Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Unraveling the convoluted and dynamic interphasial mechanisms on Li metal anode

Accurate understanding of the chemistry of solid-electrolyte interphase (SEI) is key to developing new electrolytes for high-energy batteries using lithium metal (Li-0) anodes(1). SEI is generally believed to be formed by the reactions between Li-0 and electrolyte(2,3). However, our new study shows this is not the whole story. Through synchrotron-based X-ray diffraction and pair distribution function analysis, we reveal a much more convoluted formation mechanism of SEI, which receives considerable contributions from electrolyte, cathode, moisture and native surface species on Li-0, with highly dynamic nature during cycling. Using isotope labelling, we traced the origin of LiH to electrolyte solvent, moisture and a new source: the native surface species (LiOH) on pristine Li-0. When lithium accessibility is very limited as in the case of anode-free cells, LiOH develops into plate-shaped large crystals during cycling. Alternatively, when the lithium source is abundant, as in the case of Li||NMC811 cells, LiOH reacts with Li-0 to form LiH and Li2O. While the desired anion-derived LiF-rich SEI is typically found in the concentrated electrolytes or their derivatives, we found it can also be formed in low-concentration electrolyte via the crosstalk effect, emphasizing the importance of formation cycle protocol and opening up opportunities for low-cost electrolyte development.

Polzin, Bryant J.↗

Three-Dimensional Network Adjustment of Laser Tracker Measurements for Large-Scale Metrology Applications

The adjustment of laser tracker network measurements for large-scale metrology applications has unique considerations not commonly encountered in the network adjustment approaches generally used in either standard metrology or in traditional geodetic surveying. Many applications that require the measurement accuracy of a laser tracker are confined to small working areas to measure the dimensional quality of manufactured parts. Large-scale metrology applications require the same high measurement accuracy, but over a comparatively larger working area. This paper describes a unified least-squares approach to adjust three-dimensional survey network measurements that takes into account the unique considerations of large-scale metrology networks. The impetus for these unique considerations arises from an application that falls neatly between the disciplines of metrology and geodesy—resembling a mixture of the conditions and requirements from both. In conclusion, this paper will also describe a case study of a large-scale metrology survey network used to align the particle accelerator at Michigan State University’s Facility for Rare Isotope Beams (FRIB).

42 ENGINEERING↗

Grid Strength Assessment for High Levels of Inverter-based Resources in the Puerto Rico Power

A system-wide assessment of the Puerto Rico power system grid strength is studied when considering high levels of inverter-based resource penetration. This study is carried out in PSSE and assesses the impact of inverter-based resource (IBR) contributions in response to three-phase ground faults. A hypothetical 100% inverter-based generation scenario is created to assess the extreme impact on short circuit levels and a realistic scenario is considered to assess the impact to short circuit ratios. The overall conclusion is that short circuit capacity and current will drastically decrease in a high IBR scenario, an effect that is quantified in this paper. The short circuit ratio metric is typically used to assess the impact of IBR but generally overestimates grid strength due to not accounting for the impact from multiple IBRs. Other methods such as equivalent circuit based short circuit ratio and weighted short circuit ratio offer a more comprehensive consideration for multiple IBRs and can better account for their mutual interactions. The work presented in this paper is part of the PR100 study.

inverter based resources, PR100, grid strength↗

A Cyber-Resilience Risk Management Architecture for Distributed Wind

Distributed wind is an electric energy resource segment with strong potential to be deployed in many applications, but special consideration of resilience and cybersecurity is needed to address the unique conditions associated with distributed wind. Distributed wind is a strong candidate to help meet renewable energy and carbon-free energy goals. However, care must be taken as more systems are installed to ensure that the systems are reliable, resilient, and secure. The physical and communications requirements for distributed wind mean that there are unique cybersecurity considerations, but there is little to no existing guidance on best practices for cybersecurity risk management for distributed wind systems specifically. This research develops an architecture for the consideration of cyber risks associated with distributed wind systems. The architecture takes into account the configurations, challenges, and standards for distributed wind to create a risk-focused perspective that considers of threats, vulnerabilities, and consequences, with special emphasis on what sets distributed wind systems apart from other distributed energy resources (DER). We discuss common distributed wind architectures and how they are interconnected to larger power systems. Because cybersecurity cannot exist independently, the cyber-resilience architecture must consider the system holistically. Finally, we discuss the implementation of a risk assessment process that uses the cyber-resilience framework to address challenges specific to distributed wind.

