Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Texas”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Heavy metals and trace elements in the groundwater in El Paso, Texas

The chemical elements studied here (Al, As, Ba, Cd, Cr, Cu, Fe, Pb, Mn, Hg, Ni, Se, Ag, Zn, Li, B) include toxic heavy metals and non-toxic elements which have occurred at high levels in El Paso, TX groundwater (Fe, Cu, Mn, As, Pb; up to 24,000, 17,000, 3200, 95, and 1000 ppb respectively). The objective of this study is to investigate the origins of these heavy metals in the groundwater. Previous works found some of these metals in the rocks of the mountains that recharge the watershed, and sufficient evidence for natural origins of arsenic in the groundwater. Statistical analyses in this report are consistent with natural origin also for the heavy metals studied but cannot dismiss human activity as a contributing factor. Interesting correlations with R-value>0.60, p-value<0.01 warrant further analysis.

Marquez B, Elia↗

Texas Tech Student Outreach

Giving student outreach presentation covering the basic concepts of linear induction accelerators and how they are applied to the electrical engineering field.

43 PARTICLE ACCELERATORS↗

The Geothermal Entrepreneurship Organization (GEO) Accelerating Technology Transfer, Testing and Adoption of Cutting-edge Extreme Environment Drilling

The Geothermal Entrepreneurship Organization launched in 2019 with the goal of building a geothermal innovation ecosystem at the University of Texas at Austin (UT Austin), and in the State of Texas at large. The theses underlying the work of GEO were 1) that with targeted advocacy, recruitment, organization, and coalition building, research institutions with legacy excellence in petroleum and geosystems engineering could become engines of geothermal innovation, research and development; 2) that startups were the appropriate vehicle to speed these innovations from the lab into the field, and building a geothermal startup ecosystem in Texas would not only advance next generation geothermal concepts into the field, but also help spur oil and gas engagement in the space, and 3) that with targeted engagement, education, and recruitment across stakeholders in the oil and gas industry and the State of Texas generally, the oil and gas industry, and other legacy oil and gas entities in the State could become sources of large scale deployment of geothermal energy. The overall goal was to create a ‘snowball’ effect, where targeted impactful actions would catalyze self-sustaining, organic growth of a new geothermal ecosystem in the State of Texas. That goal was achieved through GEO’s work. To test its theses, GEO began work by interviewing and recruiting UT Austin faculty and alumni into geothermal. At the beginning of the GEO project, there was no geothermal activity ongoing within the UT Austin Petroleum and Geosystems Engineering Department, the Bureau of Economic Geology, or the Jackson School of Geoscience, and many faculty approached had not before considered how their skillsets might apply in the space. By the end of the project period, three major research consortia focused on geothermal were launched as a result of GEO’s work, one at the Bureau of Economic Geology, one within the Petroleum and Geosystems Engineering Department, and another organized by GEO across six research institutions across the State of Texas, called the Texas Geothermal Institute. Geothermal curricula was launched at UT Austin, and UT Austin began attracting new geothermal enthusiasts into its faculty, including Dr. Silviu Livescu, former Chief Scientist of Baker Hughes. Startups recruited and mentored by GEO launched, raised funding, and deployed (or are currently deploying) their concepts in the field. By the end of the project period, the GEO concept expanded to faculty beyond UT Austin to other institutions, like Texas A&M, the University of Houston, and Rice University, and geothermal engagement began at those institutions as well. Multiple faculty members and alumni across these institutions launched geothermal startup companies, launched geothermal research consortia, and/or began teaching geothermal courses. In 2020, GEO launched what was to become the largest geothermal conference in the world by its second year, ‘PIVOT – From Hydrocarbons to Heat’, and the resulting momentum catalyzed the Society of Petroleum Engineers to launch a geothermal technical section, drove more startups to launch out of the ecosystem, and drove actors in the State of Texas, NGOs, and stakeholders globally to become engaged. Riding this momentum, the Texas Geothermal Energy Alliance was launched, the first ever industry association dedicated to advancing geothermal energy in the State of Texas. The Texas geothermal ecosystem after only two years of building and support is now robust, quickly growing, and self-sustaining. By 2021, the Texas geothermal ecosystem had attracted the attention of philanthropists, funding entities, media, and influencers outside of Texas, and GEO’s executive director was invited to give a TED talk about oil and gas engagement in building the future of geothermal energy, which elevated the success of the ecosystem to a global audience.

