Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “active integrators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

ISS Logistics Hardware Disposition and Metrics Validation

I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

Rogers, Toneka R.↗

NASA's ATM Ontology: Semantic Integration and Querying Across NAS Data Sources

NASA is developing an Air Traffic Management (ATM) Ontology as part of an advanced prototyping activity that demonstrates the utility of semantic technologies for integrating, querying, and searching over various sources of heterogeneous ATM data. The ontology encodes an overarching data model that functions as the backbone upon which to overlay data from multiple sources published by FAA, NOAA, NASA, and others. The integrated data can be queried to produce results not achievable using any single source alone. The ontology incorporates flight data, weather data, traffic management advisory data, airport delay data, and national airspace infrastructure data for a very limited spatial and temporal slice of airspace operations (one day of operations at a major airport).

air traffic management↗

Validation of Atmosphere/Ionosphere Signals Associated with Major Earthquakes by Multi-Instrument Space-Borne and Ground Observations

The latest catastrophic earthquake in Japan (March 2011) has renewed interest in the important question of the existence of pre-earthquake anomalous signals related to strong earthquakes. Recent studies have shown that there were precursory atmospheric/ionospheric signals observed in space associated with major earthquakes. The critical question, still widely debated in the scientific community, is whether such ionospheric/atmospheric signals systematically precede large earthquakes. To address this problem we have started to investigate anomalous ionospheric / atmospheric signals occurring prior to large earthquakes. We are studying the Earth's atmospheric electromagnetic environment by developing a multisensor model for monitoring the signals related to active tectonic faulting and earthquake processes. The integrated satellite and terrestrial framework (ISTF) is our method for validation and is based on a joint analysis of several physical and environmental parameters (thermal infrared radiation, electron concentration in the ionosphere, lineament analysis, radon/ion activities, air temperature and seismicity) that were found to be associated with earthquakes. A physical link between these parameters and earthquake processes has been provided by the recent version of Lithosphere-Atmosphere-Ionosphere Coupling (LAIC) model. Our experimental measurements have supported the new theoretical estimates of LAIC hypothesis for an increase in the surface latent heat flux, integrated variability of outgoing long wave radiation (OLR) and anomalous variations of the total electron content (TEC) registered over the epicenters. Some of the major earthquakes are accompanied by an intensification of gas migration to the surface, thermodynamic and hydrodynamic processes of transformation of latent heat into thermal energy and with vertical transport of charged aerosols in the lower atmosphere. These processes lead to the generation of external electric currents in specific regions of the atmosphere and the modifications, by dc electric fields, in the ionosphere-atmosphere electric circuit. We retrospectively analyzed temporal and spatial variations of four different physical parameters (gas/radon counting rate, lineaments change, long-wave radiation transitions and ionospheric electron density/plasma variations) characterizing the state of the lithosphere/atmosphere coupling several days before the onset of the earthquakes. Validation processes consist in two phases: A. Case studies for seven recent major earthquakes: Japan (M9.0, 2011), China (M7.9, 2008), Italy (M6.3, 2009), Samoa (M7, 2009), Haiti (M7.0, 2010) and, Chile (M8.8, 2010) and B. A continuous retrospective analysis was preformed over two different regions with high seismicity- Taiwan and Japan for 2003-2009. Satellite, ground surface, and troposphere data were obtained from Terra/ASTER, Aqua/AIRS, POES and ionospheric variations from DEMETER and COSMIC-I data. Radon and GPS/TEC were obtaining from monitoring sites in Taiwan, Japan and Italy and from global ionosphere maps (GIM) respectively. Our analysis of ground and satellite data during the occurrence of 7 global earthquakes has shown the presence of anomalies in the atmosphere. Our results for Tohoku M9.0 earthquake show that on March 7th, 2011 (4 days before the main shock and 1 day before the M7.2 foreshock of March 8, 2011) a rapid increase of emitted infrared radiation was observed by the satellite data and an anomaly was developed near the epicenter. The GPS/TEC data indicate an increase and variation in electron density reaching a maximum value on March 8. From March 3 to 11 a large increase in electron concentration was recorded at all four Japanese ground-based ionosondes, which returned to normal after the main earthquake. Similar approach for analyzing atmospheric and ionospheric parameters has been applied for China (M7.9, 2008), Italy (M6.3, 2009), Samoa (M7, 2009), Haiti (M7.0, 2010) and Chile (M8.8, 2010) eahquakes. Results have revealed the presence of related variations of these parameters implying their connection with the earthquake process. The second phase (B) of this validation included 102 major earthquakes (M>5.9) in Taiwan and Japan. We have found anomalous behavior before all of these events with no false negatives. False alarm ratio for false positives is less then 10% and has been calculated for the same month of the earthquake occurrence for the entire period of analysis (2003-2009). The commonalities for detecting atmospheric/ionospheric anomalies are: i.) Regularly appearance over regions of maximum stress (i.e., along plate boundaries); ii.) Anomaly existence over land and sea; and iii) association with M>5.9 earthquakes not deeper than 100km. Due to their long duration over the same region these anomalies are not consistent with a meteorological origin. Our initial results from the ISTF validation of multi-instrument space-borne and ground observations show a systematic appearance of atmospheric anomalies near the epicentral area, one to seven (average) days prior to the largest earthquakes, and suggest that it could be explained by a coupling process between the observed physical parameters and the pre-earthquake preparation processes.

