Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “uncertainty management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Fission Power System Technology for NASA Exploration Missions

Under the NASA Exploration Technology Development Program, and in partnership with the Department of Energy (DOE), NASA is conducting a project to mature Fission Power System (FPS) technology. A primary project goal is to develop viable system options to support future NASA mission needs for nuclear power. The main FPS project objectives are as follows: 1) Develop FPS concepts that meet expected NASA mission power requirements at reasonable cost with added benefits over other options. 2) Establish a hardware-based technical foundation for FPS design concepts and reduce overall development risk. 3) Reduce the cost uncertainties for FPS and establish greater credibility for flight system cost estimates. 4) Generate the key products to allow NASA decisionmakers to consider FPS as a preferred option for flight development. In order to achieve these goals, the FPS project has two main thrusts: concept definition and risk reduction. Under concept definition, NASA and DOE are performing trade studies, defining requirements, developing analytical tools, and formulating system concepts. A typical FPS consists of the reactor, shield, power conversion, heat rejection, and power management and distribution (PMAD). Studies are performed to identify the desired design parameters for each subsystem that allow the system to meet the requirements with reasonable cost and development risk. Risk reduction provides the means to evaluate technologies in a laboratory test environment. Non-nuclear hardware prototypes are built and tested to verify performance expectations, gain operating experience, and resolve design uncertainties.

Mason, Lee↗

Computationally efficient and error aware surrogate construction for numerical solutions of subsurface flow through porous media

Limiting the injection rate to restrict the pressure below a threshold at a critical location can be an important goal of simulations that model the subsurface pressure between injection and extraction wells. The pressure is approximated by the solution of Darcy’s partial differential equation for a given permeability field. The subsurface permeability is modeled as a random field since it is known only up to statistical properties. This induces uncertainty in the computed pressure. Solving the partial differential equation for an ensemble of random permeability simulations enables estimating a probability distribution for the pressure at the critical location. These simulations are computationally expensive, and practitioners often need rapid online guidance for real-time pressure management. An ensemble of numerical partial differential equation solutions is used to construct a Gaussian process regression model that can quickly predict the pressure at the critical location as a function of the extraction rate and permeability realization. The Gaussian process surrogate analyzes the ensemble of numerical pressure solutions at the critical location as noisy observations of the true pressure solution, enabling robust inference using the conditional Gaussian process distribution. Our first novel contribution is to identify a sampling methodology for the random environment and matching kernel technology for which fitting the Gaussian process regression model scales as O ( n log n ) instead of the typical O ( n 3 ) rate in the number of samples n used to fit the surrogate. The surrogate model allows almost instantaneous predictions for the pressure at the critical location as a function of the extraction rate and permeability realization. Our second contribution is a novel algorithm to calibrate the uncertainty in the surrogate model to the discrepancy between the true pressure solution of Darcy’s equation and the numerical solution. Finally, although our method is derived for building a surrogate for the solution of Darcy’s equation with a random permeability field, the framework broadly applies to solutions of other partial differential equations with random coefficients.

54 ENVIRONMENTAL SCIENCES↗

An Integrated Framework for Effective Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond

Net load imbalances due to imperfect day-ahead forecasts can cause variability in real-time electricity prices and higher system operations costs. We propose a novel market product called Flexibility Options that allow participants to hedge uncertainty by buying flexibility from flexible resources. Simulations show that flexibility options can reduce total system operating costs by up to 15% and can reduce variability in market participant revenues. To better quantify the flexibility that DER aggregators can provide, we develop DER flexibility scores that account for asset flexibility and uncertainty from occupant behavior and weather. Preliminary results show that realistic sets of DERs have significant variability in flexibility and uncertainty metrics.

delivery risk↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

integrated demand management↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