15 GEOTHERMAL ENERGY↗

Configuration and Intraseasonal Duration of Interannual Anomalies of the Great Plains Low-Level Jet

Despite the fact that the low-level jet of the southern Great Plains (the GPLLJ) of the U.S. is primarily a nocturnal phenomenon that virtually vanishes during the daylight hours, it is one of the most persistent and stable climatological features of the low-level continental flow during the warm-season months, May through August. We have used significant-level data to validate the skill of the GEOS-1 Data Assimilation System (DAS) in realistically detecting this jet and inferring its structure and evolution. We have then carried out a 15-year reanalysis with the GEOS-1 DAS to determine its climatology and mean diurnal cycle and to study its interannual variability. Interannual anomalies of the meridional flow associated with the GPLLJ are much smaller than the mean diurnal fluctuations, than random intraseasonal anomalies, and than the mean wind itself. There are three maxima of low-level meridional flow variance over the Great Plains and the Gulf of Mexico: a 1.2 m2 s-2 peak over the southeast Texas, to the east and south of the mean velocity peak, a 1.0 m2 s-2 peak over the western Gulf of Mexico, and a .8 m2 s-2 peak over the upper Great Plains (UGP), near the Nebraska/South Dakota border. Each of the three variance maxima corresponds to a spatially coherent, jet-like pattern of low-level flow interannual variability. There are also three dominant modes of interannual variability corresponding to the three variance maxima, but not in a simple one-to-one relationship. Cross-sectional profiles of mean southerly wind over Texas remain relatively stable and recognizable from year to year with only its eastward flank showing significant variability. This variability, however, exhibits a distinct, biennial oscillation during the first six to seven years of the reanalysis period and only then. This intermittent biennial oscillation (IBO, one of the three modes discussed in the previous paragraph) in the lowlevel flow is restricted to the region surrounding eastern Texas and is also evident in the NCEP/NCAR reanalysis data set from about 1978 to 1985 or 1986 and again from 1995 to 2000. It is evident as well in surface pressure in both the GEOS-1 and NCEP/NCAR sets. The interannual anomalies do not necessarily persist uniformly throughout an entire season, but can fluctuate from one part of the season to the next. To estimate the characteristic sub-seasonal time scales for coherence of these fluctuations, we have taken the weekly anomaly of low-level wind at each point of the domain from the climatological average for that given point and that given week of the season and computed the covariance of its fluctuations over all weeks and over all years with the weekly climatological anomaly of the meridional wind at each of the three reference points discussed above. The typical duration of a coherent interannual anomaly within a given warm season increases with decreasing latitude from 2 to 3 weeks over the UGP, to 6 to 7 weeks over eastern Texas. Coherence over the western Gulf of Mexico is intermediate between the two with a typical duration of 4 to 5 weeks. There appears to be evidence that the interannual anomalies over Texas the Gulf propagate to the UGP after a week and those over the Gulf propagate there after 2 to 3 weeks. There also appears to be some reverse propagation of interannual anomalies over the UGP to Texas and to the Gulf after a period of about one week. The interannual anomalies in southerly flow over eastern Texas seem to correlate well with interannual anomalies of surface temperature and (negative) ground wetness and over western Texas.

Helfand, H. M.↗

Columbia Accident Investigation Board Report. Volume Six

In the course of its inquiry into the February 1, 2003 destruction of the Space Shuttle Columbia, the Columbia Accident Investigation Board conducted a series of public hearings at Houston, Texas; Cape Canaveral, Florida; and Washington, DC. Testimony from these hearings was recorded and then transcribed. This appendix, Volume VI of the Report, is a compilation of those transcripts. Contents: Transcripts of Board Public Hearings; Appendix H.1 March 6, 2003 Houston, Texas; Appendix H.2 March 17, 2003 Houston, Texas; Appendix H.3 March 18, 2003 Houston, Texas; Appendix H. 4 March 25, 2003 Cape Canaveral, Florida; Appendix H.5 March 26, 2003 Cape Canaveral, Florida; Appendix H.6 April 7, 2003 Houston, Texas; Appendix H.7 April 8, 2003 Houston, Texas; Appendix H.8 April 23, 2003 Houston, Texas; Appendix H.9 May 6, 2003 Houston, Texas; Appendix H.10 June 12, 2003 Washington, DC.

