Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Creative Analytics of Mission Ops Event Messages

Historically, tremendous effort has been put into processing and displaying mission health and safety telemetry data; and relatively little attention has been paid to extracting information from missions time-tagged event log messages. Todays missions may log tens of thousands of messages per day and the numbers are expected to dramatically increase as satellite fleets and constellations are launched, as security monitoring continues to evolve, and as the overall complexity of ground system operations increases. The logs may contain information about orbital events, scheduled and actual observations, device status and anomalies, when operators were logged on, when commands were resent, when there were data drop outs or system failures, and much much more. When dealing with distributed space missions or operational fleets, it becomes even more important to systematically analyze this data. Several advanced information systems technologies make it appropriate to now develop analytic capabilities which can increase mission situational awareness, reduce mission risk, enable better event-driven automation and cross-mission collaborations, and lead to improved operations strategies: Industry Standard for Log Messages. The Object Management Group (OMG) Space Domain Task Force (SDTF) standards organization is in the process of creating a formal standard for industry for event log messages. The format is based on work at NASA GSFC. Open System Architectures. The DoD, NASA, and others are moving towards common open system architectures for mission ground data systems based on work at NASA GSFC with the full support of the commercial product industry and major integration contractors. Text Analytics. A specific area of data analytics which applies statistical, linguistic, and structural techniques to extract and classify information from textual sources. This presentation describes work now underway at NASA to increase situational awareness through the collection of non-telemetry mission operations information into a common log format and then providing display and analytics tools to provide in-depth assessment of the log contents. The work includes: Common interface formats for acquiring time-tagged text messages Conversion of common files for schedules, orbital events, and stored commands to the common log format Innovative displays to depict thousands of messages on a single display Structured English text queries against the log message data store, extensible to a more mature natural language query capability Goal of speech-to-text and text-to-speech additions to create a personal mission operations assistant to aid on-console operations. A wide variety of planned uses identified by the mission operations teams will be discussed.

events↗

Space Station power system

A Space Station Task Force was established by the NASA Administrator in May 1982 to provide focus and direction for Space Station planning activities. The Task Force also provides Congress and the Administration with sufficient information to allow them to make an informed decision on whether the United States should proceed with a Space Station as the next major national initiative in space. This paper will present the status of planning activities to date, with major emphasis on the power system. Technology options, power requirements, and schedule will be discussed.

Forestieri, A. F.↗

Space transportation nodes assumptions and requirements: Lunar base systems study task 2.1

The Space Transportation Nodes Assumptions and Requirements task was performed as part of the Advanced Space Transportation Support Contract, a NASA Johnson Space Center (JSC) study intended to provide planning for a Lunar Base near the year 2000. The original task statement has been revised to satisfy the following queries: (1) What vehicles are to be processed at the transportation node; (2) What is the flow of activities involved in a vehicle passing through the node; and (3) What node support resources are necessary to support a lunar scenario traffic model composed of a mix of vehicles in an active flight schedule. The Lunar Base Systems Study is concentrating on the initial years of the Phase 2 Lunar Base Scenario. The study will develop the first five years of that phase in order to define the transportation and surface systems (including mass, volumes, power requirements, and designs).

Kahn, Taher Ali↗

Human factors issues in performing life science experiments in a 0-G environment

An overview of the environmental conditions within the Spacelab and the planned Space Station Freedom is presented. How this environment causes specific Human Factors problems and the nature of design solutions are described. The impact of these problems and solutions on the performance of life science activities onboard Spacelab (SL) and Space Station Freedom (SSF) is discussed. The first area highlighted is contamination. The permanence of SSF in contrast to the two-week mission of SL has significant impacts on crew and specimen protection requirements and, thus, resource utilization. These requirements, in turn impose restrictions on working volumes, scheduling, training, and scope of experimental procedures. A second area is microgravity. This means that all specimens, materials, and apparatus must be restrained and carefully controlled. Because so much of the scientific activity must occur within restricted enclosures (gloveboxes), the provisions for restraint and control are made more complex. The third topic is crewmember biomechanics and the problems of movement and task performance in microgravity. In addition to the need to stabilize the body for the performance of tasks, performance of very sensitive tasks such as dissection is difficult. The issue of space sickness and adaption is considered in this context.

