Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

A case study on parallel HDF5 dataset concatenation for high energy physics data analysis

In High Energy Physics (HEP), experimentalists generate large volumes of data that, when analyzed, helps us better understand the fundamental particles and their interactions. This data is often captured in many files of small size, creating a data management challenge for scientists. In order to better facilitate data management, transfer, and analysis on large scale platforms, it is advantageous to aggregate data further into a smaller number of larger files. However, this translation process can consume significant time and resources, and if performed incorrectly the resulting aggregated files can be inefficient for highly parallel access during analysis on large scale platforms. In this paper, we present our case study on parallel I/O strategies and HDF5 features for reducing data aggregation time, making effective use of compression, and ensuring efficient access to the resulting data during analysis at scale. We focus on NOvA detector data in this case study, a large-scale HEP experiment generating many terabytes of data. Here, the lessons learned from our case study inform the handling of similar datasets, thus expanding community knowledge related to this common data management task.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The role of large scale demonstration experiments in supporting the implementation of a high level waste programme

Large scale demonstration experiments in underground research laboratories (both onsite and off-site) are currently undertaken by most high level radioactive waste management organisations. The decision to plan and implement prototype experiments, which might have a life of several decades, has both important strategic and budgetary consequences for the organisation. Careful definition of experimental objectives based on the design and safety requirements is critical. The implementation requires the involvement of many parties and needs flexible but consequent management as, for example, additional goals for the experiments, identified in the course of the implementation, might jeopardise initial primary goals. The outcomes of an international workshop in which European and Japanese implementers (SKB, Posiva, Andra, ONDRAF, NUMO and Nagra) but also certain research organisations (JAEA, RWMC) participated identified which experiments are likely to be needed depending on the progress in implementing a disposal programme. Already earlier in a programme, large scale demonstrations are generally performed aiming at reducing uncertainties identified during the safety case development such as thermo-hydraulic-mechanical process validation in the engineered barrier system and target host rock. Also feasibility testing of underground construction in a potential host rock at relevant depth might be required. Later in a programme, i.e., closer to the license application, large scale experiments aim largely at demonstrating engineering feasibility and performance confirmation of complete repository components. Ultimately, before licensing repository operation, 1:1 scale commissioning testing will be required. Factors contributing to the successful completion of large scale demonstration experiments in terms of planning, defining the objectives, optimising results and main lessons learned over the last 30 years are being discussed. The need for international coordination in defining the objectives of new large scale demonstration experiments is addressed. The paper is expected to provide guidance to implementing organisations (especially those in their early stages of the programme), considering participating in and/or or conducting on their own large scale experiments in the near future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final report of a scalable, automated, semipermanent seismic array (SASSA) method for detecting CO 2 extent during geologic CO 2 injection

The scalable, automated, semipermanent seismic array (SASSA) project led and managed by the Energy & Environmental Research Center (EERC) was designed as a 3-year proof-of-concept study to evaluate and demonstrate an innovative application of the seismic method. The concept was to use a sparse surface array of 96 nodal seismic sensors paired with a single, remotely operated active seismic source at a fixed location to monitor for CO 2 saturation changes in a subsurface reservoir by processing the data for time-lapse changes at individual, strategically chosen reservoir reflection points. The combination of autonomous equipment and modern processing algorithms was used to apply the seismic method in a manner different from the normal paradigm of collecting a spatially dense data set to produce an image. It was used instead to monitor individual, strategically chosen reservoir reflection points for detectable signal character changes that could be attributed to the passing of a CO 2 saturation front or, possibly, changes in reservoir pressure. Data collection occurred over the course of 1 year at an oil field undergoing CO 2 injection for enhanced oil recovery (EOR) and focused on four overlapping “five-spot” EOR injector–producer patterns. Selection, procurement, configuration, installation, and testing of project equipment and collection of five baseline data sets were completed in advance of CO 2 injection within the study area. Weekly remote data collection produced 41 incremental time-lapse records for each of the 96 nodes. Validation was provided by two methods: 1) a conventional 2-D seismic line acquired through the center of the study area before injection started and again after the project ended and processed in a time-lapse manner and 2) by CO 2 saturation maps created from reservoir simulations based on injection and production history matching. Interpreted results were encouraging but mixed, with indications of changes likely due to the presence of CO 2 on some node reflection points where and when effects would be expected and noneffects where no CO 2 was expected, while results at some locations where simulation outputs suggested CO 2 should be present were ambiguous. Acquisition noise impacted interpretation of data at several locations. Many lessons learned were generated by the study to inform and improve results on a follow-up study. The ultimate aim of the project was to evaluate whether deployment of a SASSA technology can provide a useful and cost-effective monitoring solution for future CO 2 injection projects. The answer appears to be affirmative, with the expectation that lessons learned applied to future iterations, together with technology advances, will likely result in significant improvements.