CAIB (COLUMBIA ACCIDENT INVESTIGATION BOARD)↗

Technology solutions for wind integration in ERCOT

Texas has for more than a decade led all other states in the U.S. with the most wind generation capacity on the U.S. electric grid. The State recognized the value that wind energy could provide, and committed early on to build out the transmission system necessary to move power from the windy regions in West Texas to the major population centers across the state. It also signaled support for renewables on the grid by adopting an aggressive renewable portfolio standard (RPS). The joining of these conditions with favorable Federal tax credits has driven the rapid growth in Texas wind capacity since its small beginning in 2000. In addition to the major transmission grid upgrades, there have been a number of technology and policy improvements that have kept the grid reliable while adding more and more intermittent wind generation. Technology advancements such as better wind forecasting and deployment of a nodal market system have improved the grid efficiency of wind. Successful large scale wind integration into the electric grid, however, continues to pose challenges. The continuing rapid growth in wind energy calls for a number of technology additions that will be needed to reliably accommodate an expected 65% increase in future wind resources. The Center for the Commercialization of Electric Technologies (CCET) recognized this technology challenge in 2009 when it submitted an application for funding of a regional demonstration project under the Recovery Act program administered by the U.S. Department of Energy1. Under that program the administration announced the largest energy grid modernization investment in U.S. history, making available some $3.4 billion in grants to fund development of a broad range of technologies for a more efficient and reliable electric system, including the growth of renewable energy sources like wind and solar. At that time, Texas was (and still is) the nation’s leader in the integration of wind into the grid, and was investing heavily in the infrastructure needed to increase the viability of this important resource. To help Texas and the rest of the nation address the challenges associated with the integration of large amounts of renewables, CCET seized on the federal opportunity to undertake a multi-faceted project aimed at demonstrating the viability of new “smart grid” technologies to facilitate larger amounts of wind energy through better system monitoring capabilities, enhanced operator visualization, and improved load management. In early 2010, CCET was awarded a $27 million grant, half funded by the Department of Energy and half-funded by project participants. With this funding, CCET undertook the project named Discovery Across Texas which has demonstrated how existing and new technologies can better integrate wind power into the state’s grid. The following pages summarize the results of seven technology demonstrations that will help Texas and the nation meet this wind integration challenge.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Activating Opportunity Zones for Rapid Solar+Storage Deployment in Low Income Communities (Final Report)

Millions of Texans choose their own power provider, giving them the option to have low-cost and even renewable energy delivered through their retail electric plan. However, Texans with less disposable income often pay more for electricity and have limited access to green energy and emergency backup power even though the costs of solar and wind power are at record lows and continue to decline. The Powered for Good initiative aimed to help deliver clean, affordable, 100% renewable electricity to low-income households in Texas’s Competitive Retail Areas, where households can choose their electricity provider. Objectives: The primary goal of this project was to develop and validate one or more affordable solar+storage products (i.e., priced less than of $0.14/kWh) that Retail Electricity Providers (REP) can offer to LI households. The team achieved three objectives: 1. Investigate how to best reduce electricity costs and increase availability of emergency power for LI customers; 2. Build momentum for, and facilitate an approach to, a Texas-based pilot deployment of such solar+storage products, with a goal of greatly expanding this approach to a large segment of the LI population in Texas; 3. Provide the structural framework, finance model, and roadmap to potentially increase investment of solar+storage projects in LI communities across U.S. states when modified to meet their state-specific laws and regulations. The team evaluated the market of viable solutions for low-income Texans through interviews and focus groups with professionals and residents with lived experience. The team then piloted a low-cost retail electric product. Following the pilot, the team developed educational materials, including fact sheets, a Go Green Save Green interactive guide, and an Electricity Bill Analysis Tool. The team is now working to increase power resilience and reduce energy insecurity with micro solar and storage in partnership with local entities in the Harris County area. Key Findings: Informed by Powered for Good research, including the experiences on Texas residents and electricity system experts, the Powered for Good team developed a pilot that was implemented by Energy Well Texas, a new company formed in late 2020. The pilot featured a combination of a 100% clean residential energy offering delivered through the electrical grid plus a selection of batteries, lights and a solar panel that provided participants with varying levels of backup power. For the 8 customers who submitted previous bills, the Energy Well Texas pilot reduced energy bills by about 30%. In Houston, residents earning less than 30% of Area median Income (AMI) spend an average 13% of their income on energy or about $1,555 per year. Repeating the pilot results for these residents could yield $466 in savings per customer or about 4% of their income. While this will not end energy poverty, it is a big step toward that goal. The Powered for Good and Energy Well Texas teams are currently planning their post-pilot phase of service offerings.

