Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Spares”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction

The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.

Reliability↗

Regenerative ECLSS and Logistics Analysis for Sustained Lunar Surface Missions

Sustained Lunar Campaign: Annual crew missions to the lunar surface with 2 to 4 crewmembers living in a Surface Habitat (SH) and/or a Pressurized Rover (PR) for 30 days or longer. Missions will require annual resupply of logistics to the lunar surface: Logistics include consumables, EVA consumables and spares, carriers, surface system spares and maintenance, and science and utilization. Water and gas (may) dominate the total logistics resupply: Water and gas = a direct function of the level of closure provided by the ECLSS in the Surface Habitat (SH) and the Pressurized Rover (PR). Logistics requirements will drive the number of required resupply landers, launch vehicles, and resupply costs. Goal of Paper: Determine a recommended regenerative ECLSS architecture option to minimize the tradeoff between ECLSS Delivery Mass and Logistics Resupply Mass

ECLSS↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Heritage to Flight; The Test Program that Brought an Inflation System Back to Life for the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID)

Following the success of the Inflatable Reentry Vehicle Experiment-3 (IRVE-3) project, the Terrestrial Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Orbital Reentry (THOR) project was stood up with a “built to print” Inflation System utilizing the IRVE-3 flight spares. When THOR was canceled, this Inflation System had already been tested and assembled, ready for use. Thus, when the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) was spun up, the THOR system seemed like a good candidate to salvage flight ready hardware. There were, however, some key differences in the IRVE/THOR system and the LOFTID one. LOFTID’s HIAD was two times the size of IRVE for starters and would require much higher flows to accommodate inflating such an article within a specific timeframe. With new requirements and a tight schedule, the LOFTID Inflation team set to work to verify flight readiness under LOFTID conditions and eliminate the need to requalify new hardware. LOFTID, utilizing an Inflation System built primarily hardware from IRVE-3 spares, successfully flew in November of 2022. This paper will outline the mission differences, the test campaign used to prepare LOFTID’s Inflation System for flight, and some lessons learned in repurposing older hardware.

Inflation System↗

Heritage to Flight: The Test Program that Brought an Inflation System Back to Life for LOFTID

Following the success of the Inflatable Reentry Vehicle Experiment-3 (IRVE-3) project, the Terrestrial Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Orbital Reentry (THOR) project was stood up with a “built to print” Inflation System utilizing the IRVE-3 flight spares. When THOR was canceled, this Inflation System had already been tested and assembled, ready for use. Thus, when the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) was spun up, the THOR system seemed like a good candidate to salvage flight ready hardware. There were, however, some key differences in the IRVE/THOR system and the LOFTID one. LOFTID’s HIAD was two times the size of IRVE for starters and would require much higher flows to accommodate inflating such an article within a specific timeframe. With new requirements and a tight schedule, the LOFTID Inflation team set to work to verify flight readiness under LOFTID conditions and eliminate the need to requalify new hardware. LOFTID, utilizing an Inflation System built primarily hardware from IRVE-3 spares, successfully flew in November of 2022. This paper will outline the mission differences, the test campaign used to prepare LOFTID’s Inflation System for flight, and some lessons learned in repurposing older hardware.

Inflation System↗

Heritage to Flight: The Test Program that Brought an Inflation System Back to Life for LOFTID

Following the success of the Inflatable Reentry Vehicle Experiment-3 (IRVE-3) project, the Terrestrial Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Orbital Reentry (THOR) project was stood up with a “built to print” Inflation System utilizing the IRVE-3 flight spares. When THOR was canceled, this Inflation System had already been tested and assembled, ready for use. Thus, when the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) was spun up, the THOR system seemed like a good candidate to salvage flight ready hardware. There were, however, some key differences in the IRVE/THOR system and the LOFTID one. LOFTID’s HIAD was two times the size of IRVE for starters and would require much higher flows to accommodate inflating such an article within a specific timeframe. With new requirements and a tight schedule, the LOFTID Inflation team set to work to verify flight readiness under LOFTID conditions and eliminate the need to requalify new hardware. LOFTID, utilizing an Inflation System built primarily hardware from IRVE-3 spares, successfully flew in November of 2022. This paper will outline the mission differences, the test campaign used to prepare LOFTID’s Inflation System for flight, and some lessons learned in repurposing older hardware.

