Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REACTORS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Benchmark Evaluation of the Medium-Power Reactor Experiment Program Critical Configurations

A series of small, compact critical assembly (SCCA) experiments were performed in 1962-1965 at the Oak Ridge National Laboratory Critical Experiments Facility (ORCEF) for the Medium-Power Reactor Experiment (MPRE) program. The MPRE was a stainless-steel clad, highly enriched uranium (HEU)-O 2 fueled, BeO reflected reactor design to provide electrical power to space vehicles. Cooling and heat transfer were to be achieved by boiling potassium in the reactor core and passing vapor directly through a turbine. Graphite- and beryllium-reflected assemblies were constructed at ORCEF to verify the critical mass, power distribution, and other reactor physics measurements needed to validate reactor calculations and reactor physics methods. The experimental series was broken into three parts, with the third portion of the experiments representing the beryllium-reflected measurements. The latter experiments are of interest for validating current reactor design efforts for a fission surface power reactor. The entire series has been evaluated as acceptable benchmark experiments and submitted for publication in the International Handbook of Evaluated Criticality Safety Benchmark Experiments and in the International Handbook of Evaluated Reactor Physics Benchmark Experiments .

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Westinghouse Small Modular Reactor nuclear steam supply system design

The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the first in a series of four papers which describe the design and functionality of the Westinghouse SMR. Also described in this series are the key drivers influencing the design of the Westinghouse SMR and the unique passive safety features of the Westinghouse SMR. Several critical motivators contributed to the development and integration of the Westinghouse SMR design. These design driving motivators dictated the final configuration of the Westinghouse SMR to varying degrees, depending on the specific features under consideration. These design drivers include safety, economics, AP1000{sup R} reactor expertise and experience, research and development requirements, functionality of systems and components, size of the systems and vessels, simplicity of design, and licensing requirements. The Westinghouse SMR NSSS consists of an integral reactor vessel within a compact containment vessel. The core is located in the bottom of the reactor vessel and is composed of 89 modified Westinghouse 17x17 Robust Fuel Assemblies (RFA). These modified fuel assemblies have an active core length of only 2.4 m (8 ft) long, and the entirety of the core is encompassed by a radial reflector. The Westinghouse SMR core operates on a 24 month fuel cycle. The reactor vessel is approximately 24.4 m (80 ft) long and 3.7 m (12 ft) in diameter in order to facilitate standard rail shipping to the site. The reactor vessel houses hot and cold leg channels to facilitate coolant flow, control rod drive mechanisms (CRDM), instrumentation and cabling, an intermediate flange to separate flow and instrumentation and facilitate simpler refueling, a pressurizer, a straight tube, recirculating steam generator, and eight reactor coolant pumps (RCP). The containment vessel is 27.1 m (89 ft) long and 9.8 m (32 ft) in diameter, and is designed to withstand pressures up to 1.7 MPa (250 psi). It is completely submerged in a pool of water serving as a heat sink and radiation shield. Housed within the containment are four combined core makeup tanks (CMT)/passive residual heat removal (PRHR) heat exchangers, two in-containment pools (ICP), two ICP tanks and four valves which function as the automatic depressurization system (ADS). The PRHR heat exchangers are thermally connected to two different ultimate heat sink (UHS) tanks which provide transient cooling capabilities. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Remote Dry Cutting Technology for Reactor Vessel Segmentation - 19176

