Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development design testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Advanced Turbine Technology Applications Project (ATTAP)

ATTAP activities during the past year included test-bed engine design and development, ceramic component design, materials and component characterization, ceramic component process development and fabrication, ceramic component rig testing, and test-bed engine fabrication and testing. Significant technical challenges remain, but all areas exhibited progress. Test-bed engine design and development included engine mechanical design, combustion system design, alternate aerodynamic designs of gasifier scrolls, and engine system integration aimed at upgrading the AGT-5 from a 1038 C (1900 F) metal engine to a durable 1372 C (2500 F) structural ceramic component test-bed engine. ATTAP-defined ceramic and associated ceramic/metal component design activities completed include the ceramic gasifier turbine static structure, the ceramic gasifier turbine rotor, ceramic combustors, the ceramic regenerator disk, the ceramic power turbine rotors, and the ceramic/metal power turbine static structure. The material and component characterization efforts included the testing and evaluation of seven candidate materials and three development components. Ceramic component process development and fabrication proceeded for the gasifier turbine rotor, gasifier turbine scroll, gasifier turbine vanes and vane platform, extruded regenerator disks, and thermal insulation. Component rig activities included the development of both rigs and the necessary test procedures, and conduct of rig testing of the ceramic components and assemblies. Test-bed engine fabrication, testing, and development supported improvements in ceramic component technology that permit the achievement of both program performance and durability goals. Total test time in 1991 amounted to 847 hours, of which 128 hours were engine testing, and 719 were hot rig testing.

Source record↗

Design, manufacture, and test of coolant pump-motor assembly for Brayton power conversion system

The design, development, fabrication, and testing of seven coolant circulating pump-motor assemblies are discussed. The pump-motor assembly is driven by the nominal 44.4-volt, 400-Hz, 3-phase output of a nominal 56-volt dc input inverter. The pump-motor assembly will be used to circulate Dow Corning 200 liquid coolant for use in a Brayton cycle space power system. The pump-motor assembly develops a nominal head of 70 psi at 3.7 gpm with an over-all efficiency of 26 percent. The design description, drawings, photographs, reliability results, and developmental and acceptance test results are included.

Gabacz, L. E.↗

Fatigue and fail-safe design features of the DC-10 airplane

The philosophy and methods used in the design of the DC-10 aircraft to assure structural reliability against cracks under repeated service loads are described in detail. The approach consists of three complementary parts: (1) the structure is designed to be fatigue resistant for a crack-free life of 60,000 flight hours; (2) inasmuch as small undetected cracks could develop from other sources, such as material flaws and manufacturing preloads, the structure also is designed to arrest and control cracks within a reasonable service-inspection interval; and (3) a meaningful service-inspection program has been defined on the basis of analysis and test experience from the design development program. This service-inspection program closes the loop to assure the structural integrity of the DC-10 airframe. Selected materials, fasteners, and structural arrangements are used to achieve these design features with minimum structural weight and with economy in manufacturing and maintenance. Extensive analyses and testing were performed to develop and verify the design. The basic design considerations for fatigue-resistant structure are illustrated in terms of material selection, design loads spectra, methods for accurate stress and fatigue damage analysis, and proven concepts for efficient detail design.

Stone, M. E.↗

Space Launch System, Core Stage, Structural Test Design and Implementation

As part of the National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, engineers at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama are working to design, develop and implement the SLS Core Stage structural testing. The SLS will have the capability to return humans to the Moon and beyond and its first launch is scheduled for December of 2017. The SLS Core Stage consist of five major elements; Forward Skirt, Liquid Oxygen (LOX) tank, Intertank (IT), Liquid Hydrogen (LH2) tank and the Engine Section (ES). Structural Test Articles (STA) for each of these elements are being designed and produced by Boeing at Michoud Assembly Facility located in New Orleans, La. The structural test for the Core Stage STAs (LH2, LOX, IT and ES) are to be conducted by the MSFC Test Laboratory. Additionally, the MSFC Test Laboratory manages the Structural Test Equipment (STE) design and development to support the STAs. It was decided early (April 2012) in the project life that the LH2 and LOX tank STAs would require new test stands and the Engine Section and Intertank would be tested in existing facilities. This decision impacted schedules immediately because the new facilities would require Construction of Facilities (C of F) funds that require congressional approval and long lead times. The Engine Section and Intertank structural test are to be conducted in existing facilities which will limit lead times required to support the first launch of SLS. With a SLS launch date of December, 2017 Boeing had a need date for testing to be complete by September of 2017 to support flight certification requirements. The test facilities were required to be ready by October of 2016 to support test article delivery. The race was on to get the stands ready before Test Article delivery and meet the test complete date of September 2017. This paper documents the past and current design and development phases and the supporting processes, tools, and methodology for supporting the SLS Core Stage STA test stands and related STE. The paper will address key requirements, system development activities and project challenges. Additionally, the interrelationships as well as interdependencies within the SLS project will be discussed.

