Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space Operations Center”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

KSC 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT) Report

This report documents analysis results of the Kennedy Space Center updated 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). This test was designed to demonstrate that the new DRWP operates in a similar manner to the previous DRWP for use as a situational awareness asset for mission operations at the Eastern Range to identify rapid changes in the wind environment that weather balloons cannot depict. Data examination and two analyses showed that the updated DRWP meets the specifications in the OAT test plan and performs at least as well as the previous DRWP. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 5,426 wind component reports from 49 concurrent DRWP and balloon profiles presented root mean square (RMS) wind component differences around 2.0 m/s. The DRWP's effective vertical resolution (EVR) was found to be 300 m for both the westerly and southerly wind component, which the best EVR possible given the DRWP's vertical sampling interval. A third analysis quantified the sensitivity to rejecting data that do not have adequate signal by assessing the number of first-guess propagations at each altitude. This report documents the data, quality control procedures, methodology, and results of each analysis. It also shows that analysis of the updated DRWP produced results that were at least as good as the previous DRWP with proper rationale. The report recommends acceptance of the updated DRWP for situational awareness usage as per the OAT's intent.

Profiler↗

Characteristics and requirements of robotic manipulators for space operations

A robotic manipulator, DTF-1, developed as part of the Flight Telerobotic Servicer (FTS) project at Goddard Space Flight Center is discussed focusing on the technical, operational, and safety requirements. The DTF-1 system design, which is based on the manipulator, gripper, cameras, computer, and an operator control station incorporates the fundamental building blocks of the original FTS, the end product of which was to have been a light-weight, dexterous telerobotic device. For the first time in the history of NASA, space technology and robotics were combined to find new and unique solutions to the demanding requirements of flying a sophisticated robotic manipulator in space. DTF-1 is considered to be the prototype for all future development in space robotics.

Andary, James F.↗

Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

Hacker, Scott↗

Nasa's Launch Communications Ground Segment for the 21st Century Florida Spaceport

The National Aeronautics and Space Administration (NASA) Near Earth Network (NEN) Project is implementing a new launch communications ground segment to provide services for the next generation of human and robotic space exploration systems. It will deliver unique and advanced capabilities to accelerate the transformation of Kennedy Space Center into a multi-user spaceport in cooperation with the United States Air Force (USAF). The project has leveraged commercial technologies and remote operations concepts matured in NASAs orbiting satellite ground systems to achieve dramatic lifecycle cost efficiencies as compared to the space shuttle-era ground segment. The purpose of this paper is to discuss the development history, capabilities and anticipated use cases of the NEN Launch Communications Segment (NEN LCS).The NASA Kennedy Space Center is co-located with the USAF Eastern Launch Range at Cape Canaveral, Florida. The USAF operates two launch communications ground stations, but they are not designed to transmit voice, commands or other data to the launch vehicle or astronauts. The bi-directional uplink-downlink communications responsibility for human missions has historically resided with the Goddard Space Flight Center in Greenbelt, Maryland. Several market analyses and feasibility studies investigating concepts to provide NASAs next generation launch communications services were performed during the Constellation Program prior to its cancellation in 2009, and as part of the Kennedy Space Centers follow-on efforts to transform itself into a 21st century multi-user spaceport. In 2012, the Kennedy Space Center and the USAF 45th Space Wing jointly led a study to analyze the market needs of current and future launch systems and assess the operational deficiencies of the Eastern Range infrastructure. The study team issued several recommendations, two of which ultimately became driving operational capability requirements for the NEN LCS: increased telemetry data rates of at least 20 Mbps, and S-band uplink capability. Additional capabilities identified in the requirements development process include spread spectrum modulation support, LDPC 12 and 78 error correction codes, support for IRIG-106 and CCSDS data formats, automated best source selection, and Space Link Extension (SLE) services for data distribution. The NEN LCS is comprised of two permanent ground stations, the new Kennedy Uplink Station (KUS) and refurbished Ponce de Leon (PDL) station. Both stations are remotely operated from the Global Monitor and Control Center at Wallops Flight Facility. This core architecture is extensible through host-tenant arrangements with the U.S. Air Force and deployable assets, enabling agile, tailored and robust solutions to meet the needs of civil, commercial or military customers. The NEN LCS has three use cases:1.To provide agile, tailored and robust launch communications solutions to Florida spaceport customers2.To provide orbital communications services to near-earth customers 3.To provide an experimental proving ground for Space Mobile Network concepts and technologies The NEN LCS driving mission is to support the bi-directional link with the Orion crew capsule and two 20 Mbps telemetry links from the Space Launch System core stage on Exploration Mission-1, the first integrated flight of NASAs flagship human exploration systems.