Decommissioning of nuclear power plants is becoming a large market due to the many reactors reaching their operational lifetime limit in the near future. One of the first activities in a decommissioning project is to segment the reactor internals and the reactor vessel. These activities are also one of the more complex ones since they deal with most of the radioactivity inventory that is left in the plant after the spent fuel is gone. They are almost always on the critical path, so an improvement in execution time will be favorable for the entire decommissioning program. Westinghouse has been successful for more than 30 years in more than 40 segmentation projects globally. The traditional technology that has been used in these projects has up until now been underwater mechanical cutting of both the reactor internals and the reactor vessel. Underwater mechanical cutting is proven and very reliable, but it is slow and since there are major advantages to the decommissioning program with improvements in schedule performance, Westinghouse is developing alternative technologies both as part of current offerings but also as entire new concepts. For reactor vessel cutting, Westinghouse has developed a new concept involving thermal cutting in a dry environment. The benefit of dry cutting is the speed of the cutting and the subsequent schedule and cost improvements. A dry environment also means that the pools can be drained which means that a critical activity can be moved forward in the schedule and that there will need to be less monitoring and controlling with no pumps, cooling and recirculation system that need to be operated. Going from underwater mechanical to dry thermal cutting reduces the on-site schedule by more than 50%. The dry cutting concept development considers both PWR and BWR reactors. Some of the challenges of dry thermal cutting involve the creation of radioactive off-gases and how to ventilate these, the extreme heat generation, remote handling of the thermal equipment, cutting station arrangements and how to remove the insulation around the reactor vessel. Depending on the concept the reactor vessel might need to be lifted from the pit in one piece, which also poses some challenges due to the weight, volume and radioactivity of the vessel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Water Ingress Effects on the Reactivity Change of the Conceptual Designed Reactor at NIST

The conceptual research reactor design with a split core for a replacement reactor project at the NIST (National Institute of Standards and Technology) Center for Neutron Research is underway. The reactor core is cooled and moderated by light water and reflected by heavy water in a reflector tank. The reactor core is immersed in light water, which is isolated from heavy water with a slightly pressurized boundary box made of zirconium alloy. The heavy water is contained in a large size cylindrical tank which also provides ample space to accommodate neutron beam tubes, cold sources and other irradiation equipment. The reflector tank is placed in the center of a large light water pool, which provides thermal and biological shielding to the reactor. Light water and heavy water have distinct physical properties in regard to neutron moderation. Light water is generally known to have greater moderating power and absorption cross-sections, while heavy water has a higher moderating ratio. Due to these differences in properties, the accidental mixing of light water and heavy water in either direction will inevitably affect the reactivity of the reactor. Moreover, since the neutron flux spectrum at different locations of the reactor will have significantly different characteristics (for example, the spectrum at the heavy tank should be much softer than that at the core center region), the effect of reactivity changes becomes complicated and will depend on the water mixing locations. From the reactor safety analysis perspective, the water ingress reactivity change is one of the required design base reactivity accidents that must be evaluated in the final safety analysis report. Given these concerns, neutronics calculations have been performed to determine the effect and trend of the reactivity changes due to water ingress in different scenarios by purposely mixing the waters at three representative places in the reactor: the reflector area, the center coolant area and the peripheral coolant area. These three places were selected for the study because of their uniqueness in the flux spectrum (as shown in the results section). Simple static neutronics calculations were performed using MCNP6 to examine the reactivity effects due to water ingress. It should be noted that all calculations performed in this study assume homogeneous water mixing in the area of interest; therefore, the local effect of the mixing situation would possibly be missed by this study. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dynamic Analysis of the Next Generation Molten-Salt Breeder Reactor System

The conceptual design of a 1000 MWe two-fluid molten-salt breeder reactor (MSBR) station was performed during 1966-1970 at Oak Ridge National Laboratory (ORNL) with the goal of using the U-233 fuel cycle. This modular design with four reactor modules has an electrical output of 250 MW/module. The abundance of Th-232 was attractive in converting it to U-233 in a thermal breeder reactor. The two-fluid reactor is graphite-moderated 'with a {sup 7}LiF-BeF{sub 2}-UF{sub 4} fuel salt circulated through the core and a {sup 7}LiF-ThF{sub 4}-BeF{sub 2} blanket salt circulated through separate flow channels distributed throughout the core, as well as in a surrounding under-moderated region'. This reactor design has the advantages of not producing Pu isotopes and easy chemical separation of U-233 in the blanket material. The low fuel cost and the graphite replacement cost are attractive for such a design, with an estimated cost of $141/kW at 1968-dollar value. Potential non-proliferation features of MSBR, the low costs of raw materials, and established chemical separation of fission products are important factors in further development of MSBRs as an alternative to current light water reactors. These reactors are often referred to as liquid fluoride thorium reactor (LFTR). The current research on the modeling of the MSBR is based on an earlier work on the preliminary dynamic model of the MSBR concept. Revisions are made to the original model. The physics parameters have been modified for the current modeling effort based on additional information including more recent values of model parameters from and several typographical misprints in equations and values. Details of this effort will be presented in a full follow-up paper. This work presents the detailed nodal models of reactor fluid core, blanket fluid loop, graphite moderator, fuel fluid heat exchanger, and the blanket fluid heat exchanger. A set of simulations has been performed to validate the model using the commercial software MATLAB{sup TM}-Simulink. Simulations were performed for the cases of source perturbation and reactivity perturbation. The model is inherently nonlinear. A description of the MSBR conceptual design, along with a tabulation of relevant system parameters, is presented. The results of simulation demonstrate stable behavior of the MSBR dynamics, temperature feedback effects, and load-following capability of the MSBR system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

