Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reasoning about programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Final Fugitive Dust Control NOV Causal Report

On June 30, 2020, a Notice of Violation (NOV) was issued by the City of Albuquerque (COA) Environmental Health Department, Air Quality Program. The NOV identified two violations of New Mexico Administrative Code (NMAC) 20.11.20, Fugitive Dust Control, stemming from an August 30, 2019 inspection of the construction site at Sandia/New Mexico (SNL/NM) Building 812. After the August 30 inspection, a Post-Instruction Notification (PIN) was issued to the SNL Construction Facilities Manager. The PIN was acknowledged by Department 4722 and sent to the COA on September 13, 2020 via email. The PIN "Comply by" date was September 13, 2019 was transmitted by National Nuclear Security Administration/ Sandia Field Office (NNSA/SFO) to COA offices on November 12, 2019. The PIN response was 48 business days past due for various reasons which were explored during the causal analysis.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

MO-F-CAMPUS-T-04: Implementation of a Standardized Monthly Quality Check for Linac Output Management in a Large Multi-Site Clinic

Purpose: This work is to investigate the feasibility of a standardized monthly quality check (QC) of LINAC output determination in a multi-site, multi-LINAC institution. The QC was developed to determine individual LINAC output using the same optimized measurement setup and a constant calibration factor for all machines across the institution. Methods: The QA data over 4 years of 7 Varian machines over four sites, were analyzed. The monthly output constancy checks were performed using a fixed source-to-chamber-distance (SCD), with no couch position adjustment throughout the measurement cycle for all the photon energies: 6 and 18MV, and electron energies: 6, 9, 12, 16 and 20 MeV. The constant monthly output calibration factor (Nconst) was determined by averaging the machines’ output data, acquired with the same monthly ion chamber. If a different monthly ion chamber was used, Nconst was then re-normalized to consider its different NDW,Co-60. Here, the possible changes of Nconst over 4 years have been tracked, and the precision of output results based on this standardized monthly QA program relative to the TG-51 calibration for each machine was calculated. Any outlier of the group was investigated. Results: The possible changes of Nconst varied between 0–0.9% over 4 years. The normalization of absorbed-dose-to-water calibration factors corrects for up to 3.3% variations of different monthly QA chambers. The LINAC output precision based on this standardized monthly QC relative to the TG-51 output calibration is within 1% for 6MV photon energy and 2% for 18MV and all the electron energies. A human error in one TG-51 report was found through a close scrutiny of outlier data. Conclusion: This standardized QC allows for a reasonably simplified, precise and robust monthly LINAC output constancy check, with the increased sensitivity needed to detect possible human errors and machine problems.

