Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

2016 Wind Technologies Market Report

The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. You can find the report, a presentation, and a data file on the Files tab, below. Additionally, several data visualizations are available in the Data Visualizations tab. Highlights of this year’s report include: -Wind power additions continued at a rapid clip in 2016: $13 billion was invested in new wind power plants in 2016. In 2016, wind energy contributed 5.6% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and 29% to 37% in three of those states—Iowa, South Dakota, and Kansas. -Bigger turbines are enhancing wind project performance: Increased blade lengths, in particular, have dramatically increased wind project capacity factors, one measure of project performance. For example, the average 2016 capacity factor among projects built in 2014 and 2015 was 42.6%, compared to an average of 32.1% among projects built from 2004 to 2011 and 25.4% among projects built from 1998 to 2001. -Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen from their highs in 2008, to $800–$1,100/kW. Overall, the average installed cost of wind projects in 2016 was $1,590/kW, down $780/kW from the peak in 2009 and 2010. -Wind energy prices remain low: After topping out at nearly 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to around 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country (such as Texas, Iowa, Oklahoma). These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. -The supply chain continued to adjust to swings in domestic demand for wind equipment: Wind sector employment reached a new high of more than 101,000 full-time workers at the end of 2016. For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>90%), towers (65-80%), and blades and hubs (50-70%), but is much lower (<20%) for most components internal to the turbine. -Continued strong growth in wind capacity is anticipated in the near term: With federal tax incentives still available, though declining, various forecasts for the domestic market show expected wind power capacity additions averaging more than 9,000 MW/year from 2017 to 2020.

17 WIND ENERGY↗

Forecasted Dynamic Line Ratings for Regional Transmission Lines

This report was prepared for the Wind Energy Technology Office for the FY 2022, quarter 3 deliverable. This details the use of forecasted dynamic line rating as an improvement over static rating for three transmission lines in three regions of interest. A selection of wind plants across Idaho, the Columbia River Gorge and offshore wind in the NYSERDA territory were modeled for their concurrent cooling effects for dynamic line rating. Regional transmission lines for the wind plant interconnections were determined and a CFD domain was created to determine local wind flows over the lines. A dynamic line rating for each of the lines was calculated for both weather observation data and HRRR model forecast data. The comparison of peaks in the wind power production were compared to the DLR peaks. It was determined that for shorter regional transmission lines, the effect of concurrent cooling that commonly occur with gen-tie lines were still valid. Concurrent cooling effects drop as the length of the regional transmission lines increase in distance from the wind plants. In addition, the accuracy of the forecasted ampacity to the weather observation data for ampacity was assessed. In general, the accuracy was best for the INL region with the NOAA-maintained sites. The Columbia River Gorge and Long Island sites showed similar levels of accuracy for the forecasted DLR. The accuracy levels were around 11% for the INL region, 15% for Columbia River Gorge and 7% for New York Long Island. The higher error for the Columbia Gorge region is likely due to the sparse availability of weather stations available, whereas both the INL site and Long Island are well instrumented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Short-term solar irradiance forecasting via satellite/model coupling

Here, the short-term (0-3 h) prediction of solar insolation for renewable energy production is a problem well-suited to satellite-based techniques. The spatial, spectral, temporal and radiometric resolution of instrumentation hosted on the geostationary platform allows these satellites to describe the current cloud spatial distribution and optical properties. These properties relate directly to the transient properties of the downwelling solar irradiance at the surface, which come in the form of 'ramps' that pose a central challenge to energy load balancing in a spatially distributed network of solar farms. The short-term evolution of the cloud field may be approximated to first order simply as translational, but care must be taken in how the advection is handled and where the impacts are assigned. In this research, we describe how geostationary satellite observations are used with operational cloud masking and retrieval algorithms, wind field data from Numerical Weather Prediction (NWP), and radiative transfer calculations to produce short-term forecasts of solar insolation for applications in solar power generation. The scheme utilizes retrieved cloud properties to group pixels into contiguous cloud objects whose future positions are predicted using four-dimensional (space + time) model wind fields, selecting steering levels corresponding to the cloud height properties of each cloud group. The shadows associated with these clouds are adjusted for sensor viewing parallax displacement and combined with solar geometry and terrain height to determine the actual location of cloud shadows. For mid/high-level clouds at mid-latitudes and high solar zenith angles, the combined displacements from these geometric considerations are non-negligible. The cloud information is used to initialize a radiative transfer model that computes the direct and diffuse-sky solar insolation at both shadow locations and intervening clear-sky regions. Here, we describe the formulation of the algorithm and validate its performance against Surface Radiation (SURFRAD; Augustine et al., 2000, 2005) network observations. Typical errors range from 8.5% to 17.2% depending on the complexity of cloud regimes, and an operational demonstration outperformed persistence-based forecasting of Global Horizontal Irradiance (GHI) under all conditions by ~10 W/m 2 .

