Network-Aware and Welfare-Maximizing Dynamic Pricing for Energy Sharing: Preprint

The proliferation of behind-the-meter (BTM) distributed energy resources (DER) within the electrical distribution network presents significant supply and demand flexibilities, but also introduces operational challenges such as voltage spikes and reverse power flows. In response, this paper proposes a network-aware dynamic pricing framework tailored for energy-sharing coalitions that aggregate small, but ubiquitous, BTM DER downstream of a distribution system operator's (DSO) revenue meter that adopts a generic net energy metering (NEM) tariff. By formulating a Stackelberg game between the energy-sharing market leader and its prosumers, we show that the dynamic pricing policy induces the prosumers toward a network-safe operation and decentrally maximizes the energysharing social welfare. The dynamic pricing mechanism involves a combination of a locational ex-ante dynamic price and an ex-post allocation, both of which are functions of the energy sharing's BTM DER. The ex-post allocation is proportionate to the price differential between the DSO NEM price and the energy sharing locational price. Simulation results using real DER data and the IEEE 13-bus test systems illustrate the dynamic nature of network-aware pricing at each bus, and its impact on voltage.

energy communities↗

Network-Aware and Welfare-Maximizing Dynamic Pricing for Energy Sharing

The proliferation of behind-the-meter (BTM) distributed energy resources (DER) within the electrical distribution network presents significant supply and demand flexibilities, but also introduces operational challenges such as voltage spikes and reverse power flows. In response, this paper proposes a network-aware dynamic pricing framework tailored for energy-sharing coalitions that aggregate small, but ubiquitous, BTM DER downstream of a distribution system operator's (DSO) revenue meter that adopts a generic net energy metering (NEM) tariff. By formulating a Stackelberg game between the energy-sharing market leader and its prosumers, we show that the dynamic pricing policy induces the prosumers toward a network-safe operation and decentrally maximizes the energysharing social welfare. The dynamic pricing mechanism involves a combination of a locational ex-ante dynamic price and an ex-post allocation, both of which are functions of the energy sharing's BTM DER. The ex-post allocation is proportionate to the price differential between the DSO NEM price and the energy-sharing locational price. Simulation results using real DER data and the IEEE 13-bus test systems illustrate the dynamic nature of network-aware pricing at each bus, and its impact on voltage.

aggregates↗

Are coupled renewable-battery power plants more valuable than independently sited installations?

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Keep it short: Exploring the impacts of configuration choices on the recent economics of solar-plus-battery and wind-plus-battery hybrid energy plants

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$10$/MWh across ISOs on average. The highest boost occurs in California ($\$15$/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$12.5$/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$12.5$/MWh coupling penalty is reduced to $\$1.6$/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$2$–$\$13$/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Best Practices Handbook for the Collection and Use of Solar Resource Data for Solar Energy Applications: Fourth Edition

As the world increasingly seeks low-carbon energy solutions, solar power emerges as the most abundant resource on our planet. However, the challenge of effectively harnessing this energy is crucial in the coming years. Solar energy applications such as photovoltaics, solar heating and cooling, and concentrating solar power use different technologies to capitalize on sunlight. Each system has unique capabilities and requirements, underscoring the need for reliable information about solar resources across diverse installations, from residential rooftops to large-scale power plants. This is especially important for substantial projects, often exceeding $1 billion in construction costs. Before embarking on such ventures, it is imperative to obtain accurate data concerning solar resource quality and reliability at specific sites. Developers require detailed historical information, including seasonal, daily, hourly, and, ideally, subhourly variability to effectively predict a power plant's annual performance. Without these vital data, financial analyses fall short. Moreover, with the growing adoption of distributed photovoltaics, integrating these generation sources becomes critical to maintaining grid reliability and stability. By accurately forecasting generation patterns, utilities and system operators can facilitate greater integration of solar energy, thus ensuring the operational stability of the grid. The complexity and importance of these issues have prompted the foremost experts in the field to collaborate under the auspices of the International Energy Agency's (IEA's) Photovoltaic Power Systems Programme (PVPS) Task 16 to publish this handbook, which summarizes state-of-the-art information about all these topics. The efforts focus on providing reliable data and insights that can help shape our investments in solar energy and drive a sustainable future.

