First Application of Mass Measurements with the Rare-RI Ring Reveals the Solar r -Process Abundance Trend at A = 122 and A = 123

The Rare-RI Ring (R3) is a recently commissioned cyclotronlike storage ring mass spectrometer dedicated to mass measurements of exotic nuclei far from stability at Radioactive Isotope Beam Factory (RIBF) in RIKEN. The first application of mass measurement using the R3 mass spectrometer at RIBF is reported. Rare isotopes produced at RIBF— 127 Sn, 126 In, 125 Cd, 124 Ag, 123 Pd—were injected in R3. Masses of 126 In, 125 Cd, and 123 Pd were measured whereby the mass uncertainty of 123 Pd was improved. This is the first reported measurement with a new storage ring mass spectrometry technique realized at a heavy-ion cyclotron and employing individual injection of the preidentified rare nuclei. The latter is essential for the future mass measurements of the rarest isotopes produced at RIBF. The impact of the new 123 Pd result on the solar r-process abundances in a neutron star merger event is investigated by performing reaction network calculations of 20 trajectories with varying electron fraction Y e . It is found that the neutron capture cross section on 123 Pd increases by a factor of 2.2 and β-delayed neutron emission probability, P 1n , of 123 Rh increases by 14%. The neutron capture cross section on 122 Pd decreases by a factor of 2.6 leading to pileup of material at A = 122, thus reproducing the trend of the solar r-process abundances. The trend of the two-neutron separation energies (S 2n ) was investigated for the Pd isotopic chain. The new mass measurement with improved uncertainty excludes large changes of the S 2n value at N = 77. Finally, such large increase of the S 2n values before N = 82 was proposed as an alternative to the quenching of the N = 82 shell gap to reproduce r-process abundances in the mass region of A = 112 – 124.

79 ASTRONOMY AND ASTROPHYSICS↗

The conversion of CESR to operate as the Test Accelerator, CesrTA. Part 3: Electron cloud diagnostics

Cornell's electron/positron storage ring (CESR) was modified over a series of accelerator shutdowns beginning in May 2008, which substantially improves its capability for research and development for particle accelerators. CESR's energy span from 1.8 to 5.6 GeV with both electrons and positrons makes it ideal for the study of a wide spectrum of accelerator physics issues and instrumentation related to present light sources and future lepton damping rings. Additionally a number of these are also relevant for the beam physics of proton accelerators. This paper is the third in a series of four describing the conversion of CESR to the test accelerator, CESRTA. The first two papers discuss the overall plan for the conversion of the storage ring to an instrument capable of studying advanced accelerator physics issues [1] and the details of the vacuum system upgrades [2]. This paper focuses on the necessary development of new instrumentation, situated in four dedicated experimental regions, capable of studying such phenomena as electron clouds (ECs) and methods to mitigate EC effects. The fourth paper in this series describes the vacuum system modifications of the superconducting wigglers to accommodate the diagnostic instrumentation for the study of EC behavior within wigglers. Lastly, while the initial studies of CESRTA focused on questions related to the International Linear Collider damping ring design, CESRTA is a very versatile storage ring, capable of studying a wide range of accelerator physics and instrumentation questions.

43 PARTICLE ACCELERATORS↗

The Muon g-2 experiment at Fermilab

Precision measurements of the anomalous magnetic moment of the muon a are a stringent test of the Standard Model. The last measurement of a at Brookhaven National Laboratory (BNL) diers from the Standard Model prediction by 3-4: a possible indication of new physics. A successor to that experi- ment has been constructed at Fermilab, with the aim of reducing the experimental uncertainty by a factor of four to 140 ppb. The measurement technique continues to use the storage ring concept from BNL, with muons circulating in a highly uni- form magnetic dipole eld. The spin precession frequency is extracted by analysing the modulation of the rate of higher-energy positrons from muon decays, which are detected by 24 calorimeters around the inside of the ring. Compared to the previous experiment, signicant improvements have been made in the areas of muon beam preparation, storage ring hardware, eld measuring equipment, and detector and electronics systems. In these proceedings, I report on the status of the experiment as of June 2018, presenting an overview of the experiment's progress, some initial data from the rst run, and the anticipated timeline for a new result.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A compact apparatus for studies of element and phase-resolved ferromagnetic resonance