58 GEOSCIENCES↗

Conceptual Evaluation for the Installation of Treatment Capability for Mixed Low Level Waste at the Nevada National Security Site

National Security Technologies, LLC, initiated an evaluation of treatment technologies that they would manage and operate as part of the mixed low-level waste (MLLW) disposal facilities at the Nevada National Security Site (NNSS). The NNSS Disposal Facility has been receiving radioactive waste from the U.S. Department of Energy (DOE) complex since the 1960s, and since 2005 the NNSS Disposal Facility has been receiving radioactive and MLLW for disposal only. In accordance with the Resource Conservation and Recovery Act (RCRA), all mixed waste must meet land disposal restrictions (LDRs) prior to disposal. Compliance with LDRs is attained through treatment of the waste to mitigate the characteristics of the listed waste hazard. Presently, most generators utilize commercial capacity for waste treatment prior to shipment to the NNSS Disposal Facility. The objectives of this evaluation are to provide a conceptual study of waste treatment needs (i.e., demand), identify potential waste treatment technologies to meet demand, and analyze implementation considerations for initiating MLLW treatment capacity at the NNSS Disposal Facility. A review of DOE complex waste generation forecast data indicates that current and future Departmental demand for mixed waste treatment capacity will remain steady and strong. Analysis and screening of over 30 treatment technologies narrowed the field of treatment technologies to four: • Macroencapsulation • Stabilization/microencapsulation • Sort and segregation • Bench-scale mercury amalgamation The analysis of treatment technologies also considered existing permits, current the NNSS Disposal Facility infrastructure such as utilities and procedures, and past experiences such as green-light and red-light lessons learned. A schedule duration estimate has been developed for permitting, design, and construction of onsite treatment capability at the NNSS Disposal Facility. Treatment capability can be ready in 20 months.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coolant Channel Design for Additively Manufactured Reactor Cores

Additive manufacturing (AM) methods are currently being explored for applications in nuclear reactors to make advanced reactors more efficient, safe, and reliable. The Transformational Challenge Reactor (TCR) program has explored AM for nuclear by designing a high-temperature gas reactor (HTGR) using an AM silicon carbide fuel form with uranium nitride–tristructural isotropic fuel. In this study, we detail the design process for the TCR fuel form’s coolant channels using computational fluid dynamics models with conjugate heat transfer. Additionally, this work discusses how these models were interfaced with other design teams, project milestones, and the agile design method used to mature the reactor design. The methodology deployed was able to create a channel design with lower maximum fuel temperatures and thermal stresses in the fuel form over traditional channel designs that can be manufactured subtractively. These results were achieved with only small manufacturing penalties. Results are discussed and presented on lessons learned for designing AM components for nuclear reactors. Finally, areas of opportunity are discussed for advanced design tools to further automate design activities and optimize reactors with fewer built-in assumptions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Manufacturing and Hydro Testing of a 10 MWe sCO2 Axial Turbine

Abstract Supercritical CO2 (sCO2) power cycles designed for thermodynamic efficiencies above 50% push component designs into pressure and temperature combinations that approach the limits of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Piping Design Codes with Turbine inlet conditions near 250 bar and 715 °C. These design conditions which limit available materials to high nickel alloys are compounded by the high fluid densities of sCO2 at these conditions which result in very compact machinery at the 10 MWe class which are currently being developed for the DOE supercritical transformational electric power (STEP) program. Design of the STEP Turbine is complete with integrated lessons learned from a previous 1 MWth subscale demonstration of a high temperature 10 MWe Turbine designed under the DOE SunShot Program. Fabrication of the STEP Turbine is nearing completion with all housings and pressure containing components in hand. This paper provides a detailed look at design intentions and limitations for the pressurized sections of the main pressure casing and the fabrication of key turbine components. Additional discussion is provided regarding postfabrication inspection and acceptance of the casing for use after issues with casing welds were identified late in the fabrication process.