Inflation System↗

Development of Aluminum Feedstock for Additive Manufacturing

The rapid evolution of materials science and manufacturing technologies in recent years has offered new pathways to manipulate materials for bespoke manufacturing. Here we aim to develop feedstocks for applications such as radiator panels, fuel tanks, and structural components for outfitting. As a strong, light weight and thermally conductive material aluminum is ideal for these applications. An often-overlooked source of aluminum waste is food packaging used on the International Space Station. Reusing this waste stream will reduce the cost and logistics of regular sparing. In Space Manufacturing (ISM) will utilize this technology is such areas as sparing and outfitting. However, processing aluminum can present challenges, especially in the context of additive manufacturing and sintering, due to its high reactivity and tendency to form a tenacious oxide layer. Identifying appropriate binders and sintering profiles can overcome these challenges. Herein we present our work on obtaining aluminum powder derived from food packaging, binder selection for aluminum feedstock, and a demonstration of bound metal deposition printing.

aluminum↗

Operating Experience Review of Tritium-in-Water Monitors

Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

RF Gun Photocathode Research at SLAC

LCLS is presently operating with a third copper photocathode in the original rf gun, with a quantum efficiency (QE) of {approx}1 x 10{sup -4} and projected emittance {gamma}{var_epsilon}{sub x,y} = 0.45 {micro}m at 250 pC bunch charge. The spare LCLS gun is installed in the SLAC Accelerator Structure Test Area (ASTA), fully processed to high rf power. As part of a wider photocathode R and D program, a UV laser system and additional gun diagnostics are being installed at ASTA to measure QE, QE lifetime, and electron beam emittance under a variety of operating conditions. The near-term goals are to test and verify the spare photocathode production/installation sequence, including transfer from the final holding chamber to the rf gun. Mid- and longer-term goals include development of a rigorous understanding of plasma and laser-assisted surface conditioning and investigation of new, high-QE photocathode materials. In parallel, an x-ray photoemission spectroscopy station is nearing completion, to analyze Cu photocathode surface chemistry. In this paper we review the status and anticipated operating parameters of ASTA and the spectroscopy test chamber.

43 PARTICLE ACCELERATORS↗

Insights Gained for Updating an Analog I&C System to a Digital System

Licensees at both Nuclear Power Plants (NPPs) and Non-Power Reactors (NPRs) are increasing their use of state-of-the-art digital technology in instrumentation and control (I&C) systems because digital systems offer improved reactor control, information processing, and information storage over analog. Digital I&C systems can range from experimental systems for reactor control research (at NPRs), to measurement and display systems, to complete reactor console replacements. Because of the increasing difficulty in finding spare parts for their original analog I&C systems, many licensees have begun or have plans to upgrade, refurbish, or replace their old analog I&C systems with digital systems. The perception is that upgrading to a digital I&C system will solve all of a facility s obsolescence problems. However, licensees need to be aware of several issues associated with upgrading to a digital system including obsolescence of the digital system (hardware and software) because of the short product life cycle and the associated cost to acquire, store, and maintain a long-term supply of spare parts. Configuration management and cyber security are also vitally important for any upgrade. Further, it must be recognized that the introduction of software and microprocessors could create new failure mechanisms, such as software errors and increased susceptibility to electromagnetic interference. In fact, experience has shown that these failure mechanisms may cause the reactor to malfunction in a way not previously considered. Thus, a conversion from analog to digital I&C systems solves some problems while potentially introducing others. Recognition of the additional risks coupled with good design, engineering, review, and testing can identify and minimize these risks.

Adams, A.↗

Transformative Technology for FLASH Radiation Therapy: A Snowmass 2021 White Paper

Conventional cancer therapies include surgery, radiation therapy, chemotherapy, and, more recently, immunotherapy. These modalities are often combined to improve the therapeutic index. The general concept of radiation therapy is to increase the therapeutic index by creating a physical dose differential between tumors and normal tissues through precision dose targeting, image guidance, and high radiation beams that deliver radiation dose with high conformality, e.g., protons and ions. However, treatment and cure are still limited by normal tissue radiation toxicity, with many patients experiencing acute and long-term side effects. Recently, however, a fundamentally different paradigm for increasing the therapeutic index of radiation therapy has emerged, supported by preclinical research, and based on the FLASH radiation effect. FLASH radiation therapy (FLASH-RT) is an ultra-high dose-rate delivery of a therapeutic radiation dose within a fraction of a second. Experimental studies have shown that normal tissues seem to be universally spared at these high dose rates, whereas tumors are not. The dose delivery conditions are not yet fully characterized. Still, it is currently estimated that large doses of 10 Gy or more delivered in 200 ms or less produce normal tissue sparing effects yet effectively kill tumor cells. There is a great opportunity, but also many technical challenges, for the accelerator community to create the required dose rates with novel and compact accelerators to ensure the safe delivery of FLASH radiation beams.