We present a compact sample holder equipped with electromagnets and high frequency transmission lines; the sample holder is intended for combined x-ray magnetic circular dichroism (XMCD) and ferromagnetic resonance measurements (FMR). Time-resolved measurements of resonant x-ray detected FMR during forced precession are enabled by use of a rf excitation that is phase-locked to the storage ring bunch clock. Several applications of the combined XMCD+FMR technique are presented, demonstrating the flexibility of the experimental design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Twiss Parameters for Injected Beam for Top Off Injection

It has been an open question as to what the Twiss parameters for the injected beam should be for top off injection into the storage ring. This question has come to the forefront recently with the discussion of the storage ring injection straight design with the pulsed sextupole. In this note we calculate the optimal Twiss parameters for the injected beam given the storage ring Twiss parameters. A method to calculate the injected beam twiss parameters will be discussed as will the codes used.

43 PARTICLE ACCELERATORS↗

Optimal Twiss Parameters for Injected Beam for Top Off Injection (With Corrected Equations)

It has been an open question as to what the Twiss parameters for the injected beam should be for top off injection into the storage ring. This question has come to the forefront recently with the discussion of the storage ring injection straight design with the pulsed sextupole. In this note we calculate the optimal Twiss parameters for the injected beam given the storage ring Twiss parameters. A method to calculate the injected beam twiss parameters will be discussed as will the codes used. Note: This note was modified to correct equations 11, 15 and 16.

36 MATERIALS SCIENCE↗

Small-amplitude synchrotron tune near transition

The separatrices of the rf buckets near transition are mapped when the synchronous phase is neither 0 or {pi}. The small-amplitude synchronous tune is derived when the rf frequency is changed. Synchrotron radiation is present in all electron storage ring. As a result, the synchronous phase is always offset from {phi}{sub s} = {pi} to compensate for the power loss. Even for proton storage rings with negligible synchrotron radiation, the synchronous phase is also required to be offset from {phi}{sub s} = 0 or {pi} slightly to compensate for beam loading. Thus for all storage rings operating near transition, beam particles reside in accelerating buckets instead of stationary bucket. It is of interest to map these buckets and see how they evolve near transition. When the rf frequency is varied, the closed orbit is pushed radially inward or outward. The momentum of the particle synchronous with the rf is thus changed. By measuring the small-amplitude synchrotron tune as a function of the rf frequency, the lowest first few orders of the slip factor can be inferred. Here, we derive this relationship up to the lowest first three orders of the slip factor when the particle velocity is not ultra-relativistic.

43 PARTICLE ACCELERATORS↗

Electron Cloud Simulations for the Electron-Ion Collider in Brookhaven National Laboratory

For high-intensity circular accelerators and storage rings, if the secondary electron emission yield (SEY) of the vacuum chamber surfaces is high, an EC (Electron Cloud) could build up with the passage of the circulating beam. The presence of EC can strongly affect the beam quality, such as transverse instabilities, transverse emittance growth, and beam loss. Furthermore, the heat load from EC can exceed the available cryogenic capability. For the RHIC superconducting (SC) arc magnets, to be used for the hadron storage ring of the Electron-Ion Collider (EIC), the dynamic heat load budget is 0.5 W/m to the 4.5 K stainless steel beam pipe. This can limit the maximum beam bunches or intensity of the EIC, hence diminishing the luminosity provided by the EIC. The EC has affected the beam instability and significantly contributed to cryogenic heat load in the Large Hadron Collider (LHC). Positron storage rings for which ECs have been a critical factor in the design and performance include KEKB in Japan and EC buildup remains one of the concerns for future high-intensity accelerators design. EC considerations have driven the SuperKEKB collider design and the positron damping ring for the proposed International Linear Collider (ILC). The LHC luminosity upgrade is contingent on reducing the bunch spacing to 25 ns; at this bunch spacing, severe EC buildup has been observed. The success of the upgrade is likely contingent on limiting EC buildup. To study the EC heat load, we did some EC simulations with PyECLOUD code for the dipole, quadrupole, sextupole magnets, and the warm (drift) section of the EIC hadron storage ring. PyECLOUD is an EC simulation code developed by CERN. The code has been validated and used to study EC in the LHC, SPS, and PS. To eliminate EC buildup, the sources of electrons must be minimized. First, we will reduce the production of electrons due to residual gas ionization by specifying the maximum gas density, which requires a vacuum chamber with low electron-stimulated desorption (ESD) yields and a sufficient (preferably distributed) pumping speed. Second, we should reduce the secondary electrons with a lower secondary electron yield (SEY) material.

