Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Enterprise Reference Library

Introduction: Johnson Space Center (JSC) offers two extensive libraries that contain journals, research literature and electronic resources. Searching capabilities are available to those individuals residing onsite or through a librarian s search. Many individuals have rich collections of references, but no mechanisms to share reference libraries across researchers, projects, or directorates exist. Likewise, information regarding which references are provided to which individuals is not available, resulting in duplicate requests, redundant labor costs and associated copying fees. In addition, this tends to limit collaboration between colleagues and promotes the establishment of individual, unshared silos of information The Integrated Medical Model (IMM) team has utilized a centralized reference management tool during the development, test, and operational phases of this project. The Enterprise Reference Library project expands the capabilities developed for IMM to address the above issues and enhance collaboration across JSC. Method: After significant market analysis for a multi-user reference management tool, no available commercial tool was found to meet this need, so a software program was built around a commercial tool, Reference Manager 12 by The Thomson Corporation. A use case approach guided the requirements development phase. The premise of the design is that individuals use their own reference management software and export to SharePoint when their library is incorporated into the Enterprise Reference Library. This results in a searchable user-specific library application. An accompanying share folder will warehouse the electronic full-text articles, which allows the global user community to access full -text articles. Discussion: An enterprise reference library solution can provide a multidisciplinary collection of full text articles. This approach improves efficiency in obtaining and storing reference material while greatly reducing labor, purchasing and duplication costs. Most importantly, increasing collaboration across research groups provides unprecedented access to information relevant to NASA s mission. Conclusion: This project is an expansion and cost-effective leveraging of the existing JSC centralized library. Adding key word and author search capabilities and an alert function for notifications about new articles, based on users profiles, represent examples of future enhancements.

Bickham, Grandin↗

Cryogenic Fluid Management Technology and Nuclear Thermal Propulsion

Cryogenic fluid management (CFM) is critical to the success of future nuclear thermal propulsion powered vehicles. While this is an issue for any propulsion system utilizing cryogenic propellants, this is made more challenging by the radiation flux produced by the reactor in a nuclear thermal rocket (NTR). Managing the cryogenic fuel to prevent propellant loss to boil off and leakage is needed to limit the required quantity of propellant to a reasonable level. Analysis shows deposition of energy into liquid hydrogen fuel tanks in the vicinity of the nuclear thermal engine. This is on top of ambient environment sources of heat. Investments in cryogenic/thermal management systems (some of which are ongoing at various organizations) are needed in parallel to nuclear thermal engine development in order to one day see the successful operation of an entire stage. High durability, low thermal conductivity insulation is one developmental need. Light weight cryocoolers capable of removing heat from large fluid volumes at temperatures as low as approx. 20 K are needed to remove heat leak from the propellant of an NTR. Valve leakage is an additional CFM issue of great importance. Leakage rates of state of the art, launch vehicle size valves (which is approximately the size valves needed for a Mars transfer vehicle) are quite high and would result in large quantities of lost propellant over a long duration mission. Additionally, the liquid acquisition system inside the propellant tank must deliver properly conditioned propellant to the feed line for successful engine operation and avoid intake of warm or gaseous propellant. Analysis of the thermal environment and the CFM technology development are discussed in the accompanying presentation.

Taylor, Brian D.↗

Examining the Changing Roles and Responsibilities of Humans in Envisioned Future In-Time Aviation Safety Management Systems

Advances in technology are enabling new concepts of operations that will trans-form aviation including increasingly autonomous capabilities to handle evolving complex dynamic ecosystems like those associated with Advanced Aerial Mobility. A major challenge is how to ensure today’s safety levels are maintained as the system scales for rapid detection and timely mitigation of safety issues. NASA has developed a concept of operation for In-Time Aviation Safety Management Systems (IASMS) that represents a system-of-system perspective on interconnected capabilities needed to proactively reduce risk in complex operational environments where unknown hazards may exist. As a result, NASA research priorities include under-standing how the balance between humans and automation changes in such envisioned systems, which may lead to novel human-machine interaction paradigms and human-autonomy teaming for informed contingency management.

Lawrence Prinzel↗

Managing Fault Management Development

As the complexity of space missions grows, development of Fault Management (FM) capabilities is an increasingly common driver for significant cost overruns late in the development cycle. FM issues and the resulting cost overruns are rarely caused by a lack of technology, but rather by a lack of planning and emphasis by project management. A recent NASA FM Workshop brought together FM practitioners from a broad spectrum of institutions, mission types, and functional roles to identify the drivers underlying FM overruns and recommend solutions. They identified a number of areas in which increased program and project management focus can be used to control FM development cost growth. These include up-front planning for FM as a distinct engineering discipline; managing different, conflicting, and changing institutional goals and risk postures; ensuring the necessary resources for a disciplined, coordinated approach to end-to-end fault management engineering; and monitoring FM coordination across all mission systems.

