Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

A Benthic Habitat Monitoring Approach for Marine and Hydrokinetic Sites (Final Technical Report)

This final technical report summarizes the work completed as part of the Standardized and Cost-Effective Benthic Habitat Mapping and Monitoring Tools for MHK Environmental Assessments project funded by U.S. Department of Energy (DOE) under contract DE-EE007826 to Integral Consulting Inc. The overall goal of this project was to demonstrate a consistent, repeatable, and semi-automated seafloor and sediment mapping approach for rapidly characterizing benthic physical and biological/habitat conditions to support marine environmental assessments for marine and hydrokinetic energy sites. The approach evaluated combines sediment profile imaging and plan view (SPI/PV) technology with multibeam echosounder surveys as an effective and low-cost benthic habitat mapping protocol. A key innovation was the development of a semi-automated computer vision system that standardizes the extraction of data from the SPI/PV images. Other elements of the project were SPI camera hardware modifications, including the design and fabrication of a prototype “power” SPI camera to improve camera prism penetration in firm substrates, and outreach to agency regulators and other stakeholders on this habitat mapping approach. This technical report consists of five main subsections that summarize: 1) the benthic mapping approach; 2) benthic mapping results from the three areas’ surveys; 3) the development and performance of the image processing algorithms; 4) SPI camera hardware improvements and prototype testing; and 5) the regulatory outreach efforts.

16 TIDAL AND WAVE POWER↗

Improving Fission Products at CARIBU: Near Field Detection (Q3/FY20 Quarterly Progress Report)

Following the report from last quarter where we reported the experimental procedures, data acquisition and filtering process for the beta decay of 156 Eu, in the past quarter we have worked on establishing the efficiency for detecting the radiation emitted from this isotope with simulations of the HPGe detector and we have started investigating the beta detector energy deposition spectra.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Enhancement of Optical Efficiency of CSP Mirrors for Reducing O&M Cost via Near-Continuous Operation of Self-Cleaning Electrodynamic Screens (EDS). Final Report