43 PARTICLE ACCELERATORS↗

MULTI-OBJECTIVE ONLINE OPTIMIZATION OF BEAM LIFETIME AT APS

In this paper, online optimization of beam lifetime at the APS (Advanced Photon Source) storage ring is presented. A general genetic algorithm (GA) is developed and employed for some online optimizations in the APS storage ring. Sextupole magnets in 40 sectors of the APS storage ring are employed as variables for the online nonlinear beam dynamics optimization. The algorithm employs several optimization objectives and is designed to run with topup mode or beam current decay mode. Up to 50\% improvement of beam lifetime is demonstrated, without affecting the transverse beam sizes and other relevant parameters. In some cases, the top-up injection efficiency is also improved.

APS↗

High Precision Magnetic Field Measurement for the Muon g-2 Experiment

The Muon g-2 experiment at Fermilab will measure the anomalous magnetic moment of the muon, aµ with a precision of 140 ppb, a four-fold improvement over the former BNL E821 result. If the current discrepancy of about 3.5σ between the Standard Model value for aµ and the former experiments was real, then the new experiment would verify the deviation with >7σ significance. The experiment uses muons with the magic momentum of 3.09 GeV/c stored in a very homogeneous magnetic field of a 45 m long storage ring. The determination of aµ requires the precise knowledge of both the anomalous muon spin precession, ωa, and the magnetic field, ωp, expressed in terms of the free-proton Larmor frequency. The field measurement uses the high precision tool of pulsed Nuclear Magnetic Resonance (pNMR) and requires cross-calibrating a set of probes: a very accurate NMR probe calibrates the 17 probes on the in-vacuum field mapping system (the so-called trolley). This trolley in turn is used to map the field over the full azimuth of the storage ring. The trolley measurement also provides the calibration of the 378 fixed probes around the ring that constantly monitor the field drift. This article presents the summary of the entire field measurement system needed to determine ωp. This work was supported in part by the US DOE, Fermilab and US DOE OHEP under contract No. KA2201020.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Decreasing the emittance using a multi-period Robinson wigglers in TPS

The Taiwan Photon Source (TPS) has been successfully commissioned. However, the minimum emittance in the TPS lattice is 1.6 nm rad. In the existing TPS storage ring lattice, it is imperative to reduce the emittance to below 1 nm rad. Therefore, a feasibility study for reducing the effective emittance of the TPS storage ring by using a Robinson wiggler was launched; the reduction is necessary to enhance the photon brilliance. In this study, a permanent-magnet multiperiod Robinson wiggler (MRW) was developed for use instead of the single-period Robinson wiggler. In general, the quadruple field of a combined function magnet in the storage ring is approximately few tesla per meter. According to beam dynamic analysis, we found that it is necessary to adopt a high gradient (40 T/m) combined-function MRW magnet to reduce the emittance effectively. Therefore, a high gradient field strength is required in the combined function MRW magnet. In this study, the quadrupole field strength of the MRW magnet was allowed to be approximately 40 T/m at a magnet gap of 20 mm. The period length of the MRW magnet was 300 mm and the period number was 16. The of MRWs is discussed in regard to the possibility of increasing the photon brilliance from IU22.

43 PARTICLE ACCELERATORS↗

Preliminary Transverse Shielding Analysis for the 1010-C RF Building

EIC is planning to construct a new building on the outer ring berm at 10 o’clock which will provide RF power to cryogenically-cooled beam line components in the electron and hadron storage rings. The distance of the building from the RHIC Tunnel and the amount of soil shielding required are the focus of this report. Siting the building closer to the RHIC Tunnel is desirable from an RF operations viewpoint since the waveguide runs and RF power losses will be minimized, but this may require the use of higher density shield materials, e.g., concrete, in addition to soil shielding. The radiological source terms are the prompt radiation hazards from the Hadron Storage Ring (HSR) and Electron Storage Ring (ESR) beam losses in the 10 o’clock sector and the lateral dose rates propagated through the shields. See Figure 1 below.

