Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Short-Term Load Forecasting Based Automatic Distribution Network Reconfiguration

In a traditional dynamic network reconfiguration study, the optimal topology is determined at every scheduled time point by using the real load data measured at that time. The development of the load forecasting technique can provide an accurate prediction of the load power that will happen in a future time and provide more information about load changes. With the inclusion of load forecasting, the optimal topology can be determined based on the predicted load conditions during a longer time period instead of using a snapshot of the load at the time when the reconfiguration happens; thus, the distribution system operator can use this information to better operate the system reconfiguration and achieve optimal solutions. This paper proposes a short-term load forecasting approach to automatically reconfigure distribution systems in a dynamic and pre-event manner. Specifically, a short-term and high-resolution distribution system load forecasting approach is proposed with a forecaster based on support vector regression and parallel parameters optimization. The network reconfiguration problem is solved by using the forecasted load continuously to determine the optimal network topology with the minimum amount of loss at the future time. The simulation results validate and evaluate the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SEASAT economic assessment. Volume 10: The SATIL 2 program (a program for the evaluation of the costs of an operational SEASAT system as a function of operational requirements and reliability

The SATIL 2 computer program was developed to assist with the programmatic evaluation of alternative approaches to establishing and maintaining a specified mix of operational sensors on spacecraft in an operational SEASAT system. The program computes the probability distributions of events (i.e., number of launch attempts, number of spacecraft purchased, etc.), annual recurring cost, and present value of recurring cost. This is accomplished for the specific task of placing a desired mix of sensors in orbit in an optimal fashion in order to satisfy a specified sensor demand function. Flow charts are shown, and printouts of the programs are given.

Source record↗

Comparison of Wind Power and Load Forecasting Error Distributions: Preprint

The introduction of large amounts of variable and uncertain power sources, such as wind power, into the electricity grid presents a number of challenges for system operations. One issue involves the uncertainty associated with scheduling power that wind will supply in future timeframes. However, this is not an entirely new challenge; load is also variable and uncertain, and is strongly influencedby weather patterns. In this work we make a comparison between the day-ahead forecasting errors encountered in wind power forecasting and load forecasting. The study examines the distribution of errors from operational forecasting systems in two different Independent System Operator (ISO) regions for both wind power and load forecasts at the day-ahead timeframe. The day-ahead timescale iscritical in power system operations because it serves the unit commitment function for slow-starting conventional generators.

17 WIND ENERGY↗

Evaluation Metrics for the Paragon XP/S-15

On February 17th 1993, the Numerical Aerodynamic Simulation (NAS) facility located at the NASA Ames Research Center installed a 224 node Intel Paragon XP/S-15 system. After its installation, the Paragon was found to be in a very immature state and was unable to support a NAS users' workload, composed of a wide range of development and production activities. As a first step towards addressing this problem, we implemented a set of metrics to objectively monitor the system as operating system and hardware upgrades were installed. The metrics were designed to measure four aspects of the system that we consider essential to support our workload: availability, utilization, functionality, and performance. This report presents the metrics collected from February 1993 to August 1993. Since its installation, the Paragon availability has improved from a low of 15% uptime to a high of 80%, while its utilization has remained low. Functionality and performance have improved from merely running one of the NAS Parallel Benchmarks to running all of them faster (between 1 and 2 times) than on the iPSC/860. In spite of the progress accomplished, fundamental limitations of the Paragon operating system are restricting the Paragon from supporting the NAS workload. The maximum operating system message passing (NORMA IPC) bandwidth was measured at 11 Mbytes/s, well below the peak hardware bandwidth (175 Mbytes/s), limiting overall virtual memory and Unix services (i.e. Disk and HiPPI I/O) performance. The high NX application message passing latency (184 microns), three times than on the iPSC/860, was found to significantly degrade performance of applications relying on small message sizes. The amount of memory available for an application was found to be approximately 10 Mbytes per node, indicating that the OS is taking more space than anticipated (6 Mbytes per node).

Traversat, Bernard↗

Characterizing HVDC Transmission Flexibility under Extreme Operating Conditions

System operators rely on system flexibility, traditionally mainly from generation, to handle unexpected reliability and resilience events, ranging from excessive resource forecast errors to extreme events like heatwaves, earthquakes, and cyberattacks. Flexible transmission, such as controllable high voltage direct current (HVDC) transmission systems present an opportunity to increase overall system flexibility to accommodate operational challenges. This paper provides a methodology to study contributions to system flexibility by controllable, power electronics based transmission. The Western Electricity Coordinating Council (WECC) system is used as an example to study contributions from existing and future HVDC lines. Under extreme system conditions, it is identified that HVDC transmission flexibility can contribute with 24.8 to 28% of avoided unserved energy, and in some areas, the benefits amount to 50 to 70%.