Engineering↗

Graphite Waste Tank Cleanup and Decontamination under the Marcoule UP1 D and D Program - 13166

The UP1 plant in Marcoule reprocessed nearly 20,000 tons of used natural uranium gas cooled reactor fuel coming from the first generation of civil nuclear reactors in France. During more than 40 years, the decladding operations produced thousands of tons of processed waste, mainly magnesium and graphite fragments. In the absence of a French repository for the graphite waste, the graphite sludge content of the storage pits had to be retrieved and transferred into a newer and safer pit. After an extensive R and D program, the equipment and process necessary for retrieval operations were designed, built and tested. The innovative process is mainly based on the use of two pumps (one to capture and the other one to transfer the sludge) working one after the other and a robotic arm mounted on a telescopic mast. A dedicated process was also set up for the removal of the biggest fragments. The retrieval of the most irradiating fragments was a challenge. Today, the first pit is totally empty and its stainless steel walls have been decontaminated using gels. In the second pit, the sludge retrieval and transfer operations have been almost completed. Most of the non-pumpable graphite fragments has been removed and transferred to a new storage pit. After more than 6 years of operations in sludge retrieval, a lot of experience was acquired from which important 'lessons learned' could be shared. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Demolition Strategy and Progress at Hanford's Plutonium Finishing Plant - 17161

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently demolishing the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. In November 2016, the project team, partnering with DOE-Richland Operations Office (DOE-RL) began demolition of the building. CH2M and DOE-RL will demolish PFP as a Hazardous Category II nuclear facility (HazCat II). The PFP is considered one of the most hazardous buildings on the Hanford site; employees have performed some of the most hazardous work anywhere across the DOE Environmental Management complex. Since 2008, employees have removed much of the plutonium-processing infrastructure. Four main buildings make up the majority of the PFP complex. As of November 2016, one building is undergoing demolition, another is ready for demolition and, concurrently, demolition preparations continue in the remaining two buildings. That hazard mitigation work includes removing contaminated ventilation duct work, process lines and performing asbestos abatement. To ensure safe and compliant demolition, CH2M employees researched, trained and deployed personal protective equipment never before used on the Hanford Site to complete some of the most hazardous demolition preparations. Project management commissioned the development of an air dispersion model that dictated ready-for-demolition criteria and established conservative demolition parameters. Management also sequenced project work to allow demolition to occur while demolition preparations continue a safe distance away in adjacent buildings. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

CalWave's xWave Design for PacWave (Final Technical Report)

CalWave Inc. (CalWave) is developing a wave energy converter (WEC) technology that can generate electricity from ocean waves. CalWave’s design offers a unique approach to wave energy conversion that operates fully submerged and can actively adjust the wave excitation. This capability gives the architecture enhanced survivability in ocean storms without adding significant costs. Prior to this project, CalWave had completed a demonstration of a fully functional WEC system in an open ocean demonstration at nominal 1:5 scale under FOA 1663. The goal of this project was the detailed design, following relevant standards and industry best-practices, of a variant of the xWave WEC technology that can safely and efficiently operate at the DOE’s PacWave South test site for a targeted deployment of up two years. The WEC design and associated review processes proceeded in two distinct project phases: a ‘Preliminary’ and a ‘Final’ design phase. The first phase of the project consisted of the systematic design of the WEC’s key features with regards to appropriate IEC standards. The work resulted in a preliminary design of the xWave hull including structural and Power Take-Off (PTO) load estimates, as well as performance estimates for all ocean conditions the WEC would operate in at PacWave South. Following the first open-water demonstration of CalWave’s small-scale “x1” device under FOA 1663, lessons learned were fed directly into a comprehensive review of the xWave design in the second design phase of this FOA project. CalWave’s work was supported by Sandia National Lab (SNL) and the National Renewable Energy Lab (NREL) on the holistic WEC design, and detailed feedback from specialized partners on hull design, mooring and anchoring specification, and electrical grid interconnection. Optimization of the WEC system was performed using a novel numerical optimization tool developed by Sandia and optimization trends were confirmed via an experimental model scale tank test campaign. Performance estimates for PacWave and a detailed xWave design including integration of all relevant system components were concluded. The mooring design was also concluded in the Final design phase using the most up to date sea floor characterization (CPT) data.