14 SOLAR ENERGY↗

Real-Time Alpine Measurement System Using Wireless Sensor Networks

Monitoring the snow pack is crucial for many stakeholders, whether for hydro-power optimization, water management or flood control. Traditional forecasting relies on regression methods, which often results in snow melt runoff predictions of low accuracy in non-average years. Existing ground-based real-time measurement systems do not cover enough physiographic variability and are mostly installed at low elevations. We present the hardware and software design of a state-of-the-art distributedWireless Sensor Network (WSN)-based autonomous measurement system with real-time remote data transmission that gathers data of snow depth, air temperature, air relative humidity, soil moisture, soil temperature, and solar radiation in physiographically representative locations. Elevation, aspect, slope and vegetation are used to select network locations, and distribute sensors throughout a given network location, since they govern snow pack variability at various scales. Three WSNs were installed in the Sierra Nevada of Northern California throughout the North Fork of the Feather River, upstream of the Oroville dam and multiple powerhouses along the river. The WSNs gathered hydrologic variables and network health statistics throughout the 2017 water year, one of northern Sierra’s wettest years on record. These networks leverage an ultra-low-power wireless technology to interconnect their components and offer recovery features, resilience to data loss due to weather and wildlife disturbances and real-time topological visualizations of the network health. Data show considerable spatial variability of snow depth, even within a 1 km 2 network location. In conclusion, combined with existing systems, these WSNs can better detect precipitation timing and phase in, monitor sub-daily dynamics of infiltration and surface runoff during precipitation or snow melt, and inform hydro power managers about actual ablation and end-of-season date across the landscape.

47 OTHER INSTRUMENTATION↗

A New Window into the Baryon Cycle at Cosmic Noon with Line Intensity Mapping: Forecasts for auto- and cross-correlations in [CII]-158$μ$m, HI 21 cm, CO$_{J+1\rightarrow J}$, and H$α$ galaxies

Across the peak of cosmic star formation at $z\sim1-2$, inflow, processing, and feedback drive rapid changes in the spatial distribution and chemical composition of baryons in galaxies and surrounding reservoirs; this baryon cycle can be tomographically mapped by line intensity mapping (LIM) of atomic hydrogen, ionized carbon, and carbon monoxide. We present a simulation-based forecasting framework for detecting auto- and cross-power spectra between spectroscopic surveys of four such tracers at $z\sim0.5-1.7$ mapping the same deep field - TIM, EoRSpec/FYST, MeerKAT, & Euclid. We forward-model 3-D distributions for these tracers from magnetohydrodynamic simulations, directly capturing the two-halo, one-halo, and shot statistics without relying on analytical decompositions. We further detail a signal-to-noise formalism, tailored to LIM surveys with highly anisotropic geometries and Fourier-space coverage. We demonstrate that galaxy cross-correlations will be the dominant discovery channel for current-generation surveys. These instruments will detect the auto-spectra for CO and HI 21 cm and the CO $\times$ 21 cm cross-spectrum at modest S/N $\sim 1-10$, while placing upper limits on the [CII]-158$μ$m signals. [CII], CO, and HI LIM will be $\sim3-30\times$ ($0.5-1.5$ dex) more sensitive to cross-correlation with the Euclid survey, however, than their respective auto-correlations, constraining all three models of line emission at high significance (S/N $\sim 10-40$) within this decade. Finally, we formulate a staged instrumental trajectory with planned or reasonable improvements, including the as-proposed SKA-Mid. We forecast advancing the per-$k$-mode sensitivities of each auto-, galaxy-line, and line-line spectrum by several orders of magnitude, enabling new percent- and sub-percent level constraints on cosmology and the redshift evolution of star formation and the baryon cycle.