14 SOLAR ENERGY↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Optimal PMU Restoration for Power System Observability Recovery After Massive Attacks

Cyber-physically resilient power system operation requires rapid recovery of situational awareness after disastrous scenarios such as massive cyber attacks. In this article, the concept of optimal sequential restoration of Phasor Measurement Units is introduced, aiming at rapid recovery of power system observability in post-attack scenarios. Additionally, the observability recovery problem is formulated as a Mixed Integer Linear Programming problem to maximize the cumulative observability level gained over time during the restoration process. Three alternative objective functions-maximizing the number of observable buses, the number of observable branches, and the total amount of observable power flow-are considered. The effectiveness of the proposed optimal strategy is verified by comparing it with heuristic approaches on the IEEE 57-bus system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wintap

Wintap is an extensible, general purpose agent framework for the Windows operating system. It provides an easy-to-use plugin architecture, an integrated streaming analytics engine, and real-time event subscriptions for host-based data. Wintap can support a wide variety of applications across production operations, cyber security operations, and cyber security research.

Frye, DavidJ↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration: Preprint

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Assessing the Impact of Variable Air Volume Box Damper Stuck Faults Using a Building Automation System and Building Energy Simulation Model

The study examines the impact of variable air volume (VAV) damper stuck faults on the system operation, building indoor conditions, and reheating energy consumption. This study includes both experimental and simulation studies for five test scenarios, including a fault-free scenario. We implemented VAV damper stuck fault through the building automation system (BAS). Results show that a damper stuck in a high opening position (60% damper opening) results in supplying an excessive amount of cold air from the rooftop unit (RTU) to the conditioned zone, increasing reheating energy consumption. The results of this research can serve as a foundational resource for developing fault detection algorithms.

Jung, Sungkyun↗

Insights Into On-Demand Transit: A Case Study of Houston METRO's curb2curb Transit Services: Preprint

As modern on-demand transit (ODT) deployments increase, the insights gained from studying real-world systems prove more useful. In this study, a shared ODT system called "METRO curb2curb" in the suburbs of Houston, Texas was studied, with a particular focus on the Missouri City zone, which has the highest ridership out of the four total zones in which the system operates. The Missouri City zone spans 18 square miles with an average daily ridership of nearly 400 as of November 2024. In order to gain a passenger perspective, data collection was performed through using the ODT system first-hand, completing 50 rides in March and April of 2023. These rides included a mix of three different types of on-demand travel accommodations - 1.) advance bookings (30 min - 2 hours ahead), 2.) as-soon-as-possible / real-time dispatch bookings, and 3.) no-reservation trips at two designated "anchor points." Wait and travel time were collected for each ride. Anecdotal findings related to ease of locating the driver/vehicle, the process of booking a ride, and popular trip purposes were also documented. This study provides an overview of the METRO curb2curb system, including its history, service provider, service area, ridership, booking options, wait time, and travel time. Intricacies related to different definitions of wait time are included. Finally, relevant considerations for automating the on-demand transit system and discussed.

33 ADVANCED PROPULSION SYSTEMS↗

Sizing ramping reserve using probabilistic solar forecasts: A data-driven method

Ramping products have been introduced or proposed in several U.S. power markets to mitigate the impact of load and renewable uncertainties on market efficiency and reliability. Current methods often rely on historical data to estimate the requirements of ramping products and fail to take into account the effects of the latest weather conditions and their uncertainties, which could lead to overly conservative or insufficient requirements. This study proposes a k-nearest-neighbor-based method to give weather-informed estimates of ramping needs based on short-term probabilistic solar irradiance forecasts. Forecasts from multiple sites are employed in conjunction with principal component analysis to derive numerical classifiers to characterize system-level weather conditions. In addition, we develop a data-driven method to optimize the model parameters in a rolling-forward manner. By using real-world data from the California Independent System Operator, we design two metrics to evaluate method performance: 1) frequency of shortage and 2) oversupply of ramping product. Our proposed method presents advantages in comparison with the baseline and a set of benchmark methods: without compromising system reliability, it reduces system ramping requirements by up to 25%, therefore improving both system reliability and economics.

