Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Operating Dynamic Reserve Dimensioning Using Probabilistic Forecasts

The rapid integration of variable energy sources (VRES) into power grids increases variability and uncertainty of the net demand, making the power system operation challenging. Operating reserve is used by system operators to manage and hedge against such variability and uncertainty. Traditionally, reserve requirements are determined by rules-of-thumb (static reserve requirements, e.g., NERC Reliability Standards), and more recently, dynamic reserve requirements from tools and methods which are in the adoption process (e.g., DynADOR, DRD, and RESERVE, among others). While these methods/tools significantly improve the static rule-of-thumb approaches, they rely exclusively on deterministic data (i.e., best guess only). Consequently, these methods disregard the probabilistic uncertainty thresholds associated with specific days and their weather conditions (i.e., best guess plus probabilistic uncertainty). This work presents practical approaches to determine the operating reserve requirements leveraging the wealth information from probabilistic forecasts. Proposed approaches are validated and tested using actual data from the CAISO system. Furthermore, results show the benefits in terms of risk reduction of considering the probabilistic forecast information into the dimensioning process of operating reserve requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Orbit Determination of Spacecraft in Earth-Moon L1 and L2 Libration Point Orbits

The ARTEMIS mission, part of the THEMIS extended mission, is the first to fly spacecraft in the Earth-Moon Lissajous regions. In 2009, two of the five THEMIS spacecraft were redeployed from Earth-centered orbits to arrive in Earth-Moon Lissajous orbits in late 2010. Starting in August 2010, the ARTEMIS P1 spacecraft executed numerous stationkeeping maneuvers, initially maintaining a lunar L2 Lissajous orbit before transitioning into a lunar L1 orbit. The ARTEMIS P2 spacecraft entered a L1 Lissajous orbit in October 2010. In April 2011, both ARTEMIS spacecraft will suspend Lissajous stationkeeping and will be maneuvered into lunar orbits. The success of the ARTEMIS mission has allowed the science team to gather unprecedented magnetospheric measurements in the lunar Lissajous regions. In order to effectively perform lunar Lissajous stationkeeping maneuvers, the ARTEMIS operations team has provided orbit determination solutions with typical accuracies on the order of 0.1 km in position and 0.1 cm/s in velocity. The ARTEMIS team utilizes the Goddard Trajectory Determination System (GTDS), using a batch least squares method, to process range and Doppler tracking measurements from the NASA Deep Space Network (DSN), Berkeley Ground Station (BGS), Merritt Island (MILA) station, and United Space Network (USN). The team has also investigated processing of the same tracking data measurements using the Orbit Determination Tool Kit (ODTK) software, which uses an extended Kalman filter and recursive smoother to estimate the orbit. The orbit determination results from each of these methods will be presented and we will discuss the advantages and disadvantages associated with using each method in the lunar Lissajous regions. Orbit determination accuracy is dependent on both the quality and quantity of tracking measurements, fidelity of the orbit force models, and the estimation techniques used. Prior to Lissajous operations, the team determined the appropriate quantity of tracking measurements that would be needed to meet the required orbit determination accuracies. Analysts used the Orbit Determination Error Analysis System (ODEAS) to perform covariance analyses using various tracking data schedules. From this analysis, it was determined that 3.5 hours of DSN TRK-2-34 range and Doppler tracking data every other day would suffice to meet the predictive orbit knowledge accuracies in the Lissajous region. The results of this analysis are presented. Both GTDS and ODTK have high-fidelity environmental orbit force models that allow for very accurate orbit estimation in the lunar Lissajous regime. These models include solar radiation pressure, Earth and Moon gravity models, third body gravitational effects from the Sun, and to a lesser extent third body gravitational effects from Jupiter, Venus, Saturn, and Mars. Increased position and velocity uncertainties following each maneuver, due to small execution performance errors, requires that several days of post-maneuver tracking data be processed to converge on an accurate post-maneuver orbit solution. The effects of maneuvers on orbit determination accuracy will be presented, including a comparison of the batch least squares technique to the extended Kalman filter/smoother technique. We will present the maneuver calibration results derived from processing post-maneuver tracking data. A dominant error in the orbit estimation process is the uncertainty in solar radiation pressure and the resultant force on the spacecraft. An estimation of this value can include many related factors, such as the uncertainty in spacecraft reflectivity and surface area which is a function of spacecraft orientation (spin-axis attitude), uncertainty in spacecraft wet mass, and potential seasonal variability due to the changing direction of the Sun line relative to the Earth-Moon Lissajous reference frame. In addition, each spacecraft occasionally enters into Earth or Moon penumbra or umbra and these shadow crossings reduche solar radiation force for several hours. The effects of these events on orbit determination accuracy will be presented. In order to plan for upcoming stationkeeping maneuvers, the maneuver planning team must take the current orbit estimate, propagate it forward to the planned maneuver time, and determine the optimal maneuver to maintain the Lissajous orbit for one or more revolutions. The propagation is performed using a Runge-Kutta 7/8 integrator and typically the position and velocity uncertainty increases with propagation time, increasing the overall uncertainty of the orbit state at the maneuver execution time. The effect of orbit knowledge uncertainty on stationkeeping operations will be presented.

