Community Renewable Energy Deployment Provides Replicable Examples of Clean Energy Projects (Fact Sheet)

This fact sheet describes the U.S. Department of Energy's Community Renewable Energy Deployment (CommRE) program, which is a more than $20 million effort funded through the American Recovery and Reinvestment Act of 2009, to promote investment in clean energy solutions and provide real-life examples for other local governments, campuses, and small utilities to replicate. Five community-basedrenewable energy projects received funding from DOE through the CommRE and their progress is detailed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis Results for ARRA Projects: Enabling Fuel Cell Market Transformation (Presentation)

This presentation discusses analysis results for American Recovery and Reinvestment Act early market fuel cell deployments and describes the objective of the project and its relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; technical accomplishments including publication of a fourth set of composite data products; and collaborations and future work.

08 HYDROGEN↗

2008 Solar Technologies Market Report

The focus of this report is the U.S. solar electricity market, including photovoltaic (PV) and concentrating solar power (CSP) technologies. The report is organized into five chapters. Chapter 1 provides an overview of global and U.S. installation trends. Chapter 2 presents production and shipment data, material and supply chain issues, and solar industry employment trends. Chapter 3 presents cost, price, and performance trends. Chapter 4 discusses policy and market drivers such as recently passed federal legislation, state and local policies, and developments in project financing. Chapter 5 provides data on private investment trends and near-term market forecasts. Highlights of this report include: (1) The global PV industry has seen impressive growth rates in cell/module production during the past decade, with a 10-year compound annual growth rate (CAGR) of 46% and a 5-year CAGR of 56% through 2008. (2) Thin-film PV technologies have grown faster than crystalline silicon over the past 5 years, with a 10-year CAGR of 47% and a 5-year CAGR of 87% for thin-film shipments through 2008. (3) Global installed PV capacity increased by 6.0 GW in 2008, a 152% increase over 2.4 GW installed in 2007. (4) The United States installed 0.34 GW of PV capacity in 2008, a 63% increase over 0.21 GW in 2007. (5) Global average PV module prices dropped 23% from $4.75/W in 1998 to $3.65/W in 2008. (6) Federal legislation, including the Emergency Economic Stabilization Act of 2008 (EESA, October 2008) and the American Recovery and Reinvestment Act (ARRA, February 2009), is providing unprecedented levels of support for the U.S. solar industry. (7) In 2008, global private-sector investment in solar energy technology topped $16 billion, including almost $4 billion invested in the United States. (8) Solar PV market forecasts made in early 2009 anticipate global PV production and demand to increase fourfold between 2008 and 2012, reaching roughly 20 GW of production and demand by 2012. (9) Globally, about 13 GW of CSP was announced or proposed through 2015, based on forecasts made in mid-2009. Regional market shares for the 13 GW are about 51% in the United States, 33% in Spain, 8% in the Middle East and North Africa, and 8% in Australasia, Europe, and South Africa. Of the 6.5-GW project pipeline in the United States, 4.3 GW have power purchase agreements (PPAs). The PPAs comprise 41% parabolic trough, 40% power tower, and 19% dish-engine systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

HEAVY WATER COMPONENTS TEST REACTOR DECOMMISSIONING

The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Removal Action with funding from the American Recovery and Reinvestment Act (ARRA). This paper summarizes the history prior to 2009, the major D&D activities, and final end state of the facility at completion of decommissioning in June 2011. The HWCTR facility was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In the early 1990s, DOE began planning to decommission HWCTR. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. In 2009 the $1.6 billion allocation from the ARRA to SRS for site footprint reduction at SRS reopened the doors to HWCTR - this time for final decommissioning. Alternative studies concluded that the most environmentally safe, cost effective option for final decommissioning was to remove the reactor vessel, both steam generators, and all equipment above grade including the dome. The transfer coffin, originally above grade, was to be placed in the cavity vacated by the reactor vessel and the remaining below grade spaces would be grouted. Once all above equipment including the dome was removed, a concrete cover was to be placed over the remaining footprint and the groundwater monitored for an indefinite period to ensure compliance with environmental regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Final Technical Report

ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was already in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive inhibitors from wood breakdown products, resulting in a non-viable process from an economic point of view. Later runs with the Chem Frac unit switched to a configuration that used dilute acid pretreatment followed by enzymatic hydrolysis. This change improved yield, increased sugar concentrations, and improved fermentability of sugars. The Hydrogenolysis unit met or exceeded all expectations with respect to unit capacity, technical performance, and economic performance. The US DOE funds for the project were provided through the American Recovery and Reinvestment Act of 2009. In addition to the scientific/technical merit of the project, this project benefited the public through the creation of approximately 75 onsite direct construction-related jobs, 25 direct on-going operations-related jobs, plus numerous indirect jobs, and thus was well aligned with the goals of the American Recovery and Reinvestment Act of 2009.

