Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Scheduler for monitoring objects orbiting earth using satellite-based telescopes

An ephemeris refinement system includes satellites with imaging devices in earth orbit to make observations of space-based objects ("target objects") and a ground-based controller that controls the scheduling of the satellites to make the observations of the target objects and refines orbital models of the target objects. The ground-based controller determines when the target objects of interest will be near enough to a satellite for that satellite to collect an image of the target object based on an initial orbital model for the target objects. The ground-based controller directs the schedules to be uploaded to the satellites, and the satellites make observations as scheduled and download the observations to the ground-based controller. The ground-based controller then refines the initial orbital models of the target objects based on the locations of the target objects that are derived from the observations.

79 ASTRONOMY AND ASTROPHYSICS↗

A Decision Support Framework for Grid-Aware Electric Bus Charge Scheduling

While there are many advantages to electric public transit vehicles, they also pose new challenges for fleet operators. One key challenge is defining a charge scheduling policy that minimizes operating costs and power grid disruptions while maintaining schedule adherence. An uncoordinated policy could result in some buses running out of charge before completing their trip, while a grid agnostic policy might incur higher energy costs or cause an adverse impact on the grid’s distribution system. We present a grid aware decision-theoretic framework for electric bus charge scheduling that accounts for energy price, grid load, and bus status. The framework connects environmental models for traffic (SUMO) and the electric grid (GridLAB-D) to a planner, which evaluates bus charging decisions with regard to their long-term effect on grid reliability and cost. The framework has been evaluated on a simulation of Richland, WA’s bus and grid network, and compared to greedy methods.

EV, machine leaning, EV-Grid, Transportation, Grid↗

Method and apparatus for asynchronous scheduling

A method and apparatus of asynchronous scheduling in a graphics device includes sending one or more instructions from an instruction scheduler to one or more instruction first-in/first-out (FIFO) devices. An instruction in the one or more FIFO devices is selected for execution by a single-instruction/multiple-data (SIMD) pipeline unit. It is determined whether all operands for the selected instruction are available for execution of the instruction, and if all the operands are available, the selected instruction is executed on the SIMD pipeline unit. The self-timed arithmetic pipeline unit (SIMD pipeline unit) is effectively encapsulated in a synchronous, (e.g., clocked by global clock), scheduler and register file environment.

Kalamatianos, John↗

Generating traffic-based building occupancy schedules in Chattanooga, Tennessee from a grid of traffic sensors

Building occupancy significantly impacts energy use, timing for demand impacts, and is a significant source of uncertainty in building energy models. There are relatively few sources that define building occupancy schedules and number of occupants per building or space type. More importantly, these sources define traditional schedules that are likely not to reflect the true occupancy of a given building. We construct traffic-based occupancy schedules which are more responsive to changes in mobility patterns, and which can realistically estimate occupant arrivals, departures, and counts in individual buildings.

Berres, Andy↗

Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An energy-aware multiobjective ant colony algorithm to minimize total completion time and energy cost on a single-machine preemptive scheduling

Energy-aware scheduling in manufacturing operations with time-of-use electricity tariffs is a challenging problem. Sustainable manufacturing is gaining significant momentum: companies are not only improving their product quality, but also optimizing the production processes to improve energy consumption (i.e., minimizing energy cost) in order to manage environmental challenges which contribute to global climate change. The purpose of this paper is to study a preemptive scheduling problem on a single-machine to minimize the total completion time and total energy cost under time-of-use electricity tariffs, which is a mixed-integer multiobjective mathematical programming model. To solve these objectives, we develop several new holistic ant colony optimization algorithms. The proposed model is solved via several methods including weighted sum method (WSM) using CPLEX, and multiobjective ant colony optimization based on a dominance ranking (ACO-DR) or based on a dominance ranking procedure and crowding distance comparison (ACO-DRC) or based on a heuristic approach to obtain an approximate Pareto-front and also provide information on when to start and resume each job for any solution on the Pareto-front. We provide detailed experimental results evaluating the performance of the proposed algorithms. In a case study, we demonstrate how the results of the multiobjective model could be utilized in decision making using the multiobjective optimization on the basis of ratio analysis (MOORA) method. Furthermore, this proposed model and heuristics allows decision makers to operate in challenging-data enabled environments in industrial internet of things ecosystem, and assists in optimizing production planning to improve energy cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bi-objective approaches for home healthcare medical team planning and scheduling problem