Woodard, Mark↗

An Enabling Technology for New Planning and Scheduling Paradigms

The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Human Space Exploration: The Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed, to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. Why the Moon? Many questions about the Moon's potential resources and how its history is linked to that of Earth were spurred by the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment for extended expeditions. The Moon also will serve as a training ground before embarking on the longer, more difficult trip to Mars. NASA plans to build a lunar outpost at one of the lunar poles, learn to live off the land, and reduce dePendence on Earth for longer missions. America needs to extend its ability to survive in hostile environments close to our home planet before astronauts will reach Mars, a planet very much like Earth. NASA has worked with scientists to define lunar exploration goals and is addressing the opportunities for a range of scientific study on Mars. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-l, scheduled for spring 2009. The U.S. Vision for Space Exploration lays out a roadmap for a long-term venture of discovery. This endeavor will inspire and attract the best and brightest students to power this nation successfully to the Moon, Mars, and beyond. If one equates the value proposition for space with simple dollars and cents, the potential of the new space economy is tremendous, from orbital space delivery services for the International Space Station to mining and solar energy collection on the Moon and asteroids. The Vision for Space Exploration is fundamentally about bringing the resources of the solar system within the economic sphere of humaind. Given the immense size of our solar system, the amount of available material and energy within it present an enormous economic opportunity.

Sexton, Jeffrey D.↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enabling a New Planning and Scheduling Paradigm

The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Expanding market opportunities: cogeneration strategies for integrated PWR and thermal energy storage systems

We assess the economic viability of nuclear cogeneration by investigating three different modes—fixed dispatch, fully flexible dispatch, and flexible dispatch with minimum heat supply requirements. The analysis focuses on an existing pressurized water reactor (PWR) integrated with thermal energy storage (TES). Heat production costs are estimated under these modes for two U.S. electricity markets: the Electric Reliability Council of Texas (ERCOT) and the Pennsylvania–New Jersey–Maryland Interconnection (PJM). A sensitivity analysis examines profitability at varying heat market prices. Results indicate that fixed heat dispatch inflates heat production costs, often rendering projects economically feasible only at higher heat price levels. Fully-flexible dispatch lowers heat production costs by an average of 43 % compared to fixed dispatch. However, the current 30 % thermal dispatch limit may be insufficient to serve high baseline industrial demands cost‐effectively; higher maximum dispatch rates could enhance project economics. Markets with higher and more volatile electricity prices (e.g., ERCOT) offer greater total energy sales potential (i.e., heat and electricity), but also increase opportunity costs when heat production scheduling restrictions are imposed. In contrast, lower-price, less volatile markets (e.g., PJM) experience smaller impacts from such constraints and provide greater flexibility in accommodating varying cogeneration modes. In conclusion, these findings provide a framework to guide nuclear plant operators in aligning cogeneration strategies with industrial process requirements and electricity market conditions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Review of NASA's Planned Mars Program