How to Produce a Reactor Neutron Spectrum Using a Proton Accelerator

A method for reproducing the neutron energy spectrum present in the core of an operating nuclear reactor using an engineered target in an accelerator proton beam is proposed. The protons interact with a target to create neutrons through various (p,n) type reactions. Spectral tailoring of the emitted neutrons can be used to modify the energy of the generated neutron spectrum to represent various reactor spectra. Through the use of moderators and reflectors, the neutron spectrum can be modified to reproduce many different spectra of interest including spectra in small thermal test reactors, large pressurized water reactors, and fast reactors. The particular application of this methodology is the design of an experimental approach for using an accelerator to measure the betas produced during fission to be used to reduce uncertainties in the interpretation of reactor antineutrino measurements. This approach involves using a proton accelerator to produce a neutron field representative of a power reactor, and using this neutron field to irradiate fission foils of the primary isotopes contributing to fission in the reactor, creating unstable, neutron rich fission products that subsequently beta decay and emit electron antineutrinos. A major advantage of an accelerator neutron source over a neutron beam from a thermal reactor is that the fast neutrons can be slowed down or tailored to approximate various power reactor spectra. An accelerator based neutron source that can be tailored to match various reactor neutron spectra provides an advantage for control in studying how changes in the neutron spectra affect parameters such as the resulting fission product beta spectrum.

43 PARTICLE ACCELERATORS↗

Spatial Burnout in Water Reactors with Nonuniform Startup Distributions of Uranium and Boron

Spatial burnout calculations have been made of two types of water moderated cylindrical reactor using boron as a burnable poison to increase reactor life. Specific reactors studied were a version of the Submarine Advanced Reactor (sAR) and a supercritical water reactor (SCW) . Burnout characteristics such as reactivity excursion, neutron-flux and heat-generation distributions, and uranium and boron distributions have been determined for core lives corresponding to a burnup of approximately 7 kilograms of fully enriched uranium. All reactivity calculations have been based on the actual nonuniform distribution of absorbers existing during intervals of core life. Spatial burnout of uranium and boron and spatial build-up of fission products and equilibrium xenon have been- considered. Calculations were performed on the NACA nuclear reactor simulator using two-group diff'usion theory. The following reactor burnout characteristics have been demonstrated: 1. A significantly lower excursion in reactivity during core life may be obtained by nonuniform rather than uniform startup distribution of uranium. Results for SCW with uranium distributed to provide constant radial heat generation and a core life corresponding to a uranium burnup of 7 kilograms indicated a maximum excursion in reactivity of 2.5 percent. This compared to a maximum excursion of 4.2 percent obtained for the same core life when w'anium was uniformly distributed at startup. Boron was incorporated uniformly in these cores at startup. 2. It is possible to approach constant radial heat generation during the life of a cylindrical core by means of startup nonuniform radial and axial distributions of uranium and boron. Results for SCW with nonuniform radial distribution of uranium to provide constant radial heat generation at startup and with boron for longevity indicate relatively small departures from the initially constant radial heat generation distribution during core life. Results for SAR with a sinusoidal distribution rather than uniform axial distributions of boron indicate significant improvements in axial heat generation distribution during the greater part of core life. 3. Uranium investments for cylindrical reactors with nonuniform radial uranium distributions which provide constant radial heat generation per unit core volume are somewhat higher than for reactors with uniform uranium concentration at startup. On the other hand, uranium investments for reactors with axial boron distributions which approach constant axial heat generation are somewhat smaller than for reactors with uniform boron distributions at startup.