17 WIND ENERGY↗

Chemical significance of x-ray photoelectron spectroscopy binding energy shifts: A Perspective

The principal intent of this Perspective is to review the mechanisms that are responsible for the shifts of binding energies, ΔBE, observed in x-ray photoelectron spectroscopy (XPS) measurements and so to relate the shifts to the electronic structure and the chemical bonding in the systems studied. To achieve this goal, several theoretical considerations are necessary beyond just the calculation of XPS BEs. Though briefly discussed here, we are not primarily interested in absolute values of BE or quantitation using relative intensities. Within the molecular orbital (MO) theory framework, it is shown that the analysis of orbital properties is critical for the correct interpretation of XPS. In particular, rigorous definitions are given for the initial state and final state contributions to BEs and to BE shifts, ΔBE. It is first shown how the BEs of core levels are related to the electronic structure by consideration of the BEs for a model atomic system to establish the origins and magnitudes of BE shifts. The mechanisms established for the model system are then applied to a review of XPS measurements and MO theory on a set of real examples. An important focus of the paper is to demonstrate that, in many cases, initial state mechanisms allow for a definitive interpretation of the XPS BE shifts and that an important role of theory is to provide qualitative explanations rather than quantitative agreement with XPS measurements. The mechanisms established are a guide to the interpretation of XPS measurements and consideration of these mechanisms may suggest additional calculations that would be useful. It is concluded that there is still a bright future for the coupling of ab initio MO theory with XPS measurements.

Materials Science↗

SNS: A Solution-Based Nonlinear Subspace Method for Time-Dependent Model Order Reduction

Several reduced order models have been successfully developed for nonlinear dynamical systems. To achieve a considerable speed-up, a hyper-reduction step is needed to reduce the computational complexity due to nonlinear terms. Many hyper-reduction techniques require the construction of nonlinear term basis, which introduces a computationally expensive offline phase. A novel way of constructing nonlinear term basis within the hyper-reduction process is introduced. In contrast to the traditional hyper-reduction techniques where the collection of nonlinear term snapshots is required, the SNS method avoids collecting the nonlinear term snapshots. Instead, it uses the solution snapshots that are used for building a solution basis, which enables avoiding an extra data compression of nonlinear term snapshots. As a result, the SNS method provides a more efficient offline strategy than the traditional model order reduction techniques, such as the DEIM, GNAT, and ST-GNAT methods. The SNS method is theoretically justified by the conforming subspace condition and the subspace inclusion relation. It is useful for model order reduction of large-scale nonlinear dynamical problems to reduce the offline cost. It is especially useful for ST-GNAT that has shown promising results, such as a good accuracy with a considerable online speed-up for hyperbolic problems in a recent paper by Choi and Carlberg [SIAM J. Sci. Comput., 41 (2019), pp. A26--A58], because ST-GNAT involves an expensive offline cost related to collecting nonlinear term snapshots. Error analysis for the SNS method is presented. Numerical results support that the accuracy of the solution from the SNS method is comparable to the traditional methods and a considerable speed-up (i.e., a factor of two to a hundred) is achieved in the offline phase.

97 MATHEMATICS AND COMPUTING↗

Chapter 1: Halide Organic Photovoltaics for Energy: Hybrid Perovskites for Solar Cells

The following sections are included: Fundamentals of Photovoltaics, What Limits PV Device Efficiencies?, Traditional Photovoltaics, Perovskite Halide-Based Hybrid Semiconductors for Photovoltaics: Novel Materials in a League of Their Own, Solution Processability, Tunability, Perovskite Solar Cell Architectures, Pairing Perovskite Absorbers, Reduction/Oxidation and Electrochemical Reactivity Considerations for High-Performance Halide Perovskite Solar Cells, Metal Electrode Corrosion, Proton-Mediated Reduction of Ni3+ at NiOx Interfaces, Electrochemistry in Solid-State Perovskite Devices, Overview of Stability Considerations for High Performance Perovskite Solar Cells, Moisture-Induced Degradation, Oxygen-Mediated Degradation, Illumination-Dependent Degradation, Bias-Dependent Degradation, Stability Considerations for Charge Selective Contacts, Electrode-Induced Degradation Modes, Conclusion, and References.

