Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “observation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

SPDE: Solar Plasma Diagnostic Experiment

The physics of the Solar corona is studied through the use of high resolution soft x-ray spectroscopy and high resolution ultraviolet imagery. The investigation includes the development and application of a flight instrument, first flown in May, 1992 on NASA sounding rocket 36.048. A second flight, NASA founding rocket 36.123, took place on 25 April 1994. Both flights were successful in recording new observations relevant to the investigation. The effort in this contract covers completion of the modifications to the existing rocket payload, its reflight, and the preliminary day reduction and analysis. Experience gained from flight 36.048 led us to plan several payload design modifications. These were made to improve the sensitivity balance between the UV and EUV spectrographs, to improve the scattered light rejection in the spectrographs, to protect the visible light rejection filter for the Normal Incidence X-ray Imager instrument (NIXI), and to prepare one new multilayer mirror coating to the NIXI. We also investigated the addition of a brassboard CCD camera to the payload to test it as a possible replacement for the Eastman type 101-07 film used by the SPDE instruments. This camera was included in the experimeter's data package for the Project Initiation Conference for the flight of NASA Mission 36.123, held in January, 1994, but for programmatic reasons was deleted from the final payload configuration. The payload was shipped to the White Sands Missile Range on schedule in early April. The launch and successful recovery took place on 25 April, in coordination with the Yohkoh satellite and a supporting ground-based observing campaign.

Bruner, Marilyn E.↗

Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications scheduling.

Short, Nick, Jr.↗

Utilization of Ancillary Data Sets for Conceptual SMAP Mission Algorithm Development and Product Generation

The planned Soil Moisture Active Passive (SMAP) mission is one of the first Earth observation satellites being developed by NASA in response to the National Research Council's Decadal Survey, Earth Science and Applications from Space: National Imperatives for the Next Decade and Beyond [1]. Scheduled to launch late in 2014, the proposed SMAP mission would provide high resolution and frequent revisit global mapping of soil moisture and freeze/thaw state, utilizing enhanced Radio Frequency Interference (RFI) mitigation approaches to collect new measurements of the hydrological condition of the Earth's surface. The SMAP instrument design incorporates an L-band radar (3 km) and an L band radiometer (40 km) sharing a single 6-meter rotating mesh antenna to provide measurements of soil moisture and landscape freeze/thaw state [2]. These observations would (1) improve our understanding of linkages between the Earth's water, energy, and carbon cycles, (2) benefit many application areas including numerical weather and climate prediction, flood and drought monitoring, agricultural productivity, human health, and national security, (3) help to address priority questions on climate change, and (4) potentially provide continuity with brightness temperature and soil moisture measurements from ESA's SMOS (Soil Moisture Ocean Salinity) and NASA's Aquarius missions. In the planned SMAP mission prelaunch time frame, baseline algorithms are being developed for generating (1) soil moisture products both from radiometer measurements on a 36 km grid and from combined radar/radiometer measurements on a 9 km grid, and (2) freeze/thaw products from radar measurements on a 3 km grid. These retrieval algorithms need a variety of global ancillary data, both static and dynamic, to run the retrieval models, constrain the retrievals, and provide flags for indicating retrieval quality. The choice of which ancillary dataset to use for a particular SMAP product would be based on a number of factors, including its availability and ease of use, its inherent error and resulting impact on the overall soil moisture or freeze/thaw retrieval accuracy, and its compatibility with similar choices made by the SMOS mission. All decisions regarding SMAP ancillary data sources would be fully documented by the SMAP Project and made available to the user community.

freeze/thaw↗

Phase connection for geodesy - Results from a 245-km baseline

In an effort to greatly improve the measurement precision of VLBI observables used to determine geodetic baselines, the potential of utilizing fringe phase has been investigated. The 245-km baseline between Mojave and Owens Valley in CA has been most thoroughly studied for this purpose. In trying several different experimental designs, it appears that source scheduling is not the critical factor in determining when phase connection can be established. Normally, instrumental instabilities are also not limiting (although nominal functioning of the instrumentation is essential). The most serious factor in limiting opportunities for phase connection seems to be atmospheric variability. However, when the observation SNR is made large (greater than 50) to give very precise group delays (and hence enhance the chance of resolving phase ambiguities), the improvement in baseline uncertainty obtained using phase delays is only marginal compared with the corresponding group delay solution. For this case, the baseline error budget is dominated by stochastic variations in clock and atmospheric delay contributions rather than by observation noise.