09 BIOMASS FUELS↗

A MultiAir®/MultiFuel Approach to Enhancing Engine System Efficiency

FCA US LLC (formally known as Chrysler Group LLC, and hereinafter “Chrysler”) was awarded an American Recovery and Reinvestment Act (ARRA) funded project by the Department of Energy (DOE) titled “A MultiAir®/MultiFuel Approach to Enhancing Engine System Efficiency” (hereinafter “project”). This award was issued after Chrysler submitted a proposal for Funding Opportunity Announcement DE-FOA- 0000079, “Systems Level Technology Development, Integration, and Demonstration for Efficient Class 8 Trucks (SuperTruck) and Advanced Technology Powertrains for Light-Duty Vehicles (ATP-LD).” Chrysler started work on this project on June 01, 2010 and completed testing activities on August 30, 2014. Overall objectives of this project were; Demonstrate a 25% improvement in combined Federal Test Procedure (FTP) City and Highway fuel economy over a 2009 Chrysler minivan; Accelerate the development of highly efficient engine and powertrain systems for light-duty vehicles, while meeting future emissions standards; and Create and retain jobs in accordance with the American Recovery and Reinvestment Act of 2009

33 ADVANCED PROPULSION SYSTEMS↗

A Low Cost, Self Acting, Liquid Hydrogen Boil-Off Recovery System

The purpose of this research was to develop a prototype liquid hydrogen boll-off recovery system. Perform analyses to finalize recovery system cycle, design detail components, fabricate hardware, and conduct sub-component, component, and system level tests leading to the delivery of a prototype system. The design point and off-design analyses identified cycle improvements to increase the robustness of the system by adding a by-pass heat exchanger. Based on the design, analysis, and testing conducted, the recovery system will liquefy 31% of the gaseous boil off from a liquid hydrogen storage tank. All components, including a high speed, miniature turbocompressor, were designed and manufacturing drawings were created. All hardware was fabricated and tests were conducted in air, helium, and hydrogen. Testing validated the design, except for the turbocompressor. A rotor-to-stator clearance issue was discovered as a result of a concentricity tolerance stack-up.

Pelfrey, Joy W.↗

A Low Cost, Self-Acting, Liquid Hydrogen Boil-Off Recovery System

PROJECT SUMMARY. 1 PROJECT OBJECTIVES. Detail Design. Final Analysis. Hardware Procurement. Component Tests. System Tests..Prototype Tests. 2. WORK PERFORMED. Detail Design. Final Analysis. Hardware Procurement. Component Tests. System Tests. Prototype Tests. 3. Results obtained. Detail Design. Final Analysis. Hardware Procurement. Component Tests. System Tests. Prototype Tests. 5. TECHNICAL MERIT AND FEASIBILITY ASSESSMENT. 6. APPENDIX A: SIZE DETAIL DRAWINGS. 7. APPENDIX B: CONSULTANTS SENSITIVITY STUDY. 8. APPENDIX C: CONSULTANTS REPORT. ROTORDYNAMIC ANALYSIS 9. SF298 REPORT DOCUMENTATION PAGE.

Pelfrey, Joy w.↗

Smith Newton Vehicle Performance Evaluation – Cumulative; Energy Efficiency & Renewable Energy (EERE), Vehicle Technologies Office (VTO)

The Fleet Test and Evaluation Team at the U.S. Department of Energy's National Renewable Energy Laboratory is evaluating and documenting the performance of electric and plug-in hybrid electric drive systems in medium-duty trucks across the nation. U.S. companies participating in this evaluation project received funding from the American Recovery and Reinvestment Act to cover part of the cost of purchasing these vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

Cost benefit analysis for smart grid projects

The U.S. is unusual in that a definition of the term “smart grid” was written into legislation, appearing in the Energy Independence and Security Act (2007). When the recession called for stimulus spending and the American Recovery and Reinvestment Act (ARRA, 2009) was passed, a framework already existed for identification of smart grid projects. About $4.5B of the U.S. Department of Energy’s (U.S. DOE’s) $37B allocation from ARRA was directed to smart grid projects of two types, investment grants and demonstrations. Matching funds from other sources more than doubled the total value of ARRA-funded smart grid projects. The Smart Grid Investment Grant Program (SGIG) consumed all but $620M of the ARRA funds, which was available for the 32 projects in the Smart Grid Demonstration Program (SGDP, or demonstrations). Given the economic potential of these projects and the substantial investments required, there was keen interest in estimating the benefits of the projects (i.e., quantifying and monetizing the performance of smart grid technologies). Common method development and application, data collection, and analysis to calculate and publicize the benefits were central objectives of the program. For this purpose standard methods and a software tool, the Smart Grid Computational Tool (SGCT), were developed by U.S. DOE and a spreadsheet model was made freely available to grantees and other analysts. The methodology was intended to define smart grid technologies or assets, the mechanisms by which they generate functions, their impacts and, ultimately, their benefits. The SGCT and its application to the Demonstration Projects are described, and actual projects in Southern California and in China are selected to test and illustrate the tool. The usefulness of the methodology and tool for international analyses is then assessed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Demolition and Disposition of 209-E Critical Mass Laboratory - 12267