Fox, Thomas A.↗

A Plan to Qualify New Fuel for the High Flux Isotope Reactor for Material Minimization

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of the high-performance reactors to operate with LEU fuels. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel.The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR.The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-regulated reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification.

Shokes, Tamara↗

Methodology and Tool for the Physical Security Analysis of Micro and Advanced Reactors

This work proposes a dynamic evaluation methodology to relax the conservatism in physical security evaluation, by leveraging an ongoing work in the Light Water Reactor Sustainability pathway. This methodology is implemented in a dynamic risk assessment tool named Event Modeling Risk Assessment using Linked Diagrams (EMRALD). The work extends EMRALD’s capability to support a sandbox feature where analysts can easily create attack scenarios and modify advanced/small modular reactor (A/SMR) security and safety features using templates. This approach saves time and cost since the analysis does not require creating detailed computer-aided design models, as is commonly required in commercial force-on-force software tools. EMRALD is completely free to use at https://emraldapp.inl.gov. We have developed basic templates including physical barriers, intrusion sensors, physical areas, and safety actions, that can be downloaded from EMRALD’s GitHub site: https://github.com/idaholab/EMRALD. These templates use generic data commonly used for training purposes, which do not reflect any actual operating nuclear reactor. Users may adjust the data in the templates with their own dataset and/or create new templates in EMRALD. The proposed methodology combines security and safety by assessing sabotage effects up to the radiological consequence to the public instead of merely the core damage state. This practice follows the industry standard for advanced non-light-water reactors currently proposed for endorsement by the Nuclear Regulatory Commission. The combination of security and safety is expressed in an achievability-consequence chart. EMRALD can be used to generate data for this chart. A hypothetical case study using a representative sodium-cooled fast reactor (SFR) facility is presented in this report to demonstrate this methodology. This case study does not contain any actual nuclear plant information. This work will benefit A/SMR vendors and utilities to implement security by design during the reactor design iteration phase, such that they do not have to perform upgrades and retrofits to the reactor after it is installed to improve its physical protection system. The tool may also be used to analyze domestic or foreign reactor designs to support the International Nuclear Security Techniques for Advanced Reactors (INSTAR) bilateral missions. Future works are planned to implement the methodology on a reference SFR reactor and a reference high-temperature gas-cooled reactor to obtain insights and lessons-learned for the A/SMR community.

97 MATHEMATICS AND COMPUTING↗

Fluid Flow Characteristic Simulation of the Original TRIGA 2000 Reactor Design Using Computational Fluid Dynamics Code

Common energy crisis has modified the national energy policy which is in the beginning based on natural resources becoming based on technology, therefore the capability to understanding the basic and applied science is needed to supporting those policies. National energy policy which aims at new energy exploitation, such as nuclear energy is including many efforts to increase the safety reactor core condition and optimize the related aspects and the ability to build new research reactor with properly design. The previous analysis of the modification TRIGA 2000 Reactor design indicates that forced convection of the primary coolant system put on an effect to the flow characteristic in the reactor core, but relatively insignificant effect to the flow velocity in the reactor core. In this analysis, the lid of reactor core is closed. However the forced convection effect is still presented. This analysis shows the fluid flow velocity vector in the model area without exception. Result of this analysis indicates that in the original design of TRIGA 2000 reactor, there is still forced convection effects occur but less than in the modified TRIGA 2000 design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Instrumentation and Control Methods for Small and Medium Reactors with IRIS Demonstration