Ray, J. R.↗

Development of the Mars Observer Laser Altimeter (MOLA)

The Mars Observer (MO) spacecraft payload scientific mission is to gather data on Martian global topography, gravity, weather, magnetic field and its interaction with the solar flux, surface chemistry, and mineralogy over one Mars year. In mid-1988 the need for a replacement altimeter as part of the payload complement arose. The Mars Observer Laser Altimeter (MOLA) was proposed by GSFC as an in-house effort and shortly afterward was 'conditionally' accepted. Constraints on funding, schedule, power, and mass were imposed with periodic reviews during the instrument development to authorize continuation. MOLA was designed, tested, and delivered in less than 36 months and integrated with the spacecraft. During spacecraft payload testing, the laser failed due to contamination in the laser cavity. In only 6 months, the laser was removed, rebuilt from spare parts, retested, and the instrument reassembled, realigned, requalified, and again delivered for spacecraft integration. Other aspects of the development of the MOLA are presented.

Johnson, Bertrand L., Jr↗

Potential applications of GSC-2 for GAIA operations

The second guide star catalog (GSC-2) is a project that aims to create a complete catalog of stars and galaxies to about the 18th magnitude, and would contain colors, magnitudes, positions and proper motions. The catalog would provide an object list for the construction of an input catalog for possible future astrometric satellites, such as the global astrometric interferometer for astrophysics (GAIA) satellite. With a schedule that is compatible with the projected timeframe of GAIA, the GSC-2 could be available in time to support the preparatory astrophysical observations for an input catalog. The availability of the digitalized images for the preparation of finding charts would improve the efficiency of this task.

Lasker, Barry M.↗

Time Varying Compensator Design for Reconfigurable Structures Using Non-Collocated Feedback

Analysis and synthesis tools are developed to improved the dynamic performance of reconfigurable nonminimum phase, nonstrictly positive real-time variant systems. A novel Spline Varying Optimal (SVO) controller is developed for the kinematic nonlinear system. There are several advantages to using the SVO controller, in which the spline function approximates the system model, observer, and controller gain. They are: The spline function approximation is simply connected, thus the SVO controller is more continuous than traditional gain scheduled controllers when implemented on a time varying plant; ft is easier for real-time implementations in storage and computational effort; where system identification is required, the spline function requires fewer experiments, namely four experiments; and initial startup estimator transients are eliminated. The SVO compensator was evaluated on a high fidelity simulation of the Shuttle Remote Manipulator System. The SVO controller demonstrated significant improvement over the present arm performance: (1) Damping level was improved by a factor of 3; and (2) Peak joint torque was reduced by a factor of 2 following Shuttle thruster firings.

Scott, Michael A.↗

Update of the Development of a Low Cost Data Acquisition System for the Space Shuttle Solid Rocket Booster Program

The space shuttle solid rocket boosters (SRBs) experience a severe environment during their brief flight. During the last few years several SRB's have sustained noticeable structural damage. The environmental characteristics (vibration, structure, and thermal) encountered by the SRB's during ascent, descent and water impact are in most cases unknown. A developmental flight instrumentation (DFI) system collected data from the SRBs' first four flights in the early 1980's, and after the first three flights during the shuttle return-to-flight phase after the Challenger accident. However, the DFI data collected are of low fidelity and do not correlate well with cases of observed structural damage. The DFI system was evaluated for reuse, but the cost to fly it was prohibitive. The space shuttle is presently scheduled to fly until 2030. To support the shuttle flight schedule, avionics on the SRB's will be upgraded. The environments on the different sections of the SRB will need to be defined more completely to properly qualify the avionics for multiple flights. The DFI data previously gathered do not provide enough information to properly qualify the avionics. Marshall Space Flight Center's (MSFC) SRB Project Office requested the Science and Engineering (S&E) Directorate to develop a stand-alone data acquisition system that could collect data from any area of the booster. In answer to this requirement, S&E developed the Enhanced Data Acquisition System (EDAS). To minimize development time and cost, the development team used state-of-the-art commercial off the shelf (COTS) equipment. The first two flights of this system occurred on shuttle mission STS-91 in June 1998 and STS-95 in October 1998. Twenty-one measurements were successfully recorded on the STS-91 right hand booster, providing new accelerometer, strain, temperature, and heating rate data to analysts. Twenty-four measurements were successfully recorded on the STS-95 left hand booster, providing data from the booster and the external tank. This paper summarizes the effort to develop, test, qualify and fly the EDAS to meet SRB flight and data collection requirements.

