Investment Optimization to Improve Power Distribution System Reliability Metrics.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
A gate buffer fabricated in a 2-mu m 4H silicon carbide (SiC) process is presented. The circuit is composed of an input buffer stage with a push-pull output stage, and is fabricated using enhancement mode N-channel FETs in a process optimized for SiC power switching devices. Simulation and measurement results of the fabricated gate buffer are presented and compared for operation at various voltage supply levels, with a capacitive load of 2 nF. Details of the design including layout specifics, simulation results, and directions for future improvement of this buffer are presented. In addition, plans for its incorporation into an isolated high-side/low-side gate-driver architecture, fully integrated with power switching devices in a SiC process, are briefly discussed. This letter represents the first reported MOSFET-based gate buffer fabricated in 4H SiC.
Abstract not provided.
Ways in which human intelligence might be simulated onboard an unmanned mission to achieve some of the decision making capability or adaptability of the manned mission are examined. The relative cost and simplicity advantages of the unmanned spacecraft missions are emphasized. Reliable techniques for making onboard decisions and for modifying mission science operations in response to the findings are analyzed.
The results of a more detailed study of three missions to the surface of Mars: (1) an advanced lander, (2) a lander with a small tethered rover, and (3) a lander with a medium sized rover that operates independently of the lander for most of its functions but communicates with Earth through the lander are presented. For all three missions it was assumed that the Viking orbiter and lander would be used with modifications as required to improve the science package, to accommodate the rovers, and to handle the increased payloads.
The design requirements and associated cost impacts for using the space shuttle to deliver the Earth Observatory Satellite (EOS) are identified. The additional impact of achieving full compatibility for resupply and retrieval is considered. Based on the results of the analysis, it is concluded that the EOS-Shuttle compatibility can be realized with reasonable spacecraft weight and cost penalties. Inherent space shuttle capabilities are adequate to meet the requirements of all missions except E and F. Mission E (Tiros 0) may be accommodated by either an EOS orbit transfer capability or a tug. The tug appears to be the only viable approach to satisfying the mission F (SEOS) requirements.
The principal concepts of the Keeney and Raiffa approach to multiattribute decision analysis are described. Topics discussed include the concepts of decision alternatives, outcomes, objectives, attributes and their states, attribute utility functions, and the necessary independence properties for the attribute states to be aggregated into a numerical representation of the preferences of the decision maker for the outcomes and decision alternatives.
Application software intended to reduce the man-hours required per flight design cycle by producing major flight design documents with little or no manual typing is described. The documentation support software is divided into two separately executable processors. However, since both processors support the same overall functions, and most of the software contained in one is also contained in the other, both are collectively presented.
An analysis of the required performance of internal avionics data bases for future launch vehicles is presented. Suitable local area networks that can service these requirements are determined.
No abstract available
This Phase 2 Project Plan includes the overview and detailed information regarding the areas of Command and Control, Detect and Integrated Test and Evaluation.
No abstract available