Ouzounov, Dimitar↗

Cooperative control theory and integrated flight and propulsion control

This report documents the activities and research results obtained under a grant (NAG3-998) from the NASA Lewis Research Center. The focus of the research was the investigation of dynamic interactions between airframe and engines for advanced ASTOVL aircraft configurations, and the analysis of the implications of these interactions on the stability and performance of the airframe and engine control systems. In addition, the need for integrated flight and propulsion control for such aircraft was addressed. The major contribution of this research was the exposition of the fact that airframe and engine interactions could be present, and their effects could include loss of stability and performance of the control systems. Also, the significance of two directional, as opposed to one-directional, coupling was identified and explained. A multi variable stability and performance analysis methodology was developed, and applied to several candidate aircraft configurations. Also exposed was the fact that with interactions present along with some integrated control approaches, the engine command/limiting logic (which represents an important non-linear component of the engine control system) can impact closed-loop airframe/engine system stability. Finally, a brief investigation of control-law synthesis techniques appropriate for the class of systems was pursued, and it was determined that multi variable techniques, included model-following formulations of LQG and/or H (infinity) methods showed promise. However, for practical reasons, decentralized control architectures are preferred, which is an architecture incompatible with these synthesis methods.

Schmidt, David K.↗

MBSE (SysML) and Digital Twin Integration to Support Engineering Analysis & Design

Problem Statement: The complexity of Gateway systems and of managing the integrated safety analysis have made traditional methods of engineering analysis and design increasingly challenging. To address these challenges, a prototype that integrate Model-Based Systems Engineering (MBSE) with Digital Twin technology has been developed to demonstrate the utilities and functions. Project Goal: Develop a prototype of a Digital Twin Of Gateway ECLSS IMV system to enhance fault management analysis through collaboration, visualization, and simulation. Overall Project Results / Accomplishments: - Developed extension to streamline the integration of SysML models with the Digital Twin platform - Demonstrated the capability to aggregate any relevant information and provide simulation integration within the DT prototype. - Generated digital twin simulation using SysML Activity Diagrams - Implemented a complex trade study use case based on the integrated SysML-Digital Twin infrastructure

MBSE↗

Capturing flight system test engineering expertise: Lessons learned

Within a few years, JPL will be challenged by the most active mission set in history. Concurrently, flight systems are increasingly more complex. Presently, the knowledge to conduct integration and test of spacecraft and large instruments is held by a few key people, each with many years of experience. JPL is in danger of losing a significant amount of this critical expertise, through retirement, during a period when demand for this expertise is rapidly increasing. The most critical issue at hand is to collect and retain this expertise and develop tools that would ensure the ability to successfully perform the integration and test of future spacecraft and large instruments. The proposed solution was to capture and codity a subset of existing knowledge, and to utilize this captured expertise in knowledge-based systems. First year results and activities planned for the second year of this on-going effort are described. Topics discussed include lessons learned in knowledge acquisition and elicitation techniques, life-cycle paradigms, and rapid prototyping of a knowledge-based advisor (Spacecraft Test Assistant) and a hypermedia browser (Test Engineering Browser). The prototype Spacecraft Test Assistant supports a subset of integration and test activities for flight systems. Browser is a hypermedia tool that allows users easy perusal of spacecraft test topics. A knowledge acquisition tool called ConceptFinder which was developed to search through large volumes of data for related concepts is also described and is modified to semi-automate the process of creating hypertext links.

