Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Prototype”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Monitoring the Prototype Hanford Barrier – Fiscal Year 2018 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test from water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2017 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test during water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation.

54 ENVIRONMENTAL SCIENCES↗

FY18 L2 Milestone #6360 Report: Initial Capability of an Arm-based Advanced Architecture Prototype System and Software Environment

The Vanguard program informally began in January 2017 with the submission of a white paper entitled "Sandia's Vision for a 2019 Arm Testbed" to NNSA headquarters. The program proceeded in earnest in May 2017 with an announcement by Doug Wade (Director, Office of Advanced Simulation and Computing and Institutional R&D at NNSA) that Sandia National Laboratories (Sandia) would host the first Advanced Architecture Prototype platform based on the Arm architecture. In August 2017, Sandia formed a Tri-lab team chartered to develop a robust HPC software stack for Astra to support the Vanguard program goal of demonstrating the viability of Arm in supporting ASC production computing workloads. This document describes the high-level Vanguard program goals, the Vanguard-Astra project acquisition plan and procurement up to contract placement, the initial software stack environment planned for the Vanguard-Astra platform (Astra), a description of how the communities of users will utilize the platform during the transition from the open network to the classified network, and initial performance results.

97 MATHEMATICS AND COMPUTING↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2017 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2 acres) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test included an enhanced precipitation stress test during the water years 1995 to 1997 to determine barrier response to extreme precipitation events and a controlled fire test in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Adaptive Gap Prototype IVU from the X9 MGU Mechanics

In consideration of affordable options to construct a prototype of an Adaptive-Gap Undulator (AGU), in which different segments along the structure may have different gaps and periods, we investigate the possible use of an existing undulator structure and mechanics from former NSLSI. An AGU is intended to allow for conforming gap clearance to the vertical "envelope" within a straight section of the NSLS-II accelerator, allowing precise tuning of its magnet array segments to the same fundamental photon energy while still satisfying impedance constraints. Placing together undulator segments with different periods and gaps portends possible undesirable effects, such as "kicks" to electron trajectories and perturbations to undulator radiation phase at the segment junctions, as well as increased impedance.

36 MATERIALS SCIENCE↗

Production Facility Prototype Blower 1000 Hour Test Results IV

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Twelve long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All twelve long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the ninth test to the twelfth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, and III.

42 ENGINEERING↗

HB650 Prototype Cryomodule

The HB650 prototype cryomodule is 9.92m long and contains 6 elliptical cavities. As SSR1 cryomodule The design is based on a strong-back at room temperature supporting the coldmass including an heat exchanger and a JT valve to produce helium at 2K.

43 PARTICLE ACCELERATORS↗

3D Printing Prototypes for a Reflector-Based Broadband Axion Search

This work sought to begin research and development on a horn antenna which can be used to transfer the energy of microwave photons produced by axions in a strong magnetic field to a coaxial cable for measurement. 3D prototypes of pyramidal horn antennas and a parabolic reflector were printed and then coated with conductive spray paint. The S 11 parameter was measured and simulated for both 3D printed horn antenna and the conical horn antenna both with and without the reflector present to determine how much of the radiated power was reflected back. Ultimately, for both the conical and pyramidal antennas, less than one percent of the energy emitted by the antennas was reflected back. When the pyramidal antenna was tilted by about 45 degrees, however, around 30-40 percent of the microwaves emitted by the antennas was reflected back.

43 PARTICLE ACCELERATORS↗

CONFIDANTE Demonstration Prototype Report

This report summarizes design optimization and performance evaluation studies for a new prototype CONFIDANTE (CONfirmation using a Fast-neutron Imaging Detector with Anti-image Null-positive Time Encoding) warhead confirmation system. It was found that a spherical mask geometry and a 2” diameter cylindrical central detector is expected to best discriminate between the parametrically varied source distributions that were evaluated. The optimized design as fabricated and its performance was evaluated in a series of laboratory measurements. The performance was in good agreement with the design studies, with demonstrated discrimination between objects with differences in scale on the order of 5 centimeters or better at 1 meter stand-off

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Prototype Distributed Ledger Technology of UF 6 Cylinder Tracking in Ethereum

We have created a demonstration permissioned Distributed Ledger Technology (DLT) datastore for the UF 6 cylinder tracking safeguards use-case utilizing the Ethereum DLT framework and using Solidity for smart contract code. Our demonstration creates a simulated dataset representing tracking of 75,000 UF 6 cylinders across 11 example nuclear facilities worldwide. Our DLT system allows for easy input and reading of shipping and receiving data, including a Graphical User Interface (GUI). Sandia’s Emulytics capability was leveraged to help create the DLT node network and assess performance. We find that our DLT prototype can easily handle to ~150,000 UF 6 cylinder shipments per year worldwide, without any excessive computational or storage burden on the IAEA or Member States. Next steps could include a demonstration to the IAEA and potentially demonstrating integration with TradeLens, a DLT in use by a consortium of international shipping companies representing over half of world shipping trade.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Production Facility Prototype Blower 1000 Hour Test Results V

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Thirteen long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All thirteen long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the thirteenth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, III, and IV.