Development and deployment of small-scale nuclear power reactors and their maintenance, monitoring, and control are part of the mission under the Small Modular Reactor (SMR) program. The objectives of this NERI-consortium research project are to investigate, develop, and validate advanced methods for sensing, controlling, monitoring, diagnosis, and prognosis of these reactors, and to demonstrate the methods with application to one of the proposed integral pressurized water reactors (IPWR). For this project, the IPWR design by Westinghouse, the International Reactor Secure and Innovative (IRIS), has been used to demonstrate the techniques developed under this project. The research focuses on three topical areas with the following objectives. Objective 1 - Develop and apply simulation capabilities and sensitivity/uncertainty analysis methods to address sensor deployment analysis and small grid stability issues. Objective 2 - Develop and test an autonomous and fault-tolerant control architecture and apply to the IRIS system and an experimental flow control loop, with extensions to multiple reactor modules, nuclear desalination, and optimal sensor placement strategy. Objective 3 - Develop and test an integrated monitoring, diagnosis, and prognosis system for SMRs using the IRIS as a test platform, and integrate process and equipment monitoring (PEM) and process and equipment prognostics (PEP) toolboxes. The research tasks are focused on meeting the unique needs of reactors that may be deployed to remote locations or to developing countries with limited support infrastructure. These applications will require smaller, robust reactor designs with advanced technologies for sensors, instrumentation, and control. An excellent overview of SMRs is described in an article by Ingersoll (2009). The article refers to these as deliberately small reactors. Most of these have modular characteristics, with multiple units deployed at the same plant site. Additionally, the topics focus on meeting two of the eight needs outlined in the recently published 'Technology Roadmap on Instrumentation, Control, and Human-Machine Interface (ICHMI) to Support DOE Advanced Nuclear Energy Programs' which was created 'to provide a systematic path forward for the integration of new ICHMI technologies in both near-term and future nuclear power plants and the reinvigoration of the U.S. nuclear ICHMI community and capabilities.' The research consortium is led by The University of Tennessee (UT) and is focused on three interrelated topics: Topic 1 (simulator development and measurement sensitivity analysis) is led by Dr. Mike Doster with Dr. Paul Turinsky of North Carolina State University (NCSU). Topic 2 (multivariate autonomous control of modular reactors) is led by Dr. Belle Upadhyaya of the University of Tennessee (UT) and Dr. Robert Edwards of Penn State University (PSU). Topic 3 (monitoring, diagnostics, and prognostics system development) is led by Dr. Wes Hines of UT. Additionally, South Carolina State University (SCSU, Dr. Ken Lewis) participated in this research through summer interns, visiting faculty, and on-campus research projects identified throughout the grant period. Lastly, Westinghouse Science and Technology Center (Dr. Mario Carelli) was a no-cost collaborator and provided design information related to the IRIS demonstration platform and defining needs that may be common to other SMR designs. The results of this research are reported in a six-volume Final Report (including the Executive Summary, Volume 1). Volumes 2 through 6 of the report describe in detail the research and development under the topical areas. This volume serves to introduce the overall NERI-C project and to summarize the key results. Section 2 provides a summary of the significant contributions of this project. A list of all the publications under this project is also given in Section 2. Section 3 provides a brief summary of each of the five volumes (2-6) of the report. The contributions of SCSU are described in Section 4, including a summary of undergraduate research experience. The project management organizational chart is provided as Figure 1. Appendices A, B, and C contain the reports on the summer research performed at the University of Tennessee by undergraduate students from South Carolina State University.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reactor Subsystem Simulation for Nuclear Hybrid Energy Systems