60 APPLIED LIFE SCIENCES↗

Formation of Imploding Plasma Liners for HEDP and MIF Application

Plasma jets with high density and velocity have a number of important applications in fusion energy and elsewhere, including plasma refueling, disruption mitigation in tokamaks, magnetized target fusion, injection of momentum into centrifugally confined mirrors, plasma thrusters, and high energy density plasmas (HEDP). In Magneto-Inertial Fusion (MIF), for example, an imploding material liner is used to compress a magnetized plasma to fusion conditions and to confine the resulting burning plasma inertially to obtain the necessary energy gain. The imploding shell may be solid, liquid, gaseous, or a combination of these states. The presence of the magnetic field in the target plasma suppresses thermal transport to the plasma shell, thus lowering the imploding power needed to compress the target to fusion conditions. This allows the required imploding momentum flux to be generated electromagnetically using off-the-shelf pulsed power technology. Practical schemes for standoff delivery of the imploding momentum flux are required and are open topics for research. One approach for accomplishing this, called plasma jet driven magneto-inertial fusion (PJMIF), uses a spherical array of pulsed plasma guns to create a spherically imploding shell of very high velocity, high momentum flux plasma. This approach requires development of plasma jet accelerators capable of achieving velocities of 50-200 km/s with very precise timing and density profiles, and with high total mass and density. Low-Z plasma jets would require the higher velocities, whereas very dense high-Z plasma shells could achieve the goal at velocities of only 50-100 km/s. In this report, we describe our work to develop the pulsed plasma gun technology needed for an experimental scientific exploration of the PJMIF concept, and also for the other applications mentioned earlier. The initial goal of a few hundred of hydrogen at 200 km/s was eventually replaced with accelerating 8000 μg of argon or xenon to 50 km/s for the Plasma Liner Experiment (PLX) at Los Alamos National Laboratory (LANL). Initial work used existing computational and analytical tools to develop and refine a specific plasma gun concept having a novel tapered coaxial electromagnetic accelerator contour with an array of symmetric ablative plasma injectors. The profile is designed to suppress the main barrier to success in coaxial guns, namely the blow-by instability in which the arc slips past and outruns the bulk of the plasma mass. Efforts to begin developing a set of annular non-ablative plasma injectors for the coaxial gun, in order to accelerate pure gases, resulted in development of linear parallel-plate MiniRailguns that turned out to work well as plasma guns in their own right and we subsequently chose them for an initial plasma liner experiment on the PLX facility at LANL. This choice was mainly driven by cost and schedule for that particular experiment, while longer term goals still projected use of coaxial guns for reactor-relevant applications for reasons of better symmetry, lower impurities, more compact plasma jet formation, and higher gun efficiency. Our efforts have focused mainly on 1) developing various plasma injection systems for both coax and linear railguns and ensuring they work reliably with the accelerator section, 2) developing a suite of plasma and gun diagnostics, 3) performing computational modeling to design and refine the plasma guns, 4) establishing a research facility dedicated to plasma gun development, and finally, 5) developing plasma guns and associated pulse power systems capable of achieving these goals and installing and testing the first two gun sets on the PLX facility at LANL. During the second funding cycle for this program, HyperV joined in a collaborative effort with LANL, the University of Alabama at Huntsville, and the University of New Mexico to perform a plasma liner experiment (PLX) to investigate the physics and technology of forming spherically imploding plasma liners. HyperV’s tasks focused on developing the plasma guns and associated pulse power systems required for the 30 gun experiment at LANL. Unfortunately, funding for the entire PLX collaborative project was terminated after only two years of the four year project due to program funding realignments which necessitated recompeting the project in midstream. Despite the loss of funding, HyperV installed two Mark1 guns and pulsed power systems on PLX, and jet characterization and merging experiments were subsequently successfully performed at LANL by the PLX Team. In parallel with those PLX experiments, HyperV continued its efforts to develop a plasma gun capable of meeting the PLX goal of 8 mg of argon at 50 km/s. HyperV was ultimately successful in this effort, demonstrating 10.8 mg at 52.8 km/s and 7.5 mg at 62.4 km/s with the Mark2 MiniRailgun.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Phenix Decommissioning Project - Overview

The first heading of your manuscript must be 'Introduction'. Phenix is the only remaining French fast breeder reactor after the shutdown of Superphenix (1999) and Rapsodie (1983). Phenix is located inside the Marcoule nuclear site along the Rhone river near Bagnols-sur-Ceze in southeastern France. Phenix is one of the facilities belonging the French Atomic Energy Commission (CEA) on the Marcoule site. It is a fast breeder reactor (FBR) developed at the end of the 1960's. that has been in operation since 1973 and was connected to the power grid in 1974. It is a second generation prototype developed while the first generation FBR, Rapsodie, was still in operation. Phenix is a 250 electrical MW power plant. During the first 20 years of operation, its main aim was to demonstrate the viability of sodium-cooled FBRs. Since the 1991 radioactive waste management act, Phenix has become an irradiation tool for the actinide transmutation program. To extend its operating life for 6 additional cycles, it was necessary to refurbish the plant; this involved major work performed from 1999 to 2003 at a total cost of about 250 M??. Today, with a realistic expectation, the final shutdown is planned for the beginning of 2009. The main objective of the Phenix dismantling project is to eliminate all the process equipment and clean all the building to remove all the radioactive zones. To reach this objective, three main hazards must be eliminated: Fuel (criticality hazard), Sodium, Radioactive equipment. The complexity of decommissioning a facility such as Phenix is increased by: - the lack of storage facility for high radioactive material, - the decision to treat all the radioactive sodium and sodium waste inside the plant, - the very high irradiation of the core structures due to the presence of cobalt alloys. On the other hand, Phenix plant is still under operating with a qualified staff and the radioactivity coming from structural activation is well known. After the final shutdown, the first operations will be conducted by the same staff under the same safety report. Another interesting fact is that the decommissioning funds project exist and are available. The CEA decided to begin the dismantling phase without waiting because after a period of decay it is not really cheaper or easier to work. This approach needs interim storage facilities not long after the final shutdown. For the low- and intermediate-level radioactive waste there are national storage centers but for the high-level wastes, each operator must manage its waste until a suitable disposal site is available. At Marcoule a new storage facility is now being designed and scheduled to begin operating after 2013-2014. After removal of the fuel and core elements, the primary sodium will be drained and eliminated by a carbonation process. To ensure biological shielding, the reference scenario calls for filling the primary vessel with water. The most radioactive structures (dia-grid and core support) will be cut up with remote tools, after which the rest of the structure will be cut up manually. Phenix contains about 1450 metric tons of sodium. The CEA initially planned to build ATENA, a new facility for all radioactive sodium waste from R and D and FBR facilities. For various reasons, but mainly to save money, the CEA decided to treat all radioactive sodium and sodium waste in the framework of the Phenix dismantling project. There are no real difficulties in the dismantling schedule because of the advanced state of development of the processes selected for the ATENA project. Because of the knowledge already obtained, the issues concern project management, waste management and human resources reduction more than technical 0014challe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Release of Evaluated 235 U(n,f) Average Prompt Fission Neutron Multiplicities Including the CGMF Model

