

54 ENVIRONMENTAL SCIENCES↗