43 PARTICLE ACCELERATORS↗

Design and fabrication of the waveguide Iris couplers for the Spallation Neutron Source drift tube linac

The Spallation Neutron Source (SNS) employs six cavities in the Drift Tube Linac (DTL) section to accelerate the H- ion beam to 87MeV. Each cavity is energized by a 2.5MW peak power klystron at 402.5MHz using rapid tapered waveguide iris couplers. All six original iris couplers have been in operation without replacement for over two decades. The increased RF power demands of the Proton Power Upgrade (PPU) project and operational problems, including arcing, temperature excursions, and vacuum bursts, have prompted the development of new iris coupler spares. The original iris couplers were made of GlidCop material, which is known to be mechanically strong and thermally stable, but is porous, expensive, and difficult to use in fabrication. To overcome these problems, the new spare couplers use Oxygen-Free Copper (OFC) and stainless steel (SS). This paper will discuss the mechanical, thermal and RF design, as well as challenges in the final coupler fabrication.

Lee, Sung-Woo↗

Adaptive Replanning Strategies Accounting for Shrinkage in Head and Neck IMRT

Purpose: Significant anatomic and volumetric changes occur in head and neck cancer patients during fractionated radiotherapy, and the actual dose can be considerably different from the original plan. The purposes of this study were (1) to evaluate the differences between planned and delivered dose, (2) to investigate margins required for anatomic changes, and (3) to find optimal replanning strategies. Methods and Materials: Eleven patients, each with one planning and six weekly helical CTs, were included. Intensity-modulated radiotherapy plans were generated using the simultaneous integrated boost technique. Weekly CTs were rigidly registered to planning CT before deformable registration was performed. The following replanning strategies were investigated with different margins (0, 3, 5 mm): midcourse (one replan), every other week (two replans), and every week (six replans). Doses were accumulated on the planning CT for comparison of various dose indices for target and critical structures. Results: The cumulative doses to targets were preserved even at the 0-mm margin. Doses to cord, brainstem, and mandible were unchanged. Significant increases in parotid doses were observed. Margin reduction from 5 to 0 mm led to a 22% improvement in parotid mean dose. Parotid sparing could be preserved with replanning. More frequent replanning led to better preservation; replanning more than once a week is unnecessary. Conclusion: Shrinkage does not result in significant dosimetric difference in targets and critical structures, except for the parotid gland, for which the mean dose increases by approx10%. The benefit of replanning is improved sparing of the parotid. The combination of replanning and reduced margins can provide up to a 30% difference in parotid dose.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Equivalence in Dose Fall-Off for Isocentric and Nonisocentric Intracranial Treatment Modalities and Its Impact on Dose Fractionation Schemes

Purpose: To investigate whether dose fall-off characteristics would be significantly different among intracranial radiosurgery modalities and the influence of these characteristics on fractionation schemes in terms of normal tissue sparing. Methods and Materials: An analytic model was developed to measure dose fall-off characteristics near the target independent of treatment modalities. Variations in the peripheral dose fall-off characteristics were then examined and compared for intracranial tumors treated with Gamma Knife, Cyberknife, or Novalis LINAC-based system. Equivalent uniform biologic effective dose (EUBED) for the normal brain tissue was calculated. Functional dependence of the normal brain EUBED on varying numbers of fractions (1 to 30) was studied for the three modalities. Results: The derived model fitted remarkably well for all the cases (R{sup 2} > 0.99). No statistically significant differences in the dose fall-off relationships were found between the three modalities. Based on the extent of variations in the dose fall-off curves, normal brain EUBED was found to decrease with increasing number of fractions for the targets, with alpha/beta ranging from 10 to 20. This decrease was most pronounced for hypofractionated treatments with fewer than 10 fractions. Additionally, EUBED was found to increase slightly with increasing number of fractions for targets with alpha/beta ranging from 2 to 5. Conclusion: Nearly identical dose fall-off characteristics were found for the Gamma Knife, Cyberknife, and Novalis systems. Based on EUBED calculations, normal brain sparing was found to favor hypofractionated treatments for fast-growing tumors with alpha/beta ranging from 10 to 20 and single fraction treatment for abnormal tissues with low alpha/beta values such as alpha/beta = 2.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Dosimetric Analysis of Respiratory-Gated Radiotherapy for Hepatocellular Carcinoma

