Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Planning Space Shuttle's maiden voyage

NASA's first Space Shuttle, Columbia, whose technological advances include a space laboratory, navigational and communication satellites, and planetary explorers, is examined, and the first few flights, scheduled for 1980, are described. The Shuttle employs an all-digital, all-electronic, computer-operated avionics system. The onboard data processing and software subsystem, encompassing five computers (four online and one backup), a data-bus network, bus terminals, and software, is analyzed in detail. Attention is given to the basic structure of the Orbiter (37.19 m in length and 23.77 m wingspan), its main engines, and the payload and cargo capacities (29,500 kg). A two-step program that could increase the power and duration of spaceflights is presented. The first step is the creation of a power extension package, using solar arrays, generating electricity to extend the basic five-day flight to 20 days, while the second step uses the same design to create a 25-kW power model capable of providing energy for a 50-day flight. Plans for construction of a manned space construction base and a larger power platform of 250 kW are also presented.

Malkin, M. S.↗

The Landsat-D/Global Positioning System experiment

The paper presents data requirements, tests, and operational procedures to validate the receiver/processor assembly (R/PA) data to the 150 meter level and to calibrate the full capability of the R/PA to the 10 meter level for the Landsat-D/Global Positioning System experiment. Current work includes designing the software for the validation and calibration processes, determining the best methods of calibration using the Ground Space Tracking Data Network (GSTDN), and determining the tracking schedule for GSTDN data to obtain best orbital accuracy.

Wooden, W. H., II↗

What we were asked to do

Recommendations are made after 32 interviews, lesson identification, lesson analysis, and mission characteristics identification. The major recommendations are as follows: (1) to develop end-to-end planning and scheduling operations concepts by mission class and to ensure their consideration in system life cycle documentation; (2) to create an organizational infrastructure at the Code 500 level, supported by a Directorate level steering committee with project representation, responsible for systems engineering of end-to-end planning and scheduling systems; (3) to develop and refine mission capabilities to assess impacts of early mission design decisions on planning and scheduling; and (4) to emphasize operational flexibility in the development of the Advanced Space Network, other institutional resources, external (e.g., project) capabilities and resources, operational software and support tools.

Source record↗

The SSM/PMAD automated test bed project

The Space Station Module/Power Management and Distribution (SSM/PMAD) autonomous subsystem project was initiated in 1984. The project's goal has been to design and develop an autonomous, user-supportive PMAD test bed simulating the SSF Hab/Lab module(s). An eighteen kilowatt SSM/PMAD test bed model with a high degree of automated operation has been developed. This advanced automation test bed contains three expert/knowledge based systems that interact with one another and with other more conventional software residing in up to eight distributed 386-based microcomputers to perform the necessary tasks of real-time and near real-time load scheduling, dynamic load prioritizing, and fault detection, isolation, and recovery (FDIR).

Lollar, Louis F.↗

Using virtual reality for science mission planning: A Mars Pathfinder case

NASA's Mars Pathfinder Project requires a Ground Data System (GDS) that supports both engineering and scientific payloads with reduced mission operations staffing, and short planning schedules. Also, successful surface operation of the lander camera requires efficient mission planning and accurate pointing of the camera. To meet these challenges, a new software strategy that integrates virtual reality technology with existing navigational ancillary information and image processing capabilities. The result is an interactive workstation based applications software that provides a high resolution, 3-dimensial, stereo display of Mars as if it were viewed through the lander camera. The design, implementation strategy and parametric specification phases for the development of this software were completed, and the prototype tested. When completed, the software will allow scientists and mission planners to access simulated and actual scenes of Mars' surface. The perspective from the lander camera will enable scientists to plan activities more accurately and completely. The application will also support the sequence and command generation process and will allow testing and verification of camera pointing commands via simulation.

