Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

G-induced vestibular dysfunction ('the wobblies') among aerobatic pilots: a case report and review

G-induced vestibular dysfunction (GIVD) is a condition well known to aircraft pilots who experience high positive and negative G loads during unlimited-aerobatic competitions and air-show demonstrations. After landing and walking from their aircraft, pilots with GIVD manifest an extremely unstable gait, which they call the wobblies. This article includes a report of one such case of GIVD, which to the author's knowledge is the first published case report of this condition in the medical literature. The author also discusses what is known and theorized about the pathogenesis of GIVD, and he reviews its diagnosis, treatment, and prevention.

Case Reports↗

Enhancing DSN Operations Efficiency with the Discrepancy Reporting Management System (DRMS)

The DRMS is the Discrepancy Reporting Management System used by the Deep Space Network (DSN). It uses a web interface and is a management tool designed to track and manage: data outage incidents during spacecraft tracks against equipment and software known as DRs (discrepancy Reports), to record "out of pass" incident logs against equipment and software in a Station Log, to record instances where equipment has be restarted or reset as Reset records, and to electronically record equipment readiness status across the DSN. Tracking and managing these items increases DSN operational efficiency by providing: the ability to establish the operational history of equipment items, data on the quality of service provided to the DSN customers, the ability to measure service performance, early insight into processes, procedures and interfaces that may need updating or changing, and the capability to trace a data outage to a software or hardware change. The items listed above help the DSN to focus resources on areas of most need.

Discrepancy Reporting Management Systems (DRMS)↗

Recommendation of a More Effective Alternative to the NASA Launch Services Program Mission Integration Reporting System (MIRS) and Implementation of Updates to the Mission Plan

Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.

recommendation↗

Summer 2014 Pathways Report

Over the summer I had the exciting opportunity to work for NASA at the Kennedy Space Center as a Mission Assurance Engineering intern. When I was offered a position in mission assurance for the Safety and Mission Assurance directorate's Launch Services Division, I didn't really know what I would be doing, but I knew it would be an excellent opportunity to learn and grow professionally. In this report I will provide some background information on the Launch Services Division, as well as detail my duties and accomplishments during my time as an intern. Additionally, I will relate the significance of my work experience to my current academic work and future career goals. This report contains background information on Mission Assurance Engineering, a description of my duties and accomplishments over the summer of 2014, and relates the significance of my work experience to my school work and future career goals. It is a required document for the Pathways program.

Pathways↗

Aviation Safety Reporting System (ASRS)

This overview of the NASA Aviation Safety Reporting System (ASRS) will describe the genesis of the program, report processing procedures, and safety products that are produced from the ASRS data.

aviation safety reporting↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118, PFAS Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from February 2022 through June 2022 at the Base Support Building (previously known as the Maintenance and Operation Building), Solid Waste Management Unit (SWMU) 014, and at the Kennedy Athletic, Recreation, and Social (KARS) Park II, (SWMU 118) located within Kennedy Space Center (KSC), Florida. SWMUs 014 and 118 were investigated independently, however, the results of the investigations indicated a single PFAS groundwater plume covering both SWMUs, so the two sites are being reported together.

PFAS↗

Part 121 Low Altitude Events: An Analysis of ASRS Reports

This presentation provides an aviation SME's human factors analysis of selected Low Altitude and Controlled Flight Towards Terrain (CFTT) events involving Part 121 air carriers as reported to the Aviation Safety Reporting System (ASRS).

low altitude↗

Progress Report No. 3 on Studies in the Fields of Space Flight and Guidance Theory

This paper contains progress reports of NASA-sponsored studies in the areas of space flight theory and guidance theory. The studies are carried on by several universities and industrial companies. This progress report covers the period from June 15, 1962 to December 20, 1962. The technical supervisor of the contracts is W.E. Miner, Deputy Chief of the Future Projects Branch of Aeroballistics Division, George C. Marshall Space Flight Center.

SPACECRAFT GUIDANCE↗

Studies in the fields of space flight and guidance theory progress report no. 7, 23 jul. 1964 - 1 apr. 1965

The progress reports of NASA-sponsored studies in the areas of space flight and guidance theory are presented. The studies are carried on by several universities and industrial companies. This progress report covers the period from July 23, 1964 to April 1, 1965. The contracts are technically supervised by personnel of the Astrodynamics and Guidance Theory Division, Aero-Astrodynamics Laboratory, Marshall Space Flight Center.

