Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “baseline program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Urban Combined Heat and Power with Integrated Renewables and Energy Storage

This project demonstrated how incorporating a diverse generation and storage portfolio allows an urban district energy system to improve its efficiency by at least 50% and increase its backup power by at least 40% with a return on investment of at least ten years. The improvement was evaluated against the baseline operations for two urban district energy systems (DESs): a synthetic DES and a George Washington University DES. The DES techno-economic framework we developed yields reliability, resilience, and vulnerability indices for urban DESs (including generation and storage) with designation of which technologies improve the security and resiliency metrics by at least 20% compared to the status quo. The indices are benchmarked against baseline scenarios, and cost projections (capital cost and return on investment) to achieve the 20% improvement are reported. The energy management system we developed to conduct these analyses was incorporated into a user-friendly interface that can be used for decision-making by a user with no technical or programming background.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Heavy Duty Natural Gas Single Cylinder Research Engine Installation, Commissioning, and Baseline Testing

Natural Gas (NG) Internal Combustion Engines (ICE) are a promising alternative to diesel engines for on-road heavy-duty applications to reduce greenhouse gas and harmful pollutant emissions. NG engines have not been widely adopted due to the lower thermal efficiency compared with diesel engine counterparts. To develop the base knowledge required to reach the desired efficiency, a Single Cylinder Engine (SCE) is the most effective platform to acquire reliable and repeatable data. A SCE test cell was developed using a Cummins 15-liter six-cylinder heavy-duty engine block modified to fire one cylinder (2.5-liter displacement). A Woodward Large Engine Control Module (LECM) is integrated to permit implementation of real-time advanced combustion control. Intake and exhaust characteristics, fuel composition, and exhaust gas recirculated substitution rate (EGR) are fully adjustable. A high-speed data acquisition system acquires in-cylinder, intake, and exhaust pressure for combustion analysis. The baseline testing shows reliable and consistent results for engine thermal efficiency, indicated mean effective pressure (IMEP), and coefficient of variance of the IMEP over a wide range of operating conditions while achieving effective control of all engine control and operation variables. This test cell will be used to conduct a research program to develop new and innovative control algorithms and CFD optimized combustion chamber designs, allowing ultra-high efficiency and low emissions for NG ICE heavy-duty on-road applications.

03 NATURAL GAS↗

The MPACT 2020 Milestone: Safeguards and Security by Design of Future Nuclear Fuel Cycle Facilities.

The Materials Protection, Accounting, and Control Technologies (MPACT) campaign, within the U.S. Department of Energy Office of Nuclear Energy, has developed a Virtual Facility Distributed Test Bed for safeguards and security design for future nuclear fuel cycle facilities. The purpose of the Virtual Test Bed is to bring together experimental and modeling capabilities across the U.S. national laboratory and university complex to provide a one-stop-shop for advanced Safeguards and Security by Design (SSBD). Experimental testing alone of safeguards and security technologies would be cost prohibitive, but testbeds and laboratory processing facilities with safeguards measurement opportunities, coupled with modeling and simulation, provide the ability to generate modern, efficient safeguards and security systems for new facilities. This Virtual Test Bed concept has been demonstrated using a generic electrochemical reprocessing facility as an example, but the concept can be extended to other facilities. While much of the recent work in the MPACT program has focused on electrochemical safeguards and security technologies, the laboratory capabilities have been applied to other facilities in the past (including aqueous reprocessing, fuel fabrication, and molten salt reactors as examples). This paper provides an overview of the Virtual Test Bed concept, a description of the design process, and a baseline safeguards and security design for the example facility. Parallel papers in this issue go into more detail on the various technologies, experimental testing, modeling capabilities, and performance testing.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Research, Development and Demonstration of Advanced Vehicle Technologies in Clean Motor Fuels (CRADA Final Report)