The purpose of this study was to define individualized internal target volume (ITV) for hepatocellular carcinoma (HCC) using 4D computed tomography (4DCT), and to determine the geometric and dosimetric benefits of respiratory gating. Gross tumor volumes (GTVs) were contoured on 10 respiratory phases of 4DCT images for 12 patients with HCC. Three treatment plans were prepared using different planning target volumes (PTVs): (1) PTV{sub 3D}, derived from a single helical clinical target volume (CTV) plus conventional margins; (2) PTV{sub 10phases}, derived from ITV{sub 10phases}, which encompassed all 10 CTVs plus an isotropic margin of 0.8 cm; (3) PTV{sub gating}, derived from ITV{sub gating}, which encompassed three CTVs within gating-window at end-expiration plus an isotropic margin of 0.8 cm. The PTV{sub 3D} was the largest volume for all patients. The ITV-based plans and gating plans spared more normal tissues than 3D plans, especially the liver. Without increasing normal tissue complication probability of the 3D plans, the ITV-based plans allowed for increasing the calculated dose from 50.8 Gy to 54.7 Gy on average, and the gating plans could further escalate the dose to 58.5 Gy. Compared with ITV-based plans, the dosimetric gains with gating plan strongly correlated with GTV mobility in the craniocaudal direction. The ITV-based plans can ensure target coverage with less irradiation of normal tissues compared with 3D plans. Respiratory-gated radiotherapy can further reduce the target volumes to spare more surrounding tissues and allow dose escalation, especially for patients with tumor mobility >1 cm.

61 RADIATION PROTECTION AND DOSIMETRY↗

Data-Driven Approach to Generating Achievable Dose-Volume Histogram Objectives in Intensity-Modulated Radiotherapy Planning

Purpose: To propose a method of intensity-modulated radiotherapy (IMRT) planning that generates achievable dose-volume histogram (DVH) objectives using a database containing geometric and dosimetric information of previous patients. Methods and Materials: The overlap volume histogram (OVH) is used to compare the spatial relationships between the organs at risk and targets of a new patient with those of previous patients in a database. From the OVH analysis, the DVH objectives of the new patient were generated from the database and used as the initial planning goals. In a retrospective OVH-assisted planning demonstration, 15 patients were randomly selected from a database containing clinical plans (CPs) of 91 previous head-and-neck patients treated by a three-level IMRT-simultaneous integrated boost technique. OVH-assisted plans (OPs) were planned in a leave-one-out manner by a planner who had no knowledge of CPs. Thus, DVH objectives of an OP were generated from a subdatabase containing the information of the other 90 patients. Those DVH objectives were then used as the initial planning goals in IMRT optimization. Planning efficiency was evaluated by the number of clicks of the 'Start Optimization' button in the course of planning. Although the Pinnacle{sup 3} treatment planning system allows planners to interactively adjust the DVH parameters during optimization, planners in our institution have never used this function in planning. Results: The average clicks required for completing the CP and OP was 27.6 and 1.9, respectively (p <.00001); three OPs were finished within a single click. Ten more patient's cord + 4 mm reached the sparing goal D{sub 0.1cc} <44 Gy (p <.0001), where D{sub 0.1cc} represents the dose corresponding to 0.1 cc. For planning target volume uniformity, conformity, and other organ at risk sparing, the OPs were at least comparable with the CPs. Additionally, the averages of D{sub 0.1cc} to the cord + 4 mm decreased by 6.9 Gy (p <.0001); averages of D{sub 0.1cc} to the brainstem decreased by 7.7 Gy (p <.005). The averages of V(30 Gy) to the contralateral parotid decreased by 8.7% (p <.0001), where V(30 Gy) represents the percentage volume corresponding to 30 Gy. Conclusion: The method heralds the possibility of automated IMRT planning.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Refurbishment program of HANARO control computer system

HANARO, an open-tank-in-pool type research reactor with 30 MW thermal power, achieved its first criticality in 1995. The programmable controller system MLC (Multi Loop Controller) manufactured by MOORE has been used to control and regulate HANARO since 1995. We made a plan to replace the control computer because the system supplier no longer provided technical support and thus no spare parts were available. Aged and obsolete equipment and the shortage of spare parts supply could have caused great problems. The first consideration for a replacement of the control computer dates back to 2007. The supplier did not produce the components of MLC so that this system would no longer be guaranteed. We established the upgrade and refurbishment program in 2009 so as to keep HANARO up to date in terms of safety. We designed the new control computer system that would replace MLC. The new computer system is HCCS (HANARO Control Computer System). The refurbishing activity is in progress and will finish in 2013. The goal of the refurbishment program is a functional replacement of the reactor control system in consideration of suitable interfaces, compliance with no special outage for installation and commissioning, and no change of the well-proved operation philosophy. HCCS is a DCS (Discrete Control System) using PLC manufactured by RTP. To enhance the reliability, we adapt a triple processor system, double I/O system and hot swapping function. This paper describes the refurbishment program of the HANARO control system including the design requirements of HCCS. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