43 PARTICLE ACCELERATORS↗

Study of Lower Emittance Lattices for SPEAR3

We study paths to significantly reduce the emittance of the SPEAR3 storage ring. Lattice possibilities are explored with the GLASS technique. New lattices are designed and optimized for practical dynamic aperture and beam lifetime. Various techniques are employed to optimize the nonlinear dynamics, including the Elegant-based genetic algorithm. Experimental studies are also carried out on the ring to validate the lattice design. The SPEAR3 storage ring is a third generation light source which has a racetrack layout with a circumference of 234.1 m. The requirement to maintain the photon beamline positions put a significant constraint on the lattice design. Consequently the emittance of SPEAR3 is not on par with some of the recently-built third generation light sources. The present operational lattice has an emittance of 10 nm. For the photon beam brightness of SSRL to remain competitive among the new or upgraded ring-based light sources, it is necessary to significantly reduce the emittance of SPEAR3. In this paper we report our ongoing effort to develop a lower emittance solution for SSRL. We first show the potential of the SPEAR3 lattice with results of the standard cell study using the GLASS technique. This is followed by a discussion of the design strategy for full-ring linear lattices. Several lattice options are compared. We then show the methods and results for dynamic aperture optimization. Experiments were also conducted on the SPEAR3 ring to implement the lattice and to measure the key lattice parameters.

43 PARTICLE ACCELERATORS↗

Concepts for the PEP-X Light Source

SSRL and SLAC groups are developing a long-range plan to transfer its evolving scientific programs from the SPEAR3 light source to a much higher performing photon source that would be housed in the 2.2-km PEP-II tunnel. While various concepts for the PEP-X light source are under consideration, including ultimate storage ring and ERL configurations, the present baseline design is a very low-emittance storage ring. A hybrid lattice has double bend achromat (DBA) cells in two of the six arcs that provide a total 30 straight sections for insertion device (ID) beam lines extending into two new experimental halls. The remaining arcs contain TME cells. Using 90 m of damping wigglers the horizontal emittance at 4.5 GeV would be 100 pm-rad with 1.5-A stored beam. PEP-X will produce photon beams having brightnesses near 10{sup 22} (ph/s/mm{sup 2}/mrad{sup 2}/0.1% BW) at 10 keV. Studies indicate that a 90-m undulator could have FEL gain and brightness enhancement at soft x-ray wavelengths with the stored beam. Crab cavities or other beam manipulation systems could be used to reduce bunch length or otherwise enhance photon emission properties. The present status of the design of PEP-X as a storage ring is presented.

XFEL↗

Novel Internal Target for Electron Scattering off Unstable Nuclei

A novel internal target has been developed, which will make electron scattering off short-lived radioactive nuclei possible in an electron storage ring. An 'ion trapping' phenomenon in the electron storage ring was successfully utilized for the first time to form the target for electron scattering. Approximately 7x10{sup 6} stable {sup 133}Cs ions were trapped along the electron beam axis for 85 ms at an electron beam current of 80 mA. The collision luminosity between the stored electrons and trapped Cs ions was determined to be 2.4(8)x10{sup 25} cm{sup -2} s{sup -1} by measuring elastically scattered electrons.

43 PARTICLE ACCELERATORS↗

Design and Measurement of the NSLS II Correctors

The National Synchrotron Light Source II (NSLS-II) under construction at Brookhaven National Laboratory will be a new state-of-the-art 3 Gev electron storage ring designed to deliver world-leading intensity and brightness, and will produce x-rays more than 10,000 times brighter than the current NSLS at Brookhaven. The 792-meter circumference storage ring is comprised of approximately 1000 magnetic elements, 300 of which are discrete corrector magnets. The three variants are: 120 of the 100 mm aperture correctors, 60 of the 156 mm aperture correctors, and 90 of the air core correctors.[1] The 100 mm and 156 mm horizontal and vertical dipole correctors come in two varieties: with and without a DC skew quad corrector. The air core is strictly an AC horizontal and vertical dipole corrector. The specifications are listed. Discrete corrector magnets are used for the 230 horizontal and vertical steering magnets in the NSLS-II storage ring. A unique design incorporates both dipole and skew quad correctors for (DC) steering in the same magnet. Separate AC (orbit feedback) correctors have also been designed. Comparison with alternate designs are presented as well as prototype measurements.