16 TIDAL AND WAVE POWER↗

Experiences Detecting Defective Hardware in Exascale Supercomputers

In May 2022, the newest supercomputer to top the TOP 500 list was Frontier at Oak Ridge National Laboratory, demonstrating the capability of computing more than 1.1 quintillion (1018) floating-point calculations every second. Driving this ground-breaking rate of computing is Frontier’s more than 37,000 graphics processing units (GPUs) and 9,408 central processing units (CPUs). In total, Frontier contains more than 60 million parts. At this scale, the smallest margin of error may generate hundreds of hardware errors across the system. These errors are capable of directly hindering world-class science performed on Frontier if not found. In this work, we describe and evaluate two strategies for finding hardware-level faults in Frontier’s 9,408 compute nodes. There are two strategies developed: the first uses the Slurm scheduler to scavenge available compute time to run the node screen, the second builds upon the lessons learned in the first strategy and enforces a weekly screen of each node. Using June 2023 as a case study, we find that the first scheduling strategy consumed more than ten times the resources as the second scheduling strategy, but successfully detected five hardware defects in Frontier. We summarize the lessons learned while developing and running a node screen on the world’s first exascale supercomputer.

Hagerty, Nick↗

Retrofit California: Better Buildings Program Overview

Energy efficiency retrofits (also called upgrades) are widely recognized as a critical component to achieving energy savings in the building sector to help lower greenhouse gas (GHG) emissions. To date, however, upgrades have accounted for only a small percentage of aggregate energy savings in building stock, both in California and nationally. Although the measures and technologies to retrofit a building to become energy efficient are readily deployed, establishing this model as a standard practice remains elusive. Retrofit California sought to develop and test new program models to increase participation in the energy upgrade market in California. The Program encompassed 24 pilot projects, conducted between 2010 and mid-2013 and funded through a $30 million American Recovery and Reinvestment Act (ARRA) grant from the U.S. Department of Energy’s (DOE) Better Buildings Neighborhood Program (BBNP). The broad scope of the Program can be seen in the involvement of the following regionally based Grant Partners: Los Angeles County (as prime grantee); Association of Bay Area Governments (ABAG), consisting of: StopWaste.org for Alameda County, Regional Climate Protection Authority (RCPA) for Sonoma County, SF Environment for the City and County of San Francisco, and City of San Jose; California Center for Sustainable Energy (CCSE) for the San Diego region; Sacramento Municipal Utilities District (SMUD). Within these jurisdictions, nine different types of pilots were tested with the common goal of identifying, informing, and educating the people most likely to undertake energy upgrades (both homeowners and contractors), and to provide them with incentives and resources to facilitate the process. Despite its limited duration, Retrofit California undoubtedly succeeded in increasing awareness and education among home and property owners, as well as contractors, realtors, and community leaders. However, program results indicate that a longer timeframe will be needed to transform the market and establish energy retrofits as the new paradigm. Innovations such as Flex Path, which came about because of barriers encountered during the Program, have already shown promise and are enabling increased participation. Together, the pilots represent an unprecedented effort to identify and address market barriers to energy efficiency upgrades and to provide lessons learned to shape future program planning and implementation. The statistics reflects the scope of the marketing and outreach campaigns, which tested a variety of approaches to increase understanding of the benefits of energy upgrades to drive participation in the Program. More traditional methods such as TV and radio advertisements were complimented by innovative community based social marketing campaigns that sought to leverage the trusted status of neighborhood organizations and leaders in order to motivate their constituents to undertake retrofits. The remainder of this report provides an overview of Retrofit California including brief summaries of the pilots’ main components and highlights, followed by the major findings or takeaway lessons from the approaches that were tested. Eleven of the pilots will be continued, with modifications, under the ratepayer-funded Regional Energy Networks. Involvement in the RENS by many of the Retrofit California partners will ensure that early lessons learned are carried forward to guide future programs for energy upgrades in California.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Secure VM for Monitoring Industrial Process Controllers

In this paper, we examine the biological immune system as an autonomic system for self-protection, which has evolved over millions of years probably through extensive redesigning, testing, tuning and optimization process. The powerful information processing capabilities of the immune system, such as feature extraction, pattern recognition, learning, memory, and its distributive nature provide rich metaphors for its artificial counterpart. Our study focuses on building an autonomic defense system, using some immunological metaphors for information gathering, analyzing, decision making and launching threat and attack responses. In order to detection Stuxnet like malware, we propose to include a secure VM (or dedicated host) to the SCADA Network to monitor behavior and all software updates. This on-going research effort is not to mimic the nature but to explore and learn valuable lessons useful for self-adaptive cyber defense systems.