Shaughnessy, Ray↗

Design, Fabrication, and Testing of a Composite Rack Prototype in Support of the Deep Space Habitat Program

In support of the Deep Space Habitat project a number of composite rack prototypes were developed, designed, fabricated and tested to various extents ( with the International Standard Payload Rack configuration, or crew quarters, as a baseline). This paper focuses specifically on a composite rack prototype with a direct tie in to Space Station hardware. The outlined prototype is an all composite construction, excluding metallic fasteners, washers, and their associated inserts. The rack utilizes braided carbon composite tubing for the frame with the sidewalls, backwall and flooring sections utilizing aircraft grade composite honeycomb sandwich panels. Novel additively manufactured thermoplastic joints and tube inserts were also developed in support of this effort. Joint and tube insert screening tests were conducted at a preliminary level. The screening tests allowed for modification, and enhancement, of the fabrication and design approaches, which will be outlined. The initial joint tests did not include mechanical fasteners. Adhesives were utilized at the joint to composite tube interfaces, along with mechanical fasteners during final fabrication (thus creating a stronger joint than the adhesive only variant). In general the prototype was focused on a potential in-space assembly approach, or kit-of-parts construction concept, which would not necessarily require the inclusion of an adhesive in the joint regions. However, given the tie in to legacy Station hardware (and potential flight loads with imbedded hardware mass loadings), the rack was built as stiff and strong as possible. Preliminary torque down tests were also conducted to determine the feasibility of mounting the composite honeycomb panels to the composite tubing sections via the additively manufactured tube inserts. Additional fastener torque down tests were also conducted with inserts (helicoils) imbedded within the joints. Lessons learned are also included and discussed.

Smith, Russ↗

A comparative study of internally and externally capped balloons using small scale test balloons

Caps have been used to structurally reinforce scientific research balloons since the late 1950's. The scientific research balloons used by the National Aeronautics and Space Administration (NASA) use internal caps. A NASA cap placement specification does not exist since no empirical information exisits concerning cap placement. To develop a cap placement specification, NASA has completed two in-hangar inflation tests comparing the structural contributions of internal caps and external caps. The tests used small scale test balloons designed to develop the highest possible stresses within the constraints of the hangar and balloon materials. An externally capped test balloon and an internally capped test balloon were designed, built, inflated and simulated to determine the structural contributions and benefits of each. The results of the tests and simulations are presented.

Bell, Douglas P.↗

Core design studies for advanced burner test reactor.