Kim, Jacqueline H.↗

The development and operation of the international solar-terrestrial physics central data handling facility

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) International Solar-Terrestrial Physics (ISTP) Program is committed to the development of a comprehensive, multi-mission ground data system which will support a variety of national and international scientific missions in an effort to study the flow of energy from the sun through the Earth-space environment, known as the geospace. A major component of the ISTP ground data system is an ISTP-dedicated Central Data Handling Facility (CDHF). Acquisition, development, and operation of the ISTP CDHF were delegated by the ISTP Project Office within the Flight Projects Directorate to the Information Processing Division (IPD) within the Mission Operations and Data Systems Directorate (MO&DSD). The ISTP CDHF supports the receipt, storage, and electronic access of the full complement of ISTP Level-zero science data; serves as the linchpin for the centralized processing and long-term storage of all key parameters generated either by the ISTP CDHF itself or received from external, ISTP Program approved sources; and provides the required networking and 'science-friendly' interfaces for the ISTP investigators. Once connected to the ISTP CDHF, the online catalog of key parameters can be browsed from their remote processing facilities for the immediate electronic receipt of selected key parameters using the NASA Science Internet (NSI), managed by NASA's Ames Research Center. The purpose of this paper is twofold: (1) to describe how the ISTP CDHF was successfully implemented and operated to support initially the Japanese Geomagnetic Tail (GEOTAIL) mission and correlative science investigations, and (2) to describe how the ISTP CDHF has been enhanced to support ongoing as well as future ISTP missions. Emphasis will be placed on how various project management approaches were undertaken that proved to be highly effective in delivering an operational ISTP CDHF to the Project on schedule and within budget. Examples to be discussed include: the development of superior teams; the use of Defect Causal Analysis (DCA) concepts to improve the software development process in a pilot Total Quality Management (TQM) initiative; and the implementation of a robust architecture that will be able to support the anticipated growth in the ISTP Program science requirements with only incremental upgrades to the baseline system. Further examples include the use of automated data management software and the implementation of Government and/or industry standards, whenever possible, into the hardware and software development life-cycle. Finally, the paper will also report on several new technologies (for example, the installation of a Fiber Data Distribution Interface network) that were successfully employed.

Lehtonen, Kenneth↗

SUPREM-DSMC: A New Scalable, Parallel, Reacting, Multidimensional Direct Simulation Monte Carlo Flow Code

An AFRL/NRL team has recently been selected to develop a scalable, parallel, reacting, multidimensional (SUPREM) Direct Simulation Monte Carlo (DSMC) code for the DoD user community under the High Performance Computing Modernization Office (HPCMO) Common High Performance Computing Software Support Initiative (CHSSI). This paper will introduce the JANNAF Exhaust Plume community to this three-year development effort and present the overall goals, schedule, and current status of this new code.

Campbell, David↗

Continued Astrometric Follow-up Of Near-Earth Objects

As the grant periods overlapped, some of this information below will also be present on the previous final report. During the period May 1 2004 to April 30 2005, approximately 100 NEOs fainter than V = 20 were observed on separate nights from the 1.2-m telescope at Mt. Hopkins. Additionally, a few comets were targeted, including astrometric support of the Deep Impact mission by observing comet P/Tempel 1. Kyle Smalley was again employed as an independent contractor, and he was trained in use of the telescope, performed several remote observing runs on his own, and has now begun critical software support of the observing program. Code to automatically operate the telescope, given a target list, is approximately 90% done. During the first observing run scheduled in late September or early October, this code will be tested at on the telescope. It is probable that the 1.2m telescope will be run automatically all night without any interruption from the observer for anything during this time. Additional work on selecting which NEO targets to observe is progressing, with a beta-release of a simple target selection web page. Additionally, two-night objects with the potential of being NEOs have been extracted on a routine basis during this last grant cycle. These will also be added to a web page to facilitate additional astrometric follow-up.

Spahr, Timothy↗

Test oracle automation for V&V of an autonomous spacecraft's planner

We built automation to assist the software testing efforts associated with the Remote Agent experiment. In particular, our focus was upon introducing test oracles into the testing of the planning and scheduling system component. This summary is intended to provide an overview of the work.

testing test oracles verification validation analy↗

The Mars Global Surveyor Spacecraft Test Laboratory

The spacecraft testbed is a crucial part of the spacecraft development and operations phase. Given the aggressive schedule of the Mars Global Surveyor spacecraft, the Spacecraft Test Laboratory will play a crucial part during the MGS development phase in support of flight software testing, fault protection testing, sequence testing, and other areas to meet the November, 1996 launch date.