This report documents an evaluation of the average prompt fission neutron multiplicity, $\overline{v}_p$, of 235 U from 200 keV to 15 MeV that is a potential release candidate for the upcoming U.S. nuclear data library, ENDF/B-VIII.1. This evaluation had to be re-done from "scratch", as the input to the $\overline{v}_p$ evaluation of the previous library, ENDF/B-VIII.0, was lost. That means that all available experimental data were re-analyzed and uncertainties were re-estimated. Another major difference to ENDF/B-VIII.0 is that this evaluation includes model information from the Hauser-Feshbach fission fragment decay code CGMF, while ENDF/B-VIII.0 is based purely on experimental data. CGMF links several fission quantities with each other; $\overline{v}_p$ is predicted by assumptions made on, e.g., pre-neutron emission yields as a function of mass, the total kinetic energy, or spin and parity of fission fragments. This allows to perform two types of validation for the new 235 U $\overline{v}_p$: On the one hand, one can employ evaluated CGMF parameters obtained from fitting to experimental 235 U $\overline{v}_p$ to predict yields as a function of mass, the average total kinetic energy, or the mean energy of the prompt fission neutron spectrum. These model-predicted values can then be compared to experimental and evaluated data. The model-predicted fission-observable values using evaluated parameters obtained here are reasonably close to experimental data indicating the evaluated 235 U(n,f) $\overline{v}_p$ are physical. On the other hand, one can validate 235 U $\overline{v}_p$ with respect to integral responses such as fast ICSBEP critical assemblies or LLNL pulsed spheres. LLNL pulsed-sphere neutron-leakage spectra are minimally impacted by the new 235 U $\overline{v}_p$ as these experimental data are shape data and the $\overline{v}_p$ would mostly lead to a change in normalization of the data as the spheres are relatively thin (0.7 and 1.5 mean-free path) and, thus, mostly depend on 235 U $\overline{v}_p$ from 12-15 MeV. The change in the predicted effective neutron multiplication factor, k eff , of selected ICSBEP critical assemblies, however, is large compared to values using ENDF/B-VIII.0 and experimental k eff : The average bias is 108 pcm across all studied k eff values versus 12 pcm for ENDF/B-VIII.0. A reasonable performance in simulating keff (mean bias of 14 pcm) can be retained by tweaking 235 U $\overline{v}_p$ from 3-5 MeV, and combining it with a recent 235 U PFNS evaluation that is also a ENDF/B-VIII.1 release candidate.

235U↗

Studies Related to the Oregon State University High Temperature Test Facility: Scaling, the Validation Matrix, and Similarities to the Modular High Temperature Gas-Cooled Reactor