The exploration of Mars has long been a prime scientific objective of the U.S. planetary exploration program. Yet no U.S. spacecraft has successfully made measurements at Mars since the Viking missions of the late 1970s. Mars Observer, which was designed to conduct global observations from orbit, failed just before orbit insertion in 1993. The Russian spacecraft Phobos 2 did succeed in making some observations of the planet in 1989, but it was designed primarily to observe Phobos, the innermost satellite of Mars; the spacecraft failed 2 months after insertion into Mars orbit during the complex maneuvers required to rendezvous with the martian satellite. In fall 1996 NASA plans to launch Mars Pathfinder for a landing on the martian surface in mid-1997. This spacecraft is one of the first two missions in NASA's Discovery program that inaugurates a new style of planetary exploration in which missions are low-cost (less than $150 million) and have very focused science objectives. As can be seen in the comparative data presented in Box 1, this mission is considerably smaller in terms of cost, mass, and scope than NASA's previous Mars missions. NASA's FY 1995 budget initiated a continuing Mars exploration program, called Mars Surveyor, that involves multiple launches of spacecraft as small as or smaller than Mars Pathfinder to Mars over the next several launch opportunities, which recur roughly every 26 months. The first mission in the program, Mars Global Surveyor, set for launch late in 1996, is intended to accomplish many of the objectives of the failed Mars Observer. Like the Discovery program, Mars Surveyor is a continuing series of low-cost missions, each of which has highly focused science objectives. See Box 1 for comparative details of those Surveyor missions currently defined. Around the same time that the Mars Surveyor series was chosen as the centerpiece of NASA's solar system exploration program, the Committee on Planetary and Lunar Exploration (COMPLEX) designated Mars as one of four scientific targets for emphasis in future studies. It was against this background that the Space Studies Board charged COMPLEX to review whether the Mars Pathfinder and Surveyor programs, as presently conceived, satisfy the highest priorities for understanding Mars as provided in its report, An Integrated Strategy for the Planetary Sciences: 1995-2010. The present document is COMPLEX's assessment of the scientific potential of NASA's new approach to Mars exploration. This assessment considers how well the scientific objectives of the Mars Surveyor program match those of the Integrated Strategy; it also addresses some advantages and disadvantages of the smaller-faster-cheaper approach to the exploration of Mars. The capabilities of the various instruments are not discussed in detail since the Mars Observer instruments, all of which are scheduled for reflight, have already been assessed by COMPLEX2 and later instruments are, in general, not yet well defined.

Source record↗

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. The full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes.

Schwabacher, Mark↗

Orion GNC Mitigation Efforts for Van Allen Radiation

The Orion Crew Module (CM) is NASA's next generation manned space vehicle, scheduled to return humans to lunar orbit in the coming decade. The Orion avionics and GN&C architectures have progressed through a number of project phases and are nearing completion of a major milestone. The first unmanned test mission, dubbed "Exploration Flight Test One" (EFT-1) is scheduled to launch from NASA Kennedy Space Center late next year and provides the first integrated test of all the vehicle systems, avionics and software. The EFT-1 mission will be an unmanned test flight that includes a high speed re-entry from an elliptical orbit, which will be launched on an expendable launch vehicle (ELV). The ELV will place CM and the ELV upper stage into a low Earth orbit (LEO) for one revolution. After the first LEO, the ELV upper stage will re-ignite and place the combined upper stage/CM into an elliptical orbit whose perigee results in a high energy entry to test CM response in a relatively high velocity, high heating environment. While not producing entry velocities as high as those experienced in returning from a lunar orbit, the trajectory was chosen to provide higher stresses on the thermal protection and guided entry systems, as compared against a lower energy LEO entry. However the required entry geometry with constraints on inclination and landing site result in a trajectory that lingers for many hours in the Van Allen radiation belts. This exposes the vehicle and avionics to much higher levels of high energy proton radiation than a typical LEO or lunar trajectory would encounter. As a result, Van Allen radiation poses a significant risk to the Orion avionics system, and particularly the Flight Control Module (FCM) computers that house the GN&C flight software. The measures taken by the Orion GN&C, Flight Software and Avionics teams to mitigate the risks associated with the Van Allen radiation on EFT-1 are covered in the paper. Background on the Orion avionics subsystem is provided, as well as an overview of the GN&C software architecture. The measures taken to handle radiation induced failure of the one or both of the FCM's are presented, and finally simulation and actual hardware-in-the-loop (HWIL) results are shown confirming the validity of the implementation. The paper presents an overview of the Orion avionics architecture describing the GNC sensors, onboard data network as well as the flight control computers and their planned restart capabilities. GN&C sensors include two Orion Inertial Measurement Units (OIMU's), a Vision Processing Unit (VPU) to process camera images, three barometric altimeters and a single GPS receiver. All of the sensors communicate to one of two Power and Data Units (PDU's). The PDU's multiplex analog and serial data from the sensors and write the data to the Orion Data Network (ODN). The OIMU s write measurement messages directly as onto the ODN, but they are routed through PDU network switches.