Agrawal, Shubh [Pennsylvania U., Dept. Math.]↗

Developing a tool to estimate water withdrawal and consumption in electricity generation in the United States.

Freshwater consumption for electricity generation is projected to increase dramatically in the next couple of decades in the United States. The increased demand is likely to further strain freshwater resources in regions where water has already become scarce. Meanwhile, the automotive industry has stepped up its research, development, and deployment efforts on electric vehicles (EVs) and plug-in hybrid electric vehicles (PHEVs). Large-scale, escalated production of EVs and PHEVs nationwide would require increased electricity production, and so meeting the water demand becomes an even greater challenge. The goal of this study is to provide a baseline assessment of freshwater use in electricity generation in the United States and at the state level. Freshwater withdrawal and consumption requirements for power generated from fossil, nonfossil, and renewable sources via various technologies and by use of different cooling systems are examined. A data inventory has been developed that compiles data from government statistics, reports, and literature issued by major research institutes. A spreadsheet-based model has been developed to conduct the estimates by means of a transparent and interactive process. The model further allows us to project future water withdrawal and consumption in electricity production under the forecasted increases in demand. This tool is intended to provide decision makers with the means to make a quick comparison among various fuel, technology, and cooling system options. The model output can be used to address water resource sustainability when considering new projects or expansion of existing plants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Photovoltaic Analysis and Response Support (PARS) Platform for Solar Situational Awareness and Resiliency Services

The project's primary objective is to develop a digital-twin based Photovoltaic (PV) Analysis and Response Support (PARS) platform, which aims to provide real-time situational awareness and optimal response plans. This platform is designed to enhance the performance of hybrid PV systems, making them competitive with or even superior to conventional generation resources. The PARS platform enabled the project team to develop and evaluate an extensive suite of grid support functionalities for the hybrid PV systems to enhance grid performance, across key areas including visibility, dispatchability, security, resilience, and reliability. Given the global push toward achieving 100% clean energy by 2035, there is a significant increase in the integration of inverter-based resources (IBRs) throughout the energy grid. Effectively managing the inherent variability and uncertainty associated with IBRs is crucial for ensuring cost-effectiveness, reliability, and security in both the main grid and islanded microgrids. Constrained to a limited array of IEEE test systems or standard feeder models, traditional IBR modeling struggles to assimilate new field data, accurately reflect system dynamics, and adapt to the evolving energy landscape. In our project, we embraced a Digital Twin (DT) strategy for crafting the PARS platform. A digital twin acts as a precise virtual counterpart of a physical system, built on historical data and continuously honed with real-time insights. This enables the high-fidelity DT to accurately mirror current system operations and forecast future scenarios. Consequently, the PARS platform becomes an ideal environment for testing and refining monitoring, control, power, and energy management algorithms designed to boost hybrid PV system performance. The defining feature of the PARS platform, distinguishing it from other advanced simulation tools, is its exceptional adaptability. This is achieved by employing actual network topologies and utilizing real-time field data for fine-tuning and calibration, ensuring a close emulation of real-world conditions. The project deliverables include: 1) High-fidelity IBR models and tools for real-time parameterization, utilizing real-time field measurements to refine IBR models for enhanced accuracy and performance; 2) Grid-forming and Grid-following capabilities to deliver resilience services, including blackstart, voltage and frequency support, cold-load pick-up, power reserves, and three-phase load balancing across grid-connected and microgrid settings; 3) Machine learning-based forecasting tools and methods for generating synthetic data and topologies, creating diverse and realistic simulation environments for evaluating varied operational scenarios; 4) Advanced microgrid power and energy management algorithms for optimizing the integration and operation of PV, storage, and demand response resources within both feeder and community scales. The power grid data sets are provided by four utility companies in North Carolina and the New York Power Administration. Acting as industry advisors, our industry partners communicated stakeholder needs and regulatory standards to the research teams, aiding technology transfer by incorporating the developed methodologies into their daily operations. This collaboration ensures that the PARS platform, functioning as a power system digital twin, enhances our understanding of IBR dynamic behaviors and enables the development and evaluation of IBR control functions that match or exceed the capabilities of conventional synchronous generators.