Over the past decade, techno-economical advancements in solar energy systems, particularly the improvement in the conversion efficiency of PV modules made with mono-crystalline silicon solar cells from 12% to 20%, as well as the cost reduction in manufacturing by a factor of about 10%, have made it possible to achieve a levelized cost of electricity (LCOE) in PV plants that is comparable to, or less than, the cost of deriving electricity from fossil fuels. Operating PV plants in mid-latitude sun-belt regions, where the solar irradiance level is highest, provides a high annual energy-yield (kWh/kWp) due to two factors: (1) the availability of predictable high solar irradiance throughout the year with the fewest interruptions in solar flux from clouds and rain, and (2) the increased conversion efficiency of crystalline solar cells, as recombination loss has decreased with increased intensity of the sunlight that illuminates the silicon solar cells. Semi-arid and desert regions, however, are plagued by high atmospheric dust concentrations and frequent sand storms. The deposition of a layer of dust on the optical surfaces of solar collectors such as PV modules and concentrating mirrors reduces the transmission efficiency of sunlight that actually reaches the solar cells or receivers, resulting in high energy-yield soiling loss. There are two major cost components to operating a solar plant: (1) installation costs, and (2) operation-and-maintenance (O&M) costs. There is no fuel cost; hence operating a solar plant in a semi-arid or desert region provides high returns on investment if soiling losses are mitigated via efficient cleaning methods and optimized cleaning frequency. If solar collectors are not cleaned, the accumulation of dust layers on solar collectors may cause the operation of such plants in arid regions to become economically unviable. Washing solar collectors with water and detergent, as is most commonly done now, is an efficient method for cleaning. The conventional approach in utility-scale solar plants is to use a large truck with a water tank and pump system for spraying deionized water on the surface of the solar collectors. Robotic cleaning with brushes, used for many solar plants, requires lesser water for cleaning. The water consumed using semi-automated cleaning of PV modules in utility-scale solar plants is approximately 2 liters/m 2 per cleaning cycle. The total optical surface area of the solar collectors in 1 TW-scale solar installation will be more than 3 × 109 m 2 ; hence an enormous amount of water be needed for cleaning. There simply is not enough fresh water in the sun-belt areas of the world for predicted cleaning needs. In solar power plants, the estimated cost of cleaning solar collectors includes expenses related to the equipment used, labor, cost of transportation of water, the energy required for cleaning, plus ancillary costs whereas the cost of water is not considered. The water used is obtained from sources located close to plant sites, unmindful of the environmental and societal impact as the power plants are oftentimes located in regions that face severe drought. This practice is very similar to the cost calculations in deriving the levelized cost of electricity (LCOE) in conventional power plants based on burning fossil fuel such as coal and gas, while disregarding the cost of climate change and health effects. Unless a water-free or low-water cleaning method is established, the expansion of solar plants may lose public support in areas suffering long intervals of drought. The goal of this research project has been the development and application of the Electrodynamic Screen (EDS) as a means for a water-free, scalable cleaning process applicable to solar-power installations, including rooftop applications. We describe here the development of an EDS film-based cleaning process as an emerging method for use on PV modules, parabolic troughs, and heliostats. This report aims to show the feasibility of integrating or retrofitting EDS films onto the optical surfaces of solar collectors (both PV and CSP) while maintaining high transmission or reflection efficiency. The cleaning action provided by the EDS film is an active method to remove dust deposits by electrodynamic force. Current lab-scale prototype EDS films, retrofitted onto solar panels and mirrors, have shown to be capable of maintaining optical transmission or specular-reflection efficiencies higher than 90% of initial values under clean conditions. The optical surfaces of solar collectors laminated with EDS films can remove more than 90% of deposited dust when the EDS is activated for less than two minutes. As an electrodynamic dust removal process, the EDS film-based method is designed primarily for the removal of dust in solar installations located in semi-arid and desert areas, where the atmosphere is often dry and dusty and rainfall is infrequent. While EDS film application minimizes water consumption and facilitates cleaning as frequently as needed, it has limitations in removing contaminants such as soot, organic pollutants deposited as fine films on the surface, and bird droppings. The dust removal efficiency of the EDS is maximum at relative humidity RH is 40 to 50% and decreases at when RH > 65%. Many solar plant sites undergo diurnal and seasonal cycles of high ambient, early afternoon temperatures and an RH that reaches the dew point early in the morning. These variations in atmospheric conditions do not limit the operation of the EDS film. This report presents a brief review of the progress and the potential of EDS film technology for mitigating the impact of dust on solar collectors via water-free cleaning, as well as current technical challenges regarding efficiency and durability. Our experimental data on the performance of EDS films show that: (1) the dust-removal efficiency (DRE) can reach levels higher than 90%, (2) the specular reflectivity (SR) of EDS film-laminated second-surface mirrors reach levels in excess of 90%, (3) the specular reflectivity restoration (SRR) can exceed 90%, (4) the output-power restoration (OPR) of PV modules can exceed 95%, and (5) the optical transmission efficiency (TE) of the EDS films can be greater than 90%. Working with Sandia National Laboratories (NM), Corning Research and Development Corporation (NY), Eastman Kodak (NY), Tomark-Worthen Industries (NH), and EDS Chile SPA (Chile), we have produced EDS film-laminated PV modules and demonstrated their self-cleaning functions without requiring water. We have demonstrated that the operational range of EDS films will cover the expected ambient temperature of solar fields at RH cycling varying from 20 to 95% as long as the EDS films are activated in the RH range 20 to 50%. (Typical solar-field climates in deserts and semi-arid lands often reach near dew point in coastal areas.) Our experiments on the application of hydrophobic-fluorinated nanoparticle coatings on EDS film surfaces show that the EDS operational range can be extended to higher RH levels that approach the dew point. At Eastman Kodak, as one of our industrial partners, we were able to establish a process for manufacturing EDS films using flexographic printing of the electrodes onto transparent polymer films. This process utilizes an existing manufacturing line at Eastman Kodak that allows fabrication of medium-scale EDS films (26 cm × 30 cm). The manufacturing process has the capacity to produce EDS films at high production speeds. The medium-scale EDS films that have been printed at Kodak were evaluated in the lab at Boston University. The EDS films produced at Kodak were laminated at Tomark-Worthen using an industrial scale vacuum laminator to produce EDS film stacks, which can be affixed onto the optical surfaces of PV modules or concentrating mirrors. The EDS film stack consists of the EDS films that have Willow® Glass (WG) which has a thickness of 100 μm as the front surface. The WG sheets obtained from Corning Research and Development Corporation are customized in size and shape to cover the active area of the EDS films. The back surface of the EDS film stack is integrated onto the optical surface of the solar panel or mirror using optically clear adhesive (OCA) films or silicone adhesives. The OCA films (thickness 25 μm) are produced by 3M. The EDS film stacks have the architecture: WG/OCA/EDS Film/OCA/ over PV module or solar mirror. The power-supply units needed for activating the electrodes of the EDS film were designed and produced at Boston University. These power supply units provide three-phase, 1.2 kV voltage pulses at a very low current (micro-ampere) level and at a low frequency (≈ 5 Hz). The voltage pulses are applied to the electrodes in a sequence such that the train of pulses resembles a unidirectional traveling wave of electrical field on the surface of the EDS film. The dust particles on the surface become charged electrostatically and are levitated by the Coulomb force. The lateral sweeping action of the traveling electric field created by the three-phase voltages pulses then sweeps the dust off the surface. The energy consumed by the EDS electrodes is less than 0.2 Wh/m 2 /cleaning cycle, enabling energy-efficient restoration of output power (OPR) of PV module or specular reflectivity restoration (SRR) for solar mirrors. The EDS system consists of (1) an EDS film stack laminated onto the solar collectors, (2) connection of the EDS film to its power supply unit and (3) Interconnection of the power supply to PV modules or solar mirrors. Design, construction and assessment of field-testing units that have EDS stack laminated PV modules for evaluating the performance of the EDS films in solar fields is being carried out at BU. Our progress under this project, aimed at the advancement of EDS film technology, has reached DOE Technology Readiness Level (TRL) 6. Based on the extensive laboratory evaluations and limited field trials, as well as contacts with potential users, we believe that the technology has reached its commercial stage. We are conducting a cost analysis using the National Renewable Energy Laboratory (NREL) System Advisory Model (SAM) and are preparing for field trials of EDS films in different solar fields in the US, Chile, India and in the Middle East. A brief description of EDS film performance, construction and testing of the field-test unit, autonomous operation of the field-test unit for evaluating EDS performance in increasing energy yield, associated revenue savings, and water conservation is presented.

