Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Profile”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Second FY 2015 Quarterly Report

During the second quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Autodesk reviewed 3D fiber orientation distribution (FOD) comparisons and provided support on improving accuracy. 2) Autodesk reviewed fiber length distribution (FLD) data comparisons and provided suggestions, assisted PNNL in FOD and FLD parameter settings optimization, and advised PNNL on appropriate through thickness thermal conductivity for improved frozen layer effect on FOD predictions. Autodesk also participated in project review meetings including preparations and discussions towards passing the go/no-go decision point. 3) Autodesk implemented an improved FOD inlet profile specification method through the part thickness for 3D meshes and provided an updated ASMI research version to PNNL. 4) The University of Illinois (Prof. C.L. Tucker) provided Autodesk with ideas to improve fiber orientation modeling 5) Purdue University re-measured fiber orientation for the fast-fill 50wt% LCF/PA66 edge-gated plaque, and delivered the fiber orientation data for this plaque at the selected locations (named A, B, and C, Figure 1) to PNNL. Purdue also re-measured fiber orientation for locations A on the fast-fill 30wt% LCF/PP and 50wt% LCF/PA66 center-gated plaques, which exhibited anomalous fiber orientation behavior. 6) Purdue University conducted fiber length measurements and delivered the length data to PNNL for the purge materials (slow-fill 30wt% LCF/PP and 30wt% LCF/PA66 purge materials) and PlastiComp plaques selected on the go/no-go list for fiber length model validation (i.e., slow-fill edge-gated 30wt% LCF/PP and 30wt% LCF/PA66 plaques, Locations A, B, and C). 7) PNNL developed a method to recover intact carbon fibers from LCF/PA66 materials. Isolated fibers were shipped to Purdue for length distribution analysis. 8) PNNL completed ASMI mid-plane analyses for all the PlastiComp plaques defined on the go/no-go list for fiber orientation (FO) model validation and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. The 15% accuracy criterion based on evaluation of tensile and bending stiffness was used to assess the accuracy in fiber orientation predictions. 9) PNNL completed ASMI mid-plane analyses for all the PlastiComp plaques defined on the go/no-go list for fiber length distribution (FLD) model validation and compared the predicted length distributions with the measured data provided by Purdue at Locations A, B, and C on these plaques. The 15% accuracy criterion based on evaluation of tensile and bending stiffness was used to assess the accuracy in fiber orientation predictions. 10) PNNL tested the new ASMI version received from Autodesk in March 2015, examined and discussed 3D fiber orientation predictions for PlastiComp plaques. 11) PlastiComp, Inc. (PlastiComp), Toyota Research Institute North America (Toyota) and Magna Exteriors and Interiors Corporation (Magna) participated in discussions with team members on the go/no-go plan. Toyota continued the discussion with Magna on tool modification for molding the complex part in order to achieve the target fiber length in the part.

42 ENGINEERING↗

Final LDRD Report: Using Linkography of Cyber Attack Patterns to Inform Honeytoken Placement

The war to establish cyber supremacy continues, and the literature is crowded with strictly technical cyber security measures. We present the results of a three year LDRD project using Linkography, a methodology new to the field of cyber security, we establish the foundation necessary to track and profile the microbehavior of humans attacking cyber systems. We also propose ways to leverage this understanding to influence and deceive these attackers. We studied the science of linkography, applied it to the cyber security domain, implemented a software package to manage linkographs, generated the preprocessing blocks necessary to ingest raw data, produced machine learning models, created ontology refinement algorithms and prototyped a web application for researchers and practitioners to apply linkography. Machine learning produced some of our key results: We trained and validated multinomial classifiers with a real world data set and predicted the attacker's next category of action with 86 to 98% accuracy; dimension reduction techniques indicated that the linkography-based features were among the most powerful. We also discovered ontology refinement algorithms that advanced the state of the art in linkography in general and cyber security in particular. We conclude that linkography is a viable tool for cyber security; we look forward to expanding our work to other data sources and using our prediction results to enable adversary deception techniques.