14 SOLAR ENERGY↗

PRIMORDIAL GRAVITATIONAL WAVE DETECTABILITY WITH DEEP SMALL-SKY COSMIC MICROWAVE BACKGROUND EXPERIMENTS

We use the Bayesian estimation on direct T - Q - U cosmic microwave background (CMB) polarization maps to forecast errors on the tensor-to-scalar power ratio r, and hence on primordial gravitational waves, as a function of sky coverage f{sub sky}. This map-based likelihood filters the information in the pixel-pixel space into the optimal combinations needed for r detection for cut skies, providing enhanced information over a first-step linear separation into a combination of E, B, and mixed modes, and ignoring the latter. With current computational power and for typical resolutions appropriate for r detection, the large matrix inversions required are accurate and fast. Our simulations explore two classes of experiments, with differing bolometric detector numbers, sensitivities, and observational strategies. One is motivated by a long duration balloon experiment like Spider, with pixel noise {proportional_to}{radical}(f{sub sky}) for a specified observing period. This analysis also applies to ground-based array experiments. We find that, in the absence of systematic effects and foregrounds, an experiment with Spider-like noise concentrating on f{sub sky} {approx} 0.02-0.2 could place a 2{sigma}{sub r} Almost-Equal-To 0.014 boundary ({approx}95% confidence level), which rises to 0.02 with an l-dependent foreground residual left over from an assumed efficient component separation. We contrast this with a Planck-like fixed instrumental noise as f{sub sky} varies, which gives a Galaxy-masked (f{sub sky} = 0.75) 2{sigma}{sub r} Almost-Equal-To 0.015, rising to Almost-Equal-To 0.05 with the foreground residuals. Using as the figure of merit the (marginalized) one-dimensional Shannon entropy of r, taken relative to the first 2003 WMAP CMB-only constraint, gives -2.7 bits from the 2012 WMAP9+ACT+SPT+LSS data, and forecasts of -6 bits from Spider (+ Planck); this compares with up to -11 bits for CMBPol, COrE, and PIXIE post-Planck satellites and -13 bits for a perfectly noiseless cosmic variance limited experiment. We thus confirm the wisdom of the current strategy for r detection of deeply probed patches covering the f{sub sky} minimum-error trough with balloon and ground experiments.

79 ASTRONOMY AND ASTROPHYSICS↗

Efficient relaxations for joint chance constrained AC optimal power flow

Evolving power systems with increasing levels of stochasticity call for a need to solve optimal power flow problems with large quantities of random variables. Weather forecasts, electricity prices, and shifting load patterns introduce higher levels of uncertainty and can yield optimization problems that are difficult to solve in an efficient manner. Solution methods for single chance constraints in optimal power flow problems have been considered in the literature, ensuring single constraints are satisfied with a prescribed probability; however, joint chance constraints, ensuring multiple constraints are simultaneously satisfied, have predominantly been solved via scenario-based approaches or by utilizing Boole's inequality as an upper bound. In this paper, joint chance constraints are used to solve an AC optimal power flow problem while preventing overvoltages in distribution grids under high penetrations of photovoltaic systems. A tighter version of Boole's inequality is derived and used to provide a new upper bound on the joint chance constraint, and simulation results are shown demonstrating the benefit of the proposed upper bound. The new framework allows for a less conservative and more computationally efficient solution to considering joint chance constraints, specifically regarding preventing overvoltages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nuclear Archeology for CANDU Power Reactors