14 SOLAR ENERGY↗

Management Review Report for 2019

The report for CY2019 provides a Management Review Report for LLNL's ES&H Analytical Services and Instrumentation Division Analytical Laboratory (ALAB).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Report on the recovery of legacy 1997-1998 Depth-of-Burial / Tunnel-and-Hole-Closure explosion data from the Kazakhstan former Soviet nuclear test site, Semipalatinsk.

In 1996, negotiations between the National Nuclear Center of the Republic of Kazakhstan (NNC), the U.S. Defense Special Weapons Administration (DSWA) and the U.S. Department of Energy led to an agreement for a joint series of experiments at the former Soviet nuclear test site Semipalatinsk (STS). These experiments had a dual purpose: to close holes and tunnels originally created for the purpose of testing nuclear weapons, and to characterize explosive sources at a former nuclear test site. This report covers the recovery of legacy data from the experiments conduct in 1997 and 1998. Two teams collected data. Los Alamos National Laboratory (LANL), in collaboration with the NNC, collected the near-source (local) data out to approximately 20 km. Lamont-Doherty Earth Observatory (LDEO), with funding from Lawrence Livermore Laboratory (LLNL), also in collaboration with NNC, collected regional data, 200 – 1000 km distant, leveraging the KZ regional seismic network that LDEO had recently installed in collaboration with NNC. The two teams also worked together to some extent, regarding instrumentation and planning. This report primarily addresses the near-source data collected by the LANL/NNC team.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