NREL/DOE has been funding research, development, and demonstration (RD&D) projects to facilitate the deployment of alternative fuels into the marketplace in order to achieve three objectives: 1) enhance the reduction of mobile source emissions in California and the U.S.; 2) increase U.S. competitiveness and economic prosperity; and 3) preserve the environment through the reduction of emissions and toxins from the motor vehicle population. The Lewis-Presley Air Quality Management Act requires the South Coast Air Quality Management District to establish a program to encourage participation in projects to increase the utilization of clean-burning fuels. The parties seek to collaborate on a joint RD&D project to perform a field test on a small vehicle fleet operating on Fischer-Tropsch synthetic diesel fuel. Recently the 106th U.S. Congress designated "gas-to-liquid" (GTL) transportation fuels that are produced from domestic products as alternative fuels under the Energy Policy Act of 1992 (EPACT). Niche markets could develop quickly for these fuel products, perhaps especially for the use of Fischer-Tropsch synthetic fuels in centrally fueled vehicle fleets in California. NREL and its project partners from the U.S. Department of Energy and West Virginia University have recently conducted what we believe to be the first-ever controlled tests of Fischer-Tropsch synthetic fuels in heavy vehicles. These tests have shown that Fischer-Tropsch fuels can be substituted in unmodified trucks and buses without any detectable loss in drivability and performance. Compared to a California diesel fuel baseline, neat Shell Fischer-Tropsch fuel emitted about 12% lower NOx and 24% lower particulate matter over a five-mile driving route while maintaining the same fuel economy on an energy equivalent basis. Whereas these exhaust emissions reductions from these previous studies have been impressive, far greater exhaust emissions reductions can be achieved if the vehicles are retrofitted with emissions control technologies that are enabled by Fischer-Tropsch fuels. For this program, a test fleet would be selected and retrofitted with continuously regenerating traps (CRT’s) or diesel particulate filters (DPF's). The University of West Virginia, under a separate subcontract to SCAQMD will have the responsibility to test and measure the emissions from the test fleet of vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternatives for Helium-3 in Multiplicity Counters

Alternatives to helium-3 are being actively pursued due to the shortage and rising costs of helium-3. For safeguards applications, there are a number of ongoing investigations to find alternatives that provide the same capability in a cost-effective manner. One of the greatest challenges is to find a comparable alternative for multiplicity counters, since they require high efficiency and short collection or die-away times. Work has been progressing on investigating three commercially available alternatives for high efficiency multiplicity counters: boron trifluoride (BF3) filled proportional tubes, boron-lined proportional tubes, and lithium fluoride with zinc sulfide coated light guides. The baseline multiplicity counter used for the investigation is the Epithermal Neutron Multiplicity Counter with 121 helium-3 filled tubes at 10 atmosphere pressure, which is a significant capability to match. The primary tool for the investigation has been modeling and simulation using the Monte Carlo N-Particle eXtended (MCNPX) radiation transport program, with experiments to validate the models. To directly calculate the coincidence rates in boron-lined (and possibly other) detectors, the MCNPX code has been enhanced to allow the existing coincidence tally to be used with energy deposition rather than neutron capture reactions. This allows boron-lined detectors to be modeled more accurately. Variations of tube number and diameter along with variations in the amount of inter-tube moderator have been conducted for the BF3 and boron-lined cases. Tube pressure was investigated for BF3, up to two atmospheres, as well as optimal boron thickness in the boron-lined tubes. The lithium fluoride was modeled as sheets of material with light guides in between, and the number and thickness of the sheets investigated. The amount of light guide, which in this case doubles as a moderator, was also optimized. The results of these modeling and simulation optimization investigations are described and results presented.

Ely, James H.↗

Characterization of Technetium Speciation in Cast Stone

This report describes the results from laboratory tests performed at Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) EM-31 Support Program (EMSP) subtask, “Production and Long-Term Performance of Low Temperature Waste Forms” to provide additional information on technetium (Tc) speciation characterization in the Cast Stone waste form. To support the use of Cast Stone as an alternative to vitrification for solidifying low-activity waste (LAW) and as the current baseline waste form for secondary waste streams at the Hanford Site, additional understanding of Tc speciation in Cast Stone is needed to predict the long-term Tc leachability from Cast Stone and to meet the regulatory disposal-facility performance requirements for the Integrated Disposal Facility (IDF). Characterizations of the Tc speciation within the Cast Stone after leaching under various conditions provide insights into how the Tc is retained and released. The data generated by the laboratory tests described in this report provide both empirical and more scientific information to increase our understanding of Tc speciation in Cast Stone and its release mechanism under relevant leaching processes for the purpose of filling data gaps and to support the long-term risk and performance assessments of Cast Stone in the IDF at the Hanford Site.