CTOP↗

Advanced Simulation and Computing: ASC FY24 Implementation Plan

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, security, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including previous nuclear tests, stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent. The ASC program is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification process, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This work requires a balance of resources, including technical staff, hardware, simulation software, and computer science solutions. The ASC program focuses on increasing the predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The Program continues to improve its unique tools for understanding and solving progressively more difficult stockpile problems (sufficient resolution, dimensionality, and scientific details), and quantifying critical margins and uncertainties. Resolving each issue requires increasingly difficult analyses because the aging process has progressively moved the stockpile further from the original test base. While the focus remains on the U.S. nuclear weapons program, where possible, the Program also enables the use of high-performance computing (HPC) and simulation tools to address broader national security needs, such as foreign nuclear weapon assessments and nuclear counterterrorism. The 2022 Nuclear Posture Review (NPR) calls for NNSA to “deliver a modern, adaptive nuclear security enterprise based on an integrated strategy for risk management, production-based resilience, science and technology innovation, and workforce initiatives.” Furthermore, “NNSA will establish a Science and Technology Innovation Initiative to accelerate the integration of science and technology (S&T) throughout its activities.” Executing this strategy necessitates the continued emphasis on developing and sustaining high-quality scientific and engineering staff, as well as supporting computational and experimental capabilities. These components constitute the foundation of the nuclear weapons program. The continued success of the SSP and LEPs is predicated upon the ability to credibly certify the stockpile, without a return to underground nuclear tests (UGTs). Shortly after the nuclear test moratorium entered into force in 1992, the Accelerated Strategic Computing Initiative (ASCI) was established to provide an extensive simulation capability to underpin stockpile certification. While computing and simulation have always been essential to the success of the nuclear weapons program, the program goal of ASCI was to execute NNSA’s vision of using these tools in support of the stockpile stewardship mission. The ASCI program was essential to the successful demonstration of the SSP, providing critical nuclear weapons simulation and modeling capabilities. ASCI officially evolved into the ASC program in fiscal year (FY) 2005, but the mission remains essentially the same: provide the simulation and computational capabilities that underpin the ability to maintain a safe, secure, effective nuclear weapon stockpile, without returning to underground nuclear testing. The capabilities that the ASC program provides at the national laboratories play a vital role in the nuclear security enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Stockpile Management and Production Modernization programs (formerly Directed Stockpile Work) also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these life extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT.

97 MATHEMATICS AND COMPUTING↗

Physics-informed machine learning assisted uncertainty quantification for the corrosion of dissimilar material joints

Jointing techniques like the Self-Piercing Riveting (SPR), Resistance Spot Welding (RSW) and Rivet-Weld (RW) joints are used for mass production of dissimilar material joints due to their high performance, short cycle time, and adaptability. However, the service life and safety usage of these joints can be largely impacted by the galvanic corrosion due to the difference in equilibrium potentials between the metals with the presence of electrolyte. Here, in this paper, we focus on Al-Fe galvanic corrosion and develop physics-informed machine learning based surrogate model for statistical corrosion analysis, which enables the reliability analysis of dissimilar material joints under corrosion environment. In this study, a physics-based finite element (FE) corrosion model has been developed to simulate the galvanic corrosion between a Fe cathode and an Al anode. Geometric and environmental factors including crevice gap, roughness of anode, conductivity, and the temperature of the electrolyte are investigated. Further, a thorough Uncertainty Quantification (UQ) analysis is conducted for the overall corrosion behavior of the Fe-Al joints. It is found that the electrolyte conductivity has the largest effects on the material loss and needs to be managed closely for better corrosion control. This will help in designing and manufacturing joints with improved corrosion performance.

42 ENGINEERING↗

Building Energy Systems as Behind-the-Meter Resources for Grid Services: Intelligent load control and transactive control and coordination

To mitigate the impacts of climate change, significant reductions in emissions from all sectors of the economy are needed. The electricity generation sector has embarked on an ambitious plan to include renewable generation as part of its decarbonization efforts, and many cities and states are mandating all-electric buildings. While renewable resources will reduce emissions, they are not dispatchable, they vary temporally, and their generation is uncertain. Under these conditions, traditional approaches to managing grid reliability, where supply follows demand, will not be efficient and may not be cost-effective. Further, there is a more efficient alternative for balancing the supply–demand imbalance and for absorbing variability and uncertainty of renewable energy using distributed energy resources (DERs) as opposed to reserve generation. Because buildings consume more than 75% of total U.S. annual electricity consumption, behind-the-meter (BTM) DERs have a load flexibility of 77 GW of power and 90 GWh of virtual energy storage capacity nationwide (Kalsi, 2017). Therefore, some portion of the supply–demand imbalance can be met by these DERs at a lower cost compared to business-as-usual solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

pnnl/SOSAT

State of Stress Analysis Tool (for carbon sequestration). The SOSAT tool provides value during GCS site screening and characterization phases to target collection of specific additional data to constrain uncertainties in geomechanical risk and to help operators to make informed decisions during the operational phase (Appriou et al., 2019). The capability represented in SOSAT, therefore, helps build stakeholder confidence that geomechanical risks are understood and manageable

Central, PNNL Developer↗

Translator Plan: A Coordinated Vision for Fiscal Years 2023-2025

Translators serve a unique role in the U.S. Department of Energy (DOE)’s Atmospheric Radiation Measurement (ARM) user facility, offering scientific input through various leadership and service roles. The Translators direct the creation of value-added products (VAPs) and analysis tools that make ARM measurements more accessible to the scientific community. Translators also serve as liaisons between users and the ARM infrastructure, collecting information about priorities and communicating ARM data and services. A key group focus is supporting the DOE Atmospheric System Research (ASR) program scientists and ASR’s efforts towards a process-level understanding of cloud-aerosol interactions, and in reducing uncertainty in global climate model projections. The ARM Translator Group (Table 1) consists of the five Translators, a representative of software development, and one from the Data Quality Office (DQO). Additionally, the ARM Engineering and Process Manager participates in this group and provides input and direction from ARM and its programmatic priorities.