McDougal, John M.↗

Future Arctic (Wild) Fires

Wildland fires in the boreal and Arctic are increasing in frequency and severity, with extreme fire seasons documented across the Pan-Arctic and boreal in five of the last seven years – including an early start to extreme fires in 2023.Human-caused and wildland fires above 60°N were larger sources of black carbon and methane than current modeled estimates of anthropogenic sectors like energy extraction and transportation. Further, these large boreal and Arctic fires have the potential to release large amounts of carbon dioxide and subsequent methane emissions from degraded permafrost and peat fires, as well as negatively impacting air quality thousands of miles south. By end of this century, current extreme fire years in the Arctic will likely be a normal fire year for much of Greenland, North America, Northern Europe, and Eurasia. As a new horizon in global wildland fire science, novel scientific pathways must be undertaken to improve our understanding and management of wildfires in the High Northern Latitudes – including understanding how NASA and U.S. researchers can enhance collaboration and develop near-real-time fire and smoke monitoring and modeling between North American and European ecology, fire, and climate scientists and stakeholders. Issues of inclusion, diversity, and equity are inherent to understanding fire ecology, impacts, and management in the Arctic and boreal, including centering and deferring to Indigenous and local communities when constructing best management practices.

Future↗

Large Payload Ground Transportation and Test Considerations

Many spacecraft concepts under consideration by the National Aeronautics and Space Administration’s (NASA’s) Evolvable Mars Campaign take advantage of a Space Launch System payload shroud that may be 8 to 10 meters in diameter. Large payloads can theoretically save cost by reducing the number of launches needed--but only if it is possible to build, test, and transport a large payload to the launch site in the first place. Analysis performed previously for the Altair project identified several transportation and test issues with an 8.973 meters diameter payload. Although the entire Constellation Program—including Altair—has since been canceled, these issues serve as important lessons learned for spacecraft designers and program managers considering large payloads for future programs. A transportation feasibility study found that, even broken up into an Ascent and Descent Module, the Altair spacecraft would not fit inside available aircraft. Ground transportation of such large payloads over extended distances is not generally permitted, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 67 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA’s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure—roads, bridges, airframes, and buildings—necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications. Although this paper focuses on the canceled Altair spacecraft as a case study, the issues identified here have wide applicability to other large payloads, including concepts under consideration for NASA’s Evolvable Mars Campaign.

Rucker, Michelle A.↗

Integrating Indigenous Traditional, Local and Scientific Knowledge for Improved Management, Policy and Decision-Making in Reindeer Husbandry in the Russian Arctic

As scientists and policy-makers from both indigenous and non-indigenous communities begin to build closer partnerships to address common sustainability issues such as the health impacts of climate change and anthropogenic activities, it becomes increasingly important to create shared information management systems which integrate all relevant factors for optimal information sharing and decision-making. This paper describes a new GIs-based system being designed to bring local and indigenous traditional knowledge together with scientific data and information, remote sensing, and information technologies to address health-related environment, weather, climate, pollution and land use change issues for improved decision/policy-making for reindeer husbandry. The system is building an easily-accessible archive of relevant current and historical, traditional, local and remotely-sensed and other data and observations for shared analysis, measuring, and monitoring parameters of interest. Protection of indigenous culturally sensitive information will be respected through appropriate data protocols. A mechanism which enables easy information sharing among all participants, which is real time and geo-referenced and which allows interconnectivity with remote sites is also being designed into the system for maximum communication among partners. A preliminary version of our system will be described for a Russian reindeer test site, which will include a combination of indigenous knowledge about local conditions and issues, remote sensing and ground-based data on such parameters as the vegetation state and distribution, snow cover, temperature, ice condition, and infrastructure.

Maynard, Nancy G.↗

Academy Sharing Knowledge (ASK). The NASA Source for Project Management Magazine, Volume 11, March 2003

APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. Contributors to this issue include: Teresa Bailey, a librarian at the Jet Propulsion Laboratory, Roy Malone, Deputy Director in the Safety and Mission Assurance (S&MA) Office at the NASA Marshall Space Flight Center (MSFC), W. Scott Cameron, Capital Systems Manager for the Food and Beverage Global Business Unit of Procter and Gamble, Ray Morgan, recent retiree as Vice President of AeroVironment, Inc., Marty Davis, Program Manager of the Geostationary Operational Environmental Satellite (GOES) at the NASA Goddard Space Flight Center (GSFC) in Greenbelt, Maryland, Todd Post, editor of ASK Magazine, and works for EduTech Ltd. in Silver Spring, Maryland, Dr. Owen Gadeken, professor of Engineering Management at the Defense Acquisition University, Ken Schwer, currently the Project Manager of Solar Dynamics Observatory, Dr. Edward Hoffmwan, Director of the NASA Academy of Program and Project Leadership, Frank Snow, a member of the NASA Explorer Program at Goddard Space Flight Center since 1992, Dr. Alexander Laufer, Editor-in-Chief of ASK Magazine and a member of the Advisory Board of the NASA Academy of Program and Project Leadership, Judy Stokley, presently Air Force Program Executive Officer for Weapons in Washington, D.C. and Terry Little, Director of the Kinetic Energy Boost Office of the Missile Defense Agency.