Cast Stone↗

Implementation and Rejection of Industrial Steam System Energy Efficiency Measures

Steam systems consume approximately one third of energy applied at U.S. industrial facilities. To reduce energy consumption, steam system energy assessments have been conducted on a wide range of industry types over the course of five years through the Energy Savings Assessment (ESA) program administered by the U.S. Department of Energy (U.S. DOE). ESA energy assessments result in energy efficiency measure recommendations that are given potential energy and energy cost savings and potential implementation cost values. Saving and cost metrics that measure the impact recommended measures will have at facilities, described as percentages of facility baseline energy and energy cost, are developed from ESA data and used in analyses. Developed savings and cost metrics are examined along with implementation and rejection rates of recommended steam system energy efficiency measures. Based on analyses, implementation of steam system energy efficiency measures is driven primarily by cost metrics: payback period and measure implementation cost as a percentage of facility baseline energy cost (implementation cost percentage). Stated reasons for rejecting recommended measures are primarily based upon economic concerns. Additionally, implementation rates of measures are not only functions of savings and cost metrics, but time as well.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2015 Cross-Domain Deterrence Seminar Bibliography

In November 2015, the Center for Global Security Research, NSO, and Global Security program jointly sponsored a seminar investigating questions related to cross-domain deterrence at Lawrence Livermore National Laboratory. At the seminar, experts were asked to moderate discussion based on the four topics below. For each of these topics, we have compiled a short list of literature that will help analysts develop a baseline understanding of the issue.

99 GENERAL AND MISCELLANEOUS↗

Status of Measuring Cross Sections of Hadrons on Argon with ProtoDUNE-SP

ProtoDUNE Single-Phase is a 700-ton liquid argon detector operated in the CERN Neutrino Platform from 2018 to 2020. It is part of the Deep Underground Neutrino Experiment (DUNE), a long-baseline neutrino oscillation experiment with a 40 kT liquid argon far detector to be built at the Sanford Underground Research Facility and a near detector, with both argon and non-argon detector technologies, to be hosted at the Fermi National Accelerator Laboratory. A critical uncertainty to understand in the neutrino oscillation program of DUNE is the uncertainty on final state interactions, either reaction or elastic, of various hadrons on argon since the scattering of neutrino-induced hadrons off argon bias the hadron's measured energy. It can also prevent algorithms from identifying the hadron's particle type. Protons, kaons, and pions from the beam are especially important for the DUNE neutrino program as they represent common final state particles in neutrino interactions off a nucl eus. Therefore, ProtoDUNE is analyzing the test beam data to measure cross sections of pions, protons, and kaons on argon, aiming to tune parameters that model charged particle scattering off argon. This talk will discuss the data-taking program for ProtoDUNE and an overview of the status and results of measuring cross sections of pions, protons, and kaons on argon. It will conclude with a brief overview of how these measurements can be used for future liquid argon neutrino detectors.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Delivery Ring Spill Characterization and Impulse Study

High-intensity particle physics experiments require uniform beam extraction to prevent instantaneous rate spikes from overwhelming detector systems. By analyzing accelerator parameters and extracted beam dynamics, we directly inform spill regulation systems that make real-time adjustments to minimize non-uniformity. This Department of Energy Visiting Faculty Program project transitioned from characterizing Main Injector half-integer slow extraction for SpinQuest to Delivery Ring third-integer slow extraction for Mu2e. Working alongside the Fast Adaptive Neural Control (FANC) group, we developed an automated pipeline that aligns asynchronous instrument channels, embeds quality metrics, and isolates clean spill populations. Analyzing baseline spills alongside a dedicated quadrupole impulse study allowed us to quantify noise structures while mapping time-varying beam response and transit-delay dynamics. These empirical measurements directly ground digital twin models, supporting FANC’s deployment of real-time, FPGA-based neural network controllers in the Mu2e Spill Regulation System.

Dolen, James William [Purdue U., West Lafayette] (↗

THE CATALOG OF POSITIONS OF OPTICALLY BRIGHT EXTRAGALACTIC RADIO SOURCES OBRS-2

Future space-borne astrometry missions, such as Gaia, will be able to determine the optical positions of hundreds of quasars with submilliarcsecond accuracies comparable to those achieved in radio by very long baseline interferometry (VLBI). Comparisons of coordinate systems from space-borne missions and VLBI will be very important, first for investigations of possible systematic errors and second for investigations of possible shifts between centroids of radio and optical emissions in active galactic nuclei. In order to make such a comparison more robust, a program for densification of the grid of radio sources detectable with both VLBI and Gaia was launched in 2006. Program sources are 398 quasars with declinations > - 10 Degree-Sign that are brighter than 18 mag at the V band. The first two observing campaigns were run in 2007-2008. In the third campaign, a set of 291 objects from that list was observed with the VLBA+EVN in 2010-2011 with the primary goal of producing their images with milliarcsecond resolution. In this paper, following the method of absolute astrometry, coordinates of observed sources have been derived with milliarcsecond accuracies from analysis of these observations. The catalog of positions of 295 target sources, estimates of their correlated flux densities at 2.2 and 8.4 GHz, and their images are presented. The accuracies of source coordinates are in a range of 2-200 mas, with a median of 3.2 mas.