The goal of this work is the development of so-called 'nuclear archeology' techniques to predict the irradiation history of both fuel-related and non-fuel-related materials irradiated in the CANDU (CANada Deuterium Uranium) family of nuclear reactors. In this application to CANDU-type reactors, two different scenarios for the collection of the appropriate data for use in these procedures will be assumed: the first scenario is the removal of the pressure tubes, calandria tubes, or fuel cladding and destructive analysis of the activation products contained in these structural materials; the second scenario is the nondestructive analysis (NDA) of the same hardware items via high-resolution gamma ray scans. There are obvious advantages and disadvantages for each approach; however, the NDA approach is the central focus of this work because of its simplicity and lack of invasiveness. The use of these techniques along with a previously developed inverse capability is expected to allow for the prediction of average flux levels and irradiation time, and the total fluence for samples where the values of selected isotopes can be measured.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assimilation of Wave Imaging Radar Observations for Real-time Wave-by-Wave Forecasting

This project addressed Topic 3: “Wave Measurement Instrumentation for Feed Forward Controls” under the FOA number DE-FOA-0000971. The overall goal of the program was to develop a phase-resolving wave forecasting technique for application to the active control of Wave Energy Conversion (WEC) devices. We have developed an approach that couples a wave imaging marine radar with a phase-resolving linear wave model for real-time wave field reconstruction and forward propagation of the wave field in space and time. The scope of the project was to develop and assess the performance of this novel forecasting system. Specific project goals were as follows: Develop and verify a fast, GPU-based (Graphical Processing Unit) wave propagation model suitable for phase-resolved computation of nearshore wave transformation over variable bathymetry; Compare the accuracy and speed of performance of the wave model against a deep water model in their ability to predict wave field transformation in the intermediate water depths (50 to 70 m) typical of planned WEC sites; Develop and implement a variational assimilation algorithm that can ingest wave imaging radar observations and estimate the time-varying wave conditions offshore of the domain of interest such that the observed wave field is best reconstructed throughout the domain and then use this to produce model forecasts for a given WEC location; Collect wave-resolving marine radar data, along with relevant in situ wave data, at a suitable wave energy test site, apply the algorithm to the field data, assess performance, and identify any necessary improvements; and Develop a production cost estimate that addresses the affordability of the wave forecasting technology and include in the Final Report. The developed forecasting algorithm (“Wavecast”) was evaluated for both speed and accuracy against a substantial synthetic dataset. Early in the project, performance tests definitively demonstrated that the system was capable of forecasting in real-time, as the GPU-based wave model backbone was very computationally efficient. The data assimilation algorithm was developed on a polar grid domain in order to match the sampling characteristics of the observation system (wave imaging marine radar). For verification purposes, a substantial set of synthetic wave data (i.e. forward runs of the wave model) were generated to be used as ground truth for comparison to the reconstructions and forecasts produced by Wavecast. For these synthetic cases, Wavecast demonstrated very good accuracy, for example, typical forecast correlation coefficients were between 0.84-0.95 when compared to the input data. Dependencies on shadowing, observational noise, and forecast horizon were also identified. During the second year of the project, a short field deployment was conducted in order to assess forecast accuracy under field conditions. For this, a radar was installed on a fishing vessel and observations were collected at the South Energy Test Site (SETS) off the coast of Newport, OR. At the SETS site, simultaneous in situ wave observations were also available owing to an ongoing field project funded separately. Unfortunately, the position and heading information that was available for the fishing vessel were not of sufficient accuracy in order to validate the forecast in a phase-resolving sense. Instead, a spectral comparison was made between the Wavecast forecast and the data from the in situ wave buoy. Although the wave and wind conditions during the field test were complex, the comparison showed a promising reconstruction of the wave spectral shape, where both peaks in the bimodal spectrum were represented. However, the total reconstructed spectral energy (across all directions and frequencies) was limited to 44% of the observed spectrum. Overall, wave-by-wave forecasting using a data assimilation approach based on wave imaging radar observations and a physics-based wave model shows promise for short-term phase-resolved predictions. Two recommendations for future work are as follows: first, we would recommend additional focused field campaigns for algorithm validation. The field campaign should be long enough to capture a range of wave conditions relevant to the target application and WEC site. In addition, it will be crucial to make sure the vessel of choice has high accuracy position and heading instrumentation (this instrumentation is commercially available but not standard on commercial fishing vessels). The second recommendation is to expand the model physics in the wave model backbone to include some nonlinear effects. Specifically, the third-order correction to the wave speed due to amplitude dispersion would be the next step in order to more accurately represent the phase speeds of large amplitude waves.