Source record↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual information processing: A robust approach to KBS-DBMS integration

Integrating the respective functionality and architectural features of knowledge base and data base management systems is a topic of considerable interest. Several aspects of this topic and associated issues are addressed. The significance of integration and the problems associated with accomplishing that integration are discussed. The shortcomings of current approaches to integration and the need to fuse the capabilities of both knowledge base and data base management systems motivates the investigation of information processing paradigms. One such paradigm is concept based processing, i.e., processing based on concepts and conceptual relations. An approach to robust knowledge and data base system integration is discussed by addressing progress made in the development of an experimental model for conceptual information processing.

Lazzara, Allen V.↗

Development of an Airspace Simulation and Modeling Tool for Enhanced Spectrum Management

The emergence of new aerial vehicles into the National Airspace System creates an increased demand for aeronautical communications to support aviation operations. However, the issue of spectrum scarcity remains an ever-present concern, and the growing demand cannot be supported using existing spectrum allocation strategies. As a result, a new spectrum management approach is required, and the National Aeronautics and Space Administration (NASA) is investigating advanced concepts to modernize the management and use of aviation spectrum by leveraging the latest advancements in wireless communications, big data and machine learning. This research proposes an autonomous spectrum allocation concept, which allocates communications resources, such as spectrum and power, based on the predicted communications and air traffic demands throughout the airspace, as opposed to the use of fixed allocations as is done today. This approach will result in improved spectrum utilization efficiency and enhanced airspace capacity. The autonomous spectrum allocation concept decomposes into three research areas: demand prediction, resource allocation, and use case evaluation. As part of the use case evaluation effort, a modeling and simulation capability is currently under development. This simulation capability includes the implementation of various features, including visualization of both live or virtually-generated airspace traffic, simulation scenario development, simulation management with data collection, and flight plan creation with corresponding trajectory generation. This modeling and simulation capability will continue to evolve as new and advanced airspace applications are introduced into existing and emerging operational environments.

Eric J. Knoblock↗

Tools and Technologies Needed for Conducting Planetary Field Geology While On EVA: Insights from the 2010 Desert RATS Geologist Crewmembers

Observation is the primary role of all field geologists, and geologic observations put into an evolving conceptual context will be the most important data stream that will be relayed to Earth during a planetary exploration mission. Sample collection is also an important planetary field activity, and its success is closely tied to the quality of contextual observations. To test protocols for doing effective planetary geologic fieldwork, the Desert RATS (Research and Technology Studies) project deployed two prototype rovers for two weeks of simulated exploratory traverses in the San Francisco volcanic field of northern Arizona. The authors of this paper represent the geologist crewmembers who participated in the 2010 field test. We document the procedures adopted for Desert RATS 2010 and report on our experiences regarding these protocols. Careful consideration must be made of various issues that impact the interplay between field geologic observations and sample collection, including time management; strategies related to duplication of samples and observations; logistical constraints on the volume and mass of samples and the volume/transfer of data collected; and paradigms for evaluation of mission success. We find that the 2010 field protocols brought to light important aspects of each of these issues, and we recommend best practices and modifications to training and operational protocols to address them. Underlying our recommendations is the recognition that the capacity of the crew to "flexibly execute" their activities is paramount. Careful design of mission parameters, especially field geologic protocols, is critical for enabling the crews to successfully meet their science objectives.

Young, Kelsey↗

Program test objectives milestone 3

The following conclusions have been developed relative to propulsion system technology adequacy for efficient development and operation of recoverable and expendable launch vehicles (RLV and ELV) and the benefits which the integrated propulsion technology demonstrator will provide for enhancing technology: (1) Technology improvements relative to propulsion system design and operation can reduce program cost. Many features or improvement needs to enhance operability, reduce cost, and improve payload are identified. (2) The Integrated Propulsion Technology Demonstrator (IPTD) Program provides a means of resolving the majority of issues associated with improvement needs. (3) The IPTD will evaluate complex integration of vehicle and facility functions in fluid management and propulsion control systems, and provides an environment for validating improved mechanical and electrical components. (4) The IPTD provides a mechanism for investigating operational issues focusing on reducing manpower and time to perform various functions at the launch site. These efforts include model development, collection of data to validate subject models, and ultimate development of complex time line models. (5) The IPTD provides an engine test bed for tri/bi-propellant engine development firings which is representative of the actual vehicle environment. (6) The IPTD provides for only a limited multiengine configuration integration environment for RLV. Multiengine efforts may be simulated for a number of subsystems and a number of subsystems are relatively independent of the multiengine influences.