The U.S. government announced in February 2006 the Global Nuclear Energy Partnership (GNEP) to expand the use of nuclear energy to meet increasing global energy demand, to address nuclear waste management concerns and to promote non-proliferation. The advanced burner reactor (ABR) based on a fast spectrum is one of the three major technologies to be demonstrated in GNEP. In FY06, a pre-conceptual design study was performed to develop an advanced burner test reactor (ABTR) that supports development of a prototype full-scale ABR, which would be followed by commercial deployment of ABRs. The primary objectives of the ABTR were (1) to demonstrate reactor-based transmutation of transuranics (TRU) as part of an advanced fuel cycle, (2) to qualify the TRU-containing fuels and advanced structural materials needed for a full-scale ABR, (3) to support the research, development and demonstration required for certification of an ABR standard design by the U.S. Nuclear Regulatory Commission. Based on these objectives, core design and fuel cycle studies were performed to develop ABTR core designs, which can accommodate the expected changes of the TRU feed and the conversion ratio. Various option and trade-off studies were performed to determine the appropriate power level and conversion ratio. Both ternary metal alloy (U-TRU-10Zr) and mixed oxide (UO{sub 2}-TRUO{sub 2}) fuel forms have been considered with TRU feeds from weapons-grade plutonium (WG-Pu) and TRU recovered from light water reactor spent fuel (LWR-SF). Reactor performances were evaluated in detail including equilibrium cycle core parameters, mass flow, power distribution, kinetic parameters, reactivity feedback coefficient, reactivity control requirements and shutdown margins, and spent fuel characteristics. Trade-off studies on power level suggested that about 250 MWt is a reasonable compromise to allow a low project cost, at the same time providing a reasonable prototypic irradiation environment for demonstrating TRU-based fuels. Preliminary design studies showed that it is feasible to design the ABTR to accommodate a wide range of conversion ratio (CR) by employing different assembly designs. The TRU enrichments required for various conversion ratios and the irradiation database suggested a phased approach with initial startup using conventional enrichment plutonium-based fuel and gradual transitioning to full core loading of transmutation fuel after its qualification phase (resulting in {approx}0.6 CR). The low CR transmutation fuel tests can be accommodated in the designated test assemblies, and if fully developed, core conversion to low CR fuel can be envisioned. Reference ABTR core designs with a rated power of 250 MWt were developed for ternary metal alloy and mixed oxide fuels based on WG-Pu feed. The reference core contains 54 driver, 6 test fuel, and 3 test material assemblies. For the startup core designs, the calculated TRU conversion ratio is 0.65 for the metal fuel core and 0.64 for the oxide fuel core. Both the metal and oxide cores show good performances. The metal fuel core requires an average TRU enrichment of 18.8% and yields a reactivity swing of 1.2 %{Delta}k over the 4-month cycle. The core average flux level is {approx}2.4 x 10{sup 15} n/cm{sup 2}s, and test assembly flux level is {approx}2.8 x 10{sup 15} n/cm{sup 2}s. Compared to the metal fuel core, the lower density oxide fuel core requires an average TRU enrichment of 21.8%, which results in a 780 kg TRU loading (as compared to 732 kg for metal) despite a {approx}9% smaller heavy metal inventory. The lower heavy metal inventory increases the burnup reactivity swing by {approx}10% and reduces the flux levels by {approx}8%. Alternative designs were also studied for a LWR-SF TRU feed and a low conversion ratio, including the recycle of the ABTR spent fuel TRU. The lower fissile contents of the LWR-SF TRU relative to the WG-Pu TRU significantly increase the required TRU enrichment of the startup cores to maintain the same cycle length. The even lower fissile fraction of the ABTR spent fuel TRU further increases the TRU enrichments of the recycled cores. The reduced fissile content increases the fissile conversion ratio, and the increased TRU enrichment decreases the TRU conversion ratio. For example, the average TRU enrichment of the recycled core increases from 18.8% to 27.2% for the metal fuel and from 21.8% to 33.4% for the oxide core. The TRU conversion ratio is decreased from 0.65 to 0.56 for the metal core and from 0.64 to 0.52 for the oxide core. In the full paper, the details of design and performance characteristics will be presented along with the analysis methods.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization and Comparison of Planar and Trench Silicon Carbide (SiC) Power MOSFETs

This paper presents a comprehensive evaluation and experimental comparison of silicon carbide power MOSFETs through double pulse test. First, a universal hardware platform is designed and developed to test power semiconductor devices with various device packages and measuring requirements. Using the developed platform, the static characteristics and switching performance of the two types of SiC MOSFETs (one planar and one trench type) are evaluated under different case temperatures from 25 oC to 175 oC. Based on the evaluation data, a comparison of both SiC MOSFETs is conducted in terms of their on-state resistance, switching loss, and temperature dependent behavior. It is found that the latest trench SiC MOSFETs present similar switching loss while much lower conduction loss compared to existing commercial planar SiC MOSFETs. Moreover, the trench devices show a nearly temperature independent switching loss, which is beneficial to suppress the potential thermal runaway issue under high temperature continuous operation.