97 MATHEMATICS AND COMPUTING↗

Modular Controllable Transformers (MCT)

Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NMSBA: Continuous Application Benchmarking & Analysis – CABA

The CABA project is a test of a new tool, Survey,developed by Trenza to be used not only for benchmarking or profiling programs but also to allow incorporation of the information provided by Survey to be utilized in a CI, continuous integration,tool such as GitLab CI.Survey is foremost a means of assessing code performance in terms of time and operations which for computer programmers is known as benchmarking.

97 MATHEMATICS AND COMPUTING↗

Dynamical Constraints on the Dark Matter Distribution of the Sculptor Dwarf Spheroidal from Stellar Proper Motions

In this work, we compare the transverse velocity dispersions recently measured within the Sculptor dwarf spheroidal galaxy to the predictions of our previously published dynamical model. This was designed to fit the observed number count and velocity dispersion profiles of both metal-rich and metal-poor stars, both in cored and in cusped potentials. At the projected radius where the proper motions (PMs) were measured, this model (with no change in parameters) predicts transverse dispersions in the range of 6–9.5 km s -1 , with the tangential dispersion about 1 km s -1 larger than the (projected) radial dispersion. Both dispersions are predicted to be about 1 km s -1 larger for metal-poor than for metal-rich stars. At this projected radius, cored and cusped potentials predict almost identical transverse dispersions. The measured tangential dispersion (8.5 ± 3.2 km s -1 ) agrees remarkably well with these predictions, while the measured radial dispersion (11.5 ± 4.3 km s -1 ) differs only at about the 1σ level. Thus, the PM data are in excellent agreement with previous data, but do not help to distinguish between cored and cusped potentials. Lastly, this will require velocity dispersion data (either from PMs or from radial velocities) with uncertainties well below 1 km s -1 over a range of projected radii.

79 ASTRONOMY AND ASTROPHYSICS↗

Putting Our Industry's Data to Work: A Case Study of Large-Scale Data Aggregation: Preprint

With increasing deployment of Advanced Metering Infrastructure (AMI), Building Automation System (BAS) controls, Internet of Things (IoT) network devices, and data-driven evaluation, measurement, and verification studies, the building sector is currently generating a staggering amount of energy-related data. In the right hands, these data sets can contribute to increased comfort and energy savings for building occupants and a more reliable electrical grid; however, due to a combination of factors, including significant privacy concerns, much of the data that are presently generated and stored are not used outside of basic operational applications. In the past year, our team has dedicated over 2,000 person-hours to accessing building energy data for a project funded by the U.S. Department of Energy (DOE) Building Technologies Office. We sought whole-building or end-use (e.g., lighting) timeseries data at the individual-building or equipment level where possible or aggregated information, such as timeseries averages and quartiles by building type (e.g., office, retail, hospital), where sharing individual building information was not an option. We are additionally working with IoT and BAS data sets to derive information important to the project. We have assembled an extensive data set that will enable the development of publicly available end-use load profiles to benefit the U.S. building and electricity industries. Here we present an overview of the data set that we have assembled to date, the motivators and approaches that got us here, and the lessons we learned through our efforts. We also discuss work underway that presents additional options for future data access.