King, Ellis T.↗

Space Launch System Accelerated Booster Development Cycle

With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study, affordability is defined as lifecycle cost, which includes design, development, test, and engineering (DDT&E), production and operational costs (P&O). For this study, the system objectives include reducing DDT&E schedule by a factor of three, showing 99.9% reliability, flying up to four times per year, serving both crew and cargo missions, and evolving to a lift capability of 130 metric tons.3 After identifying gaps in the current system s capabilities, this study seeks to identify non-traditional and innovative technologies and processes that may improve performance in these areas and assess their impacts on booster system development. The DDT&E phase may be improved by incorporating incremental development testing and integrated demonstrations to mitigate risk. To further reduce DDT&E, this study will also consider how aspects of the booster system may have commonality with other users, such as the Department of Defense, commercial applications, or international partners; by sharing some of the risk and investment, the overall development cost may be reduced. Consideration is not limited to solid and liquid rocket boosters. A set of functional performance characteristics, such as engine thrust, specific impulse (Isp), mixture ratio, and throttle range are identified and their impacts on the system are evaluated. This study also identifies how such characteristics affect overall life cycle cost, including DDT&E and fixed and variable P&O.

Arockiam, Nicole↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges and Lessons Learned in the Application of Autonomy to Space Operations

NASA's Space Operations Management Office (SOMO) is working toward a goal of providing an integrated infrastructure of mission and data services for space missions undertaken by NASA enterprises. A significant portion of this effort is focused on reducing the cost of these services. We are interested in the potential of autonomy to reduce operations costs. SOMO services support space missions, but are not part of the mission objectives; therefore the level of acceptable risk is very low. In fact, SOMO could be effective ly prevented from applying autonomy if customers merely perceive it as adding risk to their mission(s). We are interested in this workshop from the standpoint of understanding what can be done to realize the potential cost savings due to autonomy while maintaining acceptable risk and serving the needs of our customers. We would like to present our lessons learned so far in adopting autonomy and automation, which we think will contribute to clarifying the challenges facing the use of such technology. SOMO provides services to a diverse and ambitious set of mission customers. Many of these missions are groundbreaking missions for which communications, data, and other operations requirements sometimes cannot be clearly articulated early in the program. This motivates a need for systems that are robust in the face of unanticipated situations so that customer missions are not unreasonably constrained or impacted by "shortcomings" in SOMO services. One of SOMO's primary goals is to realize a paradigm in which SOMO acts as a service provider to organizations that fly space missions for NASA, other government agencies, and even the commercial sector. These organizations purchase SOMO services "by the pound" as customers. We have to provide systems that are not experiments themselves, but rather stable bases from which to do bold experiments. To this end, SOMO also seeks to work closely with industry to see that robust autonomy technology gets infused into products and services for the space industry and beyond. The potential for application of these technologies spans space-based communications networks (e.g. TDRSS) and ground-based assets including communication and tracking antenna systems, data networks, and control centers. There are several problems that are candidates for the application of autonomy, if it can be made reliable enough, including: antenna control, antenna scheduling, communication link scheduling and operation, navigation, attitude determination, fault detection, isolation, and reconfiguration (for spacecraft or ground assets), and mission-level planning and scheduling. Some attempts have been made to apply autonomy and automation in these areas in the past with varying degrees of success. We will present relevant case histories and the lessons inferred from them. Combining this past experience with anticipated future needs, we can clarify the challenges that must be met in order to realize the benefits of autonomy.