79 ASTRONOMY AND ASTROPHYSICS↗

Gasoline Ultra Efficient Fuel Vehicle with Advanced Low Temperature Combustion

The objective of this program was to develop, implement and demonstrate fuel consumption reduction technologies which are focused on reduction of friction and parasitic losses and on the improvement of thermal efficiency from in-cylinder combustion. The program was executed in two phases. The conclusion of each phase was marked by an on-vehicle technology demonstration. Phase I concentrated on short term goals to achieve technologies to reduce friction and parasitic losses. The duration of Phase I was approximately two years and the target fuel economy improvement over the baseline was 20% for the Phase I demonstration. Phase II was focused on the development and demonstration of a breakthrough low temperature combustion process called Gasoline Direct- Injection Compression Ignition (GDCI). The duration of Phase II was approximately four years and the targeted fuel economy improvement was 35% over the baseline for the Phase II demonstration vehicle. The targeted tailpipe emissions for this demonstration were Tier 2 Bin 2 emissions standards.

33 ADVANCED PROPULSION SYSTEMS↗

Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The CAPTAIN liquid argon neutrino experiment

The CAPTAIN liquid argon experiment is designed to make measurements of scientific importance to long-baseline neutrino physics and physics topics that will be explored by large underground detectors. The experiment employs two detectors – a primary detector with approximately 10-ton of liquid argon that will be deployed at different facilities for physics measurements and a prototype detector with 2-ton of liquid argon for configuration testing. The physics programs for CAPTAIN include measuring neutron interactions at Los Alamos Neutron Science Center, measuring neutrino interactions in medium energy regime (1.5–5 GeV) at Fermilab's NuMI beam, and measuring neutrino interactions in low energy regime (< 50 MeV) at stopped pion sources for supernova neutrino studies.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Energy Savings From System Efficiency Improvements in Iowa's HVAC SAVE Program

The objective of this project is to explore the energy savings potential of maximizing furnace and distribution system performance by adjusting operating, installation, and distribution conditions. The goal of the Iowa HVAC System Adjusted and Verified Efficiency (SAVE) program is to train contractors to measure installed system efficiency as a diagnostic tool to ensure that the homeowner achieves the energy reduction target for the home rather than simply performing a tune-up on the furnace or having a replacement furnace added to a leaky system. The PARR research team first examined baseline energy usage from a sample of 48 existing homes, before any repairs or adjustments were made, to calculate an average energy savings potential and to determine which system deficiencies were prevalent. The results of the baseline study of these homes found that, on average, about 10% of the space heating energy available from the furnace was not reaching the conditioned space. In the second part of the project, the team examined a sample of 10 homes that had completed the initial evaluation for more in-depth study. For these homes, the diagnostic data shows that it is possible to deliver up to 23% more energy from the furnace to the conditioned space by doing system tune ups with or without upgrading the furnace. Replacing the furnace provides additional energy reduction. The results support the author's belief that residential heating and cooling equipment should be tested and improved as a system rather than a collection of individual components.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Actions to Evaluate Tritium in ATR Complex Perched Water Well 12

On April 23, 2019, elevated tritium concentrations in monitoring well PW-12 were reported to the Advanced Test Reactor (ATR) Complex environmental manager by the Fluor Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) lead. The monitoring well is one of a series of wells located in and around the ATR Complex that are sampled on an annual basis as part of the CERCLA monitoring program. The Fluor Idaho CERCLA lead indicated the elevated concentrations had been trending upward from Fiscal Year (FY) 2017 through FY 2019. The tritium levels went from 1,880 pCi/L in October 2016 to 7,890 pCi/L in October 2017 and increased to 13,000 pCi/L in October 2018. In order to identify a baseline, the safe drinking water level (e.g. 20,000 pCi/L) can be used as a reference point for comparison only, as PW-12 is a perched water well and does not penetrate the aquifer. Although well below safe drinking water levels, an investigation was initiated to identify the source of tritium.

99 GENERAL AND MISCELLANEOUS↗