building energy data↗

Implementation of SAP Waste Management System

The Y-12 National Security Complex (Y-12) assumed responsibility for newly generated waste on October 1, 2005. To ensure effective management and accountability of newly generated waste, Y-12 has opted to utilize SAP, Y-12's Enterprise Resource Planning (ERP) tool, to track low-level radioactive waste (LLW), mixed waste (MW), hazardous waste, and non-regulated waste from generation through acceptance and disposal. SAP Waste will include the functionality of the current waste tracking system and integrate with the applicable modules of SAP already in use. The functionality of two legacy systems, the Generator Entry System (GES) and the Waste Information Tracking System (WITS), and peripheral spreadsheets, databases, and e-mail/fax communications will be replaced by SAP Waste. Fundamentally, SAP Waste will promote waste acceptance for certification and disposal, not storage. SAP Waste will provide a one-time data entry location where waste generators can enter waste container information, track the status of their waste, and maintain documentation. A benefit of the new system is that it will provide a single data repository where Y-12's Waste Management organization can establish waste profiles, verify and validate data, maintain inventory control utilizing hand-held data transfer devices, schedule and ship waste, manage project accounting, and report on waste handling activities. This single data repository will facilitate the production of detailed waste generation reports for use in forecasting and budgeting, provide the data for required regulatory reports, and generate metrics to evaluate the performance of the Waste Management organization and its subcontractors. SAP Waste will replace the outdated and expensive legacy system, establish tools the site needs to manage newly generated waste, and optimize the use of the site's ERP tool for integration with related business processes while promoting disposition of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fidelity of a Time-Resolved Imaging Diagnostic for Electron Beam Profiles

An optical tomographic diagnostic instrument has been fielded at the Dual-Axis Radiographic Hydrodynamic Test Facility at Los Alamos National Laboratory. Four optical lines of sight create projections of an image of an electron beam on a Cerenkov target, which are relayed via optical fiber to streak cameras. From these projections, a reconstruction algorithm creates time histories of the beam’s cross section. The instrument was fielded during and after facility commissioning, and tomographic reconstructions reported beam parameters. Results from reconstructions and analysis are noted.

Dual-Axis Radiographic Hydrodynamic Test, DARHT, e↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MO-G-17A-02: Computer Simulation Studies for On-Board Functional and Molecular Imaging of the Prostate Using a Robotic Multi-Pinhole SPECT System

Purpose: To investigate prostate imaging onboard radiation therapy machines using a novel robotic, 49-pinhole Single Photon Emission Computed Tomography (SPECT) system. Methods: Computer-simulation studies were performed for region-of-interest (ROI) imaging using a 49-pinhole SPECT collimator and for broad cross-section imaging using a parallel-hole SPECT collimator. A male XCAT phantom was computersimulated in supine position with one 12mm-diameter tumor added in the prostate. A treatment couch was added to the phantom. Four-minute detector trajectories for imaging a 7cm-diameter-sphere ROI encompassing the tumor were investigated with different parameters, including pinhole focal length, pinhole diameter and trajectory starting angle. Pseudo-random Poisson noise was included in the simulated projection data, and SPECT images were reconstructed by OSEM with 4 subsets and up to 10 iterations. Images were evaluated by visual inspection, profiles, and Root-Mean- Square-Error (RMSE). Results: The tumor was well visualized above background by the 49-pinhole SPECT system with different pinhole parameters while it was not visible with parallel-hole SPECT imaging. Minimum RMSEs were 0.30 for 49-pinhole imaging and 0.41 for parallelhole imaging. For parallel-hole imaging, the detector trajectory from rightto- left yielded slightly lower RMSEs than that from posterior to anterior. For 49-pinhole imaging, near-minimum RMSEs were maintained over a broader range of OSEM iterations with a 5mm pinhole diameter and 21cm focal length versus a 2mm diameter pinhole and 18cm focal length. The detector with 21cm pinhole focal length had the shortest rotation radius averaged over the trajectory. Conclusion: On-board functional and molecular prostate imaging may be feasible in 4-minute scan times by robotic SPECT. A 49-pinhole SPECT system could improve such imaging as compared to broadcross-section parallel-hole collimated SPECT imaging. Multi-pinhole imaging can be improved by considering pinhole focal length, pinhole diameter, and trajectory starting angle. The project is supported by the NIH grant 5R21-CA156390.

