Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details.

Space Nuclear Propulsion↗

Progress and Plans for a US Laser System for LISA

A highly stable and robust laser system is a key component of the space-based LISA (Laser Interferometer Space Antenna) mission architecture. We describe our progress and plans to demonstrate a TRL (Technology Readiness Level) 5 LISA laser system at Goddard Space Flight Center by 2020. The laser system includes a low-noise oscillator followed by a power fiber amplifier. The oscillator is a low-mass, compact external cavity laser, consisting of a semiconductor laser coupled to an optical cavity, built by the laser vendor Redfern Integrated Optics. The amplifier is a diode-pumped Yb fiber with 2.5 watts output, built at Goddard. We show noise and reliability data for the full laser system, and describe our plans to reach TRL 5.

Camp, J.↗

NASA's advanced space transportation system launch vehicles

Some insight is provided into the advanced transportation planning and systems that will evolve to support long term mission requirements. The general requirements include: launch and lift capacity to low earth orbit (LEO); space based transfer systems for orbital operations between LEO and geosynchronous equatorial orbit (GEO), the Moon, and Mars; and Transfer vehicle systems for long duration deep space probes. These mission requirements are incorporated in the NASA Civil Needs Data Base. To accomplish these mission goals, adequate lift capacity to LEO must be available: to support science and application missions; to provide for construction of the Space Station Freedom; and to support resupply of personnel and supplies for its operations. Growth in lift capacity must be time phased to support an expanding mission model that includes Freedom Station, the Mission to Planet Earth, and an expanded robotic planetary program. The near term increase in cargo lift capacity associated with development of the Shuttle-C is addressed. The joint DOD/NASA Advanced Launch System studies are focused on a longer term new cargo capability that will significantly reduce costs of placing payloads in space.

Branscome, Darrell R.↗

Dynamic Replanning System

Artificial-intelligence computer program for planning automatically changes plan when conditions warrant. System uses planning software called SWITCH. Contains replanning input generator. Replanning done only for situations in which SWITCH has made plan but goals have changed. System assumes original knowledge base correct, which often is not the case. Future development aimed at compatibility with changing knowledge bases.

Porta, Harry J.↗

Plans for wind energy system simulation

A digital computer code and a special purpose hybrid computer, were introduced. The digital computer program, the Root Perturbation Method or RPM, is an implementation of the classic floquet procedure which circumvents numerical problems associated with the extraction of Floquet roots. The hybrid computer, the Wind Energy System Time domain simulator (WEST), yields real time loads and deformation information essential to design and system stability investigations.

Dreier, M. E.↗

Crustal dynamics project observing plan for highly mobile systems 1981 - 1986

Measurement of crustal motion in the western United States and other tectonically active regions makes use of fixed, movable and highly mobile satellite laser ranging and very long baseline interferometry systems. Measurement of the rotational dynamics of the Earth as well as regional deformation and plate motion are discussed.

Frey, H.↗

IAC level "O" program development

The current status of the IAC development activity is summarized. The listed prototype software and documentation was delivered, and details were planned for development of the level 1 operational system. The planned end product IAC is required to support LSST design analysis and performance evaluation, with emphasis on the coupling of required technical disciplines. The long term IAC effectively provides two distinct features: a specific set of analysis modules (thermal, structural, controls, antenna radiation performance and instrument optical performance) that will function together with the IAC supporting software in an integrated and user friendly manner; and a general framework whereby new analysis modules can readily be incorporated into IAC or be allowed to communicate with it.

Vos, R. G.↗

Space launch systems - Current United States plans and the next logical steps through 2000

The United States space transportation plans are discussed with emphasis on returning the Titan and the Shuttle to operational status. In particular, Shuttle enhancements via advanced solid rocket boosters and replacement of solid rocket boosters by liquid rocket boosters are examined. The Shuttle-C vehicle is then discussed as the next logical step that could provide a heavy launch capability in the early 1990s. The Shuttle-C will provide assured and flexible access to space for large Centaur-class payloads, for Space Station assembly, and for planetary missions.

Branscome, Darrell R.↗

System testing of a production Ada (trademark) project: The GRODY study

The use of the Ada language and design methodologies that utilize its features has a strong impact on all phases of the software development project lifecycle. At the National Aeronautics and Space Administration/Goddard Space Flight Center (NASA/GSFC), the Software Engineering Laboratory (SEL) conducted an experiment in parallel development of two flight dynamics systems in FORTRAN and Ada. The teams found some qualitative differences between the system test phases of the two projects. Although planning for system testing and conducting of tests were not generally affected by the use of Ada, the solving of problems found in system testing was generally facilitated by Ada constructs and design methodology. Most problems found in system testing were not due to difficulty with the language or methodology but to lack of experience with the application.

Seigle, Jeffrey↗

Redundancy in sensors, control and planning of a robotic system for space telerobotics

The analysis and development of a manipulator redundant in structure and sensor devices controlled by a distributed multiprocessor architecture are discussed. The goal has been the realization of a modular structure of the manipulator with evident aspects of flexibility and transportability. The distributed control structure, thanks to his modularity and flexibility could be integrated in the future into an operative structure aimed to space telerobotics. The architecture is applied to the 6 DOF manipulator Gilberto.

Rovetta, A.↗

Design of a cooperative problem-solving system for enroute flight planning: An empirical study of its use by airline dispatchers

In a previous report, an empirical study of 30 pilots using the Flight Planning Testbed was reported. An identical experiment using the Flight Planning Testbed (FPT), except that 27 airline dispatchers were studied, is described. Five general questions were addressed in this study: (1) under what circumstances do the introduction of computer-generated suggestions (flight plans) influence the planning behavior of dispatchers (either in a beneficial or adverse manner); (2) what is the nature of such influences (i.e., how are the person's cognitive processes changed); (3) how beneficial are the general design concepts underlying FPT (use of a graphical interface, embedding graphics in a spreadsheet, etc.); (4) how effective are the specific implementation decisions made in realizing these general design concepts; and (5) how effectively do dispatchers evaluate situations requiring replanning, and how effectively do they identify appropriate solutions to these situations.

Smith, Philip J.↗

Bantam System Technology Project Ground System Operations Concept and Plan

The Low Cost Booster Technology Program, also known as the Bantam Booster program, is a NASA sponsored initiative to establish a viable commercial technology to support the market for placing small payloads in low earth orbit. This market is currently served by large boosters which orbit a number of small payloads on a single launch vehicle, or by these payloads taking up available space on major commercial launches. Even by sharing launch costs, the minimum cost to launch one of these small satellites is in the 6 to 8 million dollar range. Additionally, there is a shortage of available launch opportunities which can be shared in this manner. The goal of the Bantam program is to develop two competing launch vehicles, with launch costs in the neighborhood of 1.5 million dollars to launch a 150 kg payload into low earth orbit (200 nautical mile sun synchronous). Not only could the cost of the launch be significantly less than the current situation, but the payload sponsor could expect better service for his expenditure, the ability to specify his own orbit, and a dedicated vehicle. By developing two distinct launch vehicles, market forces are expected to aid in keeping customer costs low.

Moon, Jesse M.↗