Gonzalez, Wayne↗

An intelligent planning and scheduling system for the HST servicing missions

A new, intelligent planning and scheduling system has been delivered to NASA-Goddard Space Flight Center (GSFC) to provide support for the up-coming Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART is written in C and runs on a UNlX-based workstation (IBM RS/6000) under Motif. SM/PART effectively automates the complex task of building or rebuilding integrated timelines and command plans which are required by HST Servicing Mission personnel at their consoles during the missions. SM/PART is able to quickly build or rebuild timelines based on information stored in a Knowledge Base (KB) by using an Artificial Intelligence (AI) tool called the Planning And Resource Reasoning (PARR) shell. After a timeline has been built in the batch mode, it can be displayed and edited in an interactive mode with help from the PARR shell. Finally a detailed command plan is generated. The capability to quickly build or rebuild timelines and command plans provides an additional safety factor for the HST, Shuttle and Crew.

Johnson, Jay↗

Development of the command data system and ground software for the SEDSAT-1 microsatellite

SEDSAT-1 is designed to be a low cost scientific satellite which is to be used to perform a minimum of five tasks which include: (1) the acquisition of a number of important parameters associated with the tethering processes from the payloads perspective (such as accelerations incurred and imaging data of the tether during deployment), (2) to act as a remote sensing platform for making measurements of the Earth's Atmosphere (allowing research to be performed in such areas as vertical lightning observation, visible light spectrography, and cloud cover studies, (3) to act as a general purpose amateur radio communication satellite relaying information back to earth, (4) to demonstrate the feasibility of the deployment in low earth orbit of advanced technology such as the Gallium Arsenide Solar Cells, Nickel Metal Hydride batteries, and multi-chip module technology and, (5) to support student's active participation in applying the disciplines of engineering and science to space-based hardware platforms. The project includes the Three-axis Accelerometer System, TAS, Experiment which is designed to report the accelerations that the satellite undergoes during the tethering operations and during the second phase of the mission when the free floating satellite comes in contact with orbit debris. The SEASIS (SEDS Earth, Atmosphere, and Space Imaging System) is another SEDSAT experiment designed to provide images of the tether during its deployment and the earth during the second phase of the mission. To control these experiments and virtually all other satellite operations the Command Data System, CDS is employed. This system utilizes a moderate complexity micro-controller controlled by tasks operating under a real-time operating system to dynamically monitor and control the satellite. The scope of this researchers efforts has been in the general area of coordinating and assisting the student researchers with the development of the CDS and ground station interfaces. This included the low level CDS hardware design and the formulization of a general software plan and schedule for both the CDS and ground station portions of the project.

Wells, B. Earl↗

MaROS: Information Management Service

This software is provided by the Mars Relay Operations Service (MaROS) task to a variety of Mars projects for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The Information Management Service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such, greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These relay sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This software component is an application process running as a Java virtual machine. The component provides all service interfaces via a Representational State Transfer (REST) protocol over https to external clients. There are two general interaction modes with the service: upload and download of data. For data upload, the service must execute logic specific to the upload data type and trigger any applicable calculations including pass delivery latencies and overflight conflicts. For data download, the software must retrieve and correlate requested information and deliver to the requesting client. The provision of this service enables several key advancements over legacy processes and systems. For one, this service represents the first time that end-to-end relay information is correlated into a single shared repository. The software also provides the first multimission latency calculator; previous latency calculations had been performed on a mission-by-mission basis.

Allard, Daniel A.↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

An “EPIIC” Vision to Evolve Project Integration, Innovation, and Collaboration with Broad Impact for How NASA Executes Complex Projects

Evolving Project Integration, Innovation, and Collaboration (EPIIC) is a vision defined to transform the way projects manage information to support real-time decisions, capture best practices and lessons learned, perform assessments, and manage risk across a portfolio of projects. The foundational project management needs for data and information will be revolutionized through innovations on how we manage and access that data, implement configuration control, and certify compliance. The embedded intelligence of new interactive data interfaces integrate technical and programmatic data such that near real time analytics can be accomplished to more efficiently and accurately complete systems engineering and project management tasks. The system-wide data analytics that are integrated into customized data interfaces allows the growing team of engineers and managers required to develop and implement major NASA missions the ability to access authoritative source(s) of system information while greatly reducing the labor required to complete system assessments. This would allow, for example, much of what is accomplished in a scheduled design review to take place as needed, between any team members, at any time. An intelligent data interface that rigorously integrates systems engineering and project management information in near real time can provide substantially greater insight for systems engineers, project managers, and the large diverse teams required to complete a complex project. System engineers, programmatic personnel (those who focus on cost, schedule, and risk), the technical engineering disciplines, and project management can realize immediate benefit from the shared vision described herein. Implementation of the vision also enables significant improvements in the performance of the engineered system being developed.