60 APPLIED LIFE SCIENCES↗

On Escaping a Galaxy Cluster in an Accelerating Universe

We derive the escape velocity profile for an Einasto density field in an accelerating universe and demonstrate its physical viability by comparing theoretical expectations to both light-cone data generated from N -body simulations and archival data on 20 galaxy clusters. We demonstrate that the projection function ($g(\beta)$) is deemed physically viable only for the theoretical expectation that includes a cosmology-dependent term. Using simulations, we show that the inferred velocity anisotropy is more than 6σ away from the expected value for the theoretical profile that ignores the acceleration of the universe. In the archival data, we constrain the average velocity anisotropy parameter of a sample of 20 clusters to be $\beta ={0.248}_{-0.360}^{+0.164}$ at the 68% confidence level. Finally, we briefly discuss how our analytic model may be used as a novel cosmological probe based on galaxy clusters.

79 ASTRONOMY AND ASTROPHYSICS↗

A Streamlined and Standardized Benthic Habitat Mapping Approach for Marine and Hydrokinetic Site Environmental Assessments

We have combined two seafloor mapping techniques to efficiently map benthic habitat conditions. Multibeam echosounder (MBES) surveys provide detailed bathymetry and backscatter mosaics. Sediment profile and plan view imaging (SPI/PV) rapidly provides dense ground truth data on seabed physical and biological features. A key innovation of this project has been the development of a computer-assisted image processing system that standardizes the SPI data generation process. A unique combination of machine- and deep-learning techniques for grain-size classification, sediment–water interface delineation, and object detection (e.g., infauna and feeding voids) is described. An automated SPI image analysis system provides a standardized and cost-effective approach for image processing. Combining MBES with SPI/PV camera technology provides a first tier approach to rapidly documenting seabed physical and biological conditions in high resolution at MHK sites. When coupled with computer automated data extraction from the imagery, this approach provides a standardized and cost-effective method to establish and monitor benthic habitat conditions over time.

Benthic Habitat Maping, Sediment-Profile Imaging, ↗

Projected Cost, Energy Use, and Emissions of Hydrogen Technologies for Fuel Cell Vehicles

Each combination of technologies necessary to produce, deliver, and distribute hydrogen for transportation use has a corresponding levelized cost, energy requirement, and greenhouse gas emission profile depending upon the technologies' efficiencies and costs. Understanding the technical status, potential, and tradeoffs is necessary to properly allocate research and development (R&D) funding. In this paper, levelized delivered hydrogen costs, pathway energy use, and well-to-wheels (WTW) energy use and emissions are reported for multiple hydrogen production, delivery, and distribution pathways. Technologies analyzed include both central and distributed reforming of natural gas and electrolysis of water, and central hydrogen production from biomass and coal. Delivery options analyzed include trucks carrying liquid hydrogen and pipelines carrying gaseous hydrogen. Projected costs, energy use, and emissions for current technologies (technology that has been developed to at least the bench-scale, extrapolated to commercial-scale) are reported. Results compare favorably with those for gasoline, diesel, and E85 used in current internal combustion engine (ICE) vehicles, gasoline hybrid electric vehicles (HEVs), and flexible fuel vehicles. Sensitivities of pathway cost, pathway energy use, WTW energy use, and WTW emissions to important primary parameters were examined as an aid in understanding the benefits of various options. Sensitivity studies on production process energy efficiency, total production process capital investment, feed stock cost, production facility operating capacity, electricity grid mix, hydrogen vehicle market penetration, distance from the hydrogen production facility to city gate, and other parameters are reported. The Hydrogen Macro-System Model (MSM) was used for this analysis. The MSM estimates the cost, energy use, and emissions trade offs of various hydrogen production, delivery, and distribution pathways under consideration. The MSM links the H2A Production Model, the Hydrogen Delivery Scenario Analysis Model (HDSAM), and the Greenhouse Gas, Regulated Emission, and Energy for Transportation (GREET) Model. The MSM utilizes the capabilities of each component model and ensures the use of consistent parameters between the models to enable analysis of full hydrogen production, delivery, and distribution pathways. To better understand spatial aspects of hydrogen pathways, the MSM is linked to the Hydrogen Demand and Resource Analysis Tool (HyDRA). The MSM is available to the public and enables users to analyze the pathways and complete sensitivity analyses.