The Quantum Nature and Mass of the Neutrino. FY20 Annual Laboratory Continuation Progress Report

Over the last 100 years we have learned a much about the neutrino, but there remain interesting questions about this weakly interacting particle. In particular, at LLNL we are developing experiments to measure the mass and the quantum nature of the neutrino. The 2015 long range plan recommended tonne-scale neutrinoless double beta decay experiments as the top new project priority and this experiment will target the quantum nature of the neutrino. The LLNL team is motivated and focused on developing the best technology for this experiment which is a liquid xenon time project chamber called nEXO. On a longer time scale, LLNL is also developing technology to measure the neutrino mass with tritium decay experiments. Work on nEXO at LLNL started in 2015 with an LDRD and program development funds to develop the nEXO concept, publish sensitivity predictions, explore alternatives and risks, and to build a credible project team and this effort is on going. In addition, we received research funding from DOE-SC NP and LLNL manages pre-conceptual R&D for the nEXO collaboration a portion of which is executed at LLNL. The Project 8 effort is solely funded by LLNL LDRD, and ends this year. A second LDRD effort is focused on repurposing cyclotron radiation emission spectroscopy for eV-scale X-ray detection. This second effort, while separated from Project 8, still has scientific and technical commonalities with Project 8. The funding for this X-ray detection effort will continue for one more year. LLNL has a long history of building large projects, science projects and time projection chambers, but nEXO is in fact the first project of this scale that LLNL is prepared to lead for DOE-SC NP.We have the tools, skills, people and motivation to make nEXO a reality. The current program development dollars are used to prepare the nEXO concept for down select and CD1. These internal LLNL dollars pay for a number of things including project staff to organize the nEXO collaboration for the various reviews that lie ahead, to develop the draft plans and structure to manage the project as well as setting up an external advisory committee. The current LDRD is exploring alternatives that effect the risk profile as well as possible performance improvements. The DOE-SC NP base funding is targeted at simulation and analysis of the nEXO concept in preparation for the down select and refinement of the understanding of the detector as well as scientific effort on the large xenon test stand (LXTS) that will burn down one of the largest risks to the nEXO project. Lastly, LLNL is leading the pre-conceptual R&D effort and managing the funds for the nEXO collaboration. The results of this effort are reported elsewhere, but the scope of this executed at LLNL will be reported here and is primarily the engineering and construction of the LXTS experiment. The primary technical contribution of LLNL to the Project 8 concept is the formation and study of atomic tritium. Atomic tritium is necessary for Project 8 to reach the ultimate sensitivity. LLNL has considerable experience with tritium and is well suited for this crucial work. Although the focus of this work is strictly fundamental science, there has already been one significant spinoff to develop a new means to measure radio xenon in the air

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Report on FY 2020 Testing in Support of the Development and Extension of ASME Code Rules for Grade 91

This report summarizes the FY 2020 research and activities at Oak Ridge National Laboratory in support of the ASME code rule development and code extension for Grade 91 (Gr. 91) steel. Incorporation of the Gr. 91 temperature-dependent fatigue curves in Section III Division 5 was one major task, and the associated major aspects brought up during the course of the ASME balloting process are documented in this report. Experiments and analysis continued on the development of the alternative creep-fatigue evaluation based on elastic–perfectly plastic (EPP) plus simplified model test (SMT) methodology. The focus of the study in FY 2020 was the evaluation of the hold-time effect at high cycle and low strain range region. Baseline testing in support of the evaluation of hold time effects was started and will continue in FY 2021. Major on-going experiments and activities in support of the ASME code development and extension of Gr. 91 will be completed in FY 2021.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status Report on ASME Code Development for Nonmetallic Core Components in 2020