Roberts, Christopher J.↗

Dust Tolerant Commodity Transfer Interface Mechanisms for Planetary Surfaces

Regolith is present on most planetary surfaces such as Earth's moon, Mars, and Asteroids. If human crews and robotic machinery are to operate on these regolith covered surfaces, they must face the consequences of interacting with regolith fines which consist of particles below 100 microns in diameter down to as small as submicron scale particles. Such fine dust will intrude into mechanisms and interfaces causing a variety of problems such as contamination of clean fluid lines, jamming of mechanisms and damaging connector seals and couplings. Since multiple elements must be assembled in space for system level functionality, it will be inevitable that interfaces will be necessary for structural connections, and to pass commodities such as cryogenic liquid propellants, purge and buffer gases, water, breathing air, pressurizing gases, heat exchange fluids, power and data. When fine regolith dust is present in the environment it can be lofted into interfaces where it can compromise the utility of the interface by preventing the connections from being successfully mated, or by inducing fluid leaks or degradation of power and data transmission. A dust tolerant, hand held "quick-disconnect" cryogenic fluids connector housing has been developed at NASA KSC which can be used by astronaut crews to connect flex lines that will transfer propellants and other useful fluids to the end user. In addition, a dust tolerant, automated, cryogenic fluid, multiple connector, power and data interface mechanism prototype has been developed, fabricated and demonstrated by NASA at Kennedy Space Center (KSC). The design and operation of these prototypes are explained and discussed.

Dust Tolerant↗

Preliminary Development of Multi-Vehicle (m:N) Operations with NASA Langley’s Remote Vehicle Operations Center

To achieve the vision of Advanced Air Mobility (AAM), a transition from localized operations of aircraft to remote operations is being pursued across many use cases. This transition will allow fewer human operators to manage more increasingly autonomous aircraft (i.e., m operators managing N vehicles, or m:N). To study this operational concept, the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) has developed a prototype remote vehicle operations center and ground control station (GCS) software to conduct research with simulated and real flight operations. To date, flight operations at LaRC have been limited to one vehicle per operator. However, the current paper describes initial development and considerations for enabling m:N flight operations at LaRC. Further, the research described in this paper provides the foundation for a concept of operations (ConOps) that will be developed to support remote operators managing multiple increasingly autonomous vehicles, with the goal of exploring human-autonomy teaming (HAT) concepts that enable more advanced m:N operations. Two key enablers have been identified to facilitate successful m:N operations: GCS software updates for multi-vehicle management and procedural updates for vehicle handoffs during off-nominal events. Additionally, specific modifications were identified across five key areas: technology and software, team structure, inter-team communication, contingency plans, and operator decision flows. Next steps in forming the LaRC m:N ConOps will include working with subject-matter experts to identify off-nominal scenarios, implementing the recommended GCS functionality for m:N operations, and performing integration testing of facility capabilities and new operational procedures. Although the future m:N ConOps will be tailored to the NASA LaRC remote operations facility and flight range, it is intended to be a transparent, accessible, and reality-based exemplar for external organizations seeking to create or evaluate their own m:N operational concepts.

m:N↗

How to Boost Engineering Support Via Web 2.0 - Seeds for the Ares Project...and/or Yours?

The Mission Operations Laboratory (MOL) at Marshall Space Flight Center (MSFC) is responsible for Engineering Support capability for NASA s Ares launch system development. In pursuit of this, MOL is building the Ares Engineering and Operations Network (AEON), a web-based portal intended to provide a seamless interface to support and simplify two critical activities: a) Access and analyze Ares manufacturing, test, and flight performance data, with access to Shuttle data for comparison. b) Provide archive storage for engineering instrumentation data to support engineering design, development, and test. A mix of NASA-written and COTS software provides engineering analysis tools. A by-product of using a data portal to access and display data is access to collaborative tools inherent in a Web 2.0 environment. This paper discusses how Web 2.0 techniques, particularly social media, might be applied to the traditionally conservative and formal engineering support arena. A related paper by the author [1] considers use

Scott, David W.↗

Research and technology 1991 annual report

As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, NASA Kennedy is placing increasing emphasis on the center's research and technology program. In addition to strengthening those areas of engineering and operations technology that contribute to safer, more efficient, and more economical execution of the current mission, the technical tools are being developed which are needed to execute the center's mission relative to future programs. The Engineering Development Directorate encompasses most of the labs and other center resources that are key elements of research and technology program implementation and is responsible for implementation of the majority of the projects in this Kennedy Space Center 1991 annual report.