In this paper, we study the medical team planning and scheduling in home healthcare within a weekly horizon, including the planning of nursing visits and the daily traveling route scheduling. Two objectives are considered: the first one is to minimize the total operation cost of the healthcare agency and the second one is to maximize the patient satisfaction. The problem is formulated as a mixed integer program, to seek for a trade-off between two objectives, with the characteristics of the patient requirements including nursing types, nursing frequency and service length considered. Medical team types, available service days and overwork penalty are also respected in the model. Then an ϵ-constraint method is adopted to obtain exact non-dominated solutions. To address large-scale problem instances, three heuristic approaches are developed to generate approximate Pareto fronts in a reasonable time. The set of non-dominated solutions are valuable for decision-making. Computational experiments are conducted and the results demonstrate the efficiency of the approaches.

97 MATHEMATICS AND COMPUTING↗

Scheduling and Performance of Asynchronous Tasks in Fortran 2018 with FEATS

Most parallel scientific programs contain compiler directives (pragmas) such as those from OpenMP (Hermanns in Parallel programming in Fortran 95 using openMP, 2002. School of Aeronautical Engineering, Universidad Politécnica de Madrid, España, 2011), explicit calls to runtime library procedures such as those implementing the Message Passing Interface (MPI) (in A message-passing interface standard version 4.0, 2021. https://www.mpi-forum.org/docs/mpi-4.0/mpi40-report.pdf), or compiler-specific language extensions such as those provided by CUDA (Ruetsch and Fatica in CUDA Fortran for scientists and engineers: best practices for efficient CUDA Fortran programming, Elsevier, 2013). By contrast, the recent Fortran standards empower developers to express parallel algorithms without directly referencing lower-level parallel programming models (Numrich in Parallel programming with co-arrays, CRC Press, 2018, and Curcic in Modern Fortran: building efficient parallel applications, Manning Publications, 2020). Fortran’s parallel features place the language within the Partitioned Global Address Space (PGAS) class of programming models. When writing programs that exploit data parallelism, application developers often find it straightforward to develop custom parallel algorithms. Problems involving complex, heterogeneous, staged calculations, however, pose much greater challenges. Such applications require careful coordination of tasks in a manner that respects dependencies prescribed by a directed acyclic graph. When rolling one’s own solution proves difficult, extending a customizable framework becomes attractive. Further, the paper presents the design, implementation, and use of the Framework for Extensible Asynchronous Task Scheduling (FEATS), which we believe to be the first task scheduling tool written in modern Fortran. We describe the benefits and compromises associated with choosing Fortran as the implementation language, and we propose ways in which future Fortran standards can best support the use case in this paper.

97 MATHEMATICS AND COMPUTING↗

Optimal scheduling of isolated microgrid with an electric vehicle battery swapping station in multi-stakeholder scenarios: A bi-level programming approach via real-time pricing

In order to coordinate the scheduling problem between an isolated microgrid (IMG) and electric vehicle battery swapping stations (BSSs) in multi-stakeholder scenarios, a new bi-level optimal scheduling model is proposed for promoting the participation of BSSs in regulating the IMG economic operation. In this model, the upper-level sub-problem is formulated to minimize the IMG net costs, while the lower-level aims to maximize the profits of the BSS under real-time pricing environments determined by demand responses in the upper-level decision. To solve the model, a hybrid algorithm, called JAYA-BBA, is put forward by combining a real/integer-coded JAYA algorithm and the branch and bound algorithm (BBA), in which the JAYA and BBA are respectively employed to address the upper- and lower- level sub-problems, and the bi-level model is eventually solved through alternate iterations between the two levels. The simulation results on a microgrid test system verify the effectiveness and superiority of the presented approach.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal scheduling and its Lyapunov stability for advanced load-following energy plants with CO 2 capture