Woerner, Irene Wong↗

A method for computing the kernel of the downwash integral equation for arbitrary complex frequencies

For the design of active controls to stabilize flight vehicles, which requires the use of unsteady aerodynamics that are valid for arbitrary complex frequencies, algorithms are derived for evaluating the nonelementary part of the kernel of the integral equation that relates unsteady pressure to downwash. This part of the kernel is separated into an infinite limit integral that is evaluated using Bessel and Struve functions and into a finite limit integral that is expanded in series and integrated termwise in closed form. The developed series expansions gave reliable answers for all complex reduced frequencies and executed faster than exponential approximations for many pressure stations.

Desmarais, R. N.↗

L’Ralph Integration and Testing

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test, qualify and calibrate the L’Ralph instrument on the Lucy observatory. Lucy is currently in the final design and fabrication phase (phase C) of mission development. It is scheduled to launch out of Cape Canaveral, Florida, in October 2021. Lucy will be the first space mission to study the Trojan asteroids associated with Jupiter, that are thought to be remnants of the primordial material that formed the outer planets. Lucy will fly by and carry out remote sensing on six different Trojan asteroids. The mission takes its name from the fossilized human ancestor (called “Lucy” by her discoverers) whose skeleton provided unique insight into humanity's evolution. Likewise, the Lucy mission will revolutionize our knowledge of planetary origins and the formation of the solar system. L’Ralph is one of the instruments on Lucy and it is provided by the NASA Goddard Space Flight Center (GSFC). L’Ralph is a combined multi-band visible imager (the Multi-spectral Visible Imaging Camera, MVIC, 0.4-0.85 microns) and wedge-filter infrared spectrometer (Linear Etalon Imaging Spectral Array, LEISA, 1-3.6 microns). LEISA will allow the team to look for the absorption lines that serve as the fingerprints for different silicates, ices and organics that likely will be on the surface of the Trojan asteroids. MVIC will take color images of the Trojan asteroid targets, and help determine how active they are. This paper will focus on the Integration and Test (I&T) activities for L’Ralph while it is at the NASA GSFC. L’Ralph has two assemblies, the telescope detector assembly (TDA) and main electronics box (MEB). The TDA is a single telescope feeding two focal planes, MVIC and LEISA. L’Ralph integration consists of assembly and alignment of the telescope, electronics box integration, thermal systems integration and the final assembly and testing. This I&T phase will be followed by the L’Ralph calibration and characterization, environmental tests which include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration with sine sweep, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity determination. This paper will briefly discuss L’Ralph shipment and delivery to the spacecraft vendor for observatory level I&T as well as some launch preparation activities.

Spaceflight Instruments↗

Monolithic integrated high-T.sub.c superconductor-semiconductor structure

A method for the fabrication of active semiconductor and high-temperature superconducting device of the same substrate to form a monolithically integrated semiconductor-superconductor (MISS) structure is disclosed. A common insulating substrate, preferably sapphire or yttria-stabilized zirconia, is used for deposition of semiconductor and high-temperature superconductor substructures. Both substructures are capable of operation at a common temperature of at least 77 K. The separate semiconductor and superconductive regions may be electrically interconnected by normal metals, refractory metal silicides, or superconductors. Circuits and devices formed in the resulting MISS structures display operating characteristics which are equivalent to those of circuits and devices prepared on separate substrates.

Burns, Michael J.↗

Method for making a monolithic integrated high-T.sub.c superconductor-semiconductor structure

A method for the fabrication of active semiconductor and high-temperature perconducting devices on the same substrate to form a monolithically integrated semiconductor-superconductor (MISS) structure is disclosed. A common insulating substrate, preferably sapphire or yttria-stabilized zirconia, is used for deposition of semiconductor and high-temperature superconductor substructures. Both substructures are capable of operation at a common temperature of at least 77 K. The separate semiconductor and superconductive regions may be electrically interconnected by normal metals, refractory metal silicides, or superconductors. Circuits and devices formed in the resulting MISS structures display operating characteristics which are equivalent to those of circuits and devices prepared on separate substrates.