54 ENVIRONMENTAL SCIENCES↗

LLNL IPD Tasks: ICSBEP and Pulsed Spheres Benchmark [Slides]

This lecture presented benchmark of the blank and polyethylene spheres at SINBAD in April 2023. In responding to comments about the building, we uncovered a large amount of additional detailed information about the building and experimental set up. We incorporated this new information into an even higher fidelity model and are working on uncertainty analysis at a low level. Scheduled to present at SINBAD meeting in April 2024.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 15: Technical uncertainty and project complexity as correlates of information use by US industry-affiliated aerospace engineers and scientists: Results of an exploratory investigation

An exploratory study was conducted that investigated the influence of technical uncertainty and project complexity on information use by U.S. industry-affiliated aerospace engineers and scientists. The study utilized survey research in the form of a self-administered mail questionnaire. U.S. aerospace engineers and scientists on the Society of Automotive Engineers (SAE) mailing list served as the study population. The adjusted response rate was 67 percent. The survey instrument is appendix C to this report. Statistically significant relationships were found to exist between technical uncertainty, project complexity, and information use. Statistically significant relationships were found to exist between technical uncertainty, project complexity, and the use of federally funded aerospace R&D. The results of this investigation are relevant to researchers investigating information-seeking behavior of aerospace engineers. They are also relevant to R&D managers and policy planners concerned with transferring the results of federally funded aerospace R&D to the U.S. aerospace industry.

Pinelli, Thomas E.↗

Risk Estimation of Threatening Asteroids

When faced with the question of designing an asteroid deflection mission or with the decision of launching it, significant uncertainties are present in the asteroid’s physical properties, and its orbit solution. The success of the deflection mission relies heavily on these aspects. For example, a heavier than expected asteroid will reduce the imparted deflection DV. So will a larger porosity value by reducing the beta factor [1]. Here, we present a new capability that estimates asteroid impact risk under consideration of these uncertainties. The new method samples the uncertainty space along multiple dimensions, performs a predetermined deflection, propagates the deflected samples to the Earth, models the impact damage, and estimates the overall risk outcome. The work builds on the Probabilistic Asteroid Impact Risk (PAIR) assessment tool [2] by including orbital uncertainty and deflection capabilities. We demonstrate this risk estimation approach for threatening asteroids using the example of the fictitious impactor 2019 PDC. Such analysis provides a quantitative basis for the work of decision makers and disaster managers. It may further find application in areas such as mitigation mission planning where projected post-mitigation risk can be compared to premitigation levels as a means of cost-benefit analysis formitigation options.

Rumpf, Clemens↗

Models of Wake-Vortex Spreading Mechanisms and Their Estimated Uncertainties

One of the primary constraints on the capacity of the nation's air transportation system is the landing capacity at its busiest airports. Many airports with nearly-simultaneous operations on closely-spaced parallel runways (i.e., as close as 750 ft (246m)) suffer a severe decrease in runway acceptance rate when weather conditions do not allow full utilization. The objective of a research program at NASA Ames Research Center is to develop the technologies needed for traffic management in the airport environment so that operations now allowed on closely-spaced parallel runways under Visual Meteorological Conditions can also be carried out under Instrument Meteorological Conditions. As part of this overall research objective, the study reported here has developed improved models for the various aerodynamic mechanisms that spread and transport wake vortices. The purpose of the study is to continue the development of relationships that increase the accuracy of estimates for the along-trail separation distances available before the vortex wake of a leading aircraft intrudes into the airspace of a following aircraft. Details of the models used and their uncertainties are presented in the appendices to the paper. Suggestions are made as to the theoretical and experimental research needed to increase the accuracy of and confidence level in the models presented and instrumentation required or more precise estimates of the motion and spread of vortex wakes. The improved wake models indicate that, if the following aircraft is upwind of the leading aircraft, the vortex wakes of the leading aircraft will not intrude into the airspace of the following aircraft for about 7s (based on pessimistic assumptions) for most atmospheric conditions. The wake-spreading models also indicate that longer time intervals before wake intrusion are available when atmospheric turbulence levels are mild or moderate. However, if the estimates for those time intervals are to be reliable, further study is necessary to develop the instrumentation and procedures needed to accurately define when the more benign atmospheric conditions exist.