double pulse test↗

Fast Paced, Low Cost Projects at MSFC

What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in one year. FastSat HSV01 also deployed a Poly Picosatellite Orbital Deployer (PPOD) for a separate nano ]satellite class spacecraft (Cubesat: Nano Sail Demonstration) in partnership with Ames Research Center. The Robotic lunar lander is a MSFC JHU APL partnership that led to the development of a flexible architecture for landers to support robotic missions to a wide range of lunar and asteroid destinations. The team started with the goal of meeting NASA agency directives that led to the creation of a test bed focusing on GN&C and software to demonstrate the descent and landing on any airless body for the final 30 to 60 meters. The team created a complex technology demonstration as well as Guidance Control and Navigation (GN&C) algorithms providing autonomous control of the lander. The team uses a green propellant of 90% hydrogen peroxide and has completed 18 successful test flights. The International Space Station (ISS) SERVIR Environmental Research and Visualization System (ISERV) is a technology demonstration payload to assist the SERVIR project with environmental monitoring for disaster relief and humanitarian efforts. The ISERV project was a partnership with TBE. The ISERV payload consists of a commercial off the shelf camera, telescope, and MSFC developed power distribution box and interfaces on ISS with the Window Observational Research Facility in the US Lab. MSFC has identified three key areas that enabled the low cost mission success to include culture, partnering, and cost/schedule control. This paper will briefly discuss these three Class D efforts, FastSat HSV-01, the Robotic Lunar Lander and the ISERV camera system, the lessons learned, their successes and challenges.

Watson-Morgan, Lisa↗

Studies on Stress-Strain Relationships of Polymeric Materials Used in Space Applications

A two-year research plan was undertaken in association with Polymers Branch, NASA Glenn Research Center, to carry out experimental and modeling work relating stress and strain behavior of polymeric materials, especially elastomers and vulcanized rubber. An experimental system based on MTS (Mechanical Testing and Simulation) A/T-4 test facility environment has been developed for a broader range of polymeric materials in addition to a design of laser compatible temperature control chamber for online measurements of various strains. Necessary material processing has been accomplished including rubber compounding and thermoplastic elastomer processing via injection molding. A broad suite of testing methodologies has been identified to reveal the complex non-linear mechanical behaviors of rubbery materials when subjected to complex modes of deformation. This suite of tests required the conceptualization, design and development of new specimen geometries, test fixtures, and test systems including development of a new laser based technique to measure large multi-axial deformations. Test data has been generated for some of these new fixtures and has revealed some complex coupling effects generated during multi-axial deformations. In addition, fundamental research has been conducted concerning the foundation principles of rubber thermodynamics and resulting theories of rubber elasticity. Studies have been completed on morphological properties of several thermoplastic elastomers. Finally, a series of steps have been identified to further advance the goals of NASA's ongoing effort.

Jana, Sadhan C.↗

Materials, Turbomachinery and Heat Exchangers for Supercritical CO2 Systems

The objective of this project is to produce the necessary data to evaluate the performance of the supercritical carbon dioxide cycle. The activities include a study of materials compatibility of various alloys at high temperatures, the heat transfer and pressure drop in compact heat exchanger units, and turbomachinery issues, primarily leakage rates through dynamic seals. This experimental work will serve as a test bed for model development and design calculations, and will help define further tests necessary to develop high-efficiency power conversion cycles for use on a variety of reactor designs, including the sodium fast reactor (SFR) and very high-temperature gas reactor (VHTR). The research will be broken into three separate tasks. The first task deals with the analysis of materials related to the high-temperature S-CO 2 Brayton cycle. The most taxing materials issues with regard to the cycle are associated with the high temperatures in the reactor side heat exchanger and in the high-temperature turbine. The system could experience pressures as high as 20MPa and temperatures as high as 650°C. The second task deals with optimization of the heat exchangers required by the S-CO 2 cycle; the S-CO 2 flow passages in these heat exchangers are required whether the cycle is coupled with a VHTR or an SFR. At least three heat exchangers will be required: the pre-cooler before compression, the recuperator, and the heat exchanger that interfaces with the reactor coolant. Each of these heat exchangers is unique and must be optimized separately. The most challenging heat exchanger is likely the pre-cooler, as there is only about a 40°C temperature change but it operates close to the CO{sub 2} critical point, therefore inducing substantial changes in properties. The proposed research will focus on this most challenging component. The third task examines seal leakage through various dynamic seal designs under the conditions expected in the S-CO 2 cycle, including supercritical, choked, and two-phase flow conditions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Rubidium frequency standard test program for NAVSTAR GPS

Test data of the RFS Program in the Production phase and computer automation are presented, as an essential element in the evaluation of the RFS performance in a simulated spacecraft environment. Typical production test data will be discussed for stabilities from 1 to 100,000 seconds averaging time and simulated time error accumulation test. Also, design considerations in developing the RFS test systems for the acceptance test in production are discussed.