43 PARTICLE ACCELERATORS↗

Design Study of an MBA Lattice for the Advanced Photon Source

Recent interest in ultra-low-emittance designs for storage-ring-based synchrotron light sources has spurred a focused design effort on a multi-bend achromat (MBA) storage ring replacement for the Advanced Photon Source (APS). The APS is relatively large (1104 m circumference) and, as such, an upgrade to a fourth-generation storage ring holds the potential for a two to three order of magnitude enhancement of X-ray brightness due to the approximate inverse cubic scaling of emittance with the number of dipole bend magnets.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NSLS-II Preliminary Design Report

Following the CD0 approval of the National Synchrotron Light Source II (NSLS-II) during August 2005, Brookhaven National Laboratory prepared a conceptual design for a worldclass user facility for scientific research using synchrotron radiation. DOE SC review of the preliminary baseline in December 2006 led to the subsequent CD1 approval (approval of alternative selection and cost range). This report is the documentation of the preliminary design work for the NSLS-II facility. The preliminary design of the Accelerator Systems (Part 1) was developed mostly based of the Conceptual Design Report, except for the Booster design, which was changed from in-storage-ring tunnel configuration to in external- tunnel configuration. The design of beamlines (Part 2) is based on designs developed by engineering firms in accordance with the specification provided by the Project. The conventional facility design (Part 3) is the Title 1 preliminary design by the AE firm that met the NSLS-II requirements. Last and very important, Part 4 documents the ES&H design and considerations related to this preliminary design. The NSLS-II performance goals are motivated by the recognition that major advances in many important technology problems will require scientific breakthroughs in developing new materials with advanced properties. Achieving this will require the development of new tools that will enable the characterization of the atomic and electronic structure, chemical composition, and magnetic properties of materials, at nanoscale resolution. These tools must be nondestructive, to image and characterize buried structures and interfaces, and they must operate in a wide range of temperatures and harsh environments. The NSLS-II facility will provide ultra high brightness and flux and exceptional beam stability. It will also provide advanced insertion devices, optics, detectors, and robotics, and a suite of scientific instruments designed to maximize the scientific output of the facility. Together these will enable the study of material properties and functions with a spatial resolution of {approx}1 nm, an energy resolution of {approx}0.1 meV, and the ultra high sensitivity required to perform spectroscopy on a single atom. In order to meet this need, NSLS-II has been designed to provide world-leading brightness and flux and exceptional beam stability. The brightness is defined as the number of photons emitted per second, per photon energy bandwidth, per solid angle, and per unit source size. Brightness is important because it determines how efficiently an intense flux of photons can be refocused to a small spot size and a small divergence. It scales as the ring current and the number of total periods of the undulator field (both of which contribute linearly to the total flux), as well as eing nversely proportional to the horizontal and vertical emittances (the product of beam size and divergence) of the electron beam. Raising the current in the storage ring to obtain even brighter beams is ultimately limited by beam-driven, collective instabilities in the accelerator. Thus, to maximize the brightness, the horizontal and vertical emittances must be made as small as possible. With the concept of using damping wigglers, low-field bending magnets, and a large number of lattice cells to achieve ultra small emittance, the performance of NSLS-II will be nearly at the ultimate limit of storage ring light sources, set by the intrinsic properties of the synchrotron radiation process. The facility will produce x-rays more than 10,000 times brighter than those produced at NSLS today. The facility, with various insertion devices, including three-pole-wigglers and low-field dipole radiations, has the capability of covering a broad range of radiation spectra, from hard x-ray to far infra-red. The superlative character and combination of capabilities will have broad impact on a wide range of disciplines and scientific initiatives in the coming decades, including new studies of small crystals in structural biology, a wide range of nanometer-resolution probes for nanoscience, coherent imaging of the structure and dynamics of disordered materials, greatly increased applicability of inelastic x-ray scattering, and properties of materials under extreme conditions. Commissioned in 1982, the existing National Synchrotron Light Source (NSLS) provides essential scientific tools for 2,300 scientists per year from more than 400 academic, industrial, and government institutions. Their myriad research programs produce about 800 publications per year, with more than 130 appearing in premier journals. It was designed in the 1970s and is now in its third decade of service. It has been continually upgraded over the years, with the brightness increasing fully five orders of magnitude. However, it has reached the theoretical limits of performance given its small circumference and small periodicity, and only a small number of insertion devices are possible.