99 GENERAL AND MISCELLANEOUS↗

Lessons Learned from the Development of the DGR Konrad - 19619

The Federal Republic Germany builds the deep geological repository Konrad. The repository is suitable for low- and intermediate-level radioactive waste (LAW and MAW) and it is the first German repository site, which is not located in a salt geological formation. Konrad is a former iron ore mine in Salzgitter (in southeast Lower Saxony) with an active production time between 1961 and 1976. In 2007, the BGE started with the conversion of the mine infrastructure above and underground to build the repository while using the shafts and some roadways of the former mine. The experiences gained from ten years project progress with its complexities and difficulties can be used for similar repository projects in the future. The Konrad repository is designed for 303,000 m{sup 3} of LAW and MAW, which will be emplaced in chambers. The emplacement chambers are located outside of the existing mine, so an impairment by the old mine workings can be excluded. So far, the first area with emplacement chambers has been excavated. In order to be able to start repository operations in 2027, a wide range of work in building construction, civil engineering, shaft sinking and infrastructure development above and below ground has been necessary and will be completed in the next years. The main activities are focused on the Konrad 1 and 2 sites and the part of the infrastructure located in the future control area, which is used for repository operations. There are still many challenges to overcome in the Konrad repository project, although many processes have been put on the right track in recent years. Looking back on past activities and in the cautious preview, this paper gives some indications from which lessons can be drawn and should be applied to similar projects in the future. - Prefer small dimensions for the infrastructure, such as insets and roadway cross-section, and the appropriate machinery and handling equipment; - Detailed process planning for construction in existing infrastructure in the run-up to implementation; - Intensive communication with contracted partners on the preparation of planning documents for nuclear examination procedures and ensuring an excellent contract management; - Early start of the implementation planning for projects under nuclear law, taking into account the relevant boundary conditions; - Ensuring the support of the project by the local community and other stakeholders. Overall, the use of parts of the existing above and underground infrastructure for the construction of a new repository is more difficult than for a complete new construction. But using the shafts of an existing mine delivers the advantage of very good knowledge about the underground environment. In addition, the areas necessary for the construction and operation of the buildings and facilities are already available and secured and do not compete with other projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concentrating Solar Power Best Practices Study

The primary objective of this Concentrating Solar Power Best Practices Study is to publish best practices and lessons learned from the engineering, construction, commissioning, operations, and maintenance of existing concentrating solar power (CSP) parabolic trough and power tower systems. To accomplish this objective, information was solicited from many owners, operators, and engineering, procurement, and construction (EPC) contractors, independent engineers, and other stakeholders of parabolic trough and central receiver plants (also commonly referred to as power towers). Information was gathered through in-person or online meetings, site visits, and questionnaires sent to participants. The project team held about 50 information-gathering sessions with participants over the course this effort; and in the process, it collected information from participants representing nearly 80% of CSP plants operating worldwide.

14 SOLAR ENERGY↗

Lessons Learned from Site Selection Efforts for Deep Geological Disposal

This report discusses international experiences from site selection of deep geological repositories (DGR) for radioactive waste disposal. Based on experiences from three countries with recent or ongoing site selections, the report describes different site selection approaches and summarizes lessons learned. The German and Swiss programs are two slightly different examples of one end of the spectrum of potential siting approaches: Starting with the entire country, a technically based downselection is performed to select the repository site. The Canadian program is an example of the other end of the spectrum: Here, the program started with an extensive engagement program with Canadians to collaboratively develop a socially acceptable and technically sound national approach for the long-term management of used nuclear fuel. This was followed by the launch of a collaboratively developed consent-based siting process designed to seek an informed and willing host with suitable sites, considering both technical and community well-being site requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and data path integration test of the global Feature EXtractor for the ATLAS Level-1 calorimeter trigger system Phase-I upgrade

The global Feature Extractor (gFEX) is a component of the Phase-I upgrade of the Level-1 Calorimeter (L1Calo) trigger system for the ATLAS experiment at the Large Hadron Collider (LHC) at CERN. The gFEX is used to identify patterns of energy associated with the hadronic decays of high momentum Higgs, W and Z bosons, top quarks, and exotic particles in real time at the 40 MHz LHC bunch crossing rate. Three prototypes were implemented and tested from 2014 to 2017. With the lessons learned from the prototypes, the final gFEX production board has been implemented at the end of 2017. The gFEX receives up to 300 fiber optical links from the calorimeter and transmits trigger data on 96 links to the ATLAS Level-1 Topological [1] (L1Topo) trigger at a rate of up to 12.8 Gb/s. There are also 24 electrical links on board for communication between two FPGAs running at speeds of up to 25.6 Gb/s. Here, the hardware functionality and performance of the production board have been evaluated. A data path integration test between the Liquid Argon Digital Processing Blade (LDPB) [2] and the Front End LInk eXchange (FELIX) [3] was performed successfully at CERN in 2018.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