Koide, F.↗

Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

Niewoehner, Kevin R.↗

Cost effective dynamic design and test requirements for Shuttle payloads

The results of a study examining current spacecraft dynamic design and test requirements for the cost effective design and development of Shuttle payloads are presented. Dynamic environments, payload configurations, design/test requirements, test levels, assembly level of testing, simulation methods, prototype role, load limiting, test facilities, and flight measurements are discussed as they relate to the development of a cost effective design and test philosophy for Shuttle Spacelab payloads. It is concluded that changes to current design/test practices will minimize long range payload costs. However, changes to current practices need be quantitatively evaluated before an orderly progression to more cost effective methods can be achieved without undue risk of mission failures. Of major importance is optimization of test levels and plans for payloads and payload subsystems which will result in minimum project costs.

Stahle, C. V.↗

Net Shape Fabricated Low Cost MHK Pass-Through the Hub Turbine Blades with Integrated Health Management Technology

The primary objective of this project is to develop a three-blade MHK rotor with low manufacturing and maintenance costs. The proposed program will design, fabricate and test a novel half-scale low cost, net shape fabricated single piece three-blade MHK rotor with integrated health management technology to demonstrate significant Capital Expenditures (CAPEX) and Operational Expenditures (OPEX) cost reductions due to the novel design and manufacturing process. The proposed project is divided into three major tasks: Task 1: Single Piece Three-blade Kinetic Hydropower System (KHPS) Rotor Full-Scale and Half-Scale Design; Task 2: Composite Manufacturing Trials and Half-Scale Prototype Rotor Fabrication; and Task 3: Material Characterization and Half-Scale Prototype Test and Evaluation. These three tasks include design and analysis of full-scale and half-scale three-blade rotor prototypes using computational fluid dynamics (CFD) and finite-element analysis (FEA), demonstration of a novel half-scale net shape fabrication process, determination of a fatigue threshold composite strain allowable, three-blade rotor mold design, manufacture of half-scale rotor clam shell mold, three-blade rotor test fixture design and fabrication, development of final manufacturing and test plans, manufacture of the half-scale net shape composite single blade and three-blade prototypes, and test and evaluation of the half-scale rotor.

16 TIDAL AND WAVE POWER↗

Space Shuttle Orbiter Leading Edge Structural Subsystem development

The development of the Space Shuttle Orbiter Leading Edge Structural Subsystem (LESS) is traced from concept definition, through technical development, to final design, qualification testing and flight performance. A detailed description of the LESS is presented to support a discussion of the design, material development and thermal/structural integration. Extensive development/qualification tests and analytical studies were performed to verify the thermal/structural system performance and to certify the LESS for flight. Flight data and detailed post-flight inspection results are presented which support the conclusion that the LESS system performance has been outstanding.

Curry, D. M.↗

Design problems of small turbomachinery

Advanced design and testing techniques developed at NASA Lewis to achieve high efficiency in small turbomachines are described. Small radial and axial turbines and compressors were built for space power systems and associated studies at the Lewis Research Center. A six stage axial compressor of 3.5 inches diameter and axial turbines of 5 and 8.5 inches diameter were included. Radial turbines and compressors ranged from 3.5 to 6 inches. Topics discussed include maximum efficiency as a function of speed, the effect of compressibility on passage size, the use of quasi-orthogonals to calculate cross-channel velocity gradients, a design point velocity diagram study for axial turbines, and estimating off-design performance. Special turbine instruments and calibration procedures were developed to test compressors and turbines, to determine Reynolds and size number effects clearance, specific speed effects, and compressor performance. Laboratory tests conducted to study system operation and shaft and bearing motions are also reviewed.

Rohlik, H. E.↗

Space nuclear system thermoelectric NaK pump development

The engineering, design, fabrication, and test history of the dual-throat thermoelectric NaK development pump is summarized, along with the engineering and design status of a similar prototype pump intended for use on the 5-kwe reactor thermoelectric system. The history of dc pump development and testing on previous programs is also summarized.

Johnson, J. L.↗