Gaynor, T. L.↗

Making or Breaking a Rover: System Engineering Parameters On-Board the Mars 2020 Perseverance Rover

On February 18, 2021, Perseverance, NASA’s Jet Propulsion Laboratory’s (JPL’s) Mars 2020 Rover, successfully landed on Mars with all systems nominal, despite the risk surrounding the over 200,000 internal flight parameters that had to be properly configured. The Perseverance team defines these parameters as software variables that are configurable, commandable and retrievable from Earth. In 2015, the Mars 2020 project leaders focused on improving systems engineering of parameters based on their experiences from parameter management on previous Mars rovers (Curiosity, Opportunity, Spirit, and Pathfinder) and parameter failures of past missions, such as the mission-ending parameter of the Mars Climate Orbiter. The new rigorous development process allowed for efficient certification and effective implementation of the parameters, allowing the rover to approach and land on the red planet (the most challenging phase of the mission) with zero parameter issues. Although successful, the Perseverance team learned many lessons for how to better manage parameters for the continued surface operations of the Mars 2020 mission and future missions. This paper will discuss eight parameter-management topics for the Perseverance Mission. The first is parameter definition: how we define parameters on our mission, where they are physically located on the vehicle, and why we have so many of them. The second topic is the updated parameter flight software module from Curiosity, including details on the 99% reduction in parameter commands, new bulk configuration capabilities, and improved parameter traceability. The third topic is parameter selection for different mission phases; this includes improving and tweaking our preferred parameter settings until they become certification candidates and managing parameter configurations based on test venue throughout the mission life cycle. The fourth topic is our flight certification process; this includes certification of flight values for four different epochs in the mission: Launch, Entry Decent and Landing (EDL) - 6days, Landing + 5 Sols (Martian Days, still on Cruise Flight Software), and once are on Surface Flight Software (FSW). The fifth topic covers in-flight command implementation, along with details on testing, validation, and verification of those commands. In the sixth section, we will explain our use of open-source management tools, including how we used GitHub for version control and management approvals. The seventh topic will describe the ground tools used in operations, including capabilities of the in-house built tool called Parasol. The eighth and final topic will dig into lessons learned for improving parameter management in the future of this mission and others.

Roth, Brian↗

Making or Breaking a Rover- Systems Engineering Parameters On-Board the Mars 2020 Perseverance Rover

On February 18, 2021, Perseverance, NASA’s Jet Propulsion Laboratory’s (JPL’s) Mars 2020 Rover, successfully landed on Mars with all systems nominal, despite the risk surrounding the over 200,000 internal flight parameters that had to be properly configured. The Perseverance team defines these parameters as software variables that are configurable, commandable and retrievable from Earth. In 2015, the Mars 2020 project leaders focused on improving systems engineering of parameters based on their experiences from parameter management on previous Mars rovers (Curiosity, Opportunity, Spirit, and Pathfinder) and parameter failures of past missions, such as the mission-ending parameter of the Mars Climate Orbiter. The new rigorous development process allowed for efficient certification and effective implementation of the parameters, allowing the rover to approach and land on the red planet (the most challenging phase of the mission) with zero parameter issues. Although successful, the Perseverance team learned many lessons for how to better manage parameters for the continued surface operations of the Mars 2020 mission and future missions. This paper will discuss eight parameter-management topics for the Perseverance Mission. The first is parameter definition: how we define parameters on our mission, where they are physically located on the vehicle, and why we have so many of them. The second topic is the updated parameter flight software module from Curiosity, including details on the 99% reduction in parameter commands, new bulk configuration capabilities, and improved parameter traceability. The third topic is parameter selection for different mission phases; this includes improving and tweaking our preferred parameter settings until they become certification candidates and managing parameter configurations based on test venue throughout the mission life cycle. The fourth topic is our flight certification process; this includes certification of flight values for four different epochs in the mission: Launch, Entry Decent and Landing (EDL) - 6days, Landing + 5 Sols (Martian Days, still on Cruise Flight Software), and once are on Surface Flight Software (FSW). The fifth topic covers in-flight command implementation, along with details on testing, validation, and verification of those commands. In the sixth section, we will explain our use of open-source management tools, including how we used GitHub for version control and management approvals. The seventh topic will describe the ground tools used in operations, including capabilities of the in-house built tool called Parasol. The eighth and final topic will dig into lessons learned for improving parameter management in the future of this mission and others.

Roth, Brian↗