08 HYDROGEN↗

Great Lakes O shore Wind Project: Utility and Regional Integration Study

This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

17 WIND ENERGY↗

Hubble space telescope investigation of main-belt comet 133P/Elst-Pizarro

We report new observations of the prototype main-belt comet (active asteroid) 133P/Elst-Pizarro taken at high angular resolution using the Hubble Space Telescope. The object has three main components: (1) a point-like nucleus; (2) a long, narrow antisolar dust tail; and (3) a short, sunward anti-tail. There is no resolved coma. The nucleus has a mean absolute magnitude H{sub V} = 15.70 ± 0.10 and a light curve range ΔV = 0.42 mag, the latter corresponding to projected dimensions 3.6 × 5.4 km (axis ratio 1.5:1) at the previously measured geometric albedo of 0.05 ± 0.02. We explored a range of continuous and impulsive emission models to simultaneously fit the measured surface brightness profile, width, and position angle of the antisolar tail. Preferred fits invoke protracted emission, over a period of 150 days or less, of dust grains following a differential power-law size distribution with index 3.25 ≤q ≤ 3.5 and with a wide range of sizes. Ultra-low surface brightness dust projected in the sunward direction is a remnant from emission activity occurring in previous orbits, and consists of the largest (≥cm-sized) particles. Ejection velocities of one-micron-sized particles are comparable to the ∼1.8 m s{sup –1} gravitational escape speed of the nucleus, while larger particles are released at speeds less than the gravitational escape velocity. The observations are consistent with, but do not prove, a hybrid hypothesis in which mass loss is driven by gas drag from the sublimation of near-surface water ice, but escape is aided by centripetal acceleration from the rotation of the elongated nucleus. No plausible alternative hypothesis has been identified.

79 ASTRONOMY AND ASTROPHYSICS↗

Laser Transport System Vacuum Simulations and LED Atom Tracker

MAGIS-100 is an experiment using atom interferometry on strontium atoms in a 100m vacuum chamber. The laser travels through a laser transport system (LTS) before going down the chamber. Two projects were completed over the course of the internship. One project was conducting vacuum simulations on the LTS to ensure it meets the experimental pressure requirement of 10-11 torr. This was done by characterizing the pressure profile with variations in pump size, pump spacing, and orifice size. The initial design of the LTS included one 30 L/s ion pump in the high vacuum (HV) region, a lens mount with holes of diameter 0.788”, and three 150 L/s ion pumps in the ultra-high vacuum (UHV) region. After adjusting these variables, it was concluded that the lens mount holes could be reduced to 0.200” in diameter and one 150 L/s ion pump in the UHV could be removed and still meet the experimental requirements. The other project was to design an LED atom tracker that shows the position of the strontium atoms in the 100m shaft. This will help with public outreach by allowing visitors to have a visual of the experiment. An Arduino Uno and Arduino Due were programmed using classical physics formulas to direct the RGB LED strips to flash in sync with the falling atoms. The requirements for powering and connecting the hardware were calculated and recommendations for scaling the system to 100m were made.