The purpose of this report is to provide a status update on the progress and ongoing activities of the current ASME Boiler Pressure Vessel (BPV) Code Section III, Division 5, on nonmetallic core components and assemblies which includes the design rules for graphite and ceramic composite materials. Section III is concerned with the design and construction of nuclear reactor components and Division 5 focuses on high temperature reactors (HTR). The ASME Section III Committee’s function for nuclear items other than pressure-retaining components, is to establish rules of safety related to structural integrity. The term “construction” refers to the all-inclusive effort comprising of materials, design, fabrication, examination, inspection, testing, certification, and pressure relief. The Department of Energy (DOE) supports industry codes and standards development through focused research providing the technical basis for new or modified codes and standards and the participation of subject matter experts in codes and standards committees. The activities for the nonmetallic core components and assemblies committees are the pursuit of two working groups that meet quarterly during ASME BPV Code Week meetings. The two working groups are General Requirements for Graphite and Ceramic Composite Core Components and Assemblies (GR GCCCCA) and Nonmetallic Design and Materials (NDM). The rules on general requirements for nonmetallic core components are discussed in the articles of Subsection HA subpart B. Ceramic composites were recently incorporated within the rules, and the GR GCCCCA working group is now in the process of aligning the requirements with the subsections and articles of ASME BPV Code Section III NCA, the general requirements for Division 1 and 2 of the code. The NDM working group is concerned with the design rules for graphite and composite materials for core components and assemblies discussed in Subsection HH (Class SN Nonmetallic Core Components) subpart A and subpart B which reference graphite and composite materials respectively. The bulk of the progress and work is done within this working group. A significant undertaking, with discussion that started in 2015, is to gain endorsement of ASME Section III, Division 5, by the U.S. Nuclear Regulatory Commission (NRC). In June 2018, ASME formally recommended endorsement to the NRC. The NRC has since initiated the endorsement review process, which is to be concluded early in 2021. ASME task groups on metallic structures and components, as well as non-metallic core support structures, have been formed to define potential pathways and schedules for NRC endorsement of Division 5. NRC determined to perform a review on the 2017 edition of Section III Division 5 as a baseline. As a result, the use of graphite as nonmetallic core components formed part of the review, but it excluded composite materials (which were first introduced in the 2019 edition). This report documents progress in FY 2020 directed toward ASME’s efforts to develop design codes for graphite and composites. Progress includes a major code review by NRC, the first code enquiry, and its solution, an overhaul of the treatment of Weibull Statistics, and the addition of Nonmandatory Appendices to the composites code relating to carbon-carbon composite materials.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SMART Mobility. Advanced Fueling Infrastructure Capstone Report

The U.S. Department of Energy’s Systems and Modeling for Accelerated Research in Transportation (SMART) Mobility Consortium is a multiyear, multi-laboratory collaborative, managed by the Energy Efficient Mobility Systems Program of the Office of Energy Efficiency and Renewable Energy, Vehicle Technologies Office, dedicated to further understanding the energy implications and opportunities of advanced mobility technologies and services. The first three-year research phase of SMART Mobility occurred from 2017 through 2019 and included five research pillars: Connected and Automated Vehicles, Mobility Decision Science, Multi-Modal Freight, Urban Science, and Advanced Fueling Infrastructure. A sixth research thrust integrated aspects of all five pillars to develop a SMART Mobility Modeling Workflow to evaluate new transportation technologies and services at scale. This report summarizes the work of the Advanced Fueling Infrastructure Pillar. This Pillar investigated the charging infrastructure needs of electric ride-hailing and car-sharing vehicles, automated shuttle buses, and freight-delivery truck fleets. For information about the other Pillars and about the SMART Mobility Modeling Workflow, please refer to the relevant Pillar’s Capstone Report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SMART Mobility. Modeling Workflow Development, Implementation, and Results Capstone Report