The Oregon State University (OSU) High Temperature Test Facility (HTTF) is an integral experimental facility that will be constructed on the OSU campus in Corvallis, Oregon. The HTTF project was initiated, by the U.S. Nuclear Regulatory Commission (NRC), on September 5, 2008 as Task 4 of the 5 year High Temperature Gas Reactor Cooperative Agreement via NRC Contract 04-08-138. Until August, 2010, when a DOE contract was initiated to fund additional capabilities for the HTTF project, all of the funding support for the HTTF was provided by the NRC via their cooperative agreement. The U.S. Department of Energy (DOE) began their involvement with the HTTF project in late 2009 via the Next Generation Nuclear Plant project. Because the NRC interests in HTTF experiments were only centered on the depressurized conduction cooldown (DCC) scenario, NGNP involvement focused on expanding the experimental envelope of the HTTF to include steady-state operations and also the pressurized conduction cooldown (PCC). Since DOE has incorporated the HTTF as an ingredient in the NGNP thermal-fluids validation program, several important outcomes should be noted: 1. The reference prismatic reactor design, that serves as the basis for scaling the HTTF, became the modular high temperature gas-cooled reactor (MHTGR). The MHTGR has also been chosen as the reference design for all of the other NGNP thermal-fluid experiments. 2. The NGNP validation matrix is being planned using the same scaling strategy that has been implemented to design the HTTF, i.e., the hierarchical two-tiered scaling methodology developed by Zuber in 1991. Using this approach a preliminary validation matrix has been designed that integrates the HTTF experiments with the other experiments planned for the NGNP thermal-fluids verification and validation project. 3. Initial analyses showed that the inherent power capability of the OSU infrastructure, which only allowed a total operational facility power capability of 0.6 MW, is inadequate to permit steady-state operation at reasonable conditions. 4. To enable the HTTF to operate at a more representative steady-state conditions, DOE recently allocated funding via a DOE subcontract to HTTF to permit an OSU infrastructure upgrade such that 2.2 MW will become available for HTTF experiments. 5. Analyses have been performed to study the relationship between HTTF and MHTGR via the hierarchical two-tiered scaling methodology which has been used successfully in the past, e.g., APEX facility scaling to the Westinghouse AP600 plant. These analyses have focused on the relationship between key variables that will be measured in the HTTF to the counterpart variables in the MHTGR with a focus on natural circulation, using nitrogen as a working fluid, and core heat transfer. 6. Both RELAP5-3D and computational fluid dynamics (CD-Adapco’s STAR-CCM+) numerical models of the MHTGR and the HTTF have been constructed and analyses are underway to study the relationship between the reference reactor and the HTTF. The HTTF is presently being designed. It has ¼-scaling relationship to the MHTGR in both the height and the diameter. Decisions have been made to design the reactor cavity cooling system (RCCS) simulation as a boundary condition for the HTTF to ensure that (a) the boundary condition is well defined and (b) the boundary condition can be modified easily to achieve the desired heat transfer sink for HTTF experimental operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multibeam tomotherapy: A new treatment unit devised for multileaf collimation, intensity-modulated radiation therapy

A fully integrated system for treatment planning, application, and verification for automated multileaf collimator (MLC) based, intensity-modulated, image-guided, and adaptive radiation therapy (IMRT, IGRT and ART, respectively) is proposed. Patient comfort, which was the major development goal, will be achieved through a new unit design and short treatment times. Our device for photon beam therapy will consist of a new dual energy linac with five fixed treatment heads positioned evenly along one plane but one electron beam generator only. A minimum of moving parts increases technical reliability and reduces motion times to a minimum. Motion is allowed solely for the MLCs, the robotic patient table, and the small angle gantry rotation of {+-}36 deg. . Besides sophisticated electron beam guidance, this compact setup can be built using existing modules. The flattening-filter-free treatment heads are characterized by reduced beam-on time and contain apertures restricted in one dimension to the area of maximum primary fluence output. In the case of longer targets, this leads to a topographic intensity modulation, thanks to the combination of 'step and shoot' MLC delivery and discrete patient couch motion. Owing to the limited number of beam directions, this multislice cone beam serial tomotherapy is referred to as 'multibeam tomotherapy.' Every patient slice is irradiated by one treatment head at any given moment but for one subfield only. The electron beam is then guided to the next head ready for delivery, while the other heads are preparing their leaves for the next segment. The 'Multifocal MLC-positioning' algorithm was programmed to enable treatment planning and optimize treatment time. We developed an overlap strategy for the longitudinally adjacent fields of every beam direction, in doing so minimizing the field match problem and the effects of possible table step errors. Clinical case studies show for the same or better planning target volume coverage, better organ-at-risk sparing, and comparable mean integral dose to the normal tissue a reduction in treatment time by more than 50% to only a few minutes in comparison to high-quality 3-D conformal and IMRT treatments. As a result, it will be possible to incorporate features for better patient positioning and image guidance, while sustaining reasonable overall treatment times at the same time. The virtual multibeam tomotherapy design study TOM'5-CT contains a dedicated electron beam CT (TOM'AGE) and an objective optical topometric patient positioning system (TOPOS registered ). Thanks to the wide gantry bore of 120 cm and slim gantry depths of 70 cm, patients can be treated very comfortably, in all cases tumor-isocentrically, as well as with noncoplanar beam arrangements as in stereotactic radiosurgery with a couch rotation of up to {+-}54 deg. . The TOM'5 treatment unit on which this theoretical concept is based has a stand-alone depth of 40 cm and an outer diameter of 245 cm; the focus-isocenter distance of the heads is 100 cm with a field size of 40 cmx7 cm and 0.5 cm leaves, which operate perpendicular to the axis of table motion.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