Source record↗

Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

Happell, Nadine↗

Remote Operations and Ground Control Centers

The Payload Operations Integration Center (POIC) at the Marshall Space Flight Center supports the International Space Station (ISS) through remote interfaces around the world. The POIC was originally designed as a gateway to space for remote facilities; ranging from an individual user to a full-scale multiuser environment. This achievement was accomplished while meeting program requirements and accommodating the injection of modern technology on an ongoing basis to ensure cost effective operations. This paper will discuss the open POIC architecture developed to support similar and dissimilar remote operations centers. It will include technologies, protocols, and compromises which on a day to day basis support ongoing operations. Additional areas covered include centralized management of shared resources and methods utilized to provide highly available and restricted resources to remote users. Finally, the effort of coordinating the actions of participants will be discussed.

Bryant, Barry S.↗

Large space structures activity at MSFC

This paper describes a broad based set of activities which have been undertaken at the Marshall Space Flight Center (MSFC) developing technologies necessary to emplace and operate large structures in space. Progress has been made in the development of processes and equipment needed for the in space fabrication of structural members in both aluminum and graphite composite materials. Designs for member joining attachments have been completed and the evaluation of procedures for structural assembly have been simulated and evaluated utilizing the MSFC Neutral Buoyancy Facility. A concept of a flight test necessary for flight verification of the technologies for space fabrication, assembly, and operation of large space structure is described. Recently initiated is a project to develop design characteristics of a deployable structure required for the Science and Applications Space Platform (SASP). This is being accomplished through the design, fabrication, analysis, and test of a full scale ground test article which reflects the influence of system requirements of the SASP. Development of designs for erectable/deployable structures which are modular and have various applications to large space structures is in progress.

Denton, S. J.↗

Global Precipitation Measurement (GPM) and International Space Station (ISS) Coordination for CubeSat Deployments to Minimize Collision Risk

The Global Precipitation Measurement Mission (GPM) is a joint U.S. and Japan mission to observe global precipitation, extending the Tropical Rainfall Measuring Mission (TRMM), which was launched by H-IIA from Tanegashima in Japan on February 28TH, 2014 directly into its 407km operational orbit. The International Space Station (ISS) is an international human research facility operated jointly by Russia and the USA from NASA's Johnson Space Center (JSC) in Houston Texas. Mission priorities lowered the operating altitude of ISS from 415km to 400km in early 2105, effectively placing both vehicles into the same orbital regime. The ISS has begun a program of deployments of cost effective CubeSats from the ISS that allow testing and validation of new technologies. With a major new asset flying at the same effective altitude as the ISS, CubeSat deployments became a serious threat to GPM and therefore a significant indirect threat to the ISS. This paper describes the specific problem of collision threat to GPM and risk to ISS CubeSat deployment and the process that was implemented to keep both missions safe from collision and maximize their project goals.

Pawloski, James H.↗

Global Precipitation Measurement (GPM) Core Satellite & International Space Station (ISS) Coordination for CubeSat Deployments to Minimize Collision Risk

The Global Precipitation Measurement Mission (GPM) is a joint U.S. and Japan mission to observe global precipitation, extending the Tropical Rainfall Measuring Mission (TRMM) data set, which was launched by H-IIA from Tanegashima in Japan on February 28TH, 2014 directly into its 407km operational orbit. The International Space Station (ISS) is an international human research facility operated jointly by Russia and the USA from NASA's Johnson Space Center (JSC) in Houston Texas. Mission priorities lowered the operating altitude of ISS from 415km to 400km in early 2015, effectively placing both vehicles into the same orbital regime. The ISS has begun a program of deployments of cost effective CubeSats from the ISS that allow testing and validation of new technologies. With a major NASA asset flying at the same effective altitude as the ISS, CubeSat deployments became a serious threat to GPM and therefore a significant indirect threat to the ISS. This presentation describes the specific problem of collision threat to GPM and risk to ISS CubeSat deployment, the process that was implemented to keep both missions safe from collision and maximize their project goals, and the history of the process since implementation.