Nuclear Hybrid Energy Systems (NHES) could be a key part of the solution to achieving energy security, may provide reliable power availability even with increasing renewable energy penetration into the power grid, and may allow repurposing excess electricity in times of low demand. Incorporating a fission-based power source in a multi-output system (electricity and process heat) can offer significant advantages over carbon-based production sources, such as coal or natural gas, including reduction in atmospheric carbon emissions. In an integrated multi-output system, thermal energy from the nuclear reactor subsystem can be diverted to industrial applications in times of low electricity demand. High temperature, high quality heat from advanced reactor designs might be used for hydrogen production or synthetic fuel production (coal-to-liquid or natural gas-to-liquid processes). Low temperature heat from advanced reactor designs or the current and future fleet of light water reactors (LWRs) might be applied to desalination processes or be stored for later use in low temperature ammonia or hydrocarbon-based thermal cycles. The NHES research team is currently developing a dynamic simulation of an integrated hybrid energy system. A detailed simulation of proposed NHES architectures will allow initial computational demonstration of a tightly coupled NHES to identify key reactor subsystem requirements, identify candidate reactor technologies for a hybrid system, and identify key challenges to operation of the coupled system. This work will provide a baseline for later coupling of design-specific reactor models through industry collaboration. The modeling capability addressed in this report focuses on the reactor subsystem simulation. Many computational tools and methods are available for modeling a nuclear reactor, power conversion systems and associated process applications. One method is to develop a single program capable of modeling the entire system. Another is to combine two or more existing computer programs, each modeling a portion of the system for which it is validated, where the programs exchange information to compute the solution. The former method requires a lengthy development and verification and validation process. The latter method leverages industry standard software to reduce development and funding requirements. Preliminary system models have been developed by Idaho National Laboratory researchers and are currently being enhanced to assess integrated system performance given multiple sources (e.g., nuclear + wind) and multiple applications (i.e., electricity + process heat). Initial efforts to integrate a Fortran-based simulation of a small modular reactor (SMR) with the balance of plant model have been completed in FY12. This initial effort takes advantage of an existing SMR model developed at North Carolina State University to provide initial integrated system simulation for a relatively low cost. The SMR subsystem simulation details are discussed in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Reactor Supply Chain Assessment (GAIN Report)

Several net-zero scenario evaluations predict a rapid ramp up of nuclear energy in the coming decades. If this materializes, it will most likely strain the supply chains associated with the potential advanced reactor concepts awaiting deployment. To help assess the current and potential capacities of the various advanced reactor supply chains, the Gateway for Accelerated Innovation in Nuclear (GAIN) conducted a survey of companies able to produce components for advanced reactors in the near future (namely for sodium, gas-cooled, and molten salt reactors). Using an aggressive nuclear deployment scenario, the objective was to assess the ability of the various supply chains to meet the considerable demand projections for certain key components (vessels, heat exchangers, pumps, graphite, and sensors) and identify potential challenges. While individual companies were unable to meet the most optimistic nuclear deployment rate projections, it was found that on aggregate, a United States-based supply chain projected that expansion could be ramped up to meet a larger future demand of these components. However, meeting projected demand for several more complex items (namely gas or salt heat exchangers) was found to be more challenging. Deploying new reactors at scale necessitates the production of more and more supply chain components, requiring a ramp up in production. Supply chain companies were surveyed, and respondents appeared less able to meet short term demand (next year) versus longer-term demand projections (5 and 10 years). This reflects the need to obtain orders with adequate lead times (can range from 3 to 30 months). Future demand will need to be met by expanding existing capacity. These expansions will require suppliers to raise capital or secure other types of support (federal loans or grants) to invest in facilities, equipment, and workforce. Individual suppliers indicated financial investments could be in the range of $\$ $100 million to $\$ $1 billion for their own facilities (depending on the type of facility). The biggest risk, according to respondents, related to general uncertainties surrounding the future nuclear industry and whether the potential demand projections will materialize into real demand that is actionable from a business perspective. Businesses do not seem willing to take investments risks without clear orders. If businesses are not able to invest to expand the supply, it will either delay the deployment of advanced nuclear technology, or the supply chain will be met by suppliers outside of the United States. This report only focuses on the domestic supply chain’s ability to meet the various projections stipulated here for the specific assessed components (vessels, heat exchangers, pumps, graphite, and sensors). The report does not cover all reactor designs or all components that may ultimately be needed for any one reactor design. It also does not address whether any specific aspect of the supply chain will be cost competitive in the global market, nor how potential state-backed entities could affect the expansion of a United States-based supply chain. The largest challenges in ramping up capacity among respondents appear to be workforce related. This includes workforce availability, experience, training, and turnover. In addition to facility investment, suppliers will also need to invest heavily in long-term workforce training to meet production goals. This issue is not nuclear-specific, and the expansion of any supply chain will likely face similar challenges. While suppliers evaluated expected normal business demand from other markets outside of nuclear, it is possible that other market segments could expand more than predicted and compete for the same suppliers. One potential market that may compete for the same supplier resources is the United States military, as many of these suppliers support both the commercial nuclear sector as well as the Navy with reactors and components. In summary, suppliers in the United States believe that there is a way to increase production in order to begin meeting the demand which will exist for advanced reactors—as long as appropriate investments can be made in the supply chain in an appropriate timeframe. Based on the capacity projections and lead times, investment will be needed to meet the 5-year and 10-year production targets. Therefore, if significant nuclear deployment is to occur in the 2030s, investment and ramp up of the advanced nuclear supply chain will need to begin in the near future for the United States to successfully deploy these advanced reactors with domestic supply chains.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hardware-Based Demonstration of Temperature Control Functions for Reactor Systems