VALIDATION OF A RELAP5 POINT KINETICS MODEL OF TREAT

Development of advanced nuclear fuels requires testing of fuel specimens under various power-cooling mismatch conditions. The Transient Reactor Test (TREAT) facility at the Idaho National Laboratory will be used to provide transient nuclear heating of fuel specimens. Experiments will be conducted to support assessment of accident tolerant fuel designs being proposed for light water reactor applications. The experiments to be conducted at TREAT will provide data for the assessment of advanced, multi-physics computer codes. However, before the experiments can be performed, calculations are required to demonstrate that they will meet program objectives and that they can be performed safely in TREAT in the event of an unplanned reactivity insertion accident that occurs during the experiment. The safety calculations for the first experiments need to be performed in the next year and therefore will be performed with an existing computer code, RELAP5-3D. A point kinetics model of TREAT was developed for RELAP5-3D. The purpose of the model is to calculate the reactor power during experiments and to support the accident analyses of those experiments. The RELAP5-3D model was validated using data from nine TREAT experiments conducted previously. The RELAP5-3D model generates results that are in reasonable agreement with measured values of maximum core power, energy deposition, and maximum fuel temperature for a wide range of reactivity insertions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MODELS FOR METAL-POOR STARS WITH ENHANCED ABUNDANCES OF C, N, O, Ne, Na, Mg, Si, S, Ca, AND Ti, IN TURN, AT CONSTANT HELIUM AND IRON ABUNDANCES

Recent work has shown that most globular clusters have at least two chemically distinct components, as well as cluster-to-cluster differences in the mean [O/Fe], [Mg/Fe], and [Si/Fe] ratios at similar [Fe/H] values. In order to investigate the implications of variations in the abundances of these and other metals for H-R diagrams and predicted ages, grids of evolutionary sequences have been computed for scaled solar and enhanced {alpha}-element metal abundances, and for mixtures in which the assumed [m/Fe] value for each of the metals C, N, O, Ne, Na, Mg, Si, S, Ca, and Ti has been increased, in turn, by 0.4 dex at constant [Fe/H]. These tracks, together with isochrones for ages from Almost-Equal-To 5 to 14 Gyr, have been computed for -3.0 {<=} [Fe/H] {<=}-0.6, with helium abundances Y = 0.25, 0.29, and 0.33 at each [Fe/H] value, using upgraded versions of the Victoria stellar structure program and the Regina interpolation code, respectively. Turnoff luminosity versus age relations from isochrones are found to depend almost entirely on the importance of the CNO cycle, and thereby mainly on the abundance of oxygen. Since C, N, and O, as well as Ne and S, do not contribute significantly to the opacities at low temperatures and densities, variations in their abundances do not impact the predicted T{sub eff} scale of red giants. The latter is a strong function of the abundances of only Mg and Si (and Fe, possibly to a lesser extent) because they are so abundant and because they are strong sources of opacity at low temperatures. For these reasons, Mg and Si also have important effects on the temperatures of main-sequence stars. Due to their low abundances, Na, Ca, and Ti are of little consequence for stellar models. The effects of varying the adopted solar metals mixture and the helium abundance at a fixed [Fe/H] are also briefly discussed.