Moreland, Robert J.↗

MEXEC: An Onboard Integrated Planning and Execution Approach for Spacecraft Commanding

The traditional form of spacecraft commanding is with sequences that specify when commands should execute based on a schedule generated on the ground. Some sequences have control logic and event driven responses to increase flexibility, but it is limited. An approach to increase autonomy is to use goal-based planning and commanding. Using this paradigm, intention and behavior is modeled on board the spacecraft. In this paper we describe MEXEC (Multi-mission EXECutive), a multi-mission, task-based, onboard planning and execution software designed specifically to be used as flight software. As a path to infusion for future flight projects, we describe two experiments performed on the ASTERIA CubeSat and testbed that demonstrate that MEXEC can be integrated and used for spacecraft operations and increase robustness and science return compared to the standard sequences that were being used.

Campuzano, Brian↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Liquid Methane/Liquid Oxygen Propellant Conditioning Feed System (PCFS) Test Rigs

As part of their Propulsion and Cryogenic Advanced Development (PCAD) program, NASA has embarked upon an effort to develop chemical rocket engines which utilize non-toxic, cryogenic propellants such as liquid oxygen (LO2) and liquid methane (LCH4). This effort includes the development and testing of a 100 lbf Reaction Control Engine (RCE) that will be used to evaluate the performance of a LO2/LCH4 rocket engine over a broad range of propellant temperatures and pressures. This testing will take place at NASA-Glenn Research Center's (GRC) Research Combustion Laboratory (RCL) test facility in Cleveland, OH, and is currently scheduled to begin in late 2008. While the initial tests will be performed at sea level, follow-on testing will be performed at NASA-GRC's Altitude Combustion Stand (ACS) for altitude testing. In support of these tests, Sierra Lobo, Inc. (SLI) has designed, developed, and fabricated two separate portable propellant feed systems under the Propellant Conditioning and Feed System (PCFS) task: one system for LCH4, and one for LO2. These systems will be capable of supplying propellants over a large range of conditions from highly densified to several hundred pounds per square inch (psi) saturated. This paper presents the details of the PCFS design and explores the full capability of these propellant feed systems.

Skaff, A.↗

Rise and Shine: The Use of Polychromatic Short-Wavelength-Enriched Light to Mitigate Sleep Inertia at Night Following Awaking From Slow-Wave Sleep

Sleep inertia is the brief period of performance impairment and reduced alertness experienced after waking, especially from slow-wave sleep. We assessed the efficacy of polychromatic short-wavelength-enriched light to improve vigilant attention, alertness and mood immediately after waking from slow-wave sleep at night. Twelve participants (six female, 23.3 ± 4.2 years) maintained an actigraphy-confirmed sleep schedule of 8.5 hr for 5 nights, and 5 hr for 1 night prior to an overnight laboratory visit. In the laboratory, participants were awakened from slow-wave sleep, and immediately exposed to either dim, red ambient light (control) or polychromatic short-wavelength-enriched light (light) for 1 hr in a randomized crossover design. They completed a 5-min Psychomotor Vigilance Task, the Karolinska Sleepiness Scale, and Visual Analogue Scales of mood at 2, 17, 32 and 47 min after waking. Following this testing period, lights were turned off and participants returned to sleep. They were awakened from their subsequent slow-wave sleep period and received the opposite condition. Compared with the control condition, participants exposed to light had fewer Psychomotor Vigilance Task lapses (χ 2 [1] = 5.285, p = 0.022), reported feeling more alert (Karolinska Sleepiness Scale: F 1,77 = 4.955, p = 0.029; Visual Analogue Scale alert : F 1,77 = 8.226, p = 0.005), and reported improved mood (Visual Analogue Scale cheerful : F 1,77 = 8.615, p = 0.004). There was no significant difference in sleep-onset latency between conditions following the testing period (t 10 = 1.024, p = 0.330). Our results suggest that exposure to polychromatic short-wavelength-enriched light immediately after waking from slow-wave sleep at night may help improve vigilant attention, subjective alertness, and mood. Future studies should explore the potential mechanisms of this countermeasure and its efficacy in real-world environments.

alertness↗

Composites for Advanced Space Transportation Systems (CASTS)

A summary is given of the in-house and contract work accomplished under the CASTS Project. In July 1975 the CASTS Project was initiated to develop graphite fiber/polyimide matrix (GR/PI) composite structures with 589K (600 F) operational capability for application to aerospace vehicles. Major tasks include: (1) screening composites and adhesives, (2) developing fabrication procedures and specifications, (3) developing design allowables test methods and data, and (4) design and test of structural elements and construction of an aft body flap for the Space Shuttle Orbiter Vehicle which will be ground tested. Portions of the information are from ongoing research and must be considered preliminary. The CASTS Project is scheduled to be completed in September 1983.