Burns, Michael J.↗

NIRPS: A Year of Progress and Challenge

In the past 14 months NIRPS has gone from an idea on a sheet of paper to a working organization, performing tasks of national scale. NIRPS is beginning to establish itself among the Propulsion Community. Need is recognized for a coordination and integration function across the US Government s propulsion activities. NIRPS acts as a collaboration agent - serves as a catalyst and multi-agency facilitator NIRPS is leading a high-priority Government-wide task. 2012 Defense Authorization Act, Sec 1095; Develop National Rocket Propulsion Strategy. Beginning to perform in accordance with Grand Challenges. Performing to an Executable plan, adjusting to to Center and Agency priorities. Challenges remain to building a sustainable Institute. Effective integration and Coordination with other Government Agencies. Continued Active engagement with Industry and Academia. Building an Efficient and Responsive Governance System for a growing Institute.

Thomas, Dale↗

More Intelligent Gas Turbine Engines

Increased emphasis on aircraft safety, enhanced performance and affordability, and the need to reduce the environmental impact of aircrafts are being addressed through the concept of Intelligent Propulsion Systems. These systems are potentially enabled through increased efficiencies of components through active control, advanced diagnostics and prognostics integrated with intelligent engine control, and distributed control with smart sensors and actuators. The focus of this report is on "On-Board Intelligence", and the discussions are limited to the overall engine gas-path performance perspective. The emphasis throughout the report is on identifying the sensor and actuator needs to realize these intelligent engine concepts and identifying the current sensor and actuator technologies and roadmaps for emerging technologies. The report is of interest both to the "Customers" to understand the investment needs and the "Researchers" and "Technology Developers" to understand the technology needs for closing the gap from current sensor and actuator capabilities to future performance and universal requirements and targets.

active control↗

Robotic space simulation integration of vision algorithms into an orbital operations simulation

In order to successfully plan and analyze future space activities, computer-based simulations of activities in low earth orbit will be required to model and integrate vision and robotic operations with vehicle dynamics and proximity operations procedures. The orbital operations simulation (OOS) is configured and enhanced as a testbed for robotic space operations. Vision integration algorithms are being developed in three areas: preprocessing, recognition, and attitude/attitude rates. The vision program (Rice University) was modified for use in the OOS. Systems integration testing is now in progress.

Bochsler, Daniel C.↗

Organization, Management and Function of International Space Station (ISS) Multilateral Medical Operations

Long duration crews have inhabited the ISS since November of 2000. The favorable medical outcomes of its missions can be largely attributed to sustained collective efforts of all ISS Partners medical organizations. In-flight medical monitoring and support, although crucial, is just a component of the ISS system of Joint Medical Operations. The goal of this work is to review the principles, design, and function of the multilateral medical support of the ISS Program. The governing documents, which describe the relationships among all ISS partner medical organizations, were evaluated, followed by analysis of the roles, responsibilities, and decision-making processes of the ISS medical boards, panels, and working groups. The degree of integration of the medical support system was evaluated by reviewing the multiple levels of the status reviews and mission assurance activities carried out throughout the last six years. The Integrated Medical Group, consisting of physicians and other essential personnel in the mission control centers represents the front-line medical support of the ISS. Data from their day-to-day activities are presented weekly at the Space Medicine Operations Team (SMOT), where known or potential concerns are addressed by an international group of physicians. A broader status review is conducted monthly to project the state of crew health and medical support for the following month, and to determine measures to return to nominal state. Finally, a comprehensive readiness review is conducted during preparations for each ISS mission. The Multilateral Medical Policy Board (MMPB) issues medical policy decisions and oversees all health and medical matters. The Multilateral Space Medicine Board (MSMB) certifies crewmembers and visitors for training and space flight to the Station, and physicians to practice space medicine for the ISS. The Multilateral Medical Operations Panel (MMOP) develops medical requirements, defines and supervises implementation of operational countermeasures, environmental monitoring, medical care, and emergency medical services. MMOP assures the medical readiness of the Station for each subsequent mission or critical event. All boards and panels have functioned effectively and without interruptions even in various challenging circumstances. Based on the experience of the authors, consensus has prevailed as the primary nature of decisions made by all ISS medical groups, at all levels. The six first years of piloted operation have demonstrated the ability of the ISS medical authority groups and the medical infrastructure to implement medical policies and requirements, effectively interface with non-medical groups, and maintain the health and productivity of the crew in an integrated, multilaterally coordinated fashion. The medical support system appears to be mature and ready for further expansion of all Partners roles, and for the anticipated increase in the size of ISS crews.