MGS↗

Surface Operations Simulator and Scheduler (SOSS) Presentation

NASA - KAIA (Korea Agency for Infrastructure Technology Advancement) - KARI (Korea Aerospace Research Institute) collaboration surface air traffic management research has been ongoing since May 2015. In the first year collaboration, NASA's SOSS software has been transferred to KAIA and KARI teams to provide fast time simulation capability. Incheon International Airport model has been developed for SOSS.

surface traffic management↗

Occupancy Simulator Solver v1.0

Occupant schedules at room level are crucial information to building energy modeling which quantifies occupant-related energy efficiency technologies and controls for new building design as well as existing building retrofits to reduce energy use and GHG emissions in buildings. The Occupancy Simulator Solver is an executable software component that simulates the stochastic behavior of occupant presence and movement in a building using the Markov-chain model. Occupancy Simulator Solver is the calculation engine of the web App Occupancy Simulator, which takes high level input on occupants, spaces and events, then calls the Solver to simulate occupant movement and generate occupant schedules for each space. The generated schedules capture diversity and stochastic nature of occupant activities (e.g., in office, meetings, breaks, lunch). These schedules are stored in CSV files and can be downloaded from the App and used for building performance simulation.

Hong, Tianzhen↗

Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

Patterson-Hine, Ann↗

Grid Optimization (GO) Competition Platform

A software for a multi-challenge power-flow grid optimization competition was developed. The platform brings together high performance computing clusters, webservers, databases, competition datasets, schedulers, evaluation codes, and a multitude of language compilers and optimization solvers to host the competition. The original video announcing the competition, from former Secretary Perry, at: https://www.youtube.com/watch?v=hZwX3P9vS8M

Veeramany, Arun↗

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.↗

DSN data systems software methodology

A software methodology for JPL deep space network (DSN) data systems software implementations through transfer and delivery is presented. The DSN Data Systems Software Methodology is compatible with and depends on DSN software methodology and also incorporates the characteristics of real-time program development in a DSN environment. The DSN Data Systems software implementation consists of a series of six distinct phases. An Independent Group is responsible for verification and validation of the DSN Data Systems software during developing phases. The DSN data systems software methodology is applied to all development software provided for or by the DSN data systems section in Mark IV where there is a desire for reliability, maintainability, and usability within budget and schedule constraints.

Hung, C. K.↗

CHIMERA II - A real-time multiprocessing environment for sensor-based robot control

A multiprocessing environment for a wide variety of sensor-based robot system, providing the flexibility, performance, and UNIX-compatible interface needed for fast development of real-time code is addressed. The requirements imposed on the design of a programming environment for sensor-based robotic control is outlined. The details of the current hardware configuration are presented, along with the details of the CHIMERA II software. Emphasis is placed on the kernel, low-level interboard communication, user interface, extended file system, user-definable and dynamically selectable real-time schedulers, remote process synchronization, and generalized interprocess communication. A possible implementation of a hierarchical control model, the NASA/NBS standard reference model for telerobot control system is demonstrated.

Stewart, David B.↗

Virtual environment and computer-aided technologies used for system prototyping and requirements development

The Space Station Freedom (SSF) Data Management System (DMS) consists of distributed hardware and software which monitor and control the many onboard systems. Virtual environment and off-the-shelf computer technologies can be used at critical points in project development to aid in objectives and requirements development. Geometric models (images) coupled with off-the-shelf hardware and software technologies were used in The Space Station Mockup and Trainer Facility (SSMTF) Crew Operational Assessment Project. Rapid prototyping is shown to be a valuable tool for operational procedure and system hardware and software requirements development. The project objectives, hardware and software technologies used, data gained, current activities, future development and training objectives shall be discussed. The importance of defining prototyping objectives and staying focused while maintaining schedules are discussed along with project pitfalls.

Logan, Cory↗