Rossow, Vernon J.↗

Hybrid Modeling for Complex Systems Health Management

The research work presents application of hybrid physics-informed machine learning to a representative electric powertrain for unmanned aerial vehicles. The model is composed of physics-derived and empirical equations, integrated with connected networks that are strategically placed within the model to substitute equations that are subject to large uncertainty. Polynomial fit driven by heuristics or empirical observations can be substituted by more flexible networks that can minimize the error between model predictions and observations without being restricted to a predefined functional form. This modeling strategy allows training of networks deep inside the model and unknown parameters in a single learning stage. The powertrain model consists of Li-ion batteries, electronic speed controller with pulse-width modulation, and brush-less DC motor with connected propeller. Results obtained from combination of laboratory and simulation tests are discussed in this work.

PINNS↗

Machine Learning with Gradient-Based Optimization of Nuclear Waste Vitrification with Uncertainties and Constraints

Gekko is an optimization suite in Python that solves optimization problems involving mixed-integer, nonlinear, and differential equations. The purpose of this study is to integrate common Machine Learning (ML) algorithms such as Gaussian Process Regression (GPR), support vector regression (SVR), and artificial neural network (ANN) models into Gekko to solve data based optimization problems. Uncertainty quantification (UQ) is used alongside ML for better decision making. These methods include ensemble methods, model-specific methods, conformal predictions, and the delta method. An optimization problem involving nuclear waste vitrification is presented to demonstrate the benefit of ML in this field. ML models are compared against the current partial quadratic mixture (PQM) model in an optimization problem in Gekko. GPR with conformal uncertainty was chosen as the best substitute model as it had a lower mean squared error of 0.0025 compared to 0.018 and more confidently predicted a higher waste loading of 37.5 wt% compared to 34 wt%. The example problem shows that these tools can be used in similar industry settings where easier use and better performance is needed over classical approaches. Future works with these tools include expanding them with other regression models and UQ methods, and exploration into other optimization problems or dynamic control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Risk-Informed Approach to Trustworthiness Assessment in Digital Twins-Based Autonomous Control

In autonomous control systems, digital twins (DTs) are used to perform diagnostic and prognostic functions. The trustworthiness of these DTs is dependent on quality and coverage of the training data, model accuracy and integrity of sensor data. This work introduces a methodology to determine the trustworthiness of a DT system given faulty sensor data using a risk informed approach. Bayesian Belief Networks (BBNs) are used to propagate uncertainties and determine the probability of trustable recommendations. The decision to trust the control action provided by the DT is based on the DT output, expert opinion, and severity of problems. The performance of DTs is reliant on the data they are trained on. When they encounter out of distribution data, the trustworthiness of the recommendations decreases. To address this issue, we include an expert component that provides input on sensor degradation. For this, we utilize a generative artificial intelligence (AI) model, such as Generative Pretrained Transformer (GPT). The GPT functions as an expert with broad knowledge. The GPT is fine-tuned to understand and discriminate sensor degradation scenarios using manufactured data. This methodology is demonstrated through a case study on a Nearly Autonomous Management and Control System (NAMAC) during a steady state scenario. Various sensor degradation types with different severity levels are considered. Degraded sensor data is processed by the DT system and the fine-tuned GPT. Finally, using the BBN, we combine the GPT information and the DT output with its sources of uncertainty. This provides an output regarding the trustworthiness of the DT recommendation.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of short‐ and long‐term system response during gas production from a gas hydrate deposit at the UBGH2‐6 site of the Ulleung Basin in the Korean East Sea

Abstract This study is a continuation of an investigation into the feasibility of long‐term production from a marine hydrate accumulation that has the properties and conditions of the UBGH2‐6 (UBGH2, Ulleung Basin Gas Hydrates 2; 2 is the number of the scientific expedition) site at the Ulleung Basin in the Korean East Sea. The 12.7 m‐thick system is in deep water (2157 m), but at 140 m below the seafloor. It is characterized by alternating hydrate‐free clays and muds and hydrate‐rich sand layers. The layered stratigraphy and the presence of mud layers favours the use of vertical wells rather than horizontal wells for production. The analysis indicates that production from such a hydrate accumulation is technically feasible, but the gas production rates are generally low. Water production accompanying gas production from this deposit appears manageable under all the scenarios investigated in this study, however, the water‐to‐gas ratio is high. Subsidence at the ocean floor at the end of a 14 day test is quite limited. However, there is significant uncertainty in the predictions of the geomechanical system's behaviour because they are not based on measured system properties but only on estimates/assumptions from analogues. The long‐term production potential of the reservoir at the site investigated here appears challenging because of the limited effectiveness of dissociation and large water production, in addition to substantial subsidence.

Moridis, George J.↗