Duncan, James M.↗

Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned

Engineering design is a challenging activity for any product. Since launch vehicles are highly complex and interconnected and have extreme energy densities, their design represents a challenge of the highest order. The purpose of this document is to delineate and clarify the design process associated with the launch vehicle for space flight transportation. The goal is to define and characterize a baseline for the space transportation design process. This baseline can be used as a basis for improving effectiveness and efficiency of the design process. The baseline characterization is achieved via compartmentalization and technical integration of subsystems, design functions, and discipline functions. First, a global design process overview is provided in order to show responsibility, interactions, and connectivity of overall aspects of the design process. Then design essentials are delineated in order to emphasize necessary features of the design process that are sometimes overlooked. Finally the design process characterization is presented. This is accomplished by considering project technical framework, technical integration, process description (technical integration model, subsystem tree, design/discipline planes, decision gates, and tasks), and the design sequence. Also included in the document are a snapshot relating to process improvements, illustrations of the process, a survey of recommendations from experienced practitioners in aerospace, lessons learned, references, and a bibliography.

Blair, J. C.↗

Flight Test Exploration of Integrated Wildfire Response Operations with Crewed and Uncrewed Air Assets

Since 2016, Japan Aerospace Exploration Agency (JAXA) and NASA have partnered to investigate the safe and efficient integration of uncrewed aircraft systems (UAS) in disaster relief operations. Current disaster response operations would benefit from the use of UAS but are limited by the need for safe airspace integration technologies and enabling regulations. The work presented in this paper focuses on the safe integration of UAS and helicopters in active wildfire disaster response operations. The authors propose the use of mission planning and traffic management technologies, including onboard pilot situation awareness support technologies, to coordinate airspace operations between crewed and uncrewed aircraft (e.g., UAS). A representative wildfire scenario including a helicopter and UAS was developed. The helicopter mission included a flight path that mimicked the siphoning of water from a natural water reservoir (lake) and a subsequent water drop over vegetation along the progressing edge of a fire perimeter. Simulated UAS were assumed to conduct aerial ignition flights in the vicinity as part of a controlled burn of the vegetation ahead of the fire front to create a natural barrier between the fire and a nearby populated area. A situation awareness tool was developed and used to support the helicopter pilots’ task to stay clear of the volume of airspace where the UAS was conducting its operation while efficiently conducting the fire suppression mission. A flight test using JAXA’s experimental helicopter was conducted in August 2022 to validate the developed technology. The advantages of the developed technology were demonstrated, and pilot feedback confirmed that real-time awareness of the UAS operation airspace helped the flight planning and execution of a safe mission that minimized the flight time loss due to the potential interference with the UAS. Post-flight interviews with the pilots indicated no sufficient increase in the pilots’ workload and provided ideas for future technology development. Future research will provide recommendations to standards development organizations to support considerations for crewed-uncrewed interactions in disaster-response operations.

disaster response↗

Managing Analysis Models in the Design Process

Design of large, complex space systems depends on significant model-based support for exploration of the design space. Integrated models predict system performance in mission-relevant terms given design descriptions and multiple physics-based numerical models. Both the design activities and the modeling activities warrant explicit process definitions and active process management to protect the project from excessive risk. Software and systems engineering processes have been formalized and similar formal process activities are under development for design engineering and integrated modeling. JPL is establishing a modeling process to define development and application of such system-level models.

design↗

Systems Integration Challenges for a National Space Launch System

System Integration was refined through the complexity and early failures experienced in rocket flight. System Integration encompasses many different viewpoints of the system development. System Integration must ensure consistency in development and operations activities. Human Space Flight tends toward large, complex systems. Understanding the system fs operational and use context is the guiding principle for System Integration: (1) Sizeable costs can be driven into systems by not fully understanding context (2). Adhering to the system context throughout the system fs life cycle is essential to maintaining efficient System Integration. System Integration exists within the System Architecture. Beautiful systems are simple in use and operation -- Block upgrades facilitate manageable steps in functionality evolution. Effective System Integration requires a stable system concept. Communication is essential to system simplicity

May, Todd A.↗