Forrest, David J.↗

Web-Based Tools for Data-Informed Remedy Optimization: Software Theory and User Guide

This report documents the development and application of two web-based decision-support tools for pump-and-treat (P&T) groundwater remediation systems: PTOLEMY (Pump-and-Treat Optimized Location Evaluation to Maximize Yields) and OPTIMA (Optimization for Pump-and-Treat Implementation, Management, & Assessment). These tools enhance remedy design and management by leveraging advanced computational methods – specifically deep learning and multi-objective optimization – within a user-friendly platform. By integrating data-driven models with established hydrogeological knowledge, PTOLEMY and OPTIMA enable more efficient evaluation of well placement and operational strategies, helping site managers balance multiple remediation objectives under complex conditions. Both tools are implemented as modules within the SOCRATES (Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites) web platform, which provides data access, visualization, and analytics to support remedy optimization across sites in the U.S. Department of Energy Office of Environmental Management complex. PTOLEMY is a rapid screening module designed to identify promising locations for new extraction wells. It employs a multi-channel three-dimensional convolutional neural network (MC3D-CNN) trained on high-fidelity simulation data to predict the relative performance (in terms of contaminant mass recovery) of potential well sites. Through an interactive web interface, PTOLEMY visualizes the probability of high performance across a site, highlighting areas where an extraction well is likely to yield above-threshold contaminant removal over a multi-year period. PTOLEMY’s map-based displays and exportable results support transparent communication of screening analyses. By focusing attention on the most favorable candidate locations, the tool augments traditional engineering judgment and physics-based modeling, providing a data informed basis for subsequent detailed evaluations. OPTIMA is a multi objective optimization module designed to find wellfield layouts and operating schedules that meet various cleanup goals. It quickly evaluates thousands of candidate setups – combinations of well locations, timing, and rates – and returns a small set of best trade-off options for comparison. At its core, OPTIMA uses a U-Net-based surrogate model – a deep-learning emulator of a groundwater flow and transport simulator – to dramatically accelerate scenario evaluations. Coupling this fast surrogate with the NSGA-II (Non-dominated Sorting Genetic Algorithm II) evolutionary algorithm, OPTIMA explores a wide decision space of well locations and schedules to identify Pareto-optimal solutions that trade off key objectives (e.g., minimizing cleanup time, maximizing contaminant mass removal, and minimizing plume extent). The tool outputs a family of optimal configurations and visualizes their trade-offs (Pareto frontiers of cleanup metrics and maps of optimized well placements). Site managers can use these results to understand the range of viable strategies and to select candidate designs for more detailed verification. OPTIMA is currently under active development and not yet fully released; this guide provides early documentation to support planning and gather user feedback.