Establishing autonomy in reactor control systems has become essential for the expansion of nuclear technologies. Thermal regulation in particular remains crucial for maintaining stable operation and ensuring the integrity of fuel. To alleviate public skepticism of the safety of nuclear reactors, demonstrating control over this key factor is pivotal. Utilizing electric heat pads to simulate the heat released in a reactor core, thermocouples for temperature monitoring, and an Arduino micro programmable logic controller (PLC) for control, a hardware-based demonstration of a reactor heating system validates the efficacy of reactor control over this key parameter. To improve precision, a proportional-integral-derivative (PID) algorithm was implemented in the heating control loop to ensure meticulous control of reactor functions. In addition, the integration of this physical system with a digital simulator tool such as RELAP5-3D establishes a foundation for a comprehensive testing environment. This allows for a refinement of temperature control under various simulated reactor conditions, bringing another layer of reliability to the operation of the system. By facilitating a physical demonstration of reactor thermal management and control strategies, this project provides a foundation for expanded testing and educational outreach. Ultimately, this system advances the broader goal of demonstrating the safety and viability of autonomous reactor operations, contributing to public trust and future reactor deployment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Editorial: Benchmark experiments, development and needs in support of advanced reactor design

Advanced nuclear reactor designs will for the most part be a departure from low enrichment light water reactor (LWR) designs currently operated around the world. Such advanced designs include but are not limited to new TRISO-fueled high temperature gas reactors, heat-pipe cooled micro-reactors, fluoride salt cooled high-temperature reactors, molten salt reactors, lead cooled fast reactors, nuclear thermal propulsion concepts, and include LWR designs with advanced fuel and clad types. Modeling and simulation methods for advanced reactors is necessary for regulators to approve license requests. However, regulators also require that modeling approaches be validated against experimental measurements. Hence, there is a crucial need for data for advanced reactor systems that will support validation of analysis methods. To this end, this Research Topic includes eleven papers organized into topical seven categories relevant for advanced reactor design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dismantling Structures and Equipment of the MR Reactor and its Loop Facilities at the National Research Center 'Kurchatov Institute' - 12051

In 2008 a design of decommissioning of research reactors MR and RFT has been developed in the National research Center 'Kurchatov institute'. The design has been approved by Russian State Authority in July 2009 year and has received the positive conclusion of ecological expertise. In 2009-2010 a preparation for decommissioning of reactors MR and RFT was spent. Within the frames of a preparation a characterization, sorting and removal of radioactive objects, including the irradiated fuel, from reactor storage facilities and pool have been executed. During carrying out of a preparation on removal of radioactive objects from reactor sluice pool water treating has been spent. For these purposes modular installation for clearing and processing of a liquid radioactive waste 'Aqua - Express' was used. As a result of works it was possible to lower volume activity of water on three orders in magnitude that has allowed improving essentially of radiating conditions in a reactor hall. Auxiliary systems of ventilation, energy and heat supplies, monitoring systems of radiating conditions of premises of the reactor and its loop-back installations are reconstructed. In 2011 the license for a decommissioning of the specified reactors has been received and there are begun dismantling works. Within the frames of works under the design the armature and pipelines are dismantled in a under floor space of a reactor hall where a moving and taking away pipelines of loop facilities and the first contour of the MR reactor were replaced. A dismantle of the main equipment of loop facility with the gas coolant has been spent. Technologies which were used on dismantle of the radioactive contaminated equipment are presented, the basic works on reconstruction of systems of maintenance of on the decommissioning works are described, the sequence of works on the decommissioning of reactors MR and RFT is shown. Dismantling works were carried out with application of means of a dust suppression that, in aggregate with standard means at such works of individual protection of the personnel and devices of radiating control, has allowed to lower risk of action of radiation on the personnel, the population and environment at the expense of reduction of volume activity of radioactive aerosols in air. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An approach to model reactor core nodalization for deterministic safety analysis