The 209-E Critical Mass Laboratory was constructed in 1960 to provide a heavy shielded reactor room where quantities of plutonium or uranium in solution could be brought to near-critical configurations under carefully controlled and monitored conditions. In the late 1980's, the responsible contractor, Pacific Northwest National Laboratory (PNNL), was directed by the Department of Energy (DOE) to prepare the facility for unoccupied status. The facility was demolished under a Removal Action Work Plan pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The funding for this project was provided by the American Recovery and Reinvestment Act (ARRA). The primary rooms of concern with regards to contamination in 209-E facility, which is over 9,000 square feet, are the criticality assembly room (CAR), the mix room, and the change room. The CAR contained two reactor hoods (HO-140 and HO-170), which each had a high efficiency particulate air (HEPA) filter system. The CAR contained 13 tanks ranging from 38 L (10 gal) to 401 L (106 gal). Tanks TK-109 and TK-110 are below grade, and were removed as part of this demolition and disposition remedy. Nonradiological and radiological hazardous substances were removed, decontaminated, or fixed in place, prior to demolition. Except for the removal of below grade tanks TK-109 and TK-110, the facility was demolished to slab-on-grade. PNNL performed stabilization and deactivation activities that included removal of bulk fissile material and chemicals, flushing tanks, stabilizing contamination within gloveboxes and hoods, and packaging and removing waste. The removal of the contaminated plutonium equipment and materials from the 209E facility presented a number of challenges similar in nature to those associated with the inventory reduction and cleanup activities at the Plutonium Finishing Plant. Although there were no bulk fissile materials or chemicals within the facility, there were residual radiological materials (isotopes of plutonium and americium) in the tanks and hoods. The complexity of the remedy was present because of the various configurations of the tanks and hoods, combined with the residual contaminants. Because of the weight and dimensional configuration, size reduction of the slab tanks, as well as removal and disposal of the different material used for moderation and absorption, were two examples of challenges that were resolved to complete the remedy. One of the key methods developed and implemented at the facility was the design and construction of a shroud to allow the cutting of the Pu contaminated tanks. The shroud design, development and implementation at the 209E Project was an example of enhanced work planning and task hazards analysis with worker involvement. This paper will present the lessons learned from the 209E facility inventory reduction activities including the shroud and other methodologies used. The initial Lessons Learned discussion for this project was scheduled for late January 2012. This facility is the first open-air demolition of a highly contaminated plutonium-contaminated facility accomplished by CH2M Hill under the Plateau Remediation Contract. The demolition was completed without spread of contamination to the workers and the surrounding area. As with any project of this complexity, there are significant accomplishments, as well as experience that can be applied to future demolition of plutonium-contaminated facilities on the Hanford Site. These experiences will be documented at a later date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industrial Energy Efficiency Projects Improve Competitiveness and Protect Jobs

This case study describes nine industrial energy efficiency projects in Wisconsin supported by $14.4 million from the American Recovery and Reinvestment Act of 2009. Participating companies provided $15.6 million in cost share funding. Each project achieved energy savings of 25% or more, helping to improve the companies’ competitiveness and protect jobs.

American Recovery and Reinvestment Act↗

Characterization for CO2 Storage from Coal-fired Power Facilities in the Black Warrior Basin of Alabama

The project Characterization for CO2 Storage from Coal-fired Power Facilities in the Black Warrior Basin of Alabama is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas.

.las↗

MD PHEV/EV ARRA Project Data Collection and Reporting (Presentation)

This presentation describes a National Renewable Energy Laboratory project to collect and analyze commercial fleet deployment data from medium-duty plug-in hybrid electric and all-electric vehicles that were deployed using funds from the American Recovery and Reinvestment Act. This work supports the Department of Energy's Vehicle Technologies Program and its Advanced Vehicle Testing Activity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Navistar eStar Vehicle Performance Evaluation - Cumulative (Brochure)

The Fleet Test and Evaluation Team at the U.S. Department of Energy's National Renewable Energy Laboratory is evaluating and documenting the performance of electric and plug-in hybrid electric drive systems in medium duty trucks across the nation. U.S. companies participating in this evaluation project received funding from the American Recovery and Reinvestment Act to cover part of the cost of purchasing these vehicles. Through this project, Navistar will build and deploy all-electric medium-duty trucks. The trucks will be deployed in diverse climates across the country.

33 ADVANCED PROPULSION SYSTEMS↗