The U.S. Department of Energy’s Systems and Modeling for Accelerated Research in Transportation (SMART) Mobility Consortium is a multiyear, multi-laboratory collaborative, managed by the Energy Efficient Mobility Systems Program of the Office of Energy Efficiency and Renewable Energy, Vehicle Technologies Office, dedicated to further understanding the energy implications and opportunities of advanced mobility technologies and services. The first three-year research phase of SMART Mobility occurred from 2017 through 2019, and included five research pillars: Connected and Automated Vehicles, Mobility Decision Science, Multi-Modal Freight, Urban Science, and Advanced Fueling Infrastructure. A sixth research thrust integrated aspects of all five pillars to develop a SMART Mobility Modeling Workflow to evaluate new transportation technologies and services at scale. This report summarizes the work of the SMART Mobility Modeling Workflow effort. The SMART Mobility Modeling Workflow was developed to evaluate new transportation technologies such as connectivity, automation, sharing, and electrification through multi-level systems analysis that captures the dynamic interactions between technologies. By integrating multiple models across different levels of fidelity and scale, the Workflow yields insights about the influence of new mobility and vehicle technologies at the system level. For information about the other Pillars, please refer to the relevant pillar’s Capstone Report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SMART Mobility. Connected and Automated Vehicles Capstone Report

The U.S. Department of Energy’s Systems and Modeling for Accelerated Research in Transportation (SMART) Mobility Consortium is a multiyear, multi-laboratory collaborative, managed by the Energy Efficient Mobility Systems Program of the Office of Energy Efficiency and Renewable Energy, Vehicle Technologies Office, dedicated to further understanding the energy implications and opportunities of advanced mobility technologies and services. The first three-year research phase of SMART Mobility occurred from 2017 through 2019 and included five research pillars: Connected and Automated Vehicles, Mobility Decision Science, Multi-Modal Freight, Urban Science, and Advanced Fueling Infrastructure. A sixth research thrust integrated aspects of all five pillars to develop a SMART Mobility Modeling Workflow to evaluate new transportation technologies and services at scale. This report summarizes the work of the Connected and Automated Vehicles (CAVs) Pillar. This Pillar investigated the energy, technology, and usage implications of vehicle connectivity and automation and identified efficient CAV solutions. For information about the other Pillars and about the SMART Mobility Modeling Workflow, please refer to the relevant Pillar’s Capstone Report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Report of the Condition of a General Electric Transportation Systems Gearbox

Wind power plant operations and maintenance (O&M) costs remain an appreciable contributor to the overall cost of wind energy. Premature of wind turbine gearboxes failures are often a result of abrasive wear, micropitting, scuffing, white-etch cracks, and macropitting issues. Micropitting is a fatigue phenomenon that occurs in Hertzian contacts in both gears and rolling-element bearings that operate in mixed or micro elastohydrodynamic lubrication regimes. Micropitting is influenced by and manifests itself in many different ways depending on operating conditions such as load, speed and operating temperature, and on factors such as gear geometry and accuracy, tooth flank roughness, percentage of tooth sliding, and lubricant composition. Despite much research by many investigators, micropitting remains complex, unpredictable, and difficult to control and remains a problem in wind turbine gearboxes. The purpose of this report is to document and describe the micropitting damage observed in a wind turbine gearbox, thereby facilitating further analysis and examination in future reports.

17 WIND ENERGY↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (FRD-17-002 Progress Report)

Both our subcontract with ISU and the one with Frontline have been finalized and the requisitions for the initiation of them have been submitted (this places defined amounts of funding available to the subcontracts, for the first allotment of work to be done, for which we already have funds from the CEC). Once the requisitions are approved, the subcontracts will be fully executed. During the month of August, further work on the Market Report was carried out, and will continue, as this is the most adaptable of the LLNL-main tasks to working remotely, so will not have any delays due to the shelter-in-place orders. Organization of our databases and sources on availability, and potential availability of all woody biomass was continued. Tables and figures for the report were begun as well, and the outline was finalized. Additionally, a parametric study for pyrolysis’ different products was done, with a metric of return on capital investment being chosen. Evaluated parameters include feedstock price, CO2 credit price, CO2 transport cost, and minimum fuel selling price, for drop-in fuels.

09 BIOMASS FUELS↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

West Valley Demonstration Project Annual Site Environmental Report (CY2019)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2019. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2019 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