54 ENVIRONMENTAL SCIENCES↗

Overview of the Landsat-7 Mission

Landsat-7 is scheduled for launch on April 15 from the Western Test Range at Vandenberg Air Force Base, Calif., on a Delta-H expendable launch vehicle. The Landsat 7 satellite consists of a spacecraft bus being provided by Lockheed Martin Missiles and Space (Valley Forge, Pa.) and the Enhanced Thematic Mapper Plus instrument built by Raytheon (formerly Hughes) Santa Barbara Remote Sensing (Santa Barbara, Calif.). The instrument on board Landsat 7 is the Enhanced Thematic Mapper Plus (ETM+). ETM+ improves upon the previous Thematic Mapper (TM) instruments on Landsat's 4 and 5 (Fig. la and lb). It includes the previous 7 spectral bands measuring reflected solar radiation and emitted thermal emissions but, in addition, includes a new 15 in panchromatic (visible-near infrared) band. The spatial resolution of the thermal infrared band has also been improved to 60 m. Both the radiometric precision and accuracy of the sensor are also improved from the previous TM sensors. After being launched into a sun-synchronous polar orbit, the satellite will use on-board propulsion to adjust its orbit to a circular altitude of 438 miles (705 kilometers) crossing the equator at approximately 10 a.m. on its southward track. This orbit will place Landsat 7 along the same ground track as previous Landsat satellites. The orbit will be maintained with periodic adjustments for the life of the mission. A three-axis attitude control subsystem will stabilize the satellite and keep the instrument pointed toward the Earth to within 0.05 degrees. Later this year, plans call for the NASA Earth Observation System (EOS) Terra (AM-1) observatory and the experimental EO-1 mission to closely follow Landsat-7's orbit to support synergistic research and applications from this new suite of terrestrial sensor systems. Landsat is the United States' oldest land-surface observation satellite system, with satellites continuously operating since 1972. Although the program has scored numerous successes in scientific and resource-management applications, Landsat has had a tumultuous history of management and funding changes over its nearly 27-year history. Landsat-7 marks a new direction in the program to reduce the cost of data and increase systematic global coverage for use in global change research as well as commercial and regional applications. With the passage of the Land Remote Sensing Policy Act in 1992, oversight of the Landsat program began to shift from the commercial sector to the federal government. NASA integrated Landsat-7 into its EOS science program in 1994. Landsat-7 is managed and operated jointly by NASA and U.S. Geological Survey (USGS). As a result, the costs of acquiring observations from

Williams, Darrel↗

Design and implementation of two two-week Teacher Enhancement Institutes

During this summer, I have been part of a four team effort that planned and executed two two-week Teacher Enhancement Institutes (TEI) for 40 K-8 teachers from this area. The TEI was designed to enhance teachers' background in aeronautics and technology so that they would be better equipped to encourage and to train students in the mathematics, science, and technology fields. The teachers were given a stipend and three graduate credits from Christopher Newport University for their participation in this program. The four ASEE fellows worked together to develop objectives and a schedule of activities for each two-week session based on the program outline given in the grants that were funding this effort. We divided the responsibilities in coordinating and implementing each part of the TEI based on the specific strengths and background of each ASEE fellow. My specific responsibilities were: (1) to develop the course syllabus and generally handle all matters involved with the graduate course; (2) coordinate the follow-up sessions; and (3) design and manage half of the technology sessions that we had scheduled (approximately 30% of the TEI was devoted to technology). Because the first two responsibilities were primarily administrative in nature, I will address only the last. The technology sessions were divided into computer-only and other technologies (e.g., television and digital technology including scanning, digital photography and CD-ROM). I had responsibility for the computer-only technology sessions. The emphasis of these sessions was on use of the Internet specifically to locate and use educational resources. To maximize learning, these sessions were hands-on with two teachers at each computer. Each teacher received instruction in, and actually used, the most popular tools available on the Internet: email (they were given temporary accounts at NASA LaRC), anonymous ftp and archie, gopher and veronica, mosaic, and telnet. Teachers participated in hands-on workshops to learn about these programs, but were also given time during the two-week session to explore on their own and to find resources on the Net that specifically met their needs. In order to ensure that Internet access continues after their return to the classroom, aIl teachers who did not have them also applied for Learning Link accounts (from WHRO, the local public television station) and Virginia Pen accounts (from the Department of Education of Virginia), both of which allow textbased access to Internet. In addition to getting exposure to and practice with Internet tools, teachers were aIso given a hands-on seminar (and also given practice time) on ClarisWorks, an integrated word processing, spreadsheet, database, and paint package. The technology sessions (and TEI as a whole) were enthusiastically received by both new and more experienced teachers as extremely helpful in improving their ability to use technology in developing lesson pIans.

Lambert, Lynn↗