16 TIDAL AND WAVE POWER↗

Existing generating assets squeezed as new project starts slow

Most forecasting reports concentrate on political or regulatory events to predict future industry trends. Frequently overlooked are the more empirical performance trends of the principal power generation technologies. Solomon and Associates queried its many power plant performance databases and crunched some numbers to identify those trends. Areas of investigation included reliability, utilization (net output factor and net capacity factor) and cost (operating costs). An in-depth analysis for North America and Europe is presented in this article, by region and by regeneration technology. 4 figs., 2 tabs.

20 FOSSIL-FUELED POWER PLANTS↗

Understanding mercury transformations in coal-fired power plants: evaluation of homogeneous Hg oxidation mechanisms

Homogeneous mercury oxidation mechanisms described by Niksa and Qiu, and three theoretical mercury oxidation reaction rate constants developed by Wilcox were evaluated for their predictions of the extent of mercury oxidation under coal combustion conditions. Predictions were compared to results from bench-scale experiments to determine whether such models were suitable for predicting measured levels of homogeneous mercury oxidation. Experiments considered different flue gas compositions and quench rates to provide a broad range of conditions for analysis. Most mercury oxidation was predicted to occur at temperatures below 900 K. The Niksa mechanism predicted Hg oxidation to occur only in systems that were close to isothermal at temperatures above 900 K followed by a rapid gas quench. This mechanism provided the best agreement with the experimental data of Sliger. The Qiu mechanism predicted Hg oxidation in several experimental systems and conditions fairly accurately although it did not provide the best agreement in all cases. Qiu mechanism predictions for the experimental system at the University of Connecticut operating at an equivalence ratio of 0.9 in the presence of HCl/Cl{sub 2} and also SO{sub 2} were within the bounds of experimental uncertainty. The effects of flue gas composition and quench on Hg oxidation are qualitatively represented by the Qiu mechanism suggesting a relative robustness of the model, although there is still need to refine rate constants to achieve greater accuracy. The Wilcox rate constants when substituted in the Qiu mechanism predicted near-complete oxidation of Hg irrespective of HCl concentrations in systems that involve flue gas quench below temperatures of 450 K. 22 refs., 5 figs., 1 tab.

01 COAL, LIGNITE, AND PEAT↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Data-Driven Method for Adaptive Reserve Requirement Estimation via Probabilistic Net Load Forecasting

The University of Colorado Boulder Boulder, CO, 80309, USA With the increasing penetration of renewable energy, power systems are subject to more uncertainty. This makes power system reserve scheduling more challenging. Most of the current reserve requirement determination methods calculate reserve requirements based on historical data, which does not consider the real-time or future system uncertainty. In this paper, a data-driven method is developed to determine the non-spinning reserve requirement (NSRR) in the Electric Reliability Council of Texas (ERCOT) system. The method follows the procedure of the current ERCOT method while adaptively determining the NSRR based on probabilistic net load forecasts. Case studies with two years of ERCOT data show that the developed method significantly reduces the NSRR by introducing an adaptive temporal resolution and update rate. Sensitivity analysis with different forecasting and percentile thresholds indicates the flexibility of the developed method.

non-spinning reserve↗

Ultra-Short-Term Spatiotemporal Forecasting of Renewable Resources: An Attention Temporal Convolutional Network Based Approach