In this study, a two-level control methodology consisting of an upper-level scheduler and a lower-level supervisory controller is proposed for an advanced load-following energy plant with CO 2 capture. With the use of an economic objective function that considers fluctuation in electricity demand and price at the upper level, optimal scheduling of energy plant electricity production and carbon capture with respect to several carbon tax scenarios is implemented. The optimal operational profiles are then passed down to corresponding lower-level supervisory controllers designed using a methodological approach that balances control complexity with performance. Finally, it is shown how optimal carbon capture and electricity production rate profiles for an energy plant such as the integrated gasification combined cycle (IGCC) plant are affected by electricity demand and price fluctuations under different carbon tax scenarios. As a result, the paper also presents a Lyapunov stability analysis of the proposed scheme.

01 COAL, LIGNITE, AND PEAT↗

Integrating tactical planning, operational planning and scheduling using data-driven feasibility analysis

Supply chain operations and scheduling are well-studied problems in the literature. Although these problems are related, they are often solved sequentially. This uncoordinated approach usually leads to sub-optimal solutions. Here this paper proposes a methodology for integrating scheduling operations into the supply chain network, motivated by the available enterprise data, and feasibility analysis. Existing literature on integrated models for addressing the supply chain is reviewed and classified. Then the mathematical model formulation for each level is discussed, after which the proposed data-driven integrated framework is described. The methodology is tested on two different case studies of varying dimensions. For each case study, the solution solves a multi-objective problem with the overall aim of an optimal solution that is robust towards achieving optimal cost while keeping customer satisfaction in mind.

42 ENGINEERING↗

Occupancy schedules learning process through a data mining framework

Building occupancy is a paramount factor in building energy simulations. Specifically, lighting, plug loads, HVAC equipment utilization, fresh air requirements and internal heat gain or loss greatly depends on the level of occupancy within a building. Developing the appropriate methodologies to describe and reproduce the intricate network responsible for human-building interactions are needed. Extrapolation of patterns from big data streams is a powerful analysis technique which will allow for a better understanding of energy usage in buildings. A three-step data mining framework is applied to discover occupancy patterns in office spaces. First, a data set of 16 offices with 10 minute interval occupancy data, over a two year period is mined through a decision tree model which predicts the occupancy presence. Then a rule induction algorithm is used to learn a pruned set of rules on the results from the decision tree model. Finally, a cluster analysis is employed in order to obtain consistent patterns of occupancy schedules. Furthermore, the identified occupancy rules and schedules are representative as four archetypal working profiles that can be used as input to current building energy modeling programs, such as EnergyPlus or IDA-ICE, to investigate impact of occupant presence on design, operation and energy use in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal pumping schedule with high-viscosity gel for uniform distribution of proppant in unconventional reservoirs

Hydrocarbon recovery from a hydraulic-fractured unconventional reservoir can be enhanced by replacing slickwater with non-Newtonian high-viscosity gel as a fracturing fluid. However, in the literature, the role of gel rheology on hydrocarbon production from a fractured reservoir is not very well understood. This lack of understanding makes it difficult for the industry to choose appropriate viscosity parameters of fracturing gels. Motivated by these limitations, first, we have developed a high-fidelity model of non-Newtonian fluid flow to simulate fracture propagation, fluid leak-off, and gel flowback processes to predict the oil production from a hydraulic fractured reservoir. Simulation results of the high-fidelity model show how fracture geometry, formation damage, and gel cleanup process varies with the fracturing fluid rheology. Therefore, the developed model is used to understand the effect of gel rheology on hydrocarbon production via a sensitivity analysis, which provides a set of rheological parameters that maximize the cumulative amount of oil production. Finally, utilizing this optimal high-viscosity gel, a model predictive controller is designed to obtain an optimal pumping schedule necessary for producing a target fracture geometry and proppant concentration. The closed-loop simulation results demonstrate that the obtained pumping schedule successfully achieved the desired fracture geometry and proppant concentration at the end of pumping, leading to the maximum oil production from an unconventional reservoir.

