Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Empire. a study of early manned interplanetary missions final report, may 26 - nov. 25, 1962

This report summarizes the investigations and results of the EMPIRE Study Program undertaken by Aeronutronic Division of Ford Motor Company for the Future Projects Office, Marshall Space Flight Center, under Contract NAS8-5025. The dual planet flyby missions of the Crocco and Symmetric trajectory classes are discussed. The Crocco mission with an August 1971 launch window requires an interplanetary injection velocity increment of i0.i km/sec, has a return velocity of 13.5 km/sec, and takes approximately 400 days. The Symmetric mission with a July 1970 launch window has an injection velocity increment of 5.3 km/sec, a return velocity of 15.8 km/sec, and takes approximately 630 days. Additional results of the trajectory studies and abort trajectories are reported. The guidance and navigation subsystem, midcourse corrections, and planetary approach corrections are discussed. A detailed analysis of the reentry phase of EMPIRE includes consideration of an Apollo-type, a Drag Brake, and a lifting-type reentry vehicle to return the six-man crew at mission completion or in an aborted condition. The High L/D reentry vehicle is used in the missions considered. The various technological areas required for design criteria are developed and several spacecraft designs are considered. The all chemical propulsion Crocco system is discarded due to weight, complexity, and cost. The nuclear injected Crocco is treated in a similar manner. The lower energy injection for the Symmetric Mission leads to the feasibility of a nuclear injected vehicle with an Earth orbit weight of about 180,000 kilograms (400,000 pounds) before interplanetary transit. In addition, two chemical symmetric vehicles are treated. Conservative radiation exposures are derived, for the 630 day mission, of less than 200 REM and a polyethelene radiation shelter is designed. Scientific aspects of the missions are discussed. Mission Success Probabilities are presented for the various missions considered and for Saturn C-5, Nova, and Super-Nova Earth launch vehicles in light of possible development. The need for acceleration of nuclear rocket engine developments and auxiliary power developments is indicated. Definition of a larger nuclear engine of the order of 200,000 pounds thrust and about 800 seconds burning time or 50,000 pound thrust and 3600 seconds burning time is indicated for the Symmetric Mission in 1970 (energy requirements are higher in 1972 and for later launch due to the less favorable position of Mars)_ Immediate development of this advanced nuclear propulsion capability is recommended. A Development Plan and Funding Schedule is given for the 1970 launch window pinpointing the critical development areas and indicating a total program cost of $12.6 billion independent of other programmed R&D costs. In conclusion, technological feasibility for an early manned dual planet Mars-Venus flyby is believed to be demonstrated in this study. Several areas of accelerated development and experimental confirmation of theory are pinpointed. The necessary funding and development of Nova or orbital operations capability with Saturn C-5's is required. The 1970 launch window appears to offer the least expensive Symmetric Mission for several years into the 1980's.

F. P. Dixon↗

Biomedical computing facility interface design plan

The results are presented of a design study performed to establish overall system interface requirements for the Biomedical Laboratories Division's Sigma-3 computer system. Emphasis has been placed upon the definition of an overall implementation plan and associated schedule to meet both near-term and long-range requirements within the constraints at available resources.

Puckett, R. D.↗

V/STOL tilt rotor aircraft study. Volume 5: Definition of stowed rotor research aircraft

The results of a study of folding tilt rotor (stowed rotor) aircraft are presented. The effects of design cruise speed on the gross weight of a conceptual design stowed rotor aircraft are shown and a comparison is made with a conventional (non-folding) tilt rotor aircraft. A flight research stowed rotor design is presented. The program plans, including costs and schedules, are shown for the research aircraft development and a wind tunnel plan is presented for a full scale test of the aircraft.

Soule, V. A.↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Apollo Soyuz test project press kit: USA-USSR

The goals and program of the mission are described. Operations from preflight crew training through splashdown are included. Spacecraft and launch vehicle configurations are given. The 27 joint and unilateral experiments to be performed are described. A flight plan and a schedule of activities is included, together with brief crew biographies. The ground support system is discussed; it includes control centers in Houston and Moscow, and an ATS satellite to relay ground-air-ground communications. The global tracking network and the television transmission system are also described.

Source record↗

Requirements and specifications of the space telescope for scientific operations

Requirements for the scientific operations of the Space Telescope and the Science Institute are used to develop operational interfaces between user scientists and the NASA ground system. General data systems are defined for observatory scheduling, daily science planning, and science data management. Hardware, software, manpower, and space are specified for several science institute locations and support options.

West, D. K.↗

Lift cruise fan V/STOL aircraft conceptual design study T-39 modification. Volume 1: Technical report

The conversion of two T-39 aircraft into lift cruise fan research and technology vehicles is discussed. The concept is based upon modifying the T-39A (NA265-40) Sabreliner airframe into a V/STOL configuration by incorporating two LCF-459 lift cruise fans and three YJ-97 gas generators. The propulsion concept provides the thrust for horizontal flight or lift for vertical flight by deflection of bifurcated nozzles while maintaining engine out safety throughout the flight envelope. The configuration meets all the study requirements specified for the design with control powers in VTOL and conversion in excess of the requirement making it an excellent vehicle for research and development. The study report consists of two volumes; Volume 1 (Reference a) contains background data detailed description and technical substantiation of the aircraft. Volume 2 includes cost data, scheduling and program planning not addressed in Volume 1.