The rapid increase in the penetration of renewable energy resources characterized by high variability and uncertainty is bringing new challenges to the power system operation. To ensure the efficient and reliable operation of electric grid, an accurate and general short-term forecasting algorithm with interpretability is desired. Moreover, the extensive off-site information provided by the proliferation of new renewable plants stimulates the interests in the spatiotemporal forecasting. In this paper, an attention temporal convolutional network, which is built on stacked dilated causal convolutional networks and attention mechanisms, is proposed to perform the ultra-short-term spatiotemporal forecasting of renewable resources. Compared with the existing spatiotemporal forecasting methods, the presented model needs no domain knowledge and can be applied to different forecasting tasks such as solar generation and wind speed forecasting. Here, the attention mechanism improves the interpretability. The algorithm can be used to produce both point and probabilistic forecasts. Numerical results on the data sets from National Renewable Energy Laboratory show superior performance over five baselines, in terms of skill scores. Compared with the baselines, the average improvements of accuracy introduced by the proposed method for the point and probabilistic forecasting are 15.08% and 15.85%, respectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Forecasting Propagation and Evolution of CMEs in an Operational Setting: What Has Been Learned

One of the major types of solar eruption, coronal mass ejections (CMEs) not only impact space weather, but also can have significant societal consequences. CMEs cause intense geomagnetic storms and drive fast mode shocks that accelerate charged particles, potentially resulting in enhanced radiation levels both in ions and electrons. Human and technological assets in space can be endangered as a result. CMEs are also the major contributor to generating large amplitude Geomagnetically Induced Currents (GICs), which are a source of concern for power grid safety. Due to their space weather significance, forecasting the evolution and impacts of CMEs has become a much desired capability for space weather operations worldwide. Based on our operational experience at Space Weather Research Center at NASA Goddard Space Flight Center (http://swrc.gsfc.nasa.gov), we present here some of the insights gained about accurately predicting CME impacts, particularly in relation to space weather operations. These include: 1. The need to maximize information to get an accurate handle of three-dimensional (3-D) CME kinetic parameters and therefore improve CME forecast; 2. The potential use of CME simulation results for qualitative prediction of regions of space where solar energetic particles (SEPs) may be found; 3. The need to include all CMEs occurring within a ~24 h period for a better representation of the CME interactions; 4. Various other important parameters in forecasting CME evolution in interplanetary space, with special emphasis on the CME propagation direction. It is noted that a future direction for our CME forecasting is to employ the ensemble modeling approach.

forecasting↗

Mid-Atlantic Offshore Wind Interconnection and Transmission (MAOWIT)

This project has carried out a detailed analysis to evaluate the pros and cons of offshore transmission, a possible method to decrease balance-of-system costs and permitting time identified in the DOE Office Wind Strategic Plan (DOE, 2011). It also addresses questions regarding the adequacy of existing transmission infrastructure and the ability of existing generating resources to provide the necessary Ancillary Services (A/S) support (spinning and contingency reserves) in the ISO territory. This project has completed the tasks identified in the proposal: 1. Evaluation of the offshore wind resource off PJM, then examination of offshore wind penetrations consistent with U.S. Department of Energy’s (DOE) targets and with their assumed resource size (DOE, 2011). 2. Comparison of piecemeal radial connections to the Independent System Operator (ISO) with connections via a high-voltage direct current (HVDC) offshore network similar to a team partner. 3. High-resolution examination of power fluctuations at each node due to wind energy variability 4. Analysis of wind power production profiles over the Eastern offshore region of the regional ISO to assess the effectiveness of long-distance, North- South transmission for leveling offshore wind energy output 5. Analysis of how the third and fourth items affect the need for ISO grid upgrades, congestion management, and demand for Ancillary Services (A/S) 6. Analysis of actual historic 36-hr and 24-hr forecasts to solve the unit commitment problem and determine the optimal mix of generators given the need to respond to both wind variability and wind forecasting uncertainties.

17 WIND ENERGY↗