14 SOLAR ENERGY↗

Collaborative Decision Approach for Electricity Pricing-demand Response Stackelberg Game

Demand response programs are considered as a valuable resource in smart grids that provide several advantages of load shifting, peak load reduction, mediating intermittency of renewable energy integration, etc. Flexible price-based incentives have been recognized as a critical strategy in motivating and compensating consumers' load adjustment actions for successful implementation of demand response. Game theoretical approaches, especially Stackelberg games are popularly adopted to model the relationship between electricity price and customers' demand response and solved by the classical centralized backward induction (BI) method. However, the BI method generally requires convexity of the follower's model for necessary optimality conditions, and the computational time of any centralized approach increases sharply with larger problem instances. In this paper, the Stackelberg game of electricity pricing-demand response between a distribution system operator (DSO) and load aggregators (LAs) is decomposed based on a collaborative optimization (CO) framework, where each LA is treated as a discipline with its own domain constraints (e.g. building temperature control), while the DSO at the system level tries to reduce the solution discrepancy and guide the searching towards optimality. Several groups of comparison experiments have demonstrated the effectiveness of the proposed collaborative decision approach in solving the demand response game.

Chen, Yang↗

Understanding Regional Inertia Dynamics in CAISO from Real Grid Disturbances

The shift from synchronous generators to inverter-based resources has caused power system inertia to be unevenly distributed across power grids. As a result, certain grid regions are more vulnerable to high rate-of-change of frequency (RoCoF) during disturbances. This paper presents a measurement-based framework for estimating grid inertia in CAISO (California Independent System Operator) region using real disturbance-driven frequency data from the Frequency Monitoring Network (FNET/GridEye). By analyzing confirmed disturbances from 2013 to 2024, we identify trends in regional inertia and frequency dynamics, highlighting their relationship with renewable generation and the evolving duck curve. Regional RoCoF values were up to six times higher than interconnection-wide values, coinciding with declining inertia. Recent recovery in inertia is attributed to the increased deployment of battery energy storage systems with synthetic inertia capabilities. These findings underscore the importance of regional inertia monitoring, strategic resource planning, and adaptive operational practices to ensure grid reliability amid growing renewable integration.

Dulal, Saurav [University of Tennessee, Knoxville ↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Networked HIL Simulation System for Modeling Large-scale Power Systems

This paper presents a network hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAR regulation technologies as an example to illustrate system setups, communication requirements among different HIL test systems, and connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.

digital twin, distribution system, co-simulation, ↗

Grid Resiliency with a 100% Renewable Microgrid

San Diego Gas & Electric Company (SDG&E) installed America’s first and largest utility-scale microgrid in Borrego Springs in 2013. The first generation Borrego Springs Microgrid utilized diesel generators to form and stabilize the microgrid island, with support from grid-scale batteries and local solar photovoltaic (PV) generation. In this project, SDG&E in partnership with National Renewable Energy Laboratory (NREL) demonstrated through modeling, simulation and utility field testing that blackstart and islanding of the microgrid can be led with 100% renewable, inverter based resources (IBRs), to help reduce community reliance on conventional generation resources. Through equipment upgrades, grid-forming island leader capability was transitioned to a battery IBR instead of the Borrego Springs Microgrid diesel generators. A new microgrid controller was integrated to the microgrid and programmed to control and manage multiple energy storage systems. Synchrophasor and other power quality data verified autonomous, high-speed response of the IBRs through blackstart, islanding, and load step testing. Results of project field evaluations provide distribution systems operators (DSO) with increased confidence that renewable, IBR can replace traditional generators to blackstart and island microgrids and rapidly establish stable island frequency with rapid changes in peak power demand. Importantly, the project validated the integration feasibility of a distributed energy resource management system (DERMS) controller that manages multiple grid-forming and grid-following IBRs, establishing a standard design interface to reduce the complexity of integrating new DERs in the future and supporting replication by the industry. As a result of learnings in this project, SDG&E has implemented the microgrid controller strategy at multiple other microgrid sites, thereby validating the replicability of the solution. Hardware-in-the-loop (HIL) simulations including power and controller HIL hardware — along with electromagnetic transient (EMT) simulations of Borrego Springs Microgrid —informed adjustments to inverter parameters and were important to characterize the performance of the IBRs in relevant operating conditions before deployment. The EMT and HIL simulations of islanding the entire community are important contributions in providing confidence in IBR performance prior to future islanding of the community in the field. High-fidelity EMT and/or HIL simulation of IBRs can de-risk field operations, and its relevance and importance as a tool is increasing as distribution grids and microgrids become more complex and dynamic with an increasing proportion of renewable generation, distributed energy storage, and two-way power and energy flows.

24 POWER TRANSMISSION AND DISTRIBUTION↗