HVDC transmission, PCM, Balancing authorities↗

Production Operations Management System

The Production Operations Management System (POMS) is a set of software tools which allows production teams and analysis groups across multiple Fermilab experiments to launch, modify and monitor large scale campaigns of related Monte Carlo or data processing jobs. POMS provides a web service interface that enables automated jobs submission on distributed resources according to customers’ requests and subsequent monitoring and recovery of failed submissions, debugging and record keeping. POMS interfaces with existing HEP data access, processing, movement and monitoring tools at Fermilab, including Jobsub, dCache, SAM, and FIFEmon, and in combination with them handles the creation and tracking of unique filenames for multistage campaigns. A flexible, interactive GUI interface exists as part of the system to visualize campaign stages, parallelization tracks and data flow. An important feature of POMS is a one-to-one connection between the GUI campaign visualizer and a text based representation of the complete campaign configuration. An extensible library of template campaign configurations is available. The templates are user modifiable and map cleanly to and from the GUI description of the campaign. Future releases of POMS will interface with Rucio for file movement.

97 MATHEMATICS AND COMPUTING↗

Multimegabit Operation Multiplexer System

The Multimegabit Operation Multiplexer System (MOMS) is a high-data-rate PCM telemetry unit capable of sampling and encoding 60 scanning radiometer and four vidicon channels at 250 kilosamples/second and 5 megasamples/second, respectively. This sampling capacity plus the seven-bit quantization requires a total throughput rate of 40 megasamples/second and 280 megabits/second. To produce these rates efficiently, the system was divided into a pair of identical 140-megabit blocks. A low-power 20-MHz analog multiplexer and analog-to-digital converter were developed together with a video sample-and-hold that features an aperture time error of less than 50 psec. Breadboard testing of these basic building blocks confirmed the design prediction that the total system would consume 27 watts of power. Two 140-megabit output parts are suitable for quadriphase modulation.

Giri, R. R.↗

Methods and systems for operating a redox flow battery system

A method of operating a redox flow battery, may include maintaining a positive electrode compartment pressure greater than a negative electrode compartment pressure, and maintaining a cross-over pressure less than a membrane break-through pressure, wherein the cross-over pressure equals the negative electrode compartment pressure subtracted from the positive electrode compartment pressure. In this way, ionic resistance across the separator can be maintained at a lower level by reducing gas bubbles trapped therein while reducing separator break-through, thereby increasing performance of the redox flow battery system.

25 ENERGY STORAGE↗

Solar power satellite system definition study. Volume 3: Operations and systems synthesis, phase 2

The results of the operations analyses are reported. Some of these analyses examined operations aspects of space vehicle in-space maintenance. Many of the analyses explored in great depth operations concerned the LEO Base cargo handling operations. Personnel transportation operations and cargo packaging were also analyzed. These operations analyses were performed to define the operational requirements for all of the SPS system elements so that equipment and facilities could be synthesized, and to make estimates of the manpower requirements. An overall, integrated, end-to-end description of the SPS operations is presented. The detailed operations analyses, upon which this integrated description was based, are included.

Source record↗

Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A

The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.

Woodcock, G. R.↗

Operations management system

The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

Brandli, A. E.↗

A COMPUTERIZED OPERATOR SUPPORT SYSTEM PROTOTYPE

A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. A prototype COSS was developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. The initial version of the prototype is now operational at the Idaho National Laboratory using the Human System Simulation Laboratory.

99 GENERAL AND MISCELLANEOUS↗

Stochastic availability analysis of operational data systems in the Deep Space Network

Existing availability models of standby redundant systems consider only an operator's performance and its interaction with the hardware performance. In the case of operational data systems in the Deep Space Network (DSN), in addition to an operator system interface, a controller reconfigures the system and links a standby unit into the network data path upon failure of the operating unit. A stochastic (Markovian) process technique is used to model and analyze the availability performance and occurrence of degradation due to partial failures are quantitatively incorporated into the model. Exact expressions of the steady state availability and proportion degraded performance measures are derived for the systems under study. The interaction among the hardware, operator, and controller performance parameters and that interaction's effect on data availability are evaluated and illustrated for an operational data processing system.

Issa, T. N.↗

A Robust Yule-Walker Method for Online Monitoring of Power System Electromechanical Modes of Oscillation

Reliable power system operation requires that system operators maintain a satisfactory small-signal stability margin at all times. Mode meters allow system operators to continuously monitor the stability margin by analyzing synchrophasor measurements. Experience with mode meters at the Bonneville Power Administration (BPA) has revealed that mode meters sometimes suffer severe bias following transient disturbances. In this paper, a robust version of the Yule-Walker mode meter algorithm is proposed to mitigate this bias. The robust capability is introduced by modifying the estimator of the autocovariance sequence (ACS) on which the algorithm depends. Tests with field-measured data demonstrate that the robust Yule-Walker (RYW) algorithm significantly outperforms its conventional counterpart and is better able to provide system operators with accurate information about the system's stability margin.

Follum, James D.↗

Architecture for removable media USB-ARM

A storage device is coupled to a computing system comprising an operating system and application software. Access to the storage device is blocked by a kernel filter driver, except exclusive access is granted to a first anti-virus engine. The first anti-virus engine is directed to scan the storage device for malicious software and report results. Exclusive access may be granted to one or more other anti-virus engines and they may be directed to scan the storage device and report results. Approval of all or a portion of the information on the storage device is based on the results from the first anti-virus engine and the other anti-virus engines. The storage device is presented to the operating system and access is granted to the approved information. The operating system may be a Microsoft Windows operating system. The kernel filter driver and usage of anti-virus engines may be configurable by a user.

97 MATHEMATICS AND COMPUTING↗