79 ASTRONOMY AND ASTROPHYSICS↗

A METHOD FOR ESTIMATING GAS PRESSURE IN 3013 CONTAINERS USING AN ISP DATABASE QUERY

The U.S. Department of Energy's Integrated Surveillance Program (ISP) is responsible for the storage and surveillance of plutonium-bearing material. During storage, plutonium-bearing material has the potential to generate hydrogen gas from the radiolysis of adsorbed water. The generation of hydrogen gas is a safety concern, especially when a container is breached within a glove box during destructive evaluation. To address this issue, the DOE established a standard (DOE, 2004) that sets the criteria for the stabilization and packaging of material for up to 50 years. The DOE has now packaged most of its excess plutonium for long-term storage in compliance with this standard. As part of this process, it is desirable to know within reasonable certainty the total maximum pressure of hydrogen and other gases within the 3013 container if safety issues and compliance with the DOE standards are to be attained. The principal goal of this investigation is to document the method and query used to estimate total (i.e. hydrogen and other gases) gas pressure within a 3013 container based on the material properties and estimated moisture content contained in the ISP database. Initial attempts to estimate hydrogen gas pressure in 3013 containers was based on G-values (hydrogen gas generation per energy input) derived from small scale samples. These maximum G-values were used to calculate worst case pressures based on container material weight, assay, wattage, moisture content, container age, and container volume. This paper documents a revised hydrogen pressure calculation that incorporates new surveillance results and includes a component for gases other than hydrogen. The calculation is produced by executing a query of the ISP database. An example of manual mathematical computations from the pressure equation is compared and evaluated with results from the query. Based on the destructive evaluation of 17 containers, the estimated mean absolute pressure was significantly higher (P<.01) than the mean GEST pressure. There was no significant difference (P>.10) between the mean pressures from DR and the calculation. The mean predicted absolute pressure was consistently higher than GEST by an average difference of 57 kPa (8 psi). The mean difference between the estimated pressure and digital radiography was 11 kPa (2 psi). Based on the initial results of destructive evaluation, the pressure query was found to provide a reasonably conservative estimate of the total pressure in 3013 containers whose material contained minimal moisture content.

08 HYDROGEN↗

Comparison of silver release predictions using PARFUME with results from the AGR-2 irradiation experiment

The PARFUME (PARticle FUel ModEl) code was used to predict silver release from tristructural isotropic (TRISO) coated fuel particles and compacts during the second irradiation experiment (AGR-2) of the Advanced Gas Reactor Fuel Development and Qualification program. The PARFUME model for the AGR-2 experiment used the fuel compact volume average temperature for each of the 559 days of irradiation to calculate the release of fission product silver from a representative particle for a select number of AGR-2 compacts and individual fuel particles containing either mixed uranium carbide/oxide (UCO) or 100% uranium dioxide (UO2) kernels. Post-irradiation examination (PIE) measurements were performed to provide data on release of silver from these compacts and individual fuel particles. The available experimental fractional releases of silver were compared to their corresponding PARFUME predictions. Preliminary comparisons show that PARFUME under-predicts the PIE results in UCO compacts and is in reasonable agreement with experimental data for UO2 compacts. The accuracy of PARFUME predictions is impacted by the code limitations in the modeling of the temporal and spatial distributions of the temperature across the compacts. Nevertheless, the comparisons on silver release lie within the same order of magnitude.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The research progress of some key problems about the protection of industrial electron irradiation accelerator - Paper 9

In the last decades, electronic irradiation accelerator has made great progress and been widely used in fields. Because of its distinguishing feature of reliability and safety, electronic irradiation accelerator has attracted more attention of the investors, and created a huge economic value and social benefits. It will become the mainstream equipment of irradiation processing industry in future. So the further study of the shielding design around irradiation accelerator is of great significance. Different designs of ventilation duct will greatly influence dose rate of the exit. Because of the high dose rate under the target, it is suitable to use multi-tortuous duct when duct locating under target. It will reduce the dose rate about 3 orders of magnitude at the exit that add one backscattering interface in duct. Choose reasonable diameter and angle of embedded duct so that photons scatter as much as possible. We can use multiple small diameter ducts to replace large diameter duct. The system of Mini-DDL, Gamma detector and PC give a better reflection on the running statue of accelerator, its perfect usability can produce intuitive images for analyzed, it is important and helpful for workers and researchers to know about the radiation level of machine and environment. The measured results along the maze show that the maze must be long enough in order to achieve the desired shielding thickness. In future, we will combine the different kinds and motor patterns of body models, Monte Carlo programs, real time monitoring system with theoretical calculations to explore how the radiation field around accelerator has impact on human organs, get the dose distribution of body models so that improve the radiation protection to electron accelerator. (authors)

43 PARTICLE ACCELERATORS↗

Carbon Fiber Prepreg Recycling- Automated Perform Manufacturing Equipment (Final Technical Report)