13 HYDRO ENERGY↗

30 Gy or 34 Gy? Comparing 2 Single-Fraction SBRT Dose Schedules for Stage I Medically Inoperable Non-Small Cell Lung Cancer

Purpose: To review outcomes of 2 single-fraction lung stereotactic body radiation therapy (SBRT) schedules used for medically inoperable early stage lung cancer. Methods and Materials: Patients in our institution have been treated on and off protocols using single-fraction SBRT (30 Gy and 34 Gy, respectively). All patients had node-negative lung cancer measuring ≤5 cm and lying ≥2 cm beyond the trachea-bronchial tree and were treated on a Novalis/BrainLAB system with the ExactTrac positioning system for daily image guidance. Results: For the interval from 2009 to 2012, 80 patients with 82 lesions were treated with single-fraction lung SBRT. Fifty-five patients (69%) and 25 patients (31%) received 30 Gy and 34 Gy, respectively. In a comparison of 30 Gy and 34 Gy cohorts, patient and tumor characteristics were balanced and median follow-up in months was 18.7 and 17.8, respectively. The average heterogeneity-corrected mean doses to the target were 33.75 Gy and 37.94 Gy for the 30-Gy and 34-Gy prescriptions, respectively. Comparing 30-Gy and 34-Gy cohorts, 92.7% and 84.0% of patients, respectively, experienced no toxicity (P was not significant), and had neither grade 3 nor higher toxicities. For the 30-Gy and 34-Gy patients, rates of 1-year local failure, overall survival, and lung cancer-specific mortality were 2.0% versus 13.8%, 75.0% versus 64.0%, and 2. 1% versus 16.0%, respectively (P values for differences were not significant). Conclusions: This is the largest single-fraction lung SBRT series yet reported. and it confirms the safety, efficacy, and minimal toxicity of this schedule for inoperable early stage lung cancer.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Tumor Induction in Mice After Localized Single- or Fractionated-Dose Irradiation: Differences in Tumor Histotype and Genetic Susceptibility Based on Dose Scheduling

Purpose: To investigate differences in tumor histotype, incidence, latency, and strain susceptibility in mice exposed to single-dose or clinically relevant, fractioned-dose γ-ray radiation. Methods and Materials: C3Hf/Kam and C57BL/6J mice were locally irradiated to the right hindlimb with either single large doses between 10 and 70 Gy or fractionated doses totaling 40 to 80 Gy delivered at 2-Gy/d fractions, 5 d/wk, for 4 to 8 weeks. The mice were closely evaluated for tumor development in the irradiated field for 800 days after irradiation, and all tumors were characterized histologically. Results: A total of 210 tumors were induced within the radiation field in 788 mice. An overall decrease in tumor incidence was observed after fractionated irradiation (16.4%) in comparison with single-dose irradiation (36.1%). Sarcomas were the predominant postirradiation tumor observed (n=201), with carcinomas occurring less frequently (n=9). The proportion of mice developing tumors increased significantly with total dose for both single-dose and fractionated schedules, and latencies were significantly decreased in mice exposed to larger total doses. C3Hf/Kam mice were more susceptible to tumor induction than C57BL/6J mice after single-dose irradiation; however, significant differences in tumor susceptibilities after fractionated radiation were not observed. For both strains of mice, osteosarcomas and hemangiosarcomas were significantly more common after fractionated irradiation, whereas fibrosarcomas and malignant fibrous histiocytomas were significantly more common after single-dose irradiation. Conclusions: This study investigated the tumorigenic effect of acute large doses in comparison with fractionated radiation in which both the dose and delivery schedule were similar to those used in clinical radiation therapy. Differences in tumor histotype after single-dose or fractionated radiation exposures provide novel in vivo evidence for differences in tumor susceptibility among stromal cell populations.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The Total Body Irradiation Schedule Affects Acute Leukemia Relapse After Matched T Cell–Depleted Hematopoietic Stem Cell Transplantation