absorbers↗

Halide Perovskite Solar Photovoltaics

Technological progress in photovoltaic (PV) technologies provides hope that a comprehensive and desperately needed decarbonization of the energy sector is possible. Commercially successful PV technologies based predominantly on silicon wafer technology are reliable and cost-effective, but remain capital- and carbon-intensive. In this context, emerging PV technologies, such as metal-halide perovskites (MHPs), could further catalyze the energy transition by providing technological opportunities for even lower-cost, mass-producible, high-efficiency solar cells with a significantly reduced "carbon footprint." This themed issue of MRS Bulletin on "Halide perovskite solar photovoltaics summarizes the current state of the art, challenges, and opportunities of perovskite photovoltaics with contributions and perspectives from six expert teams worldwide. The topics covered provide a status update on perovskite PV, remaining hurdles to their deployment, and challenges to realizing the potential of this technology to impact climate goals. Articles in this collection address scalability of perovskite PV and prospects for industrial manufacturing; perovskite PV as an add-on technology on top of commercial silicon PV; environmental and sustainability considerations; and durability and reliability considerations. Further considerations include prospects of automation, coupled to artificial intelligence and machine learning, for accelerating material-based solutions to these outstanding challenges including the possibilities of discovering new absorber and device component materials to enable success and ultimately deployment of these next-generation PVs.

metal-halide perovskites↗

CO2 Transport Planning Database

The CO2 Transport Planning Database v3.0 is a geospatial resource, containing over 70 gigabytes of data representing critical considerations for the spatial routing of pipelines and transport of CO2, from source to sink. Considerations include state-specific legislation, land use requirements, existing infrastructure, and hazard prevention areas. Built to support strategic domestic energy transport planning and development, more than 60 layers of this database have been weighted (Weight fields) according to current legislation and pipeline construction recommendations. Weighted values range from zero to one, where zero represents potentially more acceptable areas for transport based on the various considerations, and a value of one represents areas that should be avoided. This geospatial database provides a baseline for the Smart CO2 Transport Planning Tool.

Boundaries↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Comparing Capacity Credit Calculations for Wind: A Case Study in Texas

The degree to which wind energy can contribute to the capacity needed to meet resource adequacy requirements, also known as capacity credit (CC), varies regionally with wind resource and correlation to net load. CC is an important metric widely used for resource planning and resource adequacy assessments. However, there are multiple methods for computing and estimating CC, depending on specific needs, access to data, and computational burden. It is unclear the extent to which the CC computation method may influence the result. To address this, we use a probabilistic resource adequacy tool and multiple approximation methods to systematically assess the CC of wind for near-term wind deployment under a case study in Texas. We find that proper consideration of transmission constraints is important; some approximation methods may overestimate the CC of wind due to a lack of consideration of transmission constraints, while other approximation methods may underestimate the CC by not capturing the ability of wind to be shipped to neighboring regions. In this case study, we find that several approximation methods do come close to the CC calculated by more robust probabilistic methods. However, the best approximation method may vary on a case-by-case basis, depending on system-specific considerations.

17 WIND ENERGY↗

Transformational Challenge Reactor – On the Application of Design for Additive Manufacturing (DfAM) Techniques to the Conception of Nuclear Core