Elliott, D. W.↗

Manned geosynchronous mission requirements and systems analysis study. Volume 1: Executive summary

The crew capsule of the MOTV was studied with emphasis on crew accommodations, crew capsule functional requirements, subsystem interface definition between crew module and propulsion module, and man rating requirements. Competing mission modes were studied covering a wide range of propulsion concepts. These included one stage, one and one half stage, and two stage concepts using either the standard STS or an augmented STS. Several deorbit concepts were considered, including all propulsive modes, direct re-entry, and aeromaneuvering skip in skip out in the upper reaches of Earth's atmosphere. A five year plan covering costs, schedules, and critical technology issues is discussed.

Boyland, R. E.↗

Satellite Power System (SPS) FY 79 program summary

The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.

Source record↗

Dynamic scheduling of runway operations

Automated ATM/C decision making is discussed. Runway scheduling and flight plan generator algorithms are considered. Terminal area geometry, ATM/C schematics, vector controller display and simulation work are reported.

Pararas, J.↗

Managers Handbook for Software Development

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

Agresti, W.↗

Technology requirements for telerobotic satellite servicing in space

Telerobotic servicer technology requirements were identified for typical on-orbit servicing operations, including: automation requirements and automated system utilization in typical servicing missions; key automation technologies used for servicing; evolution concepts; technology development timetable; and servicing technology drivers. Teleoperation, robotics, and artificial intelligence are needed in the servicing missions investigated. Analysis shows that teleoperation will be used more widely than fully robotic systems, at least during the early space station years because of the diversity and unpredictability of many servicing tasks which call for the human operator's skills, resourcefulness, and decision-making ability. There will be heavy dependence on a sophisticated, flexible, readily accessible, high-speed and high-capacity data management system which can provide the expert system support required in diagnosing, troubleshooting, decision making, task scheduling, and mission planning.

Meissinger, Hans F.↗

Neural-Network Processor Would Allocate Resources

Global optimization problems solved quickly. Neural-network processor optimizes allocation of M resources among N expenditures according to cost of pairing each resource with each expenditure and subject to limit on number of resources feeding into each expenditure and/or limit on number of expenditures to which each resource allocated. One cell performs several analog and digital functions. Potential applications include assignment of jobs, scheduling, dispatching, and planning of military maneuvers.

Eberhardt, Silvio P.↗

The onset of the solar active cycle 22

There is a great deal of interest in being able to predict the main characteristics of a solar activity cycle (SAC). One would like to know, for instance, how large the amplitude (R sub m) of a cycle is likely to be, i.e., the annual mean of the sunspot numbers at the maximum of SAC. Also, how long a cycle is likely to last, i.e., its period. It would also be interesting to be able to predict the details, like how steep the ascending phase of a cycle is likely to be. Questions like these are of practical importance to NASA in planning the launch schedule for the low altitude, expensive spacecrafts like the Hubble Space Telescope, the Space Station, etc. Also, one has to choose a proper orbit, so that once launched the threat of an atmospheric drag on the spacecraft is properly taken into account. Cosmic ray data seem to indicate that solar activity cycle 22 will surpass SAC 21 in activity. The value of R sub m for SAC 22 may approach that of SAC 19. It would be interesting to see whether this prediction is borne out. Researchers are greatly encouraged to proceed with the development of a comprehensive prediction model which includes information provided by cosmic ray data.

Ahluwalia, H. S.↗

Rocketdyne LOX bearing tester program

The cause, or causes, for the Space Shuttle Main Engine ball wear were unknown, however, several mechanisms were suspected. Two testers were designed and built for operation in liquid oxygen to empirically gain insight into the problems and iterate solutions in a timely and cost efficient manner independent of engine testing. Schedules and test plans were developed that defined a test matrix consisting of parametric variations of loading, cooling or vapor margin, cage lubrication, material, and geometry studies. Initial test results indicated that the low pressure pump thrust bearing surface distress is a function of high axial load. Initial high pressure turbopump bearing tests produced the wear phenomenon observed in the turbopump and identified an inadequate vapor margin problem and a coolant flowrate sensitivity issue. These tests provided calibration data of analytical model predictions to give high confidence in the positive impact of future turbopump design modification for flight. Various modifications will be evaluated in these testers, since similar turbopump conditions can be produced and the benefit of the modification will be quantified in measured wear life comparisons.

Keba, J. E.↗

Development of a preprototype Advanced Extravehicular Mobility Unit (AEMU) regenerable life support subsystem - A progress report

Regenerable life support (RLS) technologies are being developed for use in the Advanced Extravehicle Mobility Unit (AEMU) aboard Space Station Freedom. This report describes the requirements that these RLS technologies must satisfy in the Space Station application and the significant features of the technologies now being evaluated. Who is developing the equipment and how the subsystems will be integrated are addressed. An overview of the planned test program schedule is given.

Allen, Norman C.↗

Software design with fuzzy requirements (A case study)

The author describes the resource allocation and planning helper (RALPH) scheduling system developed at NASA's Jet Propulsion Laboratory. RALPH addresses the concerns of designing software systems to minimize the need to recode for changes and upgrades; this concern is acute when requirements are uncertain or changing. Determining requirements, understanding the problem, designing for change, and tradeoffs are also discussed.

Werntz, David G.↗