Purpose: We sought to determine whether the total body irradiation (TBI) schedule affected outcome in patients with acute leukemia in complete remission who received T cell–depleted allogeneic hematopoietic stem cell transplantation from HLA identical siblings. Methods and Materials: The study recruited 55 patients (median age, 48 years; age range, 20-66 years; 30 men and 25 women; 34 with acute myeloid leukemia and 21 with acute lymphoid leukemia). Hyperfractionated TBI (HTBI) (1.2 Gy thrice daily for 4 days [for a total dose of 14.4 Gy] from day −12 to day −9) was administered to 29 patients. Single-dose TBI (STBI) (8 Gy, at a median dose rate of 10.7 cGy/min on day −9) was given to 26 patients. Results: All patients achieved primary, sustained engraftment with full donor-type chimerism. At 10 years, the overall cumulative incidence of transplant-related mortality was 11% (SE, ±0.1%). It was 7% (SE, ±0.2%) after HTBI and 15% (SE, ±0.5%) after STBI (P=.3). The overall cumulative incidence of relapse was 33% (SE, ±0.5). It was 13% (SE, ±0.5%) after HTBI and 46% (SE, ±1%) after STBI (P=.02). The overall probability of disease-free survival (DFS) was 59% (SE, ±7%). It was 67% (SE, ±0.84%) after HTBI and 37% (SE, ±1.4%) after STBI (P=.01). Multivariate analyses showed the TBI schedule was the only risk factor that significantly affected relapse and DFS (P=.01 and P=.03, respectively). Conclusions: In patients with acute leukemia, HTBI is more efficacious than STBI in eradicating minimal residual disease after HLA-matched T cell–depleted hematopoietic stem cell transplantation, thus affecting DFS.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Abscopal Effects With Hypofractionated Schedules Extending Into the Effector Phase of the Tumor-Specific T-Cell Response

Hypofractionated radiation therapy (hRT) combined with immune checkpoint blockade can induce T-cell–mediated local and abscopal antitumor effects. We had previously observed peak levels of tumor-infiltrating lymphocytes (TILs) between days 5 and 8 after hRT. Because TILs are regarded as radiosensitive, hRT schedules extending into this period might be less immunogenic, prompting us to compare clinically relevant, short and extended schedules with equivalent biologically effective doses combined with anti-programmed cell death 1 (PD1) antibody treatment.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

An empirical study of moving horizon closed-loop demand response scheduling

The potential of electricity-intensive chemical plants to engage in demand response (DR) initiatives in support of power grid operations has been the subject of many conceptual studies. In this work, using an industrially-relevant model of an air separation unit, we undertake an extensive simulation study of moving horizon (MH) rescheduling approaches, where we "close the scheduling loop" based on updated information regarding disturbances such as changes in electricity prices, ambient conditions and chemical product demand. Our study produces several unexpected findings regarding the non-periodic nature of rescheduling solutions, the impact of the accuracy of disturbance forecasts on the economics of DR scheduling, and on the interplay of simultaneously dealing with fluctuations on both the supply side (i.e., electricity prices) and the product demand side of the plant. Furthermore, we posit that the latter fluctuations pose significant limitations to the potential of a chemical plant to engage in DR.

24 POWER TRANSMISSION AND DISTRIBUTION↗