Additive manufacturing (AM) technologies are radically changing the way objects are designed and manufactured. They allow building by deposition and solidification of material layer by layer, enabling the possibility to create simple and complex features alike, almost seamlessly. Generally, the design optimization process requires to define objectives, design variables and constraints. Additive manufacturing does not challenge this process per se but does allow designers to completely redefine the constraints space as the ones originating from fabrication can be considerably relaxed compared to more “traditional” manufacturing. Thus, design optimization becomes naturally far more responsive to the actual physics being solved and considerably less influenced by fabrication limitations, leading to dramatically different designs. To take advantage of these new opportunities, so-called Designing for Additive Manufacturing (DfAM) techniques are emerging. Development of design techniques specifically tailored for additive manufacturing is warranted because, considering AM, the design space is typically considerably larger than with traditional manufacturing. The ability to explore the design space efficiently is of paramount importance for designers. This study proposes to investigate and apply some of these DfAM techniques to the conception of nuclear core. The goal being to assess if these new methods can be applied to core design and if core design could benefits from additive manufacturing technologies. After a brief investigation on the pertinence of some DfAM techniques for core design, algorithms are proposed and a workflow is established to carry neutronics and steady-state thermal-hydraulics analyses. To diminish the work load, the workflow has been automated using python modules. These modules allow the rapid creation of input files, post-treatment of output files and visualization. To test the pertinence of the proposed workflow, three test cases have been investigated: a research and test reactor, a micro-reactor and a space propulsion reactor. These test cases offered a variety of objectives, constraints and operating conditions. It is observed that the proposed workflow is capable of converging quickly and efficiently to valid design solutions. It is then concluded that DfAM techniques can be applied to core design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

Due to the urgency around climate change and associated goals for clean energy transition, and Battelle Energy Alliance's (BEA) and Idaho National Laboratory's (INL) role as the nation's nuclear energy laboratory, numerous stakeholders have asked for BEA’s thoughts and recommendations to reduce the time and costs associated with licensing new reactors at the U.S. Nuclear Regulatory Commission (NRC). As an M&O contractor for an FFRDC, BEA is a long-term partner with the Government in seeking to achieve clean energy goals, yet has a level of independence needed to appropriately evaluate this topic. The views herein are informed by extensive BEA experience supporting nuclear energy endeavors including ongoing discussions with current and former regulators, applicants, and licensees. With this background in mind, the United States benefits from having an agency such as the NRC, which is viewed internationally as the leader in nuclear safety licensing and regulation. Nonetheless, while acknowledging the important nuclear safety role satisfied by the NRC, it is apparent that one of the most significant time and resource intensive activities for new reactor developers is the NRC licensing process. The time and cost to obtain NRC licenses add significant financial stress for new reactor projects and may result in abandonment of projects or failure to even begin new projects. The challenge is particularly acute for advanced reactors which may raise unique or new regulatory questions and may be smaller in size, resulting in a much higher proportional impact from regulatory and cost challenges. This situation presents a particularly troublesome risk for the nation given the urgency in which utilities are working to transition to clean, non-carbon-emitting energy sources like nuclear energy. Reforms to the NRC licensing process have the potential to greatly increase certainty and support the successful progress of new reactors. The NRC can retain its world-class nuclear safety reputation while becoming a world leader for regulatory efficiency and a critical enabler to the clean energy transition. This report describes potential NRC reforms, focusing on those with a statutory connection. Recognizing the potential tradeoffs with any proposed changes, the report attempts to highlight those considerations in the analysis of the reforms. The recommendations are presented as a set of options for consideration. Unless noted, they are independent options, offering stakeholders the option to select a subset for further consideration. Although difficult to calculate precise time improvements for some of the changes, the reforms have the potential for substantial improvements, perhaps even by a factor of two.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Digital Engineering and Cybersecurity Decision Analysis in Early Phases of SMR-Driven IES Projects

Considerable efforts are underway to ensure cybersecurity is integrated into the systems engineering lifecycle. Cyber-informed engineering and security-by-design frameworks are intended to identify and engineer out cybersecurity risks throughout the lifecycle. While these approaches are valuable for promoting the need to include cybersecurity considerations in early design phases to create more secure systems, they may not consider the entirety of digital risks. Digital risks in a digital instrumentation and control system include adversarial and unintentional risks from internal and external factors, such as human performance errors, design flaws, environmental conditions, and equipment degradation or failure. This report provides a detailed discussion on digital risk prior to describing the background and concept of operations for a small modular reactor-driven integrated energy system connected to industrial applications. The challenges of competing objectives and competing stakeholder requirements are discussed and the impacts on digital engineering, security considerations, and interdependencies are evaluated for mission-level, facility-level, and system-level decisions.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Power Supply Options for the Marpi Landfill, Saipan: Addendum to 2023 Feasibility Study