14 SOLAR ENERGY↗

Gulf of Mexico Miocene CO2 Site Characterization Mega Transect

The project Gulf of Mexico Miocene CO2 Site Characterization Mega Transect is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas. The University of Texas at Austin study focused on (1) collecting high-resolution, 3-D (HR3D) seismic datasets of the shallow geologic section to evaluate the capacity of potential reservoirs and the sealing capacity of the confining system, and (2) producing a regional CO2 atlas of Miocene age units of the upper Texas coast submerged lands (southeast Texas). The goal of the study was to evaluate the capability of the Miocene age geologic section of Texas submerged lands to permanently store large volumes of anthropogenic CO2. The geographic locations of three HR3D, “P-Cable” seismic surveys collected in the near-shore waters of southeast Texas offers a vertical and horizontal view (data “cube”) example from the second survey. The dataset's high quality allowed for defining recognizable geologic morphologies (shapes) and possible fluid content, which are important for determining an area’s prospects for geologic storage. The regional CO2 atlas of Miocene age units highlights several topics, including: (1) a regional analyses of petroleum systems as analogs for CO2 storage; (2) petrography, petrology, and extent of confining systems of the Miocene section; (3) static capacity estimate; and (4) examples of characterization methodologies of prospect areas. The HR3D datasets and regional analyses within the CO2 atlas of the offshore Texas Miocene provide a sound basis for a future generation of specific CO2 prospects in the study area.

.las↗

Impacts of Spatial Resolution in a High-Fidelity Capacity Expansion Model: An ERCOT Case Study

Capacity expansion models are important tools in examining the evolution of the electric power sector. Embedded in these tools are many modeling choices with consequential impacts on computational burden and associated analysis. In this study, we adjust the spatial resolution of the Regional Energy Deployment System (ReEDS) to understand the implications of higher-fidelity modeling on energy system projections and model solve times. The native ReEDS regions capture the contiguous United States in 134 balancing areas whereas the regions in the higher-resolution version are defined by over 3,000 U.S. counties. Using both resolutions, we conduct a case study of the Texas Interconnection (The Electric Reliability Council of Texas [ERCOT]) to explore differences in model projections and to inform appropriate applications of high spatial resolution in a large-scale, applied capacity expansion model.

county↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Carbon Capture and Sequestration (via Enhanced Oil Recovery) from a Hydrogen Production Facility in an Oil Refinery

The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE’s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities (associated with CO2 capture technologies and geologic sequestration MVA), and Environmental Information Volume. Specific accomplishments of this Phase include: 1. Finalization of the Project Management Plan 2. Development of engineering designs in sufficient detail for defining project performance and costs 3. Preparation of Environmental Information Volume 4. Completion of Hazard Identification Studies 5. Completion of control cost estimates and preparation of business plan During the Phase 1 detailed cost estimate, project costs increased substantially from the previous estimate. Furthermore, the detailed risk assessment identified integration risks associated with potentially impacting the steam methane reformer operation. While the Phase 1 work identified ways to mitigate these integration risks satisfactorily from an operational perspective, the associated costs and potential schedule impacts contributed to the decision not to proceed to Phase 2. We have concluded that the project costs and integration risks at Texas City are not commensurate with the potential benefits of the project at this time.

03 NATURAL GAS↗