Crawford, Kevin↗

Using a Commerical off the Shelf Data Acquisition System for the Space Shuttle Solid Rocket Booster Program

The space shuttle solid rocket boosters (SRBs) experience a severe environment during their brief flight. During the last few years several SRB's have sustained noticeable structural damage. The environmental characteristics (vibration, structure, and thermal) encountered by the SRB's during ascent, descent and water impact are in most cases unknown. A developmental flight instrumentation (DFI) system collected data from the SRBs' first four flights in the early 1980's, and after the first three flights during the shuttle return-to-flight phase after the Challenger accident. However, the DFI data collected are of low fidelity and do not correlate well with cases of observed structural damage. The DFI system was evaluated for reuse, but the cost to fly it was prohibitive. The space shuttle is presently scheduled to fly until 2030. To support the shuttle flight schedule, avionics on the SRB's will be upgraded. The environments on the different sections of the SRB will need to be defined more completely to properly qualify the avionics for multiple flights. The DFI data previously gathered do not provide enough information to properly qualify the avionics. Marshall Space Flight Center's (MSFC) SRB Project Office requested the Science and Engineering (S&E) Directorate to develop a stand-alone data acquisition system that could collect data from any area of the booster. In answer to this requirement, S&E developed the Enhanced Data Acquisition System (EDAS). To minimize development time and cost, the development team used state-of-the-art commercial off the shelf (COTS) equipment. The first two flights of this system occurred on shuttle mission STS-91 in June 1998 and STS-95 in October 1998. Twenty-one measurements were successfully recorded on the STS-91 right hand booster, providing new accelerometer, strain, temperature, and heating rate data to analysts. Twenty-four measurements were successfully recorded on the STS-95 left hand booster, providing data from the booster and the external tank. This paper summarizes the effort to develop, test, qualify and fly the EDAS to meet SRB flight and data collection requirements.

Crawford, Kevin↗

Human Centered Design and Development for NASA's MerBoard

This viewgraph presentation provides an overview of the design and development process for NASA's MerBoard. These devices are large interactive display screens which can be shown on the user's computer, which will allow scientists in many locations to interpret and evaluate mission data in real-time. These tools are scheduled to be used during the 2003 Mars Exploration Rover (MER) expeditions. Topics covered include: mission overview, Mer Human Centered Computers, FIDO 2001 observations and MerBoard prototypes.

Trimble, Jay↗

An Overview of SIMBIOS Program Activities and Accomplishments

The SIMBIOS Program was conceived in 1994 as a result of a NASA management review of the agency's strategy for monitoring the bio-optical properties of the global ocean through space-based ocean color remote sensing. At that time, the NASA ocean color flight manifest included two data buy missions, the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) and Earth Observing System (EOS) Color, and three sensors, two Moderate Resolution Imaging Spectroradiometers (MODIS) and the Multi-angle Imaging Spectro-Radiometer (MISR), scheduled for flight on the EOS-Terra and EOS-Aqua satellites. The review led to a decision that the international assemblage of ocean color satellite systems provided ample redundancy to assure continuous global coverage, with no need for the EOS Color mission. At the same time, it was noted that non-trivial technical difficulties attended the challenge (and opportunity) of combining ocean color data from this array of independent satellite systems to form consistent and accurate global bio-optical time series products. Thus, it was announced at the October 1994 EOS Interdisciplinary Working Group meeting that some of the resources budgeted for EOS Color should be redirected into an intercalibration and validation program (McClain et al., 2002).

Fargion, Giulietta S.↗

The Swift Mission and the REM Telescope

Following a description of the science drive which originated the Swift Mission, this is US NASA MIDEX Mission with the collaboration of Italy and the UK, we will describe the status of the hardware and the observing strategy. The telemetry is carried out via the TDRSS satellite for those communications that need immediate response. The data transfer and the scheduled uploading of routine commands will be done through the ASI Malindi station in Kenia. Both in the US and in Europe a large effort will be done to follow the bursts with the maximum of efficiency and as soon as possible after the alert. We will describe how the ESO VLT telescopes are able to respond to the alert. To address the problematic of the dark bursts and to immediately follow up all of the bursts also in the Near Infrared we designed and built a 60 cm NIR Robotic telescope, REM, to be located on the ESO ground at Cerro La Silla. The instrumentation includes also a low dispersion spectrograph with the capability of multi wavelength optical photometry.

Gehrels, N.↗

Use of Acoustic Emission to Monitor Progressive Damage Accumulation in Kevlar (R) 49 Composites

Acoustic emission (AE) data acquired during intermittent load hold tensile testing of epoxy impregnated Kevlar(Registeres TradeMark) 49 (K/Ep) composite strands were analyzed to monitor progressive damage during the approach to tensile failure. Insight into the progressive damage of K/Ep strands was gained by monitoring AE event rate and energy. Source location based on energy attenuation and arrival time data was used to discern between significant AE attributable to microstructural damage and spurious AE attributable to noise. One of the significant findings was the observation of increasing violation of the Kaiser effect (Felicity ratio < 1.0) with damage accumulation. The efficacy of three different intermittent load hold stress schedules that allowed the Felicity ratio to be determined analytically is discussed.