The Marpi Landfill (Marpi or the landfill), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase sustainable energy consumption within the CNMI. Pacific Northwest National Laboratory (PNNL) authored a feasibility study in 2023 that explores alternative power supply options for the landfill. This feasibility study (hereafter referred to as Phase I of this study) culminated in a report named “Power Supply Options for the Marpi Landfill, Saipan.” In Phase I, the project team investigated and prioritized seven different power supply scenarios (Table ES-1) for the landfill according to Solid Waste (SW) Taskforce priorities. The project team found that Scenario 4 (100 kW of solar photovoltaic [PV] generation, a 75 kW/300 kWh battery energy storage system [BESS], and 160 kW of diesel generation) ranked highest. Following the Phase I feasibility study, the SW Taskforce secured additional funding for PNNL to assess additional considerations regarding power supply options for Marpi. The purpose of Phase II of this study is to investigate these additional considerations, as compiled in this addendum. Some of the findings compiled here replace findings from the original report. The project team evaluated additional considerations regarding power supply options for the landfill, including modified operations to account for 24/7 power supply, electrified landfill equipment, new and replacement distribution line costs, and the social cost of carbon.

14 SOLAR ENERGY↗

Community Planning for Solar: Conducting a Community Solar Survey

This guide is designed to assist community officials, volunteers, and regional planning agency staff in conducting a survey of residents to learn about attitudes and development preferences towards solar energy within the community. The guide will provide the key steps, timelines, distribution options, ethics, and considerations that should be made in developing a survey distribution strategy. The guide also contains an overview of various question types and response categories, with considerations for the type of data that are needed for the study. The guide concludes with recommendations for managing data and databases, data visualization, and reporting results. The appendix includes samples of materials used in a solar energy survey, from invitation letters to the survey. This document is intended to provide a practical guide for implementing a survey in communities that are proactively planning for solar development. The guide offers a practical “how-to” plan for conducting a survey. It may be advantageous to consult with an expert in survey development who will be familiar with any methods and techniques described in this guide, but this is not necessary. This guide offers basic considerations and examples of questions and analyses to help a community understand preferences of the community.

14 SOLAR ENERGY↗

Reevaluation of Radiation-Protection Standards for Workers and the Public Based on Current Scientific Evidence

President Trump’s recent executive orders to “Usher in a Nuclear Renaissance,” coupled with the global pledge to triple nuclear energy capacity by 2050, underscore nuclear energy’s importance to national security and economic prosperity. This renewed interest has prompted efforts to spur nuclear-energy deployment, including assessing factors impeding it. One issue that has previously been identified as adding to the cost of nuclear energy is excessively conservative requirements, including those related to radiation protection. This technical review, therefore, examines current radiation-protection standards that were established decades ago when more limited data were available and nuclear-energy expansion was not a national priority. The review focuses on scientific evidence regarding the health effects of ionizing radiation at annual doses of 10,000 mrem or less. The review evaluates epidemiological studies, radiobiological research, and positions of relevant professional organizations to assess whether such doses result in discernable or observable increases in negative health outcomes. The review also surveys the literature related to economic and practical implications of current radiation-protection standards and practices. Based on this assessment, we propose maintaining an annual occupational whole-body dose limit of 5,000 mrem/yr and eliminating all “as low as reasonably achievable” requirements and limits below this threshold. This change could potentially reduce radiation-protection costs by millions of dollars annually for each reactor, as well as decrease the overall costs and correct misconceptions about the risks associated with all nuclear technologies. The evidence further supports future consideration of a 10,000 mrem/yr limit that would maintain appropriate safety margins while further reducing protection costs. Similarly, given the data and that the average annual radiation dose per person in the U.S. is 620 mrem, we believe the public dose limits of 100 mrem/yr are unnecessarily restrictive; increasing to 500 mrem/yr would maintain substantial safety margins—a factor of 10 below the occupational limit—while reducing regulatory burdens and associated bureaucracy. While we acknowledge ongoing scientific debate and encourage continued research on the health effects of ionizing radiation, our review indicates current frameworks are overly conservative. These overly stringent limits not only impose unnecessary economic burdens without corresponding health benefits but also divert safety focus and resources from more important considerations. Although this study was motivated by nuclear-power considerations, reforms to radiation-protection requirements have significant positive implications for other areas, such as nuclear medical applications, environmental remediation, nuclear-waste management and disposal, and industrial applications of nuclear technologies.

61 RADIATION PROTECTION AND DOSIMETRY↗