36 MATERIALS SCIENCE↗

Summary Report on the Refined User Requirements for U.S. Fusion Prototypic Neutron Source

The Fusion Prototypic Neutron Source (FPNS) is proposed as an urgent near-term facility necessary for understanding D-T fusion neutron degradation processes in materials and for the development of high-performance radiation tolerant materials for fusion power reactors. This facility is central to our goal of predicting the behavior of materials in the harsh D-T neutron environment and calibrating and verifying the materials performance models necessary to support design of next-generation fusion reactors. Key FPNS performance metrics were previously defined for the cost-efficient facility necessary to adequately and expediently resolve key materials science knowledge gaps required to move to next-step fusion devices. This brief report is intended to expand upon this previous metrics discussion as an aid to selecting the most desirable FPNS concept and enabling a facility that meets the program needs.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Fiscal Year 2021 Filtration of Hanford Tank 241-AP-107 Supernatant Samples Obtained at Prototypic Tank Level and Filtered at 16 °C

Bench-scale filtration testing of 8.5 liters of supernatant from Hanford waste tank 241-AP-107, chilled to 16 °C, was conducted using a backpulse dead-end filter (BDEF) filtration system equipped with a feed vessel and a Mott inline filter Model 6610 (Media Grade 5) in the hot cells of the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. This was done to assess the impact of a lower sampling location within the tank as well the lowered filtration temperature on supernatant stability and fouling. The as-received samples were transferred to 1.5-liter poly bottles and held at 16 °C for approximately 1 week prior to filtration. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft 2 to match the prototypic operation of the TSCR system. During the initial period of filtration, the differential pressure required to effect filtration at 0.065 gpm/ft 2 increased until it reached 2 psid [the Tank Side Cesium Removal (TSCR) action limit] at 26 hours. After this, the filter was backpulsed to dislodge accumulated solids and reduce this pressure differential. An additional eight backpulses were conducted during the initial filtration period; each time, the target pressure was reached sooner than during the previous interval. Volume filtered decreased from 0.9 to 0.03 m 3 /m 2 over the course of 14 processing hours. After the ninth backpulse, the backpulse frequency had become unsustainable, and it was decided to perform an extensive filter cleaning. The filter was cleaned by draining the chilled AP-107 feed into chilled holding containers, introducing 0.1 M NaOH into the feed vessel, and recirculating the NaOH through the system for 20 minutes before allowing the system to soak for 2 hours without temperature control. A measurable decrease in filter resistance during this recirculation indicated that the 0.1 M NaOH was likely dissolving some of the solids that had deposited on the filter. Post cleaning, the filter resistance was effectively restored to initial conditions as the initial transmembrane pressure was restored to original levels. However, resumed processing of the AP-107 feed at 16 °C continued to result in an increased rate of filter resistance. An additional five backpulses were conducted (four during feed processing, one during subsequent cleaning) before the conclusion of the test. Solids concentrated from the backpulse solutions displayed sodium oxalate-type phases, Al-oxides and sodium Al-oxides/carbonates, iron oxides, and Ca-bearing phases (calcite). The scanning electron microscopy analyses also revealed a large distribution of particles, with some particles, notably sodium phosphate dodecahydrate, having diameters close to 0.5 mm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Atrial Model Development and Prototype Simulations; Final Report for CRADA No. TC02224.0

This project was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Amgen, Inc. ("Amgen"), to develop a capability to computationally evaluate the importance and roles of different ion channels in atrial fibrillation. The first phase of this collaboration was to implement the atrial model, run prototype simulations, and analyze the results. Two No-Cost Time Extension (NCTE) requests were executed for this project. The first NCTE was executed on April 1, 2016, and extended the CRADA project for an additional two months to allow enough time to complete the tasks and deliverables, due to a delay in the start of the project. A second NCTE was executed on June 28, 2016, extending the project by three months, through November 3, 2016, to allow enough time to complete the final tasks and deliverables as well as negotiate a CRADA extension. The actual duration of this project was fourteen months. Amgen was unable to obtain budget approval to extend the CRADA past November 3, 2016. All of the deliverables for this CRADA project were successfully completed according to schedule.

59 BASIC BIOLOGICAL SCIENCES↗

Prototyping a self-learning digital twin platform for personalized treatment in melanoma patients (Final Report)

We completed all the Milestones and disseminated results at the 2021 Computational Approaches for Cancer Workshop (CAFCW21) at the SuperComputing21 conference. As part of Milestone 1, we developed and implemented a prototype digital twin of metastatic melanoma patients, performed quality checks on the code and released it as open source. The work has directly driven major grant proposals by the team on computational digital twins and supporting software infrastructure, including a successful fellowship application by the PI. Work was lead by Paul Macklin (Contact PI, Indiana University), in collaboration with Ilya Shmulevich (PI, Institute for Systems Biology), Tina Hernandez-Boussard (PI, Stanford Univ.), Jeffrey Bryan (Co-I, University of Missouri), Snigdhansu Chatterjee (Co-I, University of Minnesota), and Mohammad Fallahi-Sichani (Co-I, U. of Virginia). Postdoctoral student Heber L. Rocha (Macklin lab, IU) performed intensive computational work, in collaboration with Senior Research Scientist Boris Aguilar (Shmulevich lab, ISB).

59 BASIC BIOLOGICAL SCIENCES↗

Integration of Electric Power Infrastructure into the Drinking Water Shared Risk Framework: Prototype Development

An existing shared risk framework designed for assessing and comparing threat-based risks to water utilities is being extended to incorporate electric power. An important differentiating characteristic of this framework is the use of a system-centric rather than an asset-centric approach. This approach allows anonymous sharing of results and enables comparison of assessments across different utilities within an infrastructure sector. By allowing utility owners to compare their assessments with others, they can improve their self-assessments and identification of "unknown unknowns". This document provides an approach for extension of the framework to electric power, including treatment of dependencies and interdependencies. The systems, threats, and mathematical description of associated risks used in a prototype framework are provided. The method is extensible so that additional infrastructure sectors can be incorporated. Preliminary results for a proof of concept calculation are provided.

42 ENGINEERING↗