Davis, J. G., Jr.↗

Applications of artificial intelligence to mission planning

The scheduling problem facing NASA-Marshall mission planning is extremely difficult for several reasons. The most critical factor is the computational complexity involved in developing a schedule. The size of the search space is large along some dimensions and infinite along others. It is because of this and other difficulties that many of the conventional operation research techniques are not feasible or inadequate to solve the problems by themselves. Therefore, the purpose is to examine various artificial intelligence (AI) techniques to assist conventional techniques or to replace them. The specific tasks performed were as follows: (1) to identify mission planning applications for object oriented and rule based programming; (2) to investigate interfacing AI dedicated hardware (Lisp machines) to VAX hardware; (3) to demonstrate how Lisp may be called from within FORTRAN programs; (4) to investigate and report on programming techniques used in some commercial AI shells, such as Knowledge Engineering Environment (KEE); and (5) to study and report on algorithmic methods to reduce complexity as related to AI techniques.

Ford, Donnie R.↗

Test/score/report: Simulation techniques for automating the test process

A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.

Hageman, Barbara H.↗

An At-Home Evaluation of a Light Intervention to Mitigate Sleep Inertia Symptoms

Introduction: Sleep inertia symptoms typically occur after waking from nocturnal sleep. Under laboratory settings, light exposure upon waking has been shown to improve alertness, mood, and vigilant attention. We investigated whether a field-deployable light-emitting device would help to improve alertness and working memory in a real-world setting. Methods: Thirty-five participants (18 female; 26.4 ± 6.0 y) completed an at-home, within-subject, randomized crossover study. Participants wore actiwatches during their normal sleep-wake schedule for five nights ahead of the adaptation and experimental nights. On the experimental night, participants performed baseline testing before their self-selected bedtime. Forty-five minutes after bedtime, participants received a phone call and were instructed to perform test bouts while wearing light-emitting glasses with the light either on (light condition) or off (control). A 3-minute descending subtraction task (DST) and the Karolinska Sleepiness Scale (KSS) were performed at +7, +17, +27, and +37 minutes after the call. Participants were then instructed to go back to sleep and were called 45 minutes after lights out to repeat the test bouts in the opposite condition. A series of mixed-effects models were performed with fixed effects of condition, test bout, and their interaction, and a random effect of participant. Condition order, sex, and baseline were included as covariates. Results: There was a significant effect of test bout for DST total responses (χ2 [3] = 17.42; p < .001) and total correct (χ2 [3] = 21.29; p < .001) with improved performance at +27 and +37 minutes compared to +7 minutes. Sex was a significant predictor for KSS (F1,30 = 10.26; p = .003), with females (8.20 ± 0.23) rating higher sleepiness than males (7.10 ± 0.25). There were no other significant effects for DST or KSS outcomes (p > .05). Conclusion: These results suggest that the intervention was not able to improve working memory or alertness under naturalistic at-home settings. Further analysis is needed to determine whether these results are applicable to other cognitive performance domains.

light↗

Timeline Resource Analysis Program (TRAP): User's manual and program document

The Timeline Resource Analysis Program (TRAP), developed for scheduling and timelining problems, is described. Given an activity network, TRAP generates timeline plots, resource histograms, and tabular summaries of the network, schedules, and resource levels. It is written in ANSI FORTRAN for the Honeywell SIGMA 5 computer and operates in the interactive mode using the TEKTRONIX 4014-1 graphics terminal. The input network file may be a standard SIGMA 5 file or one generated using the Interactive Graphics Design System. The timeline plots can be displayed in two orderings: according to the sequence in which the tasks were read on input, and a waterfall sequence in which the tasks are ordered by start time. The input order is especially meaningful when the network consists of several interacting subnetworks. The waterfall sequence is helpful in assessing the project status at any point in time.

Sessler, J. G.↗