NASA Program↗

Early manned interplanetary mission study, volume i summary report

The studies reported herein were prepared by Lockheed Missiles & Space Company for the George C. Marshall Space Flight Center, Huntsville, Ala., under Contract No. NAS 8-5024. The results of the Early Manned Interplanetary Mission Study are reported in two volumes. Volume 1 contains the unclassified portion of the studies and Volume 2 presents the classified (CRD) studies relating to orbital escape propulsion systems.

Manned space flight↗

Empire. a study of early manned interplanetary missions final report, may 26 - nov. 25, 1962

This report summarizes the investigations and results of the EMPIRE Study Program undertaken by Aeronutronic Division of Ford Motor Company for the Future Projects Office, Marshall Space Flight Center, under Contract NAS8-5025. The dual planet flyby missions of the Crocco and Symmetric trajectory classes are discussed. The Crocco mission with an August 1971 launch window requires an interplanetary injection velocity increment of i0.i km/sec, has a return velocity of 13.5 km/sec, and takes approximately 400 days. The Symmetric mission with a July 1970 launch window has an injection velocity increment of 5.3 km/sec, a return velocity of 15.8 km/sec, and takes approximately 630 days. Additional results of the trajectory studies and abort trajectories are reported. The guidance and navigation subsystem, midcourse corrections, and planetary approach corrections are discussed. A detailed analysis of the reentry phase of EMPIRE includes consideration of an Apollo-type, a Drag Brake, and a lifting-type reentry vehicle to return the six-man crew at mission completion or in an aborted condition. The High L/D reentry vehicle is used in the missions considered. The various technological areas required for design criteria are developed and several spacecraft designs are considered. The all chemical propulsion Crocco system is discarded due to weight, complexity, and cost. The nuclear injected Crocco is treated in a similar manner. The lower energy injection for the Symmetric Mission leads to the feasibility of a nuclear injected vehicle with an Earth orbit weight of about 180,000 kilograms (400,000 pounds) before interplanetary transit. In addition, two chemical symmetric vehicles are treated. Conservative radiation exposures are derived, for the 630 day mission, of less than 200 REM and a polyethelene radiation shelter is designed. Scientific aspects of the missions are discussed. Mission Success Probabilities are presented for the various missions considered and for Saturn C-5, Nova, and Super-Nova Earth launch vehicles in light of possible development. The need for acceleration of nuclear rocket engine developments and auxiliary power developments is indicated. Definition of a larger nuclear engine of the order of 200,000 pounds thrust and about 800 seconds burning time or 50,000 pound thrust and 3600 seconds burning time is indicated for the Symmetric Mission in 1970 (energy requirements are higher in 1972 and for later launch due to the less favorable position of Mars)_ Immediate development of this advanced nuclear propulsion capability is recommended. A Development Plan and Funding Schedule is given for the 1970 launch window pinpointing the critical development areas and indicating a total program cost of $12.6 billion independent of other programmed R&D costs. In conclusion, technological feasibility for an early manned dual planet Mars-Venus flyby is believed to be demonstrated in this study. Several areas of accelerated development and experimental confirmation of theory are pinpointed. The necessary funding and development of Nova or orbital operations capability with Saturn C-5's is required. The 1970 launch window appears to offer the least expensive Symmetric Mission for several years into the 1980's.

F. P. Dixon↗

Procedure developed for reporting fast-neutron exposure

Procedure for reporting fast-neutron exposure involves determination of the spectrum shape and absolute magnitude, selection of an energy weighting for the neutrons, and definition of a unit for reporting exposure. Using this method, comparisons of irradiation data from different reactors will be free from errors resulting from differences between the spectra.

Rossin, A. D.↗

Apollo 7 Mission Report Communications System Performance

This report presents the results of an evaluation of the communications system performance during the Apollo 7 mission. The report includes, in addition to a communications system performance evaluation presented previously (Reference 1 of Appendix A), a supplemental evaluation of additional data.

Source record↗

Geographic applications program: Reports completed and in preparation

The purpose of the present compilation is to bring together for ready reference a list of all reports, both completed and in preparation, resulting from NASA sponsorship of the geography program. Wherever possible, complete bibliographic citations are given. Since some of the 141 reports listed are not yet completed, citations can not all be in complete form. The reason for including incomplete citations is the sponsor's need for rather rapid feed-back of information so that it can have a bearing on on-going program planning. This should, therefore, be considered a working bibliography.

Alexander, R. H.↗