Adopting good nodalization strategy is essential to produce an accurate and high quality input model for Deterministic Safety Analysis (DSA) using System Thermal-Hydraulic (SYS-TH) computer code. The purpose of such analysis is to demonstrate the compliance against regulatory requirements and to verify the behavior of the reactor during normal and accident conditions as it was originally designed. Numerous studies in the past have been devoted to the development of the nodalization strategy for small research reactor (e.g. 250kW) up to the bigger research reactor (e.g. 30MW). As such, this paper aims to discuss the state-of-arts thermal hydraulics channel to be employed in the nodalization for RTP-TRIGA Research Reactor specifically for the reactor core. At present, the required thermal-hydraulic parameters for reactor core, such as core geometrical data (length, coolant flow area, hydraulic diameters, and axial power profile) and material properties (including the UZrH{sub 1.6}, stainless steel clad, graphite reflector) have been collected, analyzed and consolidated in the Reference Database of RTP using standardized methodology, mainly derived from the available technical documentations. Based on the available information in the database, assumptions made on the nodalization approach and calculations performed will be discussed and presented. The development and identification of the thermal hydraulics channel for the reactor core will be implemented during the SYS-TH calculation using RELAP5-3D{sup ®} computer code. This activity presented in this paper is part of the development of overall nodalization description for RTP-TRIGA Research Reactor under the IAEA Norwegian Extra-Budgetary Programme (NOKEBP) mentoring project on Expertise Development through the Analysis of Reactor Thermal-Hydraulics for Malaysia, denoted as EARTH-M.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NEW MATERIALS DEVELOPED TO MEET REGULATORY AND TECHNICAL REQUIREMENTS ASSOCIATED WITH IN-SITU DECOMMISSIONING OF NUCLEAR REACTORS AND ASSOCIATED FACILITIES

For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and Technology, Savannah River National Laboratory's Mike Serrato reported initial information on the newly developed specialty grout materials necessary to satisfy all requirements associated with in-situ decommissioning of P-Reactor and R-Reactor at the U.S. Department of Energy's Savannah River Site. Since that report, both projects have been successfully completed and extensive test data on both fresh properties and cured properties has been gathered and analyzed for a total of almost 191,150 m{sup 3} (250,000 yd{sup 3}) of new materials placed. The focus of this paper is to describe the (1) special grout mix for filling the P-Reactor vessel (RV) and (2) the new flowable structural fill materials used to fill the below grade portions of the facilities. With a wealth of data now in hand, this paper also captures the test results and reports on the performance of these new materials. Both reactors were constructed and entered service in the early 1950s, producing weapons grade materials for the nation's defense nuclear program. R-Reactor was shut down in 1964 and the P-Reactor in 1991. In-situ decommissioning (ISD) was selected for both facilities and performed as Comprehensive Environmental Response, Compensations and Liability Act actions (an early action for P-Reactor and a removal action for R-Reactor), beginning in October 2009. The U.S. Department of Energy concept for ISD is to physically stabilize and isolate intact, structurally robust facilities that are no longer needed for their original purpose of producing (reactor facilities), processing (isotope separation facilities), or storing radioactive materials. Funding for accelerated decommissioning was provided under the American Recovery and Reinvestment Act. Decommissioning of both facilities was completed in September 2011. ISD objectives for these CERCLA actions included: (1) Prevent industrial worker exposure to radioactive or hazardous contamination exceeding Principal Threat Source Material levels; (2) Minimize human and ecological exposure to unacceptable risk associated with radiological and hazardous constituents that are or may be present; (3) Prevent to the extent practicable the migration of radioactive or hazardous contaminants from the closed facility to the groundwater so that concentrations in groundwater do not exceed regulatory standards; (4) Eliminate or control all routes of human exposure to radiological and chemical contamination; and (5) Prevent animal intruder exposure to radioactive and hazardous contamination.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