Discontinuous fiber composites have a compelling business case as related to light metals such as aluminum and magnesium machined or die cast components. DFC’s have been in commercial production using carbon fiber/epoxy prepreg for both commercial aircraft and for military applications for a number of years and their usage is expanding into automotive and consumer goods components. Reasons for this include significantly lower cost as compared to continuous fiber composites easier design and understanding of the material by metal traditionalists, higher degree of part complexity with relatively simple and low cost molds when compared to high-pressure die casting, and potential for near zero waste. IACMI’s 10-year goals of reduction in carbon fiber reinforced plastics manufacturing cost by 25%, reduction in their embodied energy by 50%, and recyclability of 95% can all be advanced through robust recycling. With recycling We have shown that a 15% contribution in manufacturing cost reduction is feasible, that a significant reduction in embodied energy (over 90% for the recycled fraction) is achievable, and that when combined with primary pyrolysis recycling, the 95% target can be met. Large-scale application of advanced composites began with the aerospace industry, and CRTC’s location in Washington State provided access to a waste stream of nearly 900 tonnes/year that was going to landfill. As the aerospace industry has automated parts production, their material forms have become significantly easier to recycle, and some evidence of this exists for the future automotive and wind turbine components as well. CRTC decided to focus on re-purposing the carbon fiber/epoxy aerospace scrap streams through materials reformatting and reuse, and not on primary recycling (pyrolysis mainly) as this technology is commercially available. The main reasons for this were that it offers a route to effective use of the most widely available and consistent feedstock called edge-trim, as well as allows creation of complex and low-cost parts using rapid and cost-effective compression molding technologies. The reasons also include leading the way for potential automotive pre-preg recycling as the combination of roughly 85% virgin pre-preg and 15% recycled pre-preg directly supports IACMI’s goals and enables significant part cost reduction and a path to zero-waste composite manufacturing at the OEMs or Tier 1’s. The purpose of the project was to develop equipment and technology to transform continuous fiber pre-preg in roll forms into smaller chip-format DFC feedstock, and to determine impacts on moldability and performance based on lessons learned along the path. The availability of scrap from pre-preg manufacturers was a significant value to the program even though the aerospace pre-preg is designed to be autoclave molded thus has handling, tackiness, and processing factors that are not ideal for DFCs. The scope of the project was to develop a Phase 1 system that could identify and resolve some of the major hurdles, determine where to focus effort on building a commercial-scale Phase 2 system, and develop technology for handling a wide variety of incoming scrap materials to produce the most usable product. A chopping system was developed and reduced to practice via an experimental approach that enabled all forms of scrap coming from the pre-preg manufacturers and some forms of the scrap coming from OEM production lines to be very effectively re-purposed. The systems that were developed were not considered to be production robust but rather identified and resolved some of the major technical hurdles, and demonstrated the path towards effective full-scale commercialization.

36 MATERIALS SCIENCE↗

DETECTING MASSIVE GRAVITONS USING PULSAR TIMING ARRAYS

At the limit of weak static fields, general relativity becomes Newtonian gravity with a potential field that falls off as inverse distance rather than a theory of Yukawa-type fields with a finite range. General relativity also predicts that the speed of disturbances of its waves is c, the vacuum light speed, and is non-dispersive. For these reasons, the graviton, the boson for general relativity, can be considered to be massless. Massive gravitons, however, are features of some alternatives to general relativity. This has motivated experiments and observations that, so far, have been consistent with the zero-mass graviton of general relativity, but further tests will be valuable. A basis for new tests may be the high sensitivity gravitational wave (GW) experiments that are now being performed and the higher sensitivity experiments that are being planned. In these experiments, it should be feasible to detect low levels of dispersion due to non-zero graviton mass. One of the most promising techniques for such a detection may be the pulsar timing program that is sensitive to nano-Hertz GWs. Here, we present some details of such a detection scheme. The pulsar timing response to a GW background with the massive graviton is calculated, and the algorithm to detect the massive graviton is presented. We conclude that, with 90% probability, massless gravitons can be distinguished from gravitons heavier than 3 x 10{sup -22} eV (Compton wavelength {lambda}{sub g} = 4.1 x 10{sup 12} km), if bi-weekly observation of 60 pulsars is performed for 5 years with a pulsar rms timing accuracy of 100 ns. If 60 pulsars are observed for 10 years with the same accuracy, the detectable graviton mass is reduced to 5 x 10{sup -23} eV ({lambda}{sub g} = 2.5 x 10{sup 13} km); for 5 year observations of 100 or 300 pulsars, the sensitivity is respectively 2.5 x 10{sup -22} ({lambda}{sub g} = 5.0 x 10{sup 12} km) and 10{sup -22} eV ({lambda}{sub g} = 1.2 x 10{sup 13} km). Finally, a 10 year observation of 300 pulsars with 100 ns timing accuracy would probe graviton masses down to 3 x 10{sup -23} eV ({lambda}{sub g} = 4.1 x 10{sup 13} km).