GPM↗

NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present Missions

The United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.

Dumbacher, Daniel L.↗

Automated Derivation of Complex System Constraints from User Requirements

The Payload Operations Integration Center (POIC) located at the Marshall Space Flight Center has the responsibility of integrating US payload science requirements for the International Space Station (ISS). All payload operations must request ISS system resources so that the resource usage will be included in the ISS on-board execution timelines. The scheduling of resources and building of the timeline is performed using the Consolidated Planning System (CPS). The ISS resources are quite complex due to the large number of components that must be accounted for. The planners at the POIC simplify the process for Payload Developers (PD) by providing the PDs with a application that has the basic functionality PDs need as well as list of simplified resources in the User Requirements Collection (URC) application. The planners maintained a mapping of the URC resources to the CPS resources. The process of manually converting PD's science requirements from a simplified representation to a more complex CPS representation is a time-consuming and tedious process. The goal is to provide a software solution to allow the planners to build a mapping of the complex CPS constraints to the basic URC constraints and automatically convert the PD's requirements into systems requirements during export to CPS.

Foshee, Mark↗

Dynamic Sampling of Trace Contaminants During the Mission Operations Test of the Deep Space Habitat

The atmospheric composition inside spacecraft during long duration space missions is dynamic due to changes in the living and working environment of crew members, crew metabolism and payload operations. A portable FTIR gas analyzer was used to monitor the atmospheric composition within the Deep Space Habitat (DSH) during the Mission Operations Test (MOT) conducted at the Johnson Space Center (JSC). The FTIR monitored up to 20 gases in near- real time. The procedures developed for operating the FTIR were successful and data was collected with the FTIR at 5 minute intervals. Not all the 20 gases sampled were detected in all the modules and it was possible to measure dynamic changes in trace contaminant concentrations that were related to crew activities involving exercise and meal preparation.

Monje, Oscar↗

Assessment of Atmospheric Winds Aloft during NASA Space Shuttle Program Day-of-Launch Operations

The Natural Environments Branch at the National Aeronautics and Space Administration s Marshall Space Flight Center monitors the winds aloft at Kennedy Space Center in support of the Space Shuttle Program day of launch operations. High resolution wind profiles are derived from radar tracked Jimsphere balloons, which are launched at predetermined times preceding the launch, for evaluation. The spatial (shear) and temporal (persistence) wind characteristics are assessed against a design wind database to ensure wind change does not violate wind change criteria. Evaluations of wind profies are reported to personnel at Johnson Space Center.

Decker, Ryan K.↗

Cryogenic Optical Systems and Instrumentation IX (AM 116) Newly Modified Cryogenic Optical Test Facility at the Marshall Space Flight Center

Marshall Space Flight Center (MSFC) has maintained and operated a world-class x-ray optics and detector testing facility known as the X-ray Calibration Facility (XRCF) since the mid 1970's. The ground test and calibration of the Chandra X-ray Observatory optics and detectors were successfully completed at the XRCF in 1997. The beginning of the Next Generation Space Telescope (NGST) development programs (NMSD, SBMD, AMSD, etc.) and the establishment of the Space Optics Manufacturing Technology Center at MSFC have led to an XRCF modification. In 1999 the facility was upgraded to perform cryogenic testing of lightweight visible optics (without compromising the existing x-ray testing capability). A thermal enclosure capable of 20 degrees Kelvin and vibration isolated instrumentation mount were added. A vacuum-compatible five-axis motion table was modified to operate under cryogenic conditions. Optics up to two meters in diameter with radii of curvature of up to twenty meters can be accommodated. Facility characterization tests and one NGST program mirror test have been completed to date. By July 2000, two other mirrors will be tested. Optical wavefront measurements were made at < 35 degrees Kelvin with several instruments located at the test mirror's radius of curvature. The current wavefront measuring instruments include a Shack-Hartman wavefront sensor, a point diffraction interferometer, a point spread function-measuring device, and a radius of curvature measuring instrument. A vibration insensitive phase shifting interferometer is planned for future optical testing. This paper will present a brief history of the facility, a discussion of its current x-ray optic testing capabilities, and a complete description of the new capabilities in the visible optical testing regime.

Eng, Ronnie↗