43 PARTICLE ACCELERATORS↗

COVID-19 biomarkers based on respiratory microbiome content

COVID-19 patient care management would greatly benefit from new tools that enable accurate assessment of disease severity and stage, potentially enabling a personalized medicine approach. Detection of the SARS-CoV-2 virus itself, or even quantitation of viral loads, is not sufficient for accurate assessment of disease state beyond diagnosis of infection [eg, doi:10.1093/cid/ciaa344]. Levels of usual suspect protein biomarkers associated with host response to infection [eg, C-reactive protein (CRP); cytokines like IL-6, TNF-alpha, and IL-10; complement proteins like C3a and C5a], and of individual blood cell types (eg, leukocytes, lymphocytes, and subsets thereof), show limited correlation with disease severity and stage, with high patient-to-patient and study-to-study variability [eg, doi:10.1093/cid/ciaa248]. High-dimensional panels of biomarkers should have greater predictive power and resilience to unavoidable sources of variability; however, their assembly from proteins and cell types is extremely difficult, due to technical limitations in analyte measurement, especially with regard to starting material requirements and detection sensitivity. Host response profiling through Next Generation Sequencing (NGS) of gene expression patterns (ie, RNA-Seq) is a promising approach, but at the time of this project there were only two publicly available datasets of relevance [doi:10.1093/cid/ciaa203, doi:10.1080/22221751.2020.1747363], and close inspection of them revealed that each had at least one major flaw that severely undermined its value in supporting robust analysis of host response to SARS-CoV- 2 infection. However, the first of these studies [doi:10.1093/cid/ciaa203] fortuitously collected NGS data not only from host cells, but also from bacteria present in bronchoalveolar lavage fluid (BALF) recovered from COVID-19 patients; and because the respiratory microbiome (in terms of bacterial species content) is far less complex than the human transcriptome, the NGS data collected were sufficient to provide coverage depth supporting robust analysis. Surprisingly, the authors of the study did not carry out a detailed analysis of these data and their potential for revealing important new information about COVID-19. Therefore, we carried out a meta-analysis of the dataset as a first step in evaluating the potential for profiling of respiratory microbiome dynamics as a means of accurately assessing COVID-19 disease state.

59 BASIC BIOLOGICAL SCIENCES↗

Zambia : long-term generation expansion study - executive summary.

The objective of this study is to analyze possible long-term development options of the Zambian electric power system in the period up to 2015. The analysis involved the hydro operations studies of the Zambezi river basin and the systems planning studies for the least-cost generation expansion planning. Two well-known and widely accepted computer models were used in the analysis: PC-VALORAGUA model for the hydro operations and optimization studies and the WASP-III Plus model for the optimization of long-term system development. The WASP-III Plus model is a part of the Argonne National Laboratory's Energy and Power Evaluation Model (ENPEP). The analysis was conducted in close collaboration with the Zambia Electricity Supply Corporation (ZESCO). On the initiative from The World Bank, the sponsor of the study, ZESCO formed a team of experts that participated in the analysis and were trained in the use of computer models. Both models were transferred to ZESCO free of charge and installed on several computers in the ZESCO corporate offices in Lusaka. In September-October 1995, two members of the ZESCO National Team participated in a 4-week training course at Argonne National Laboratory near Chicago, U.S.A., focusing on the long-term system expansion planning using the WASP and VALORAGUA models. The hydropower operations studies were performed for the whole Zambezi river basin, including the full installation of the Kariba power station, and the Cahora Bassa hydro power station in Mozambique. The analysis also included possible future projects such as Itezhi-Tezhi, Kafue Gorge Lower, and Batoka Gorge power stations. As hydropower operations studies served to determine the operational characteristics of the existing and future hydro power plants, it was necessary to simulate the whole Zambezi river basin in order to take into account all interactions and mutual influences between the hydro power plants. In addition, it allowed for the optimization of reservoir management and optimization of hydro cascades, resulting in the better utilization of available hydro potential. Numerous analyses were performed for different stages of system development. These include system configurations that correspond to years 1997, 2001, 2015 and 2020. Additional simulations were performed in order to determine the operational parameters of the three existing hydro power stations Victoria Falls, Kariba, and Kafue Gorge Upper, that correspond to the situation before and after their rehabilitation. The rehabilitation works for these three major power stations, that would bring their operational parameters and availability back to the design level, are planned to be carried out in the period until 2000. The main results of the hydro operations studies are presented in Table ES-1. These results correspond to VALORAGUA simulations of system configurations in the years 2001 and 2015. The minimum, average, and maximum electricity generation is based on the simulation of monthly water inflows that correspond to the chronological series of unregulated water inflows at each hydro profile in the period from April 1961 to March 1990. The recommended hydrology dataset provided in the Hydrology Report of the SADC Energy Project AAA 3.8 was used for this study.

24 POWER TRANSMISSION AND DISTRIBUTION↗