79 ASTRONOMY AND ASTROPHYSICS↗

Influence of Sea Ice on Arctic Marine Sulfur Biogeochemistry in the Community Climate System Model

Global climate models (GCMs) have not effectively considered how responses of arctic marine ecosystems to a warming climate will influence the global climate system. A key response of arctic marine ecosystems that may substantially influence energy exchange in the Arctic is a change in dimethylsulfide (DMS) emissions, because DMS emissions influence cloud albedo. This response is closely tied to sea ice through its impacts on marine ecosystem carbon and sulfur cycling, and the ice-albedo feedback implicated in accelerated arctic warming. To reduce the uncertainty in predictions from coupled climate simulations, important model components of the climate system, such as feedbacks between arctic marine biogeochemistry and climate, need to be reasonably and realistically modeled. This research first involved model development to improve the representation of marine sulfur biogeochemistry simulations to understand/diagnose the control of sea-ice-related processes on the variability of DMS dynamics. This study will help build GCM predictions that quantify the relative current and possible future influences of arctic marine ecosystems on the global climate system. Our overall research objective was to improve arctic marine biogeochemistry in the Community Climate System Model (CCSM, now CESM). Working closely with the Climate Ocean Sea Ice Model (COSIM) team at Los Alamos National Laboratory (LANL), we added 1 sea-ice algae and arctic DMS production and related biogeochemistry to the global Parallel Ocean Program model (POP) coupled to the LANL sea ice model (CICE). Both CICE and POP are core components of CESM. Our specific research objectives were: 1) Develop a state-of-the-art ice-ocean DMS model for application in climate models, using observations to constrain the most crucial parameters; 2) Improve the global marine sulfur model used in CESM by including DMS biogeochemistry in the Arctic; and 3) Assess how sea ice influences DMS dynamics in the arctic marine environment and predict how it will do so in the future.

54 ENVIRONMENTAL SCIENCES↗

Comparison of silver release predictions using PARFUME with results from the AGR-2 irradiation experiment - 18579

The PARFUME (Particle Fuel Model) code was used to predict silver release from tri-structural isotropic (TRISO) coated fuel particles and compacts during the second irradiation experiment (AGR-2) of the Advanced Gas Reactor Fuel Development and Qualification program. The PARFUME model for the AGR-2 experiment used the fuel compact volume average temperature for each of the 559 days of irradiation to calculate the release of fission product silver from a representative particle for a select number of AGR-2 compacts and individual fuel particles containing either mixed uranium carbide/oxide (UCO) or 100% uranium dioxide (UO{sub 2}) kernels. Post-irradiation examination (PIE) measurements were performed to provide data on release of silver from these compacts and individual fuel particles. The available experimental fractional releases of silver were compared to their corresponding PARFUME predictions. Preliminary comparisons show that PARFUME under-predicts the PIE results in UCO compacts and is in reasonable agreement with experimental data for UO{sub 2} compacts. The accuracy of PARFUME predictions is impacted by the code limitations in the modeling of the temporal and spatial distributions of the temperature across the compacts. Nevertheless, the comparisons on silver release lie within the same order of magnitude. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Code Verification and Solution Verification framework in pin-resolved neutron transport code MPACT

Program verification in scientific computing encompasses the application of formal and mathematical techniques to a scientific computing code for its credibility, accuracy, and validity. Code Verification identifies bugs and performance issues in the software development stage. Solution Verification assesses the applicability of the code and the accuracy of the solution to problems of interest. Both activities utilize application cases and quantify the error against prescribed acceptance criteria. However, simply executing more application cases does not guarantee stronger or more comprehensive credibility. Here, we establish a verification framework that involves Code Verification and Solution Verification, both of which work together such that the overarching goal of “converge to the correct answer for the intended application” can be reasonably inferred. The application of such a verification framework is demonstrated using the pin-resolved neutron transport code MPACT, where standard unit tests and regression tests are covered, and where the Method of Exact Solutions and the Method of Manufactured Solutions are successfully used. Additionally, the applicability of Method of Manufactured Solutions is extended to the OECD/NEA C5G7 benchmark problems of practical material and geometric configurations. Solution Verification activities are demonstrated on a practical hierarchy of application models of increasing complexity ranging from 2D pin cell problems to 3D assembly problems. The convergence behavior and rate of convergence with respect to each individual variable are studied and provided. This framework can be adapted broadly to other fields involving scientific computing codes.

97 MATHEMATICS AND COMPUTING↗