Waller, Jess M.↗

Low-Thrust Orbit Transfer Design for DAWN Operations at VESTA

Upon arrival at the asteroid Vesta, scheduled for July of 2011, the Dawn spacecraft will target a series of four distinct mapping orbits, each providing a unique opportunity to observe Vesta. The unknown, and potentially complex, Vesta gravity field presents challenges for designing low-thrust transfers between these mapping orbits while maintaining spacecraft safety from Vesta occultation of the Sun. This paper provides a description of the orbit transfers designed for Vesta operations along with a discussion of the constraints and methods used to design these transfers. The effect of alternate gravity fields on the viability of the designs and the design method is also considered

low thrust↗

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗

Postlaunch Assessment of the Response Versus Scan Angle for the Thermal Emissive Bands of Visible Infrared Imaging Radiometer Suite On-Board the Suomi National Polar-Orbiting Partnership Satellite

The visible infrared imaging radiometer suite (VIIRS) is a key sensor carried on the Suomi national polar-orbiting partnership (S-NPP) satellite, which was launched in October 2011. It has several on-board calibration components, including a solar diffuser and a solar diffuser stability monitor for the reflective solar bands, a V-groove blackbody for the thermal emissive bands (TEB), and a space view port for background subtraction. These on-board calibrators are located at fixed scan angles. The VIIRS response versus scan angle (RVS) was characterized prelaunch in lab ambient conditions and is currently used to characterize the on-orbit response for all scan angles relative to the calibrator scan angle. Since the RVS is vitally important to the quality of calibrated radiance products, several independent studies were performed to analyze the prelaunch RVS measurement data. A spacecraft level pitch maneuver was scheduled during the first 3 months of intensive Cal/Val. The S-NPP pitch maneuver provided a rare opportunity for VIIRS to make observations of deep space over the entire range of Earth view scan angles, which can be used to characterize the TEB RVS. This study provides our analysis of the pitch maneuver data and assessment of the derived TEB RVS by comparison with prelaunch results. In addition, the stability of the RVS after the first 5 years of operation is examined using observed brightness temperatures (BT) over a clear ocean at various angles of incidence (AOI). To reduce the impact of variations in the BT measurements, the daily overpasses collected over the ocean are screened for cloud contamination, normalized to the results obtained at the blackbody AOI, and averaged each year.

Wu, Aisheng↗

Using Automated Scheduling for Mission Design: A Case Study for EMIT

The Earth Surface Mineral Dust Source InvesTigation (EMIT) is an Earth Ventures-Instrument (EVI-4) mission to map the surface mineralogy of arid dust source regions. EMIT used automated scheduling technology to analyze aspects of the mission design. The automated scheduling technology was used to construct schedules which were then automatically analyzed with respect to science acquired. These analyses can be performed for a range of spacecraft hardware configurations, observation strategies, and science requirements. By studying the effects of changes on the above inputs, better hardware configurations, observation strategies, and science requirements can be formulated. The use of a pointing mirror on EMIT was under consideration, and this analysis aided in determining whether or not to keep it as part of the design of the instrument. Clouds will also have a large impact on the coverage of science targets achievable by the mission. Analysis was done on how clouds could impact the coverage achievable as well as the data volume. This analysis with clouds also aided in determining the coverage criteria for the mission. It was necessary to find a criteria that was achievable with some margin as well as satisfies the science goals of the mission.

Thompson, David R.↗

Show Me the Money! Evaluating A Graduated Incentive Structure to Keep Respondents Engaged Through 101 Surveys in 28 Days

We report the results of a survey test conducted in advance of a series of community response tests (CRTs) to evaluate response to noise from NASA’s X-59 aircraft. The CRTs will require a substantial number of observations to generate a dose response curve for noise exposure and related annoyance levels and the timeframe is limited due to resource and scheduling constraints with an experimental aircraft. Within each CRT area, we will recruit a sample of residents in advance and ask them to fill out a brief survey each time the aircraft passes over. Respondents will be asked to fill out the survey either on the web or as part of an application they are able to download onto their mobile phones. Respondents will be notified each time the plane flies over, asking for their reactions. On many days, respondents will be asked to fill out the survey for multiple flights. Typical incentives are used during the recruitment phase (pre-incentive for a household screener and post-paid for a background survey completed by the selected respondent) and post-paid for an end of study survey. To improve response rates over such a demanding survey schedule (101 surveys in 28 days) we will implement a weekly incentive based upon participation rates, with higher incentives for greater participation and increasing rates each week. The survey test will follow the proposed methodology of the CRTs. We will report on the participation rates by incentive amount and the effectiveness of the incentive structure in obtaining and maintaining response rates over the 4 weeks. We will examine how quickly participation fades over the 4-week period and consider whether the incentive schedule could be improved by altering the distribution of payments. Finally, we will compare how these rates varied across web and app respondents. We will use the results of this work to confirm or improve the design of the CRTs, ensuring the collection of data needed by